Shoshone National Forest — Project Detail

13 projects with crawled detail · milestones · contacts · documents

Shoshone National Forest

R02 Rocky Mountain · 13 projects · crawled 2026-06-17
In Progress 3 Developing Proposal 2 Completed 8
Decision Memo 8 Environmental Assessment 4 Categorical Exclusion 1
13 with documents 6 with comments page
Categorical Exclusion · Washakie Ranger District · updated 5/21/2026
Hugh Otte Recreation Site · Fremont, Wyoming

To prevent further damage to Cultural, Riparian, and Upland Habitat, the Forest Service is proposing to alter the Hugh Otte recreation site configuration, contain use to designated areas, rehabilitate needless ground disturbance, and install engineered controls.

Recreation managementVegetation management (other than forest products)Watershed managementWildlife, fish, rare plants
NEPA Start Date
2/24/2026
Finding/Decision Date
5/19/2026
Project documents
Evan Guzik · evan.guzik@usda.gov
NEPA / regulatory detail
Categorical ExclusionTVA 22 (18 CFR Appendix A to Subpart C of Part 1318(22))
Decision Signed Date5/19/2026
Decision Memo · Wind River Ranger District · updated 3/4/2026
Worthen Meadows Trailhead. Snow Oval D · Fremont, Wyoming

Three existing recreation site restroom facilities will be demolished and replaced with new restroom facilities. The existing restroom facilities are outdated and in dilapidated condition.

Recreation management
Scoping Start
06/17/2025
Decision
03/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Jeff VonKienast · jeff.vonkienast@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.
ForestsShoshone National Forest
DistrictsWind River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Washakie Ranger District · updated 2/3/2026
Wolf Point · Fremont, Wyoming

The Nature Conservancy, a USFS administered rangeland permittee proposes to install a virtual cattle allotment fence in part on USFS administered lands. The intent of the virtual fence is to have greater control over how cattle utilize the landscape.

Grazing management
Scoping Start
12/22/2025
Decision
01/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Steven Schacht · steven.schacht@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsShoshone National Forest
DistrictsWashakie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Wind River Ranger District · updated 12/11/2025
Windy Ridge Communication Site, Windy Mountain · Fremont, Wyoming

Proposal to re-align existing administrative use road FSR 961 to ensure safe and reliable access to Windy Ridge Communication Site infrastructure.

Road management
Scoping Start
03/24/2022
Comment Period
11/26/2024
Decision
12/2025 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Seth Halman · seth.halman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Road Maintenance; Road Improvements/Construction
ForestsShoshone National Forest
DistrictsWind River Ranger District
Legal Land DescriptionSection 21, 22, T. 41 N., R. 107 W. 6th Principal Meridian
Sunnyside Trail Completed
Decision Memo · Washakie Ranger District · updated 12/1/2025
Sinks Canyon of the Shoshone National Forest, Washakie Ranger District. · Fremont, Wyoming

The intent of this project is to construct a new trail. The trail will be a continuation of an already constructed trail on the immediately adjacent state park. User created trails in the area will either be decommissioned or adopted as system trails

Recreation management
Scoping Start
05/09/2025
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
Steven Schacht · steven.schacht@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsShoshone National Forest
DistrictsWashakie Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Wind River Ranger District · updated 11/18/2025
Fitzpatrick Wilderness of the Wind River Ranger District · Fremont, Wyoming

The SNF is proposing to authorize the WGFD to expand their bighorn sheep test and remove program to the eastern segment of the Whiskey Mountain herd, located, in part, within the Fitzpatrick Wilderness for a period of 5 years.

Wildlife, fish, rare plants
Scoping Start
06/01/2025
Comment Period
08/14/2025
Decision
10/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
Jeff VonKienast · jeff.vonkienast@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Population Enhancements
ForestsShoshone National Forest
DistrictsWind River Ranger District
Legal Land DescriptionNot Applicable
Green Union Completed
Environmental Assessment · R2 - Rocky Mt. Region All Units · updated 10/29/2024
The project is located on the Wind River Ranger District of the Shoshone National Forest near Dubois, Wyoming and within the Dunoir Fireshed. · Fremont; Sublette; Teton, Wyoming

Increase the resiliency of forest landscapes and communities to wildfire, decrease the impacts of wildfires within the wildland urban interface, and allow for an effective and safe response to wildfires when they occur.

