Actions would include the installation of a generator (Genarac SD080-80kW) utilizing a 131bhp internal combustion engine and a 300 gallon diesel fuel tank at an existing tower at Long Ridge.
Location
The location of the proposed restoration activities is at the Long Ridge Electronic site in Pinyon/Juniper elevation 7755ft, T. 17 S., R. 10 E. Section 14.
Project timeline
1
Scoping Start
09/26/2018
2
Decision
10/2018 (Estimated)
3
Implementation
11/2018 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| American Tower Backup Generator | Decision Signed Date: 10/23/2018 |
| Forests | Lincoln National Forest |
| Districts | Sacramento Ranger District |
| Legal Land Description | Not Applicable |