Kootenai National Forest — Project Detail

43 projects with crawled detail · milestones · contacts · documents

Kootenai National Forest

R01 Northern · 43 projects · crawled 2026-06-17
In Progress 2 Developing Proposal 34 On Hold 2 Completed 3 Cancelled 2
Environmental Assessment 20 Environmental Impact Statement 10 Categorical Exclusion 10 Decision Memo 3
43 with documents 42 with comments page
Flat Tail Developing Proposal
Environmental Assessment · Cabinet Ranger District · updated 6/12/2026 · decision 1/2027 (Estimated)
The Flat Tail project area is located southeast of Trout Creek, Montana. The analysis area encompasses lands between Big Beaver Creek Road and White Pine Creek Road and includes Larch Point, Set Creek, Larch Creek, and Basin Creek. · Sanders, Montana

Vegetation and fuels management activities near the communities of Whitepine and Beaver Creek, Sanders County, Montana.

Forest productsFuels managementVegetation management (other than forest products)
NEPA Start Date
1/6/2026
Finding/Decision Date
Project documents
Steve Snell · steven.snell@usda.gov
Libby Creek Mining Operations Developing Proposal
Environmental Assessment · Libby Ranger District · updated 6/12/2026
This project is located twenty-three miles south of Libby, Montana · Lincoln, Montana

The Northwest Montana Gold Prospectors Ace Placer is located adjacent to the Libby Creek Recreational Gold Panning Area and would occur on an already existing mining operation site. The proponent has requested permission to expand their operation adjacent to the current operation.

Minerals and geology
NEPA Start Date
Finding/Decision Date
Project documents
Jennifer Runnels · jennifer.runnels@usda.gov
Environmental Impact Statement · Cabinet Ranger District · updated 6/12/2026
The Pilgrim Creek Timber Sale Project area is located within the Pilgrim, Smeads, and Stevens Creek drainages, west of Noxon Reservoir on the Cabinet Ranger District on Kootenai National Forest in Sanders County, Montana. · Sanders, Montana

The original proposal included timber harvest and prescribed fire on National Forest Service lands in Pilgrim Creek near the community of Noxon, Montana. Activities to still to be completed include 219 acres of timber harvest, ~4,564 acres of burning, 370 acres of planting and road storage work.

Forest productsFuels managementRoad management
NEPA Start Date
Finding/Decision Date
Project documents
Michael Feiger · michael.feiger@usda.gov
Ripley Project Developing Proposal
Environmental Assessment · Libby Ranger District · updated 6/12/2026
The Ripley project area is located east of Libby, Montana in all or portions of Townships 29, 30, and 31 North, Ranges 30 and 31 West P. M.M. in Lincoln County, Montana. · Lincoln, Montana

This is a supplemental EA. Potential project activities would focus on forest health issues including insect and disease, hazardous fuels reduction, and restoration activities and may include vegetation and road management, watershed improvements, and noxious weed treatments.

Forest productsFuels managementRecreation managementRoad managementWildlife, fish, rare plants
NEPA Start Date
Finding/Decision Date
Project documents
Jennifer Runnels · jennifer.runnels@usda.gov
Environmental Impact Statement · Kootenai National Forest · updated 5/29/2026

We are proposing to complete motorized over-snow planning across the forest to comply with the Travel Management Rule in the Over-snow Motorized Use Travel Plan. This travel plan includes National Forest System lands on the Libby, Cabinet, Three Rivers, Fortine and Rexford Ranger Districts.

NEPA Start Date
Finding/Decision Date
Project documents
Moira McKelvey · moira.mckelvey@usda.gov
Knotty Pine Developing Proposal
Environmental Assessment · Three Rivers Ranger District · updated 5/28/2026
The Knotty Pine Project is located north and west of Troy, Montana and includes Pine Creek, Curley Creek, Lime Creek, Rocky Creek, and Red Top Creek watersheds. Line Point, Murphy and Red Top mountains form the northern boundary of the project, the Idaho state line forms the western edge, the Kootenai River the southern boundary, and the Yaak River the eastern boundary. · Boundary; Lincoln, Idaho; Montana

The proposed alternative includes recreation improvements, harvest on 2,971 acres, non-harvest fuels treatment on 6,856 acres, permanent and temporary road construction, road maintenance, and road storage, treatment in old growth, and harvest units over 40 acres.

