Uinta-Wasatch-Cache National Forest — Project Detail

37 projects with crawled detail · milestones · contacts · documents

Uinta-Wasatch-Cache National Forest

R04 Intermountain · 37 projects · crawled 2026-06-17
In Progress 15 Developing Proposal 6 On Hold 1 Completed 15
Decision Memo 21 Environmental Assessment 10 Categorical Exclusion 3 Environmental Impact Statement 3
35 with documents 16 with comments page
Brigham City Powerline Relocation Developing Proposal
Environmental Assessment · Logan Ranger District · updated 6/17/2026 · decision 4/2027 (Estimated)
NE Brigham City Utah

The purpose and need of the project is to respond to Brigham City’s request to relocate a portion of transmission line from private land onto National Forest System Lands.

Special use management
NEPA Start Date
4/1/2026
Finding/Decision Date
Project documents
Marshall Blom · marshall.blom@usda.gov
Big Cottonwood Canyon Project Developing Proposal
Environmental Assessment · Uinta-Wasatch-Cache National Forest · updated 6/15/2026 · decision 12/2026 (Estimated)
Big Cottonwood Canyon · Salt Lake, Utah

The Utah Department of Transportation proposes a transportation project to reduce wintertime traffic congestion in Big Cottonwood Canyon. Due to change in webpages/systems this may be a duplicate webpage see: https://www.fs.usda.gov/r04/uinta-wasatch-cache/projects/68879

Recreation managementRoad managementSpecial use management
NEPA Start Date
12/3/2025
Finding/Decision Date
Project documents
Adam Shaw · Adam.Shaw@usda.gov
Environmental Assessment · Salt Lake Ranger District · updated 6/9/2026 · decision 5/2027 (Estimated)
Big Cottonwood Canyon · Salt Lake; Summit; Utah; Wasatch, Utah

The Forest Service proposes using a combination of vegetation, fuels, and restoration activities to improve ecosystem conditions and reduce risk of uncharacteristic wildfire and associated adverse effects to the watershed within the Big Cottonwood Canyon drainage and tributaries.

Fuels managementVegetation management (other than forest products)Watershed management
NEPA Start Date
5/26/2026
Finding/Decision Date
Project documents
Adam Shaw · adam.shaw@usda.gov
Environmental Assessment · Uinta-Wasatch-Cache National Forest · updated 5/29/2026 · decision 8/2025 (Estimated)
Emerald Lake, Mount Timpanogos · Utah, Utah

The Forest Service proposes to reconstruct the Emerald Lake Shelter (Shelter) project located in the Mount Timpanogos Wilderness, Utah County, Utah to restore Wilderness character. Page may be duplicate to change in systems see: https://www.fs.usda.gov/r04/uinta-wasatch-cache/projects/66370

Special area management
NEPA Start Date
8/12/2024
Finding/Decision Date
Project documents
Arben Kraja · arben.kraja@usda.gov
Categorical Exclusion · Uinta-Wasatch-Cache National Forest · updated 5/19/2026
Grizzly Gulch parking area across from Alta day lodge road · Salt Lake, Utah

Project would construct and maintain toilets in the Grizzly Gulch area. Toilets would be constructed and maintained by Alta Ski Area.

Recreation management
NEPA Start Date
3/1/2026
Finding/Decision Date
5/12/2026
Project documents
Adam Shaw · adam.shaw@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-44d-USFS
Decision Signed Date5/12/2026
Categorical Exclusion · Ogden Ranger District · updated 5/5/2026
Snowbasin - Orson · Weber, Utah

Accommodate increasing popularity and use of terrain park Containing freestyle use to specific area Improve “return cycle” for park and dedicated race lane

Special use management
NEPA Start Date
2/25/2025
Finding/Decision Date
2/20/2026
Larry Framme · lawrence.framme@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-44d-USFS
Decision Signed Date2/20/2026
Hopkins Access Authorization Developing Proposal
Categorical Exclusion · Logan Ranger District · updated 4/23/2026 · decision 10/2026 (Estimated)
Upper Right Hand Fork near Seep Spring off Road 160 · Cache, Utah

Project would approve a special use authorization for construction of a short access road to a private inholding.

