Authorize DMEA to replace an existing segment of buried powerline around the Mesa Point Towers com site with new power & fiber lines and replace existing overhead powerline at Island Lake with buried power & fiber lines within largely disturbed area.
Location
Mesa Point and Island Lakes, Grand Mesa, Colorado
Project timeline
1
NEPA Start Date
3/20/2025
2
Finding/Decision Date
6/16/2026
NEPA / regulatory detail
| Categorical Exclusion | DOE B4.13 (10 CFR 1021 Appx B); DOE B4.6 (10 CFR 1021 Appx B) |
| Decision Signed Date | 6/16/2026 |