Categorical Exclusion · Crooked River National Grassland · updated 6/11/2026
T13s, R14e, S30; the mapped polygon is approximate due to constraints with mapping program at time of data entry. See more detailed maps in the project Pinyon Public folder. · Jefferson, Oregon
Day Management Corporation submitted an application to install a 60' support tower, foundation and ice bridge on the existing site. This would allow for transmitting and receiving wireless communication signals. ACCESS DOCUMENTS: https://usfs-public.box.com/s/p6wjo60fl9mal90ej8oo9tmtph0y3uaw
Special use management
Finding/Decision Date
6/11/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 6/11/2026 |
Categorical Exclusion · Ochoco National Forest · updated 5/26/2026
Reissue permit to Jefferson County for stockpile on Jordan Road and allow for expansion to 4 acres.
Special use management
Project documents
Environmental Assessment · Ochoco National Forest · updated 5/26/2026 · decision 3/2027 (Estimated)
Lookout Mountain and Paulina Ranger Districts, Upper Trout and Bridge Creek Watersheds. The project area is in the norther region of both Districts; however, only includes a small portion of the far western extent of the Pauline District.
Ochoco National Forest is proposing tree thinning and fuels reduction for this project to create economic opportunities and increase timber supplies, reduce wildfire and tree insect/disease risks, and improve firefighter safety.
Forest productsFuels managementVegetation management (other than forest products)
Environmental Assessment · Ochoco National Forest · updated 5/20/2026 · decision 3/2027 (Estimated)
Paulina Ranger District
The ONF proposes tree harvest treatments focusing on retaining large, healthy, fire and drought resistant species. Simultaneously, this project will improve forest health and wildfire resiliency and reduce threats to nearby private properties.
Forest productsFuels management
Decision Memo · Ochoco National Forest All Units · updated 12/11/2025
T13S, R23E, Sections 23 and 26 · Wheeler, Oregon
The project is to improve hydrologic conditions and aquatic habitat on portions of Jackson Creek and Derr Creek. Specific actions include beaver dam analogues, riparian planting, LWD placement, meadow encroachment reduction and buck and pole fence.
Watershed management
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Usfws B(3) (516 Dm 8.5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Ochoco National Forest |
| Districts | Paulina Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Paulina Ranger District · updated 11/7/2025
Sites are located within fires scars on the Ochoco National Forest Maury Mountains (Lookout Mountain District) and eastern half of the Paulina District. · Crook; Grant; Wheeler, Oregon
The Forest experienced 3 very large wildfires in 2024 which require reforestation though planting native fire-adapted tree species where regeneration is unlikely. Plantings would generally take place in areas that had greater than 75% mortality.
Vegetation management (other than forest products)Watershed management
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements |
| Forests | Ochoco National Forest |
| Districts | Lookout Mountain Ranger District; Paulina Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Crooked River Natl Grassland · updated 7/15/2025
9 miles west of Madras, OR. Located between SW Mountain View Drive and Lake Simtustus, and approximately 1 mile south of SW Belmont Lane. · Jefferson, Oregon
Installation of 2850ft powerline with 200ft ROW, pole/foundation structures, new 540ft road to connect Round Butte Substation to a solar facility on Warm Springs Reservation; improve existing road and expand ROW to 15ft; maintenance activities.
Special use management
Scoping Start
07/2025 (Estimated)
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction |
| Forests | Ochoco National Forest |
| Districts | Crooked River Natl Grassland |
| Legal Land Description | Not Applicable |
Decision Memo · Lookout Mountain Ranger District · updated 6/30/2025
Located in the Maurys portion of the Ochoco NF, about 8 miles southeast of Post, Oregon; includes main roads on east side of fire area. · Crook, Oregon
The Lookout Mountain Ranger District will reduce roadside hazards along approximately 21.7 miles open roads within the Wiley Flat wildfire area through commercial salvage. After further analysis, 2.6 more miles of roadside treatment were added.
Road management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Blm I(1) (516 Dm 11.9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Forests | Ochoco National Forest |
| Districts | Lookout Mountain Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Crooked River Natl Grassland · updated 5/2/2025
Southeast corner of Crooked River National Grassland, Jefferson County, Oregon. Forest Service land and ODOT ROW along north side of Hwy 26, between Grizzly Mtn Road and SE Lone Pine Rd. · Jefferson, Oregon
Central Electric Cooperative needs to remove 19 deteriorating poles from a cross-country area, and are requesting to relocate the new poles/line to a nearby Oregon Department of Transportation Right-of-Way. This would allow easier maintenance
Special use management
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations; Noxious Weed Treatments |
| Forests | Ochoco National Forest |
| Districts | Crooked River Natl Grassland |
| Legal Land Description | Not Applicable |
Decision Memo · Crooked River Natl Grassland · updated 5/2/2025
Westside of Highway 97. The project is dispersed between or borders Warm Springs Reservation, State, BLM and private lands. · Jefferson, Oregon
Developing project to reduce fuels in the Central area of the Crooked River National Grassland in response to the Wildfire Crisis Strategy (WCS). Work will primarily involve juniper thinning followed by piling/burning and native shrub planting.
Fuels management
Scoping Start
06/2025 (Estimated)
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Ochoco National Forest |
| Districts | Crooked River Natl Grassland |
| Legal Land Description | Not Applicable |
Decision Memo · Ochoco National Forest All Units · updated 5/2/2025
Centered about ten miles north of Paulina, Oregon · Crook; Wheeler, Oregon
The Paulina Ranger District will reduce roadside hazard trees along several open roads in the Crazy Creek wildfire area through commercial salvage.
Road management
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Blm I(1) (516 Dm 11.9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Forests | Ochoco National Forest |
| Districts | Paulina Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Paulina Ranger District · updated 4/28/2025
Willamette Meridian. T.15S., R.21E.:Sec. 1,2,9-16,21-24,26-29,32-35. T.15S., R.22E.:Sec. 1-20. T.14S., R.21E.:Sec. 26-29,31-35. T.15S., R.23E.:Sec. 1-18,24. T.14S., R.23E.:Sec. 27-29,31-36. · Crook, Oregon
The main project purpose is to improve forest resilience to disturbance events, like insect and disease outbreaks and wildfire, and to promote adaptation to drought conditions by reducing tree density and fuels loading.
Special area managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels management
Comment Period
11/01/2023
Objection Period Start
09/13/2024
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Watershed Improvements |
| Forests | Ochoco National Forest |
| Districts | Paulina Ranger District |
| Legal Land Description | Not Applicable |