Removal of two undersized culverts and replacement as follows: Site 1: 103" span x 71" rise corrugated steel pipe-arch with a 46' length; and, Site 2: a concrete box culvert, currently being designed.
Location
Site 1: MP 19.5 Selway Road; Site 2: Approximately 100 feet upstream from that location in an exisitng campsite.
Project timeline
1
Scoping Start
08/25/2014
2
Decision
04/2015 (Estimated)
3
Implementation
05/2015 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Decision Memo | Decision Signed Date: 04/21/2015 |
| Forests | Nez Perce-Clearwater National Forest |
| Districts | Moose Creek Ranger District |
| Legal Land Description | NE 1/4 T31N, R9E, Section 12 (Boise Meridian) |