Special use management
NEPA Start Date
4/23/2026
Finding/Decision Date
Marshall Blom · marshall.blom@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 4/17/2026
The project is located in the High Uintas Wilderness in both Duchesne and Summit counties. The project is located northeast of Duchesne, UT and southwest of Manila, UT. · Duchesne; Summit, Utah

This project is an evaluation of the effects of continued domestic sheep grazing in the High Uintas Wilderness, including five sheep allotments on the Ashley NF and five sheep allotments on the Uinta-Wasatch-Cache NF.

Grazing management
NOI in Federal Register
12/01/2015
DEIS NOA in Federal Register
07/14/2023
FEIS NOA in Federal Register
07/23/2025
Objection Period Start
07/23/2025
Decision
04/2026 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
857 West South Jordan Parkway · Bethany.Nickison@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsAshley National Forest; Uinta-Wasatch-Cache National Forest
DistrictsRoosevelt Ranger District; Duchesne Ranger District; Evanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/13/2026
Approximately 31 miles southeast of Evanston, Wyoming, on the eastern side of the West Fork of the Blacks Fork River along FR063 · Summit, Utah

The Forest Service is considering a proposal to realign FR093 to improve stream and riparian habitat. Project would affect High Uintas Inventoried Roadless Area for 1.4ac. (0.7ac restoration, 0.7ac realigned roadway)

Watershed managementRoad management
Scoping Start
04/02/2025
Comment Period
02/13/2026
Decision
02/2026 (Estimated)
Implementation
02/2027 (Estimated)
Project documents
Justin Robinson · justin.c.robinson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Travel Management; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 1/23/2026
Approximately 3 miles East of the Pleasant Grove Ranger station. It is situated on the North and West facing slopes of Mt. Timpanogos and outside of the wilderness area. · Utah, Utah

Improve ecosystem resilience to risk of uncharacteristic wildfire and declining ecosystem conditions and associated effects via 2,375 acres of treatments within a 14,909 acre project area in American Fork Canyon.

Vegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
09/23/2025
Decision
01/2026 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
Guy Wilson · guy.wilson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 1/6/2026
The project is located in the Soapstone Area, east of Kamas, UT in Wasatch County. · Wasatch, Utah

Project would restore watershed resiliency and improve vegetation conditions within the Soapstone Landscape. Across the 36,417 acre project area, the Forest Service proposes approximately 13,624 acres of treatments.

Forest productsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
06/06/2025
Comment Period
01/2026 (Estimated)
Decision
01/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Bethany Nickison · bethany.nickison@usda.gov
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/4/2025
The project area is ~15 east of Francis, UT. The project area is south of State HWY 150 to the north and State HWY 35 to the south, known as Soapstone Basin. · Wasatch, Utah

Restore wildlife and avian habitat on approximately 527-acres via timber harvest and 4818-acres via fuels treatments(Rx-fire). Timber and Fuels treatments overlap. Only prescribed fire in roadless areas, no vegetation cutting or timber in roadless.

Forest productsFuels management
Scoping Start
03/05/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Scott Frost · scott.frost@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
Flytree and Silver Meadows Area Restoration Project, August 2025Decision Signed Date: 08/01/2025
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/2/2025
Neffs Canyon Trailhead area, 4326 White Way, Salt Lake City, UT 84124 · Salt Lake, Utah

Project would issue a special use permits to conduct a geotechnical exploration near the mouth of Neff's Canyon.

