Mark Twain National Forest — Project Detail

21 projects with crawled detail · milestones · contacts · documents

Mark Twain National Forest

R09 Eastern · 21 projects · crawled 2026-06-17
In Progress 1 Developing Proposal 6 Completed 14
Environmental Assessment 14 Decision Memo 6 Categorical Exclusion 1
16 with documents 15 with comments page
Environmental Assessment · Mark Twain National Forest · updated 6/16/2026 · decision 11/2026 (Estimated)
Programmatic amendment for the entire Mark Twain National Forest · Phelps, Missouri

Proposal to amend the 2005 Mark Twain National Forest Plan to include updated standards relating to timber management near National Recreation Trails.

Land management planningRecreation managementRegulations, directives, ordersVegetation management (other than forest products)
NEPA Start Date
11/11/2025
Finding/Decision Date
Project documents
Seanna Whisenhunt · seanna.whisenhunt@usda.gov
Buck Hollow In Progress
Environmental Assessment · ELEVEN POINT RANGER DISTRICT · updated 6/10/2026 · decision 12/2026 (Estimated)
The Buck Hollow Project area includes locations in Oregon County. The legal description for the locations includes: 24 N., R. 3 W., sec. 3-4, 7-10, 16-18; 5th Principal Meridian. · Oregon, Missouri

Vegetation management, old growth designation, firewood collection, glade restoration, wetland & pond restoration, transportation system management, decommission illegal routes, & trash removal.

Forest productsFuels managementLand management planningRoad managementSpecial area managementWildlife, fish, rare plants
NEPA Start Date
12/10/2025
Finding/Decision Date
Jones Ranch Proposal Developing Proposal
Environmental Assessment · Ava/Cassville/Willow Springs Ranger District · updated 5/20/2026
This project is located on federal lands of the ACWRD in Christian County, MO, 1.5mi west of Chadwick, 16mi SE of Springfield, and 10mi NE of Branson.

This project seeks to improve forest health within the Jones Ranch proposal area by encouraging species diversity, optimizing stocking, removing trees with declining health, and moving conditions toward those in Appendix A-3 of the Forest Plan.

Forest productsVegetation management (other than forest products)
NEPA Start Date
Finding/Decision Date
Project documents
James Cady · james.cady@usda.gov
Environmental Assessment · Mark Twain National Forest All Units · updated 5/18/2026
East border of Piney Creek Wilderness in Stone County Missouri. Legal description is T23N, R24W, Sections 20, 29, 30, 31, and 32. · Stone, Missouri

The proposal area is a wildland-urban interface of ~2700ac. Dumping of trash, illicit drug use, user-created trails, and other activities have led to damage to the trail system and safety concerns.

Special use managementRoad management
Scoping Start
12/09/2025
Comment Period
02/20/2026
Decision
05/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Catherine McRae · Catherine.McRae2@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
ForestsMark Twain National Forest
DistrictsAva / Cassville / Willow Springs Ranger District
Legal Land DescriptionNot Applicable
Range and Open Lands Proposal Developing Proposal
Environmental Assessment · Ava/Cassville/Willow Springs Ranger District · updated 5/12/2026 · decision 3/2027 (Estimated)

This project is needed to improve cool and warm season grass pasture conditions and enhance native plant communities in grazing allotments, hay production areas, wildlife areas, and wildlife openings.

NEPA Start Date
3/26/2026
Finding/Decision Date
MIchael Lewis · michael.lewis3@usda.gov
Environmental Assessment · Mark Twain National Forest · updated 5/11/2026 · decision 1/2027 (Estimated)

This project covers a Land Exchange (LEX) of approximately 353.7 acres of private lands, adjacent to Mark Twain National Forest (MTNF) land on the Houston/Rolla/Cedar Creek (HRCC) Ranger District for approximately 2,616.11 acres of Federal lands.

NEPA Start Date
1/12/2026
Finding/Decision Date
Environmental Assessment · Ava/Cassville/Willow Springs Ranger District · updated 5/11/2026 · decision 12/2026 (Estimated)

This proposal is needed to restore and provide a safer vehicle transit connection over Bull Creek, thereby restoring access for service and emergency vehicles and mitigating lengthy rerouting of local traffic.