Forest productsFuels managementRecreation managementRoad managementWildlife, fish, rare plants
NEPA Start Date
Finding/Decision Date
Project documents
Lisa Osborn · lisa.osborn@usda.gov
McKay-Engle Cancelled
Environmental Assessment · Cabinet Ranger District · updated 5/28/2026
Approximately 10 miles northwest of Trout Creek, Montana, in the McKay, Orr, and Rock Creek drainages in Sanders County · Sanders, Montana

Build resistance and resiliency to disturbance through vegetation management, reduce hazardous fuels, provide forest products, and build whitebark pine resistance to blister rust through restoration and planting

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementRoad management
Scoping Start
07/15/2021
Comment Period
07/2025 (Estimated)
Objection Period Start
12/2025 (Estimated)
Decision
04/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Ruth Heying · Ruth.Heying@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green)
ForestsKootenai National Forest
DistrictsCabinet Ranger District
Legal Land Descriptionportions of sections 4-6 of T25N, R31W; 1 and 2 of T25N, R32W; 7, 16-21, and 28-33 of T26N, R31W; 9-16, 21-28, 33-36 of T26N, R32W, PMM
Environmental Assessment · Three Rivers Ranger District · updated 5/28/2026
West of Troy, MT · Lincoln, Montana

This project proposes to reduce hazardous fuels and manage stands to increase forest health and resilience in the project area. This project includes 808 acres of non-harvest fuel treatment, 916 acres of harvest treatment, treatment in old growth and road construction and maintenance.

Forest productsFuels managementRoad management
NEPA Start Date
Finding/Decision Date
Project documents
Lisa Osborn · lisa.osborn@usda.gov
Starry Goat Project Developing Proposal
Environmental Impact Statement · Three Rivers Ranger District · updated 5/27/2026
Callahan Creek, Brush Creek, Ruby Creek, and Star Creek are the major drainages in the project area which all flow into the Kootenai River at the project area boundary. Callahan Creek Road, National Forest System Road (NFSR) 427 and the South Side Road (NFSR 4402) are major travel routes through the project area.

Alternative 2 include regeneration harvest, intermediate harvest, regeneration harvest with opening over 40 acres, non-harvest fuel treatments, pre-commercial thinning, road decommissioning and storage, road construction and maintenance, road work to improve the watershed and recreation improvements

Forest productsFuels managementRecreation managementRoad managementWatershed management
NEPA Start Date
Finding/Decision Date
Project documents
Lisa Osborn · lisa.osborn@usda.gov
Libby Exploration Project Developing Proposal
Environmental Assessment · Libby Ranger District · updated 5/26/2026

The USFS’ need is to respond to Montanore Minerals Corporation's submittal of a Plan and ensure operations would be conducted, where feasible, to reasonably minimize adverse environmental impacts on NFS surface resources (36 Code of Federal Regulations [CFR] 228.8, Subpart A).

NEPA Start Date
Finding/Decision Date
Project documents
Julie Hopkinson · julie.hopkinson@usda.gov
Categorical Exclusion · Three Rivers Ranger District · updated 5/21/2026
East/Northeast of Yaak, MT · Lincoln, Montana

Fuels Reduction Project east/northeast of Yaak, MT. This project aims to restore forest stands and enhance forest resiliency by shifting stands from their current condition towards desired conditions, as outlined in the Forest Plan.

Forest productsFuels managementVegetation management (other than forest products)
NEPA Start Date
10/24/2025
Finding/Decision Date
5/11/2026
Project documents
Jennifer Runnels · jennifer.runnels@usda.gov
NEPA / regulatory detail
Categorical ExclusionSection 605 of HFRA (16 U.S.C.6591d)
Decision Signed Date5/11/2026
Galton Developing Proposal
Environmental Impact Statement · Fortine Ranger District · updated 5/19/2026

Travel management, Timber sales (green), Timber sales (salvage), Forest vegetation improvements, Fuel treatments (non-activity fuels)

NEPA Start Date
Finding/Decision Date
Project documents
Marcy Goheen · marcy.goheen@usda.gov
Gateway Ecological Restoration Developing Proposal
Environmental Assessment · Rexford Ranger District · updated 5/19/2026

Prescribed burning of hazardous fuels in the WUI; vegetation management, meadow encroachment reduction, thinning, aspen enhancement; wildlife habitat improvement, reduction of non-native invasive species and noxious weeds; travel system management.

