Dixie National Forest — Project Detail

14 projects with crawled detail · milestones · contacts · documents

Dixie National Forest

R04 Intermountain · 14 projects · crawled 2026-06-17
In Progress 2 Developing Proposal 2 Completed 10
Decision Memo 7 Environmental Assessment 5 Environmental Impact Statement 2
14 with documents 7 with comments page
Environmental Assessment · Cedar City Ranger District · updated 5/13/2026
Multiple locations across the Cedar City Ranger District in Garfield, Iron, and Kane Counties, Utah. · Garfield; Iron; Kane, Utah

This project would open 3 new mineral pits, authorize/reauthorize 10 existing pits (expanding 7), and close/reclaim 17 pits across the Cedar City Ranger District to facilitate sources of minerals for project work over the next 15-20 years.

Minerals and geology
NEPA Start Date
12/17/2024
Finding/Decision Date
3/4/2026
Project documents
Michael Golden · michael.golden@usda.gov
NEPA / regulatory detail
Decision Signed Date3/4/2026
Environmental Impact Statement · Cedar City Ranger District · updated 5/12/2026 · decision 7/2027 (Estimated)
Surrounding Brian Head Town, UT. · Iron, Utah

Brian Head Resort is proposing terrain and ski area improvements within and adjacent to their current special use permit (SUP) on the Dixie National Forest. The plan includes adding an additional 1,651 acres to their Special Use Permit boundary.

Recreation managementSpecial use management
NEPA Start Date
7/15/2025
Finding/Decision Date
Project documents
Matt Loscalzo · Matthew.Loscalzo@usda.gov
Environmental Assessment · Cedar City Ranger District · updated 5/12/2026 · decision 11/2025 (Estimated)
The Dry Camp – Houston Mountain Road, Forest System Route (FSR) 30051 between the Tippets Valley Road (FSR 30381) and Duck Creek Village, UT. · Iron; Kane, Utah

The Cedar City Ranger Disitrict is proposing to realign the Dry Camp - Houston Mountain Road (FSR 30051). The project would decommission 2.6 miles of existing road prism across meadow areas with sensitive soils and reconstruct 3.5 miles of new road.

Recreation managementRoad managementWatershed management
NEPA Start Date
11/12/2024
Finding/Decision Date
Project documents
Michael Golden · michael.golden@usda.gov
Decision Memo · Pine Valley Ranger District · updated 9/30/2025
West Pinto Road, Iron County, Utah · Iron, Utah

The Extension will supply power to a customer requesting service. A total of 0.75 acres will occupy USFS Dixie National Forest. The proposed power line will run adjacent to West Pinto Road. Ten wooden poles will be installed with a height of 45 feet.

Special use management
Scoping Start
05/30/2025
Decision
09/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
Hannah Schramm · hannah.schramm@udsa.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsDixie National Forest
DistrictsPine Valley Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Dixie National Forest All Units · updated 6/4/2025
The project area encompasses the following watersheds: HUC6 Upper Pine Creek 140700050105 HUC6 Lower Pine Creek 140700050106 HUC6 Upper North Creek 140700050103 HUC6 Lower North Creek 14070005010 · Garfield, Utah

The Hungry Creek Project would facilitate landscape-scale forest vegetation management to promote resiliency of the ecosystem while maintaining the aesthetics and character of the landscape.

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
10/20/2021
Comment Period
07/28/2023
Objection Period Start
05/17/2024
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Terry DeLay · terry.delay@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Salvage); Watershed Improvements
ForestsDixie National Forest
DistrictsEscalante Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pine Valley Ranger District · updated 5/30/2025
Various riparian corridors throughout the District. See attached maps. · Iron; Washington, Utah

The goal of the project is to install fencing around six riparian areas to force livestock to disperse, establish the ability to graze the fenced areas in a more controlled manner, and over time improve riparian health.

Wildlife, fish, rare plantsGrazing managementWatershed management
Scoping Start
07/16/2024
Decision
05/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Hannah Schramm · Hannah.Schramm@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Grazing Structural Improvements; Watershed Improvements
ForestsDixie National Forest
DistrictsPine Valley Ranger District
Legal Land DescriptionSeveral located throughout the District, see maps.
Environmental Assessment · Pine Valley Ranger District · updated 5/23/2025
The project located in Iron and Washington Counties near Saint George, Utah. The project includes a portion of the Pine Valley Wildfire Crisis Landscape (WSCL). · Iron; Washington, Utah

Reduce fire threat to values at risk in the wildfire crisis landscape including high-risk firesheds, the WUI zones, and areas adjacent to critical infrastructure including roads, municipal watersheds, and energy corridors.

Fuels management
Scoping Start
12/23/2024
Comment Period
12/23/2024
05/15/2025
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Joseph Rechsteiner · joseph.rechsteiner@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other; 2021 Infrastructure: Emergency Actions
Notice and Comment Regulation2021 Infrastructure: Emergency Actions
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsDixie National Forest
DistrictsPine Valley Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Dixie National Forest All Units · updated 7/26/2024
This Decision could be applied throughout the Dixie National Forest with the exception of designated Wilderness and Research Natural Areas. · Garfield; Iron; Kane; Washington, Utah

Dixie NF is proposing a forest-wide prescribed fire project to reduce the risk of uncharacteristic wildfire, increase resilience of existing vegetation groups and improve ecological function in native vegetation communities and wildlife habitats.