Special use management
Scoping Start
05/28/2025
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Adam Shaw · adam.shaw@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/2/2025
Smithfield canyon near smithfield city, utah · Cache, Utah

Project would reconstruct existing Smithfield Waterline within a right-of-way(road and road prism)

Special use managementFacility management
Scoping Start
06/02/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1); 32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/14/2025
This area is located adjacent to Mirror Lake HWY to the north and across from the existing smaller Soapstone Parking Area · Summit, Utah

Proposed project would expand the existing Soapstone Trailhead to improve visitor use and safety

Recreation management
Scoping Start
05/14/2025
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Gary Gray · gary.gray@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/14/2025
Yellow Pine Trailhead along UT 150 on north side of road · Summit, Utah

Project would expand existing Yellow Pine Trailhead parking to better meet visitor needs and improve safety.

Recreation management
Scoping Start
05/14/2025
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Gary Gray · gary.gray@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/9/2025
Forestwide in disturbed areas across the Uinta-Wasatch-Cache National Forest · Box Elder; Cache; Davis; Duchesne; Juab; Morgan; Rich; Salt Lake; Sanpete; Summit; Tooele; Utah; Wasatch; Weber; Uinta, Utah; Wyoming

The Forest Service is considering a proposal to analyze reconstruction, replacement, relocation, and installation of utility lines in disturbed areas in a programmatic environmental analysis.

Special use managementFacility managementRoad management
Scoping Start
04/08/2025
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Bethany Nickison · Bethany.Nickison@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/24/2025
Forestwide · Box Elder; Cache; Davis; Duchesne; Juab; Morgan; Rich; Salt Lake; Sanpete; Summit; Tooele; Utah; Wasatch; Weber, Utah

The Forest Service proposes to use ecologically appropriate native plant materials to plant/seed disturbed areas that are either not anticipated to recover independently or are following undesirable trajectories with the goal of restoring ecosystems

Forest productsVegetation management (other than forest products)
Scoping Start
03/24/2025
Decision
04/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Scott Frost · scott.frost@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 7/31/2024
Mill Creek Canyon, Salt Lake County, Utah · Salt Lake, Utah

Road improvements for safety in Mill Creek Canyon. Cooperating Agency with Federal Highways Administration. Forest Service would make decision on new easement and proposed work outside of easement(trailhead work, temporary construction permit etc.)

Road management
Scoping Start
02/29/2024
Comment Period
03/06/2024
Objection Period Start
05/22/2024
Decision
07/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 7/10/2024
The proposed project activities on the Streeper Creek South Allotment are located 32 miles south of Heber City, Utah and east of Strawberry Reservoir. Elevations range between 7,700 to 8,700 feet. · Duchesne; Summit; Wasatch, Utah

Project would reduce safety concerns by expanding water distribution off of FS Road 042 in the Streeper Creek South Alloemtn.

Grazing management
Scoping Start
05/06/2024
Comment Period
05/31/2024
Objection Period Start
07/2024 (Estimated)
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Amber Helmus · amber.helmus@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 3/4/2024
Project is east of Kamas/Oakely in the Upper Weber River watershed and runs south of East Weber Canyon Road. · Summit, Utah

Proposed Action would complete vegetation and fuels management activities across a 34,056 acre landscape to reduce potential wildfire effects and improve ecosystem conditions in the upper Weber River watershed.

Vegetation management (other than forest products)Fuels management
Scoping Start
03/04/2024
Comment Period
03/2024 (Estimated)
Objection Period Start
04/2024 (Estimated)
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Daniel Jauregui · daniel.jauregui@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT1S, R6E, 13, 14, 22, 23, 24, 25, 26, and 34
Environmental Assessment · Spanish Fork Ranger District · updated 12/13/2023
Nephi-Salt Creek, Payson, and Diamond Fork Allotments, Spanish Fork Ranger District, south and east of Spanish Fork, UT. · Juab; San Juan; Utah, Utah

Proposed action would install two water developments, three corrals, and 950-feet of fence to improve livestock distribution and concentration and reduce potential impacts to resources over three allotments on the Spanish Fork Ranger District.

