Santa Fe National Forest — Project Detail

12 projects with crawled detail · milestones · contacts · documents

Santa Fe National Forest

R03 Southwestern · 12 projects · crawled 2026-06-17
In Progress 2 Developing Proposal 1 Completed 9
Decision Memo 6 Environmental Assessment 4 Categorical Exclusion 2
11 with documents 6 with comments page
Categorical Exclusion · Santa Fe National Forest · updated 5/28/2026
Along Buckman Road near the Buckman Direct Diversion, 35.83 degrees N/106.16 degrees W · Santa Fe, New Mexico

The City of Santa Fe is proposing a project to implement the NM OSE Permit (SP-4842-RFP) for the re-use of San Juan-Chama Project (SJCP) water by constructing an 18-mile long pipeline, across BLM and NFS lands, to convey unconsumed reclaimed SJCP water from the City’s PRWRF to the Rio Grande River.

Special use management
NEPA Start Date
12/5/2025
Finding/Decision Date
4/30/2026
Project documents
Hector Alvarez (Bureau of Reclamation), Lead Agency · hgarcia@usbr.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-32d-USFS
Decision Signed Date4/30/2026
Categorical Exclusion · Santa Fe National Forest · updated 5/28/2026
The authorization will cover approximately 133.355 miles in New Mexico, with 36.04 miles in Rio Arriba County, 89.15 miles in Sandoval, and 8.16 in Santa Fe County. · Los Alamos; Rio Arriba; Sandoval, New Mexico

JMEC is requesting a reauthorization of their master permit to maintain and operate approximately 349.49 acres of electrical lines (266.2 acres of distribution lines, 30.87 acres of buried distribution lines and 52.42 acres of overhead transmission lines), total of 133.355 miles, across NFS lands.

Special use management
NEPA Start Date
11/3/2025
Finding/Decision Date
5/27/2026
JUSTIN MAPULA · justin.mapula@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date5/27/2026
Environmental Assessment · Espanola Ranger District · updated 5/11/2026
Santa Fe Ski area, NM Hwy 475 · Santa Fe, New Mexico

Ski Santa Fe is proposing to modernize and expand snowmaking infrastructure, which includes replacing and upgrading existing infrastructure to increase in water storage capacity and enhance the efficiency of snowmaking operation.

Recreation managementSpecial use management
NEPA Start Date
Finding/Decision Date
Project documents
Claudia Brookshire · claudia.brookshire@usda.gov
Environmental Assessment · Santa Fe National Forest All Units · updated 3/11/2026
Project area encompasses the approx. 167,000 acres directly effected from the 2022 HPCC fires on the Pecos/Las Vegas RD, SFNF. · Mora; San Miguel, New Mexico

Proposal to facilitate restoration and recovery within the HPCC burned area on the Pecos/Las Vegas Ranger District.

Recreation managementGrazing managementVegetation management (other than forest products)Fuels managementWatershed managementRoad managementProjects that may affect wilderness (for mailing list contacts)
Scoping Start
09/09/2024
Comment Period
09/19/2025
03/10/2026
Decision
03/2026 (Estimated)
Implementation
03/2026 (Estimated)
Project documents
Jennifer Cramer · jennifer.cramer@usda.gov
NEPA / regulatory detail
Special Authority2021 Infrastructure: Emergency Actions
Notice and Comment Regulation2021 Infrastructure: Emergency Actions
Project ActivityDeveloped Site Management; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Trail Management; Road Maintenance; Road Improvements/Construction; Grazing Structural Improvements; Watershed Improvements
ForestsSanta Fe National Forest
DistrictsPecos-Las Vegas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Fe National Forest All Units · updated 1/5/2026
The Sierra de los Pinos line in Jemez, approximately the intersection of Hwy 4 and Hwy 126 to the subdivision Sierra de los Pinos in Jemez Springs, NM. · Sandoval, New Mexico

Windstream internet service provider proposes to install buried and aerial fiber optic lines along roads and powerlines within the Santa Fe National Forest, to Sierra de los Pinos, Sulphur Creek and Mesa de Cuba.

Special use management
Scoping Start
03/03/2025
Decision
01/2026 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
Jeremy Golston · jeremy.golston@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsSanta Fe National Forest
DistrictsCuba Ranger District; Jemez Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Santa Fe National Forest All Units · updated 10/16/2025
Project locations are along NM Highway 475, along the Santa Fe Ski Basin Road. · Santa Fe, New Mexico

To replace three old vault toilets along Highway 475 to Ski Santa Fe and provide ADA access.