Watershed managementFuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
10/27/2021
Comment Period
11/22/2022
Objection Period Start
08/25/2023
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Keith Adams · keith.r.adams@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
ForestsDixie National Forest
DistrictsDixie National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Impact Statement · R4 - Intermountain Region All Units · updated 10/25/2023
Sagebrush lands in National Forests of Nevada, Utah, southern Idaho, southwest Montana, southwest & south-central Wyoming and northern Colorado. · Adams; Blaine; Bonneville; Camas; Caribou; Cassia; Elmore; Fremont; Madison; Churchill; Clark; Elko; Eureka; Humboldt; Lincoln; Nye; Pershing; Washoe; White Pine; Beaver; Box Elder; Cache; Carbon; Daggett; Davis; Duchesne; Emery; Garfield; Grand; Iron; Juab; Kane; Millard; Morgan; Piute; Rich; Salt Lake; San Juan; Sanpete; Sevier; Summit; Tooele; Uintah; Utah; Wasatch; Washington; Wayne; Weber; Albany; Campbell; Carbon; Converse; Crook; Laramie; Lincoln; Natrona; Niobrara; Platte; Sublette; Teton; Weston; Jackson; Moffat; Routt, Colorado; Idaho; Nevada; Utah; Wyoming

The Forest Service is considering amending its land management plans to address new and evolving issues arising since implementing sage-grouse plans in 2015. This project is in cooperation with the USDI Bureau of Land Management.

Land management planningWildlife, fish, rare plants
NOI in Federal Register
11/21/2017
DEIS NOA in Federal Register
10/05/2018
FEIS NOA in Federal Register
08/02/2019
Objection Period Start
08/02/2019
Decision
12/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
John Shivik · john.shivik@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsMedicine Bow-Routt National Forest; Ashley National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest
DistrictsMedicine Bow-Routt National Forest All Units; Ashley National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Dixie National Forest All Units · updated 10/12/2021
35 existing communication sites across the DNF · Garfield; Iron; Kane; Washington, Utah

The Communication Sites are located throughout Dixie National Forest.They include existing Communication Site Designations, Site Plans and inspection records, Site NEPA, and follow National and Forest Plan goals and directives.

Special use management
Scoping Start
09/16/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Jennifer Green · jennifer.e.green@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/12/2021
ForestsDixie National Forest
DistrictsDixie National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Cedar City Ranger District · updated 10/8/2021
Navajo Lake is a small (418 acre) natural lake system approximately 18 miles southeast of Cedar City, UT. · Kane, Utah

The Utah Division of Wildlife Resources proposes to remove all fish from Navajo Lake using piscicides in October 2021. It would then restock with sportfish.

Wildlife, fish, rare plants
Scoping Start
08/02/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Michael Golden · michael.golden@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
Decision Decided Date10/08/2021
ForestsDixie National Forest
DistrictsCedar City Ranger District
Legal Land DescriptionT38S, R9W, Sections 2, 11, and 12 and T38S, R8W, Sections 7, 8, and 9; Salt Lake City Baseline and Meridian
Decision Memo · Dixie National Forest All Units · updated 11/8/2018
820 North Main Street, Cedar City, UT 84721 · Iron, Utah

The project would occur at an administrative site currently owned by the Forest Service in downtown Cedar City, UT. Old Forest Service facilities would be taken down to provide space for a new administrative office for the Forest Service.

Facility management
Scoping Start
08/13/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Steven O'Neil · soneil@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
Decision Decided Date11/08/2018
ForestsDixie National Forest
DistrictsDixie National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Cedar City Ranger District · updated 8/31/2017
Panguitch Watershed near Delong Creek · Garfield, Utah

Fencing permitted livestock out of springs within the Panguitch Municipal Watershed in order to protect public health and safety. The watershed is currently at risk due to fecal coliform contamination.

Watershed managementRegulations, directives, orders
Scoping Start
07/15/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Chris Butler · cbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Decision Decided Date08/31/2017
ForestsDixie National Forest
DistrictsCedar City Ranger District
Legal Land DescriptionT34S R7W Section 13 and T34S R6W section 18
Decision Memo · Cedar City Ranger District · updated 9/28/2016
Strawberry Road (FS Road 30058) beginning at the intersection of State Route 14 to the Strawberry Point overlook. · Kane, Utah

The purpose of the project is to grant Kane County, Utah to continue to operate and maintain Strawberry Road.

Land ownership management
Scoping Start
07/15/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Linda Chappell · lchappell@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/28/2016
ForestsDixie National Forest
DistrictsCedar City Ranger District
Legal Land DescriptionSection 15, T. 38 S., R 7 W., SLBM to Section 11, T. 39 S. R. 8 W SLBM