Grazing management
Scoping Start
12/13/2023
Comment Period
12/2023 (Estimated)
Objection Period Start
03/2024 (Estimated)
Decision
04/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
Linda Appel · Linda.Appel@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/3/2023
Along SR 210 between the Alta Bypass Road and the Rustler Lodge. · Salt Lake, Utah

Alta proposes to close most south-side roadside parking along SR-210 between Rustler Lodge and Alta Bypass Road, and to replace the lost parking through adjustments to the Wildcat parking lot.

Recreation management
Scoping Start
11/03/2023
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · R4 - Intermountain Region All Units · updated 10/25/2023
Sagebrush lands in National Forests of Nevada, Utah, southern Idaho, southwest Montana, southwest & south-central Wyoming and northern Colorado. · Adams; Blaine; Bonneville; Camas; Caribou; Cassia; Elmore; Fremont; Madison; Churchill; Clark; Elko; Eureka; Humboldt; Lincoln; Nye; Pershing; Washoe; White Pine; Beaver; Box Elder; Cache; Carbon; Daggett; Davis; Duchesne; Emery; Garfield; Grand; Iron; Juab; Kane; Millard; Morgan; Piute; Rich; Salt Lake; San Juan; Sanpete; Sevier; Summit; Tooele; Uintah; Utah; Wasatch; Washington; Wayne; Weber; Albany; Campbell; Carbon; Converse; Crook; Laramie; Lincoln; Natrona; Niobrara; Platte; Sublette; Teton; Weston; Jackson; Moffat; Routt, Colorado; Idaho; Nevada; Utah; Wyoming

The Forest Service is considering amending its land management plans to address new and evolving issues arising since implementing sage-grouse plans in 2015. This project is in cooperation with the USDI Bureau of Land Management.

Land management planningWildlife, fish, rare plants
NOI in Federal Register
11/21/2017
DEIS NOA in Federal Register
10/05/2018
FEIS NOA in Federal Register
08/02/2019
Objection Period Start
08/02/2019
Decision
12/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
John Shivik · john.shivik@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsMedicine Bow-Routt National Forest; Ashley National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest
DistrictsMedicine Bow-Routt National Forest All Units; Ashley National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/26/2023
Draper City Corner Canyon Half Marathon starts and finishes out of the Corner Canyon Trailhead at Andy Ballard Arena. The BCC (Big Cottonwood Canyon) Flea Market is in Brighton Resort Parking lot · Salt Lake, Utah

Proposed project is to issue the Draper City Half Marathon in Corner Canyon, and the BCC Flea Market at the Brighton Resort Parking lot new 5-year term, recreation event permits.

Special use management
Scoping Start
07/25/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Mary Armbruster · mary.armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date07/26/2023
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/26/2023
Races take place at the Solitude and Brighton Ski Areas, almost entirely within ski area boundaries, except for Powder Keg races that drop off the back side of Brighton onto mostly private land. · Salt Lake; Wasatch, Utah

Proposed project would reissue race permits for a 5-year duration at/near Brighton and Solitude ski areas.

Special use management
Scoping Start
07/25/2023
Decision
07/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Mary Armbruster · mary.armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date07/26/2023
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/25/2023
This project is located in Seymour Canyon, east of Oakley, UT and above the Oakley Water System. The road is a private road leading up to private infrastructure outside the Forest Boundary. · Summit, Utah

Proposed project is to reduce fuel loading over 2-acres of NFS lands along Seymour Canyon road to improve safety and reduce risk of uncharacteristic wildfire to public and private lands. Project would occur in a roadless area.

Fuels management
Scoping Start
07/25/2023
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Daniel Jauregui · daniel.jauregui@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Spanish Fork Ranger District · updated 11/8/2022
Maple Lake and McClellan Lake are above Payson City in the Payson Management Area. · Utah, Utah

Dam rehabilitation includes reconstructing spillways, removing clogged outlet pipes and replacing with properly sized conduits, installing drain systems, and buttressing existing structures to prevent movement or failure during seismic events.

