Categorical Exclusion · Pleasant Grove Ranger District · updated 8/10/2026 · decision 11/2026 (Estimated)
Near FS 111 and FS 007, American Fork Canyon · Utah, Utah
Project would connect the construct a connector route between FR 007 and FR 111 over Sinner's Pass. The proposed route would start at the Mineral Basin Road near the American Fork River, extend over Sinner’s Pass in a series of switchbacks, and then connect to Forest Service Road 111.
Recreation managementRoad management
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS; USDA-46d-USFS |
Environmental Assessment · Uinta-Wasatch-Cache National Forest · updated 8/4/2026
Big Cottonwood Canyon · Salt Lake, Utah
The Utah Department of Transportation proposes a transportation project to reduce wintertime traffic congestion in Big Cottonwood Canyon. Due to change in webpages/systems this may be a duplicate webpage see: https://www.fs.usda.gov/r04/uinta-wasatch-cache/projects/68879
Recreation managementRoad managementSpecial use management
NEPA Start Date
12/3/2025
Finding/Decision Date
7/31/2026
Project documents
NEPA / regulatory detail
| Decision Signed Date | 7/31/2026 |
Environmental Assessment · Logan Ranger District · updated 8/4/2026
NE Brigham City Utah · Box Elder, Utah
The purpose and need of the project is to respond to Brigham City’s request to relocate a portion of transmission line from private land onto National Forest System Lands.
Special use management
Finding/Decision Date
7/31/2026
Project documents
NEPA / regulatory detail
| Decision Signed Date | 7/31/2026 |
Environmental Assessment · Salt Lake Ranger District · updated 7/30/2026 · decision 5/2027 (Estimated)
Big Cottonwood Canyon · Salt Lake; Summit; Utah; Wasatch, Utah
The Forest Service proposes using a combination of vegetation, fuels, and restoration activities to improve ecosystem conditions and reduce risk of uncharacteristic wildfire and associated adverse effects to the watershed within the Big Cottonwood Canyon drainage and tributaries.
Fuels managementVegetation management (other than forest products)Watershed management
NEPA Start Date
5/26/2026
Project documents
Environmental Assessment · Evanston-Mountain View Ranger District · updated 6/23/2026 · decision 2/2027 (Estimated)
Utah-Wyoming border west of Stateline Reservoir · Summit; Uinta, Utah; Wyoming
The Gilbert Creek Aspen Restoration project would restore aspen stands and improve forest health across approximately 7,217 acres on the North Slope of the Uinta Mountains. Treatments include mechanical and hand thinning, mastication, pile burning, prescribed fire, and riparian habitat improvements
Forest productsFuels managementVegetation management (other than forest products)
Project documents
Environmental Assessment · Uinta-Wasatch-Cache National Forest · updated 5/29/2026 · decision 8/2025 (Estimated)
Emerald Lake, Mount Timpanogos · Utah, Utah
The Forest Service proposes to reconstruct the Emerald Lake Shelter (Shelter) project located in the Mount Timpanogos Wilderness, Utah County, Utah to restore Wilderness character. Page may be duplicate to change in systems see: https://www.fs.usda.gov/r04/uinta-wasatch-cache/projects/66370
Special area management
NEPA Start Date
8/12/2024
Project documents
Categorical Exclusion · Uinta-Wasatch-Cache National Forest · updated 5/19/2026
Grizzly Gulch parking area across from Alta day lodge road · Salt Lake, Utah
Project would construct and maintain toilets in the Grizzly Gulch area. Toilets would be constructed and maintained by Alta Ski Area.
Recreation management
Finding/Decision Date
5/12/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-44d-USFS |
| Decision Signed Date | 5/12/2026 |
Categorical Exclusion · Ogden Ranger District · updated 5/5/2026
Snowbasin - Orson · Weber, Utah
Accommodate increasing popularity and use of terrain park Containing freestyle use to specific area Improve “return cycle” for park and dedicated race lane
Special use management
NEPA Start Date
2/25/2025
Finding/Decision Date
2/20/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-44d-USFS |
| Decision Signed Date | 2/20/2026 |
Categorical Exclusion · Logan Ranger District · updated 4/23/2026 · decision 10/2026 (Estimated)
Upper Right Hand Fork near Seep Spring off Road 160 · Cache, Utah
Project would approve a special use authorization for construction of a short access road to a private inholding.
