Geotechnical investigation for placement of power pole foundations in relation to Navopache Electric's proposed electric line reroute and power pole replacement with increased size and capacity running from the Wagon Wheel substation to Pinetop lake.
Location
Lakeside Arizona off Penrod Road: T9N; R22E; S11,14,13/ T9N; R23E, S18,19,30,32,33/ T8N; R23E; S3
Project timeline
1
Scoping Start
03/13/2024
2
Decision
07/2025 (Estimated)
3
Implementation
11/2025 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Facility Improvements/Construction; Special Use Authorizations; Research And Development |
| NEC Bore Holes for Wagon Wheel Tap to Pinetop Lakes Reroute | Decision Signed Date: 07/17/2025 |
| Forests | Apache-Sitgreaves National Forests |
| Districts | Lakeside Ranger District |
| Legal Land Description | Not Applicable |