NEPA Start Date
Finding/Decision Date
Project documents
Marcy Goheen · marcy.goheen@usda.gov
Glen Sinclair Developing Proposal
Categorical Exclusion · Fortine Ranger District · updated 5/19/2026

Hazardous fuel reduction activities, including on Forest Service lands in the Wildland Urban Interface in the Glen Lake, Sinclair Creek, and Ksanka foothills areas.

NEPA Start Date
Finding/Decision Date
Project documents
Marcy Goheen · marcy.goheen@usda.gov
Young-Dodge Developing Proposal
Environmental Impact Statement · Rexford Ranger District · updated 5/19/2026

Timber harvest (3,400 acres), prescribed burning (2,000 acres); prescribed burning w/ mechanical pre-treatment (1,500 acres); road management (decommissioning, etc); and recreation facilities. Forest Plan exceptions and openings greater than 40 acre.

NEPA Start Date
Finding/Decision Date
Project documents
Marcy Goheen · marcy.goheen@usda.gov
Decision Memo · Fortine Ranger District · updated 7/1/2025
North Dickey Lake Campground and Boat launch, 16 miles south of Eureka, MT along US Highway 93 on the Northwest shore of Dickey Lake. · Lincoln, Montana

Great American Outdoors Act project to modernize and redesign of campsites, boat launch road access, overflow, and parking at North Dickey Lake Campground.

Recreation management
Scoping Start
07/01/2025
Comment Period
07/01/2025
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Marcella Butts · Marcella.Butts@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsKootenai National Forest
DistrictsFortine Ranger District
Legal Land DescriptionT34N R25W Section 9
Stimson Bobtail Access Developing Proposal
Decision Memo · Libby Ranger District · updated 4/3/2025
Northwest of Libby, Montana in the Bobtail Creek drainage off of National Forest System roads 14485 and 6146. · Lincoln, Montana

Provide management access to Stimson Lumber Company lands through National Forest land. Two short segments of new road, totaling about 2600 feet (about 3 acres), would replace access on costly and currently inaccessible National Forest System roads.

Special use managementRoad management
Scoping Start
04/2025 (Estimated)
Decision
08/2025 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Keith Karoglanian · keith.karoglanian@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
ForestsKootenai National Forest
DistrictsLibby Ranger District
Legal Land DescriptionT32N, R31W, S18-19
Environmental Assessment · Rexford Ranger District · updated 3/28/2025
Douglas Hill area near the mouth of the Tobacco River. West of Eureka, Mt · Lincoln, Montana

Recreation Site management to address increased use

Recreation management
Scoping Start
07/27/2022
Comment Period
07/27/2022
Objection Period Start
06/2025 (Estimated)
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Marcella Butts · marcella.butts@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityDeveloped Site Management
ForestsKootenai National Forest
DistrictsRexford Ranger District
Legal Land DescriptionT36N R27W, Section 6; T36N R28W, Section 1; T37N R27W, Sections 29-32
Pleasant Pheasant Project Developing Proposal
Environmental Assessment · Three Rivers Ranger District · updated 1/7/2025
This project area is located about 10 miles north of Troy, MT and is bordered on the north and west by the Yaak River, the east by the South Yaak River/Pipe Creek and the south by 17 Mile Creek. · Lincoln, Montana

We are proposing timber harvest; mechanical and hand piling of fuels; wildlife and aquatic habitat improvement such as prescribed burning and stream restoration work.

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
01/2027 (Estimated)
Comment Period
03/2027 (Estimated)
Objection Period Start
08/2027 (Estimated)
Decision
01/2028 (Estimated)
Implementation
03/2028 (Estimated)
Project documents
Lisa Osborn · losborn@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Special Area Management; Scenery Management; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsKootenai National Forest
DistrictsThree Rivers Ranger District
Legal Land DescriptionNot Applicable
Norman McCedar Completed
Environmental Assessment · Kootenai National Forest All Units · updated 10/23/2024
The project area is located approximately 1 air mile west of the Libby, Montana, community. · Lincoln, Montana

