Eldorado NF with PCWA propose a landscape project in the MF American River watershed headwaters for long-term forest health, resilience, & sustainability; to protect natural & cultural resources; & to protect utility infrastructure. https://usfs-public.box.com/s/m4u1mz1bk4a19yhr6winapo3t4x27v5m
Eldorado National Forest
Proposal to designate over-snow vehicle (OSV) areas and trails for public OSV use, consistent with Subpart C of the Travel Management Regulations, and identify OSV trails where grooming will occur. PALS # 46034.
Remove encroaching conifers to reestablish historic Aspen stands on the Amador Ranger District of the Eldorado National Forest.
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Eldorado National Forest |
| Districts | Amador Ranger District |
| Legal Land Description | Not Applicable |
This project aims to restore ecosystem health and resilience to wildfire, insect and disease, and drought through forest thinning, fuels reduction and a suite of watershed improvement actions.
NEPA / regulatory detail
| Special Authority | Not Applicable / Other; 2021 Infrastructure: Emergency Actions |
| Notice and Comment Regulation | 2021 Infrastructure: Emergency Actions |
| Project Activity | Biomass; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Plan Amendment; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Green); Watershed Improvements |
| Mokelumne Amador Calaveras Forest Resilience Project - ENF | Decision Signed Date: 04/17/2026 |
| Mokelumne Amador Calaveras Forest Resilience Project - STF | Decision Signed Date: 04/17/2026 |
| Forests | Eldorado National Forest; Stanislaus National Forest |
| Districts | Amador Ranger District; Calaveras Ranger District |
| Legal Land Description | Not Applicable |
The project would replace approximately 2.2 miles (11,402 linear feet) of existing steel water line used to supply Kirkwood Mountain Resort with water for on-mountain snowmaking from Caples Lake to Chair 1.
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Special Use Authorizations |
| Forests | Eldorado National Forest |
| Districts | Amador Ranger District |
| Legal Land Description | Township 9 & 10N Range 17 & 18E |
Fuels & Forest Health EAD approved. Restoration activities: fuels management, harvest & disposal of fire killed trees, reforestation, repair of damaged roads infrastructure. Landscape-level prescribed fire includes mechanical txts & weed txts.
NEPA / regulatory detail
| Special Authority | 2021 Infrastructure: Emergency Actions |
| Notice and Comment Regulation | 2021 Infrastructure: Emergency Actions |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Eldorado National Forest |
| Districts | Georgetown Ranger District |
| Legal Land Description | Not Applicable |
The Project will reduce the risk of uncharacteristic or catastrophic wildfires, restore severely burned areas, and repair fire damaged infrastructure. Maximum Extent Scenario decision under Forest Health and Fuels ESD signed December 2025.
NEPA / regulatory detail
| Special Authority | 2021 Infrastructure: Emergency Actions |
| Notice and Comment Regulation | 2021 Infrastructure: Emergency Actions |
| Project Activity | Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Special Use Authorizations; Trail Management; Noxious Weed Treatments; Road Maintenance; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements |
| Caldor Fire Restoration Project Phase 1 | Decision Signed Date: 03/25/2025 |
| Caldor Fire Restoration Project Maximum Extent Scenario | Decision Signed Date: 12/12/2025 |
| Forests | Eldorado National Forest |
| Districts | Amador Ranger District; Pacific Ranger District; Placerville Ranger District |
| Legal Land Description | Not Applicable |
Enhance fire resilience through hazardous fuel reduction or reforestation on approximately 1,400 acres. Create a 4.5-mile shaded fuel break along Mosquito Road. Salvage fire-damaged and hazardous trees. Conduct controlled burns. Road repair.
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Improvements/Construction; Timber Sales (Salvage) |
| Forests | Eldorado National Forest |
| Districts | Georgetown Ranger District |
| Legal Land Description | Not Applicable |
Trail maintenance work using hand tools and a mini excavator to trim overgrown vegetation, conduct trail tread work, construct drainages, and minor trail realignment where necessary due to extensive erosion.
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Decision Decided Date | 06/17/2024 |
| Forests | Eldorado National Forest |
| Districts | Placerville Ranger District |
| Legal Land Description | Not Applicable |