Special use management
NEPA Start Date
4/23/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 4/17/2026
The project is located in the High Uintas Wilderness in both Duchesne and Summit counties. The project is located northeast of Duchesne, UT and southwest of Manila, UT. · Duchesne; Summit, Utah
This project is an evaluation of the effects of continued domestic sheep grazing in the High Uintas Wilderness, including five sheep allotments on the Ashley NF and five sheep allotments on the Uinta-Wasatch-Cache NF.
Grazing management
NOI in Federal Register
12/01/2015
DEIS NOA in Federal Register
07/14/2023
FEIS NOA in Federal Register
07/23/2025
Objection Period Start
07/23/2025
Decision
04/2026 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management; Grazing Authorizations |
| Forests | Ashley National Forest; Uinta-Wasatch-Cache National Forest |
| Districts | Roosevelt Ranger District; Duchesne Ranger District; Evanston-Mountain View RD |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/13/2026
Approximately 31 miles southeast of Evanston, Wyoming, on the eastern side of the West Fork of the Blacks Fork River along FR063 · Summit, Utah
The Forest Service is considering a proposal to realign FR093 to improve stream and riparian habitat. Project would affect High Uintas Inventoried Roadless Area for 1.4ac. (0.7ac restoration, 0.7ac realigned roadway)
Watershed managementRoad management
Comment Period
02/13/2026
Decision
02/2026 (Estimated)
Implementation
02/2027 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction; Travel Management; Watershed Improvements |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Evanston-Mountain View RD |
| Legal Land Description | Not Applicable |
Decision Memo · Pleasant Grove Ranger District · updated 1/23/2026
Approximately 3 miles East of the Pleasant Grove Ranger station. It is situated on the North and West facing slopes of Mt. Timpanogos and outside of the wilderness area. · Utah, Utah
Improve ecosystem resilience to risk of uncharacteristic wildfire and declining ecosystem conditions and associated effects via 2,375 acres of treatments within a 14,909 acre project area in American Fork Canyon.
Vegetation management (other than forest products)Fuels managementWatershed management
Decision
01/2026 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Watershed Improvements |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Pleasant Grove Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Heber-Kamas Ranger District · updated 1/6/2026
The project is located in the Soapstone Area, east of Kamas, UT in Wasatch County. · Wasatch, Utah
Project would restore watershed resiliency and improve vegetation conditions within the Soapstone Landscape. Across the 36,417 acre project area, the Forest Service proposes approximately 13,624 acres of treatments.
Forest productsVegetation management (other than forest products)Fuels managementWatershed management
Comment Period
01/2026 (Estimated)
Decision
01/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Heber-Kamas Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/4/2025
The project area is ~15 east of Francis, UT. The project area is south of State HWY 150 to the north and State HWY 35 to the south, known as Soapstone Basin. · Wasatch, Utah
Restore wildlife and avian habitat on approximately 527-acres via timber harvest and 4818-acres via fuels treatments(Rx-fire). Timber and Fuels treatments overlap. Only prescribed fire in roadless areas, no vegetation cutting or timber in roadless.
Forest productsFuels management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage) |
| Flytree and Silver Meadows Area Restoration Project, August 2025 | Decision Signed Date: 08/01/2025 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Heber-Kamas Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/14/2025
This area is located adjacent to Mirror Lake HWY to the north and across from the existing smaller Soapstone Parking Area · Summit, Utah
Proposed project would expand the existing Soapstone Trailhead to improve visitor use and safety
Recreation management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Heber-Kamas Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/14/2025
Yellow Pine Trailhead along UT 150 on north side of road · Summit, Utah
Project would expand existing Yellow Pine Trailhead parking to better meet visitor needs and improve safety.
Recreation management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Heber-Kamas Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/9/2025
Forestwide in disturbed areas across the Uinta-Wasatch-Cache National Forest · Box Elder; Cache; Davis; Duchesne; Juab; Morgan; Rich; Salt Lake; Sanpete; Summit; Tooele; Utah; Wasatch; Weber; Uinta, Utah; Wyoming
The Forest Service is considering a proposal to analyze reconstruction, replacement, relocation, and installation of utility lines in disturbed areas in a programmatic environmental analysis.
Special use managementFacility managementRoad management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Uinta-Wasatch-Cache All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/24/2025
Forestwide · Box Elder; Cache; Davis; Duchesne; Juab; Morgan; Rich; Salt Lake; Sanpete; Summit; Tooele; Utah; Wasatch; Weber, Utah
The Forest Service proposes to use ecologically appropriate native plant materials to plant/seed disturbed areas that are either not anticipated to recover independently or are following undesirable trajectories with the goal of restoring ecosystems
Forest productsVegetation management (other than forest products)
Decision
04/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Uinta-Wasatch-Cache All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 3/4/2024
Project is east of Kamas/Oakely in the Upper Weber River watershed and runs south of East Weber Canyon Road. · Summit, Utah
Proposed Action would complete vegetation and fuels management activities across a 34,056 acre landscape to reduce potential wildfire effects and improve ecosystem conditions in the upper Weber River watershed.