Project to reduce fuels in the Libby fireshed.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
01/03/2023
Comment Period
08/06/2024
10/22/2024
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Lisa Osborn · lisa.osborn@usda.gov
NEPA / regulatory detail
Special Authority2021 Infrastructure: Emergency Actions
Notice and Comment Regulation2021 Infrastructure: Emergency Actions
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
Norman McCedarDecision Signed Date: 10/22/2024
ForestsKootenai National Forest
DistrictsLibby Ranger District
Legal Land DescriptionT31N R32W Sections 22, 23-27, 34-36; T31N R31W Section 31, T30N R32W, Sections 1-3, 12; T30N R31W Sections 6-7
Environmental Impact Statement · Fortine Ranger District · updated 4/29/2024
The project area is located North and East of Eureka, Montana. · Lincoln, Montana

Designation of over-snow motorized use areas and non-snow trail management.The Forest Service has undertaken a new Forest-Wide over-snow project to include the Ten Lakes Wilderness Study Area project, combined, as of 4/26/2024.

Recreation management
NOI in Federal Register
04/13/2015
DEIS NOA in Federal Register
04/14/2015
FEIS NOA in Federal Register
01/2019 (Estimated)
Objection Period Start
01/2019 (Estimated)
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Moira McKelvey · moira.mckelvey@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management
ForestsKootenai National Forest
DistrictsFortine Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · R6 - Pacific Northwest Region All Units · updated 12/12/2023
The trail begins at the Continental Divide in Glacier National Park and travels 1,200 miles through 7 National Forests, 3 National Parks, BLM, state, tribal, municipal and private lands in MT, ID, WA. · Bonner; Boundary; Flathead; Glacier; Lincoln; Clallam; Ferry; Island; Jefferson; Okanogan; Pend Oreille; Skagit; Stevens; Whatcom, Idaho; Montana; Washington

The Comprehensive Plan will develop administrative and management objectives and practices and desired conditions for the Pacific Northwest National Scenic Trail on public lands in Forest Service Regions 1 and Regions 6.

Recreation managementSpecial area management
Scoping Start
11/01/2017
Comment Period
03/16/2023
Objection Period Start
07/13/2023
Decision
11/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Lisa Romano · lisa.romano@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Creation/Revision; Trail Management; Special Area Management
Pacific Northwest National Scenic Trail Comprehensive Plan Decision NoticeDecision Signed Date: 11/13/2023
ForestsIdaho Panhandle National Forest; Flathead National Forest; Kootenai National Forest; Mt Baker-Snoqualmie National Forest; Olympic National Forest; Okanogan-Wenatchee National Forest; Colville National Forest
DistrictsBonners Ferry Ranger District; Priest Lake Ranger District; Glacier View Ranger District; Rexford Ranger District; Fortine Ranger District; Three Rivers Ranger District; Mt Baker Ranger District; Olympic National Forest All Units; Methow Valley Ranger District; Republic Ranger District; Sullivan Lake Ranger District; Tonasket Ranger District; Three Rivers Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Fortine Ranger District · updated 12/4/2023
Sunday Creek Drainage, Stryker MT · Flathead; Lincoln, Montana

Vegetation Management and Fuels Reduction in the Sunday Creek area.

Vegetation management (other than forest products)Fuels management
Scoping Start
02/28/2023
Comment Period
02/28/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Moira McKelvey · moira.mckelvey@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsKootenai National Forest
DistrictsFortine Ranger District
Legal Land DescriptionAll or Portions of T34N R25W, T34N R24W, T33N R25W, T33N R24W, T32N R26W, T32N R25W
Environmental Impact Statement · Kootenai National Forest All Units · updated 7/2/2019
National Forest System Lands across the Kootenai National Forest. · Lincoln; Sanders, Montana

Vegetation management via precommercial and commercial harvest, & burning of activity fuels only within previously managed, second growth stands across the Forest. The project is part of the Montana Governor's Forest in Focus Initiative.

Fuels managementForest productsVegetation management (other than forest products)Wildlife, fish, rare plants
NOI in Federal Register
07/21/2015
DEIS NOA in Federal Register
08/25/2017
FEIS NOA in Federal Register
07/2019 (Estimated)
Objection Period Start
12/2018 (Estimated)
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Quinn Carver · qcarver01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Timber Sales (Green)
ForestsKootenai National Forest
DistrictsKootenai National Forest All Units
Legal Land DescriptionNot Applicable