Excavation of mineral deposits from two test pits using a front loader. Material would be processed through a trommel and sluice. The water source is the Grizzly Mine adit, piped to a 7000 gallon tank. Water is discharged to a rock percolation area.
Location
The project is near the North Fork Feather River in Seneca, CA. Legal location T26N, R8E, Se 1/4 of Section 16, MDBM.
Project timeline
1
Scoping Start
02/02/2017
2
Comment Period
10/25/2017
3
Decision
12/2017 (Estimated)
4
Implementation
08/2018 (Estimated)
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Ridge Placer Mining Exploration | Decision Signed Date: 12/11/2017 |
| Forests | Plumas National Forest |
| Districts | Mt. Hough Ranger District |
| Legal Land Description | Not Applicable |