Vegetation management (other than forest products)Fuels management
Comment Period
03/2024 (Estimated)
Objection Period Start
04/2024 (Estimated)
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Heber-Kamas Ranger District |
| Legal Land Description | T1S, R6E, 13, 14, 22, 23, 24, 25, 26, and 34 |
Environmental Assessment · Spanish Fork Ranger District · updated 12/13/2023
Nephi-Salt Creek, Payson, and Diamond Fork Allotments, Spanish Fork Ranger District, south and east of Spanish Fork, UT. · Juab; San Juan; Utah, Utah
Proposed action would install two water developments, three corrals, and 950-feet of fence to improve livestock distribution and concentration and reduce potential impacts to resources over three allotments on the Spanish Fork Ranger District.
Grazing management
Comment Period
12/2023 (Estimated)
Objection Period Start
03/2024 (Estimated)
Decision
04/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Spanish Fork Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/3/2023
Along SR 210 between the Alta Bypass Road and the Rustler Lodge. · Salt Lake, Utah
Alta proposes to close most south-side roadside parking along SR-210 between Rustler Lodge and Alta Bypass Road, and to replace the lost parking through adjustments to the Wildcat parking lot.
Recreation management
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Salt Lake Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · R4 - Intermountain Region All Units · updated 10/25/2023
Sagebrush lands in National Forests of Nevada, Utah, southern Idaho, southwest Montana, southwest & south-central Wyoming and northern Colorado. · Adams; Blaine; Bonneville; Camas; Caribou; Cassia; Elmore; Fremont; Madison; Churchill; Clark; Elko; Eureka; Humboldt; Lincoln; Nye; Pershing; Washoe; White Pine; Beaver; Box Elder; Cache; Carbon; Daggett; Davis; Duchesne; Emery; Garfield; Grand; Iron; Juab; Kane; Millard; Morgan; Piute; Rich; Salt Lake; San Juan; Sanpete; Sevier; Summit; Tooele; Uintah; Utah; Wasatch; Washington; Wayne; Weber; Albany; Campbell; Carbon; Converse; Crook; Laramie; Lincoln; Natrona; Niobrara; Platte; Sublette; Teton; Weston; Jackson; Moffat; Routt, Colorado; Idaho; Nevada; Utah; Wyoming
The Forest Service is considering amending its land management plans to address new and evolving issues arising since implementing sage-grouse plans in 2015. This project is in cooperation with the USDI Bureau of Land Management.
Land management planningWildlife, fish, rare plants
NOI in Federal Register
11/21/2017
DEIS NOA in Federal Register
10/05/2018
FEIS NOA in Federal Register
08/02/2019
Objection Period Start
08/02/2019
Decision
12/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Medicine Bow-Routt National Forest; Ashley National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest |
| Districts | Medicine Bow-Routt National Forest All Units; Ashley National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/26/2023
Draper City Corner Canyon Half Marathon starts and finishes out of the Corner Canyon Trailhead at Andy Ballard Arena. The BCC (Big Cottonwood Canyon) Flea Market is in Brighton Resort Parking lot · Salt Lake, Utah
Proposed project is to issue the Draper City Half Marathon in Corner Canyon, and the BCC Flea Market at the Brighton Resort Parking lot new 5-year term, recreation event permits.
Special use management
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/26/2023 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Salt Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/26/2023
Races take place at the Solitude and Brighton Ski Areas, almost entirely within ski area boundaries, except for Powder Keg races that drop off the back side of Brighton onto mostly private land. · Salt Lake; Wasatch, Utah
Proposed project would reissue race permits for a 5-year duration at/near Brighton and Solitude ski areas.
Special use management
Decision
07/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/26/2023 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Salt Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/25/2023
This project is located in Seymour Canyon, east of Oakley, UT and above the Oakley Water System. The road is a private road leading up to private infrastructure outside the Forest Boundary. · Summit, Utah
Proposed project is to reduce fuel loading over 2-acres of NFS lands along Seymour Canyon road to improve safety and reduce risk of uncharacteristic wildfire to public and private lands. Project would occur in a roadless area.