NEPA Start Date
12/9/2025
Finding/Decision Date
Cathrine McRae · catherine.mcrae2@usda.gov
Environmental Assessment · Mark Twain National Forest All Units · updated 5/6/2026
The CECC distribution/transmission line systems are in the Cassville Unit of the Ava/Cassville/Willow Springs Ranger District (ACWRD) while the WRVEC system is located on the Ava and Cassville RD. · Barry; Christian; Stone; Taney, Missouri

CECC & WRVEC powerline herbicide use will cover approximately 61 miles or 263 acres of aerial powerline ROW. CECC ROW Expansion will require the removal of approximately 13.6 forested acres expanding the existing widths to 60 feet.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
05/08/2025
Comment Period
01/01/2026
Decision
05/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Robin Edwards · robin.l.edwards@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements
ForestsMark Twain National Forest
DistrictsAva / Cassville / Willow Springs Ranger District
Legal Land DescriptionNot Applicable
Categorical Exclusion · Ava/Cassville/Willow Springs Ranger District · updated 2/17/2026 · decision 2/2026 (Estimated)
Stone County, T23N, R24W, Sections 29 and 32 · Stone, Missouri

Use and maintenance of a road on National Forest System lands in the County of Stone, State of Missouri, that is 20.00 feet wide including a 14.00 foot wide semi-graveled two track and is 3,214.00 feet long, and covers approximately 1.48 acres in the T23N, R24W, Sections 29 and 32. This is a road us

Special use management
NEPA Start Date
8/20/2025
Finding/Decision Date
Catherine McRae · Catherine.McRae2@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Arcadia South Completed
Environmental Assessment · Potosi / Fredericktown Ranger District · updated 1/2/2026
T.32N., R.4E., 05; T.32N., R.5E., 05; T.33N., R.4E., 05 · Iron; Madison, Missouri

Various management activities that will move national forest resource conditions closer to the long-term goals published in the Land and Resource Management Plan.

Land management planningRecreation managementHeritage resource managementWildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
11/13/2024
Comment Period
11/03/2025
Objection Period Start
10/28/2025
Decision
01/2026 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
Michael Norris · michael.e.norris@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Heritage Resource Management; Trail Management; Noxious Weed Treatments; Species Population Enhancements; Watershed Improvements; Wilderness Management
ForestsMark Twain National Forest
DistrictsPotosi / Fredericktown Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Doniphan / Eleven Point Ranger District · updated 10/8/2025
The project is located in Carter and Oregon counties on the Eleven Point Ranger District, Mark Twain National Forest · Carter; Oregon, Missouri

Salvage logging operations around the Ozark Trail on the Eleven Point Ranger District

Recreation managementVegetation management (other than forest products)
Scoping Start
07/07/2025
10/06/2025
Decision
10/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Jennifer Morse · jennifer.morse@usda.gov
NEPA / regulatory detail
Special Authority2021 Infrastructure: Emergency Actions
Notice and Comment Regulation2021 Infrastructure: Emergency Actions
Project ActivityTrail Management; Timber Sales (Salvage)
ForestsMark Twain National Forest
DistrictsDoniphan / Eleven Point Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Doniphan / Eleven Point Ranger District · updated 7/28/2025
Banner Road, Oregon County Road 430, near the junction of Forest Road 4155, Forest Road 4155A and Oregon County Road 430. The project area is located on the Northwestern side of County Road (CR) 430 and Southwest of Forest Road 4155. · Oregon, Missouri

The construction of a trailhead and parking area adjacent to Banner Road, (Oregon County Road 430) and a trail connecting to the Blue Ridge Horse Trail, will create a designated western trailhead and terminus for the Blue Ridge Horse Trail.

Recreation management
Scoping Start
06/2025 (Estimated)
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Jennifer Morse · jennifer.morse@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
ForestsMark Twain National Forest
DistrictsDoniphan / Eleven Point Ranger District
Legal Land DescriptionNE 1/4 of the SW 1/4, Section 15, Township 25 North, Range 5 West, 5th Principal Meridian & NW 1/4 of the SE 1/4 of Section 15, Township 25 North, Range 5 West, 5th Principal Meridian.
Decision Memo · Potosi / Fredericktown Ranger District · updated 7/28/2025
Berryman, Missouri · Washington, Missouri

The project will connect a new trailhead to the Ozark Trail, decommission the old connector trail, and decommission a segment of FR2901 that lead to the old trailhead.

Recreation managementVegetation management (other than forest products)Road management
Scoping Start
05/07/2025
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Christopher Woods · christopher.woods@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Trail Management
ForestsMark Twain National Forest
DistrictsPotosi / Fredericktown Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Potosi / Fredericktown Ranger District · updated 7/28/2025
N37 54.893', W91 4.564' at the Lost Creek crossing on the Ozark Trail at approximately 1,000 feet south of the Highway 8 Trailhead. · Washington, Missouri

This project realigns a short segment of the Ozark Trail at the Lost Creek crossing in order to mitigate the hazardous condition of the current trail corridor which was created by the development of a cut-bank.

Recreation management
Scoping Start
05/07/2025
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Christopher Woods · christopher.woods@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMark Twain National Forest
DistrictsPotosi / Fredericktown Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ava / Cassville / Willow Springs Ranger District · updated 7/25/2025
Project is spread across the Ava portion of the ACW Ranger District. Larger cities such as Springfield, MO are within 20 miles of the closest stands. · Christian; Ozark; Taney, Missouri

This project seeks to address ecological degradation of natural community types and to address a public request for forest products via various vegetation management activities on the Ava/Cassville/Willow Springs (ACW) Ranger District.