Vegetation management (other than forest products)Fuels management
Scoping Start
09/01/2023
Comment Period
03/19/2024
09/27/2024
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Jeff VonKienast · jeff.vonkienast@usda.gov
NEPA / regulatory detail
Special Authority2021 Infrastructure: Emergency Actions
Notice and Comment Regulation2021 Infrastructure: Emergency Actions
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsShoshone National Forest
DistrictsWind River Ranger District
Legal Land DescriptionTownships 41, 42, 43 North, Ranges 107,108, 109, 110 West, and Sections 1, 2, 3, 4, 6-31, 33-36.
Decision Memo · Wapiti Ranger District · updated 11/16/2023
The North Fork of the Shoshone River from the eastern Forest Service boundary to the East Gate of Yellowstone National Park · Park, Wyoming

The Forest is proposing the construction of three boat launch sites to improve recreation opportunities, increase the safety of put-in/take-out sites, minimize impacts to hydrology resources, and protect cultural resources.

Recreation management
Scoping Start
07/25/2023
Decision
03/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Eliana Rothleutner · Eliana.Rothleutner@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsShoshone National Forest
DistrictsWapiti Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Wapiti Ranger District · updated 11/16/2023
Along the North Fork corridor of the Shoshone River, extending from the eastern boundary of the Forest to approximately two miles east of the western boundary with Yellowstone National Park. · Park, Wyoming

The proposed activities of the project would include a combination of fuels reduction and mitigation work (cut/pile/burn), aspen enhancement, removal of dead/dying timber, and improvement of defensible space adjacent to values-at-risk.

Fuels management
Scoping Start
02/03/2023
Decision
02/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Shawn Gettings · shawn.gettings@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsShoshone National Forest
DistrictsWapiti Ranger District
Legal Land DescriptionT53N R104W Sec 13, 24, 27, 28, 31, 32, 33, 34, 35; T25N R105W Sec 1, 3, 4, 5, 8, 9, 10, 11, 12
High Lakes Resiliency Project Developing Proposal
Environmental Assessment · Clarks Fork Ranger District · updated 9/11/2023
From t58N R104W Section 24 (Cooke City) east to the Beartooth Pass in T58N R104W Section 31. · Park, Wyoming

Proposed project to treat areas along federal highway 212 in the Clarks Fork District with a combination of vegetation management prescriptions including sanitation salvage, shelterwood/seed tree harvest prescription, and other methods.

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
09/2023 (Estimated)
Comment Period
12/2023 (Estimated)
Objection Period Start
04/2024 (Estimated)
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Eliana Rothleutner · Eliana.Rothleutner@usda.gov
NEPA / regulatory detail
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Special Products Sales; Timber Sales (Salvage); Timber Sales (Green)
ForestsShoshone National Forest
DistrictsClarks Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Shoshone National Forest All Units · updated 9/9/2022
Near Big Hermit Gulch on the Washakie Ranger District · Fremont, Wyoming

Proposal to develop a year-round spring with associated infrastructure.

Special use management
Scoping Start
10/2022 (Estimated)
Decision
11/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Justin Hawkins · justin.hawkins@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsShoshone National Forest
DistrictsWashakie Ranger District
Legal Land DescriptionT: 29N, R: 100W, S: 5, GPS Coordinates: 42.51025; 108.80295
Decision Memo · R2 - Rocky Mt. Region All Units · updated 3/19/2018
The project location is approximately 8 miles SW of the junction of State Highway 296 and County Road 7GQ. · Park, Wyoming

This is a proposed long term solution for bank stabilization on Sunlight Creek where it intersects with FSR 101.2A (7D Rd). 200 linear feet of bank will be stabilized using large woody debris and historic gravel will be replaced.

Watershed managementRoad management
Scoping Start
03/01/2018
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Fredrick Oliver · foliver@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
ForestsShoshone National Forest
DistrictsClarks Fork Ranger District
Legal Land DescriptionT55N, R106W, Section 24NW/SE 1/4
Environmental Assessment · Wapiti Ranger District · updated 7/18/2013
Sleeping Giant Ski Area, located 50 miles west of Cody, WY · Park, Wyoming

Proposed developments at Sleeping Giant Ski Area, including a zip line and a snow tubing area.

Special use management
Scoping Start
04/16/2012
Comment Period
03/06/2013
Decision
07/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Amy Haas · ahaas@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsShoshone National Forest
DistrictsWapiti Ranger District