Watershed management
Scoping Start
11/08/2022
Decision
06/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Luke Decker · luke.decker@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 5/24/2022
South of Tunnel Springs Park & Trailhead in Salt Lake City, UT · Salt Lake, Utah

Proposal to provide access to the recently approved Bonneville Shoreline Trail in Davis County.

Recreation management
Scoping Start
05/2022 (Estimated)
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Zinnia Wilson · zinnia.wilson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/20/2022
Wasatch Front from Mt. Olympus to American Fork Canyon, Utah · Salt Lake; Utah, Utah

Proposal from Utah Abandoned Mine Reclamation Program to close 28 abandoned hard rock mines with 8 mines closed in Wilderness and 20 mines closed outside of Wilderness areas.

Watershed managementMinerals and geologySpecial area management
Scoping Start
04/20/2022
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
Roger Kesterson · roger.kesterson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHeritage Resource Management; Abandoned Mine Land Clean-Up
Decision Decided Date04/20/2022
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District; Pleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 6/29/2021
Whitney area of the Evanston Mountain View Ranger District · Summit, Utah

Amend existing WPG 10-year priority use permit to include 100 service days on the EMVRD based on WPG's acquisition of Cloudveil Mountain Heli.

Special use management
Scoping Start
06/28/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11); 32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date06/29/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 6/25/2021
Little Cottonwood Canyon, Salt Lake City, Utah · Salt Lake, Utah

Proposal from Utah Department of Transportation to analyze transportation improvements in and near Little Cottonwood Canyon in Salt Lake City, Utah. The USDAFS is a cooperating agency. For information visit: https://littlecottonwoodeis.udot.utah.gov/

Road management
NOI in Federal Register
04/23/2021
DEIS NOA in Federal Register
06/25/2021
FEIS NOA in Federal Register
12/2021 (Estimated)
Objection Period Start
12/2021 (Estimated)
Decision
03/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 6/14/2021
Mutual Dell LDS Org Camp in American Fork Canyon] · Utah, Utah

pPoposal to construct a new entrance sign, reconstruction of a natural stone retaining wall, and to reconstruct a barrier fence between the Bear Canyon trailhead and entrance to trail.

Recreation managementSpecial use management
Scoping Start
06/14/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Sarah Flinders · sflinders@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Decision Decided Date06/14/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 6/14/2021
Mutual Dell LDS Org Camp in American Fork Canyon · Utah, Utah

Proposal to construct a new pavilion in a wooded area about 300 yards behind the main road and entrance of the camp.

Special use management
Scoping Start
06/14/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Sarah Flinders · sflinders@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Decision Decided Date06/14/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/1/2021
Mirror Lake Highway · Duchesne; Summit; Wasatch, Utah

Proposal to remove dead trees along the Mirror Lake Highway from mile marker 6 of HKRD to mile marker 49 of EVMRD. Treatments would occur 150 ft on either side of the MLH and access routes to campgrounds, trailheads, lake shores, day use facilities.

Road management
Scoping Start
01/28/2021
Decision
02/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Daniel Jauregui · daniel.jauregui@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Decision Decided Date02/01/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District; Evanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/20/2020
Big Cottonwood Canyon, Spruces Campground · Salt Lake, Utah

Proposal to remove hazard trees with a ten-foot zone around a CCC cabin, including trees that are contacting or that otherwise pose a danger to the cabin%u2019s structural and/or historic integrity and defensible space around the structure.

Recreation managementHeritage resource managementVegetation management (other than forest products)
Scoping Start
07/17/2020
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Forest Vegetation Improvements; Heritage Resource Management
Decision Decided Date07/20/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 2/14/2018
In Logan Canyon, approximately 30 miles east of Logan, Utah · Cache, Utah

The purpose of the action is to respond to a request from Nordic United to expand its winter Nordic skiing grooming activities to the Swan Flat area north of U.S. Hwy 89.

Special use management
Scoping Start
01/19/2018
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date02/14/2018
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT. 14 N., R. 4 E., Sections 9, 16, Salt Lake Meridian