Pacific Power will replace an existing deteriorated distribution pole with a new pole within 5-feet of the existing pole being replaced. The project area will require minor clearing of brush, 50-feet by 50-feet around the pole being replaced.
Location
The project area is located approximately 3 miles south of the town of Chiloquin, OR.
Project timeline
1
Scoping Start
05/23/2024
2
Decision
07/2024 (Estimated)
3
Implementation
09/2024 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission |
| Pacific Power Batch 94 Pole Replacement Project | Decision Signed Date: 07/24/2024 |
| Forests | Fremont-Winema National Forest |
| Districts | Chiloquin Ranger District |
| Legal Land Description | T. 35 S., R. 7 E., Sec. 15 |