3-Part Proposal: 1.Use of ca.1995ft of NFSR910C west from HWY59 2.Use and reconstruct ca.4717ft of NFSR910C to a 24ft wide road (C&D; gravel surface) within a ca.40ft construction ROW 3.Use of ca.298ft of exist O&G access road south of NFSR910
Location
To access the project area drive south from Wright WYO on Hwy59 for ca. 11 miles. Turn right (west) on NFSR 910C to enter the project area
Project timeline
1
Scoping Start
12/17/2014
2
Decision
03/2015 (Estimated)
3
Implementation
03/2015 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Natural Gas; Oil |
| Ballard Petroleum Holdings, LLC, RUP For NFS Road 910-C | Decision Signed Date: 03/26/2015 |
| Forests | Medicine Bow-Routt National Forest |
| Districts | Douglas and Thunder Basin Ranger District |
| Legal Land Description | SWSW S14 and S2S2 S15, T42NR72W |