Wayne National Forest — Project Detail

9 projects with crawled detail · milestones · contacts · documents

Wayne National Forest

R09 Eastern · 9 projects · crawled 2026-08-13
Developing Proposal 6 Completed 3
Categorical Exclusion 6 Environmental Assessment 2 Decision Memo 1
8 with documents 8 with comments page
Categorical Exclusion · Ironton Ranger District · updated 7/10/2026
Lakes and ponds in which activities can take place include Lake Vesuvius, Timbre Ridge Lake, all ponds in the Hanging Rock recreation area, Smith Hollow Lake, and Kenton Lake (also known as Pumpkintown Lake). · Gallia; Lawrence; Scioto, Ohio

This project will add woody structure to lakes and ponds throughout the Ironton district by shoreline tree felling, Christmas tree drops, and fish cribs to enhance aquatic habitat. Tree girdling for Osprey habitat and fish stocking with desired species will also occur in this project.

Wildlife, fish, rare plants
NEPA Start Date
1/29/2026
Finding/Decision Date
6/18/2026
NEPA / regulatory detail
Categorical ExclusionUSDA-31d-USFS
Decision Signed Date6/18/2026
Ironton Pine Project Developing Proposal
Categorical Exclusion · Ironton Ranger District · updated 7/10/2026
The Ironton Pine Project is generally located in the central part of the District, near the Olive Furnace in Gallia, Lawrence, and Scioto counties, Ohio. Thirty-six forested stands totaling to about 515 acres have been selected for harvest. · Gallia; Lawrence; Scioto, Ohio

This project would increase forest resiliency and restore native mixed hardwood forests by harvesting about 515 acres of planted pine in the Ironton District. https://usfs-public.app.box.com/s/hz0eltj7xumyzw8i08warmhfbm6i15nb

Vegetation management (other than forest products)Wildlife, fish, rare plants
NEPA Start Date
Finding/Decision Date
Project documents
Benjamin Poling · Benjamin.Poling@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-47d-USFS
Environmental Assessment · Ironton Ranger District · updated 7/6/2026
Portions of Lawrence, Jackson, and Gallia counties. · Gallia; Jackson; Lawrence, Ohio

This Supplemental EA provides additional information and analysis around criteria for the shelterwood harvests in light of a deficiency in the original project that was identified by District Court.

Forest productsVegetation management (other than forest products)Wildlife, fish, rare plants
NEPA Start Date
12/20/2025
Finding/Decision Date
4/23/2026
Project documents
Rachel Reed · Rachel.Reed@usda.gov
NEPA / regulatory detail
Decision Signed Date4/23/2026
Wingett 280 Developing Proposal
Categorical Exclusion · Athens Ranger District · updated 6/1/2026
East of Bloomfield and north of State Route 260 in Ludlow Township, Washington County, Ohio · Washington, Ohio

This project is intended to increase forest resiliency and diversity, take steps towards restoration of watershed conditions, and enhance wildlife and rare plant habitat. https://usfs-public.app.box.com/s/iqz37vxpzlw4y51ehradi8vacurge1pp

Vegetation management (other than forest products)Watershed managementWildlife, fish, rare plants
NEPA Start Date
Finding/Decision Date
Project documents
Benjamin Poling · Benjamin.poling@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-47d-USFS
Long Ridge SE Project Developing Proposal
Categorical Exclusion · Athens Ranger District · updated 5/29/2026 · decision 3/2019 (Estimated)
The project is located in the general area east of Nelsonville, southeast of Carbon Hill, and west of Chauncey in Athens and Hocking counties. · Athens; Hocking, Ohio

This project improves the diversity & quality of habitat by using prescribed fire & manual tree cutting. Implementation would open up the forest floor to reduce competition threatening oak seedlings & saplings, & would reduce hazard fuels in the area

Fuels managementVegetation management (other than forest products)
NEPA Start Date
9/24/2018
Finding/Decision Date
Project documents
Benjamin Poling · Benjamin.Poling@usda.gov
Categorical Exclusion · Athens Ranger District · updated 5/29/2026 · decision 8/2022 (Estimated)
NFS lands in Washington, Noble, and Monroe counties, Ohio · Monroe; Noble; Pleasants; Tyler; Washington, Ohio; West Virginia

This project would authorize aerial applications of mating disruption pheromone and species-specific larvicide known as Gypchek in the Marietta Unit of the WNF. This would be a multi-year project for slow-the-spread treatments.

Vegetation management (other than forest products)
NEPA Start Date
2/10/2022
Finding/Decision Date
Project documents
Benjamin Poling · Benjamin.Poling@usda.gov
Six Creeks Fireshed Project Developing Proposal
Categorical Exclusion · Ironton Ranger District · updated 5/29/2026 · decision 11/2024 (Estimated)
Parts of Scioto, Lawrence, and Gallia counties · Gallia; Lawrence; Scioto, Ohio

Conduct a combination of non-commercial vegetation cutting and prescribed fire to promote oak regeneration, improve oak health, improve wildlife habitat, and reduce fuel loading.

Vegetation management (other than forest products)Wildlife, fish, rare plants
NEPA Start Date
5/8/2024
Finding/Decision Date
Project documents
Benjamin Poling · Benjamin.Poling@usda.gov
Environmental Assessment · Wayne National Forest · updated 5/27/2026 · decision 4/2026 (Estimated)
All NFS lands in Athens, Hocking, Gallia, Jackson,Monroe, Morgan, Noble, Perry, Vinton, and Washington counties. · Cabell; Gallia; Jackson; Lawrence; Scioto, West Virginia; Ohio

Evaluate mechanical, chemical, and biological treatment methods for non-native invasive plants. This project would allow for treatments to occur across the National Forest and in partnership with adjacent, interested land managers or owners.

Vegetation management (other than forest products)
NEPA Start Date
4/28/2025
Finding/Decision Date
Project documents
Rachel Reed · Rachel.Reed@usda.gov
Decision Memo · Wayne National Forest All Units · updated 9/4/2025
The project area is located in Perry Township of Monroe County, Ohio of the Wayne National Forests Athens Ranger District, Marietta Unit on Township Road 1004 · Monroe, Ohio

remove the existing truss bridge that has become deficient with a single span bridge and abutments, about .25 acres outside ROW is needed for traffic and access, grading will occur with reseeding upon completion, minimal tree removal is expected

Special use management
Scoping Start
06/02/2025
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Caleb Butcher · caleb.butcher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWayne National Forest
DistrictsAthens Ranger District
Legal Land DescriptionSection 15, Township 3N, Range 5W.