The operator is proposing to process existing tailings material excavated from up to eight test pits. The material would be screened on-site using a grizzly, followed by processing through a trommel wash plant. All activities would take place within the designated project area.
Location
MHRD Township 26 North, Range 8 East, within the south 1/2 of Section 35, and the north 1/2 Section 2,
Project timeline
1
NEPA Start Date
3/24/2026
2
Finding/Decision Date
5/20/2026
NEPA / regulatory detail
| Categorical Exclusion | USGS 9.5B (516 DM 9) |
| Decision Signed Date | 5/20/2026 |