Fuels management
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Heber-Kamas Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Spanish Fork Ranger District · updated 11/8/2022
Maple Lake and McClellan Lake are above Payson City in the Payson Management Area. · Utah, Utah
Dam rehabilitation includes reconstructing spillways, removing clogged outlet pipes and replacing with properly sized conduits, installing drain systems, and buttressing existing structures to prevent movement or failure during seismic events.
Watershed management
Decision
06/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance; Watershed Improvements |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Spanish Fork Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Salt Lake Ranger District · updated 5/24/2022
South of Tunnel Springs Park & Trailhead in Salt Lake City, UT · Salt Lake, Utah
Proposal to provide access to the recently approved Bonneville Shoreline Trail in Davis County.
Recreation management
Scoping Start
05/2022 (Estimated)
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Salt Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/20/2022
Wasatch Front from Mt. Olympus to American Fork Canyon, Utah · Salt Lake; Utah, Utah
Proposal from Utah Abandoned Mine Reclamation Program to close 28 abandoned hard rock mines with 8 mines closed in Wilderness and 20 mines closed outside of Wilderness areas.
Watershed managementMinerals and geologySpecial area management
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Heritage Resource Management; Abandoned Mine Land Clean-Up |
| Decision Decided Date | 04/20/2022 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Salt Lake Ranger District; Pleasant Grove Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Evanston-Mountain View RD · updated 6/29/2021
Whitney area of the Evanston Mountain View Ranger District · Summit, Utah
Amend existing WPG 10-year priority use permit to include 100 service days on the EMVRD based on WPG's acquisition of Cloudveil Mountain Heli.
Special use management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11); 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 06/29/2021 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Evanston-Mountain View RD |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 6/25/2021
Little Cottonwood Canyon, Salt Lake City, Utah · Salt Lake, Utah
Proposal from Utah Department of Transportation to analyze transportation improvements in and near Little Cottonwood Canyon in Salt Lake City, Utah. The USDAFS is a cooperating agency. For information visit: https://littlecottonwoodeis.udot.utah.gov/
Road management
NOI in Federal Register
04/23/2021
DEIS NOA in Federal Register
06/25/2021
FEIS NOA in Federal Register
12/2021 (Estimated)
Objection Period Start
12/2021 (Estimated)
Decision
03/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Improvements/Construction |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Salt Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pleasant Grove Ranger District · updated 6/14/2021
Mutual Dell LDS Org Camp in American Fork Canyon] · Utah, Utah
pPoposal to construct a new entrance sign, reconstruction of a natural stone retaining wall, and to reconstruct a barrier fence between the Bear Canyon trailhead and entrance to trail.
Recreation managementSpecial use management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Decision Decided Date | 06/14/2021 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Pleasant Grove Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pleasant Grove Ranger District · updated 6/14/2021
Mutual Dell LDS Org Camp in American Fork Canyon · Utah, Utah
Proposal to construct a new pavilion in a wooded area about 300 yards behind the main road and entrance of the camp.
Special use management
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Decision Decided Date | 06/14/2021 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Pleasant Grove Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/1/2021
Mirror Lake Highway · Duchesne; Summit; Wasatch, Utah
Proposal to remove dead trees along the Mirror Lake Highway from mile marker 6 of HKRD to mile marker 49 of EVMRD. Treatments would occur 150 ft on either side of the MLH and access routes to campgrounds, trailheads, lake shores, day use facilities.
Road management
Decision
02/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (1), 36 Cfr 220.6(D)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Decision Decided Date | 02/01/2021 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Heber-Kamas Ranger District; Evanston-Mountain View RD |
| Legal Land Description | Not Applicable |
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/20/2020
Big Cottonwood Canyon, Spruces Campground · Salt Lake, Utah
Proposal to remove hazard trees with a ten-foot zone around a CCC cabin, including trees that are contacting or that otherwise pose a danger to the cabin%u2019s structural and/or historic integrity and defensible space around the structure.
Recreation managementHeritage resource managementVegetation management (other than forest products)
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Forest Vegetation Improvements; Heritage Resource Management |
| Decision Decided Date | 07/20/2020 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Salt Lake Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Logan Ranger District · updated 2/14/2018
In Logan Canyon, approximately 30 miles east of Logan, Utah · Cache, Utah
The purpose of the action is to respond to a request from Nordic United to expand its winter Nordic skiing grooming activities to the Swan Flat area north of U.S. Hwy 89.
Special use management
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 02/14/2018 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Logan Ranger District |
| Legal Land Description | T. 14 N., R. 4 E., Sections 9, 16, Salt Lake Meridian |