Recreation managementFacility management
Scoping Start
03/03/2025
Decision
10/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Lynn Bjorklund · lynn.bjorklund@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsSanta Fe National Forest
DistrictsEspanola Ranger District
Legal Land DescriptionBig Tesuque T 18N, R 11E, sec 20; Aspen Vista T18N, R. 11 E, section 17; Aspen Basin T 18N 11 E, Section 8
Decision Memo · Santa Fe National Forest All Units · updated 9/29/2025
Padre Springs Grazing Allotment · Santa Fe, New Mexico

Replace existing non-functioning well with new well and pipeline to connect new well to existing pipeline and watering facilities. Fencing around new well.

Grazing managementSpecial use management
Scoping Start
03/19/2025
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Jacob Archuleta · jacob.archuleta@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsSanta Fe National Forest
DistrictsPecos-Las Vegas Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Santa Fe National Forest All Units · updated 9/9/2025
The project area is located on the Coyote and Cuba Ranger Districts in Rio Arriba County, New Mexico. · Rio Arriba, New Mexico

To restore the frequent-fire forests by modifying the arrangement of forest stands, openings, and interspaces in order to improve the potential for stand regeneration and offset the risk of forest type loss due to natural success an wildfire.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
11/19/2019
Comment Period
03/15/2024
Objection Period Start
04/07/2025
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
June Galloway · june.galloway@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsSanta Fe National Forest
DistrictsCoyote Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Santa Fe National Forest All Units · updated 8/13/2025
Project activities proposed to occur on the Santa Fe National Forest located on the Caja del Rio, located to the west and northwest of Santa Fe, NM. · Santa Fe, New Mexico

NNSA proposes to construct and operate a 115 kV transmission line on the Santa Fe NF (SFNF) to meet anticipated power needs at the Los Alamos National Laboratory. This project includes amending the SFNF Land Management Plan under 36 CFR 219 Regs

Land management planningSpecial use management
Scoping Start
04/19/2021
Comment Period
01/22/2024
Objection Period Start
09/11/2024
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Julian Madrid · julian.madrid@usda.gov
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Plan Amendment
ForestsSanta Fe National Forest
DistrictsEspanola Ranger District
Legal Land DescriptionProposed project activities fall within Townships 17 and 18 N, Ranges 7 and 8 E.
Decision Memo · Pecos-Las Vegas Ranger District · updated 8/12/2025
Fisher Hill Allotment located approximately 30 miles west of Las Vegas, NM; El Solitario Allotment, east of Hermit's Peak, approx. 40 miles northwest of Las Vegas, NM. · Mora; San Miguel, New Mexico

Repair/reconstruction of allotment and boundary fences damaged by fire on the Fisher Hill (2 mi), El Solitario (11 mi), and Rosilla (3.5 mi) Allotments; hazard tree mitigation on Forest Service lands to protect the new fences.

Grazing managementVegetation management (other than forest products)
Scoping Start
03/25/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Carlos Lovato · cslovato@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Grazing Allotment Management; Grazing Structural Improvements
ForestsSanta Fe National Forest
DistrictsPecos-Las Vegas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pecos-Las Vegas Ranger District · updated 6/25/2025
T17N R14E Sections: 7,8,9,13,14,15 / T18N R15E Section: 17 · San Miguel, New Mexico

Hazard tree reduction within 100 feet of each side of the existing MSM powerlines in the HPCC post-fire landscape to reduce risk of damage to powerlines and potential fire hazard and to protect public safety using hand crews and chainsaws.

Vegetation management (other than forest products)Fuels management
Scoping Start
03/26/2025
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Elizabeth Robinson · elizabeth.robinson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsSanta Fe National Forest
DistrictsPecos-Las Vegas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Espanola Ranger District · updated 8/17/2017
Upstream from Buckman Diversion Project on the Caja del Rio, Santa Fe National Forest. · Santa Fe, New Mexico

USGS has two gage stations upstream of Buckman Diversion Project to monitor river flow levels. Gages are together about 25 feet from the Rio Grand and transmit flow data through telemetry. Consist of metal box on stilts and a pipe going into river.

Special use management
Scoping Start
08/04/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Lynn Bjorklund · lbjorklund@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date08/17/2017
ForestsSanta Fe National Forest
DistrictsEspanola Ranger District
Legal Land DescriptionT19 N, R7 E, NW sec 36