Forest productsVegetation management (other than forest products)
Scoping Start
06/04/2025
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
James Cady · james.cady@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ACWRD Cedar Removal ProjectDecision Signed Date: 07/22/2025
ForestsMark Twain National Forest
DistrictsAva / Cassville / Willow Springs Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Houston / Rolla / Cedar Creek Ranger District · updated 7/25/2025
Northeast corner of Paddy Creek Wilderness, off Slabtown Road. East of Roby, MO. · Texas, Missouri

Reroute of several trails to minimize resource damage and allow for better maintenance.

Recreation management
Scoping Start
03/24/2025
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Tray Hall · tray.hall@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMark Twain National Forest
DistrictsHouston / Rolla / Cedar Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Poplar Bluff Ranger District · updated 6/18/2025
Approximately three miles northwest of Williamsville, Missouri along with Black River in Wayne County · Wayne, Missouri

This project will be implemented to restore approximately two miles of naturally functioning channels leading to the Black River.

Wildlife, fish, rare plants
Scoping Start
07/18/2024
Decision
06/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Megan York harris · megan.york-harris@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Adam's Tract Channel Restoration ProjectDecision Signed Date: 06/17/2025
ForestsMark Twain National Forest
DistrictsPoplar Bluff Ranger District
Legal Land DescriptionT27N R4E Section 10
Environmental Assessment · Ava / Cassville / Willow Springs Ranger District · updated 2/6/2025
The Project is located on Federal lands of the Ava/Cassville/Willow Springs Ranger District in Christian County and contains 6,820 acres. · Christian, Missouri

This project addresses concerns over public health and safety on the existing trail system as well as issues caused by user-created trails within the Chadwick recreation area.

Recreation managementForest productsRoad management
Scoping Start
03/20/2023
Comment Period
05/09/2024
Objection Period Start
08/22/2024
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Tray Hall · tray.hall@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Trail Management
ForestsMark Twain National Forest
DistrictsAva / Cassville / Willow Springs Ranger District
Legal Land DescriptionT26N, R20W, Sections 21-28 and 31-36; T25N, R20W, Sections 2-11, 15-22, and 27-34, Fifth Principal Meridian
Corn Creek Completed
Environmental Assessment · Houston / Rolla / Cedar Creek Ranger District · updated 11/15/2024
The project area is approximately 12,110 acres located between the communities of Doolittle and Edgar Springs, MO. https://experience.arcgis.com/experience/5c5ec6c8768d4d5293d051a47ce72d5e/ · Phelps, Missouri

Objectives for the Corn Creek project are to improve forest health, provide a wide variety of goods, uses and services including wood products to the local community, improve recreation opportunities, and improve habitat for many species.

Recreation managementForest productsFacility management
Scoping Start
01/19/2023
Comment Period
01/19/2023
Objection Period Start
08/29/2024
Decision
11/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
Zachary Piper · Zachary.Piper@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsMark Twain National Forest
DistrictsHouston / Rolla / Cedar Creek Ranger District
Legal Land DescriptionNot Applicable
Bee Fork Completed
Environmental Assessment · Salem Ranger District · updated 7/19/2024
Reynolds County, Missouri - East of Bunker · Reynolds, Missouri

Vegetation restoration to create ecosystems that are healthy, resilient, and resistant to diseases, insect infestations, and non-native species invasion.

Recreation managementWildlife, fish, rare plantsFuels managementForest productsVegetation management (other than forest products)Watershed managementRoad management
Scoping Start
09/28/2022
Comment Period
01/17/2024
Objection Period Start
04/09/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
David Massengale · david.massengale@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
ForestsMark Twain National Forest
DistrictsSalem Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ava / Cassville / Willow Springs Ranger District · updated 7/19/2024
The Zone 3 Fuels Reduction and Prescribed Fire project is situated throughout Southern Missouri on the Ava/Cassville/Willow Springs and Houston/Rolla/Cedar Creek Ranger Districts. · Barry; Christian; Douglas; Howell; Laclede; Ozark; Phelps; Pulaski; Stone; Taney; Texas; Wright, Missouri

This project seeks to implement a Zone-wide framework for the Ava/Cassville/Willow Springs and Houston/Rolla/Cedar Creek Ranger Districts to address the need to move existing fire regimes toward an ideal Fire Regime Condition Class.

Vegetation management (other than forest products)Fuels management
Scoping Start
09/27/2022
Comment Period
11/17/2022
Objection Period Start
12/21/2023
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Reggie Bray · reggie.bray@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Timber Sales (Green); Wilderness Management
ForestsMark Twain National Forest
DistrictsAva / Cassville / Willow Springs Ranger District
Legal Land DescriptionNot Applicable