Medicine Bow-Routt National Forests & Thunder Basin National Grassland — Project Detail

616 projects with crawled detail · milestones · contacts · documents

Medicine Bow-Routt National Forests & Thunder Basin National Grassland

R02 Rocky Mountain · 616 projects · crawled 2026-08-01
Completed 500 Cancelled 116
Decision Memo 501 Environmental Assessment 92 Environmental Impact Statement 23
616 with documents 249 with comments page
Environmental Impact Statement · Brush Creek/Hayden Ranger District · updated 5/13/2026
Federal parcel in the Sierra Madre range, near WY State Hwy 70 and West Fork Battle Creek, about 19 west of Encampment and 28 miles east of Baggs. State parcels scattered across the Sierra Madre. · Carbon, Wyoming

Evaluating a proposal to exchange about 1,762 acres of USFS-managed lands with up to about 4,400 acres managed by the State of Wyoming. Part of a larger NRCS-led project that could include a new reservoir, partly on lands currently managed by USFS.

Land ownership management
NOI in Federal Register
12/28/2022
DEIS NOA in Federal Register
01/2027 (Estimated)
FEIS NOA in Federal Register
08/2027 (Estimated)
Objection Period Start
08/2027 (Estimated)
Decision
09/2027 (Estimated)
Implementation
10/2027 (Estimated)
Project documents
Jessica Vogt · Jessica.Vogt@usda.gov
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Exchanges
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT14N, R87W, Sec. 36; T14N, R86W, Sec. 31; T13N, R87W, Secs. 1, 2, and 12; and T13N, R86W, Section 6
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 4/29/2026
27 miles northwest of Steamboat Springs in an area of North Routt County east of Sand Mountain and south of the town of Columbine. · Routt, Colorado

Treating forests affected by a mountain pine beetle epidemic to create optimum conditions for timber resiliency, growth, and health, reduce large fuels, address dwarf mistletoe infections, and provide commercial forest products.

Forest products
Scoping Start
07/2024 (Estimated)
Decision
02/2025 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
Samuel Hahn · Samuel.Hahn@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 4/29/2026
National Forest System Road 952.1. Sec 1 & 2, T. 4 N, R. 88 W., 6TH Principal Meridian, Yampa Ranger District of the Routt National Forest, Routt County, Colorado · Routt, Colorado

Co-owners of the Dunkley-Dubeau Reservoir request a permit to access the reservoir for operation and maintenance. A new permit from private property south-east along NFSR 952.1 would authorize a road approximately 0.8 miles and 15 feet wide.

Special use management
Scoping Start
06/01/2023
Decision
04/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/24/2025
Access by NFS Road 973, NFSR 1400.B, and other connecting routes, within the Antelope Cr. watershed. · Converse, Wyoming

Authorization of two off-lease operational oil well sites and associated commercial road use. These sites became part of national grassland upon a prior land exchange.

Minerals and geologySpecial use management
Scoping Start
07/2025 (Estimated)
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Kyle Schumacher · Kyle.Schumacher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations; Road Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 4, 5, 8, and 9 T40N R69W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/24/2025
Vicinity of South Beaver Cr. and Mush Creek primary access via County Road 58 (Mush Creek Road). · Weston, Wyoming

Realignment or replacement of distribution power lines. Operator is PRECorp.

Special use management
Scoping Start
07/2025 (Estimated)
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Kyle Schumacher · Kyle.Schumacher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT44N R64W Sec 8, 9, 10, 11, 16, 17
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 6/24/2025
The analysis area includes all burned areas within the last 10 years on the Routt National Forest. · Grand; Jackson; Routt, Colorado

This project proposes to plant native tree seedlings in post-fire areas where trees are not reestablishing naturally.

Forest productsVegetation management (other than forest products)
Scoping Start
02/12/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Sarah Hegg · sarah.hegg@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District; Hahns Peak/Bears Ears Ranger District; Parks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 6/9/2025
Laramie Ranger District · Albany, Wyoming

Collection of cones/seed from conifer trees to maintain an adequate seed bank for reforestation. Methods include felling trees, tree climbing or use of lifts or other devices.

Vegetation management (other than forest products)
Scoping Start
07/10/2024
Decision
06/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Timothy Douville · timothy.douville@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Tramway Salvage Completed
Decision Memo · Brush Creek/Hayden Ranger District · updated 4/22/2025
Eight miles west of the Town of Encampment, in Township 14 North, Range 85 West, Sections 9, 10, and 15, 6th Principal Meridian, Carbon County, Wyoming. · Carbon, Wyoming

Salvage and sanitation of primarily lodgepole pine on 30 acres.

Forest productsFuels management
Scoping Start
03/28/2025
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Matthew Schweich · Matthew.schweich@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/21/2025
See attached · Weston, Wyoming

The Douglas Ranger District Office is reviewing the application for renewal and amendment of an existing crude oil buried pipeline right-of-way across public lands.

Special use management
Scoping Start
04/21/2025
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Sheryl Crowe · Sheryl.Crowe@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (4)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionWill upload as an attachment
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/21/2025
Two well pads. · Campbell, Wyoming

Surface use plans for two fluid mineral development sites per Applications for Permit to Drill. Operator is Anschutz.

Minerals and geology
Scoping Start
11/30/2023
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Kyle Schumacher · Kyle.Schumacher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations; Natural Gas; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/18/2025
Steamboat Springs Ski Resort · Routt, Colorado

Replacement of the Sunshine Express lift, development of a new snowmaking control pumphouse and associated infrastructure, and construction of the Thunderhead Hiking Trail Cutoff.

Recreation managementSpecial use management
Scoping Start
08/01/2024
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Don Dressler · donald.dressler@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 2/28/2025
North of Harris Park, in Soldier Creek watershed area, access by NFS Road 633 (Harris Park Road). · Albany, Wyoming

Integrated vegetation management, fuels reduction, hand crew work in roadless area portion.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
05/08/2023
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Blake Cobb · blake.cobb@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5); 32.3 (9)
Special AuthorityHfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT28N R71W Sec. 27, 34.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 2/10/2025
The project is located within the Red Dirt, Middle Yampa, and Grizzly Creek Geographic Areas of the Hahns Peak/Bears Ears and Yampa Ranger Districts in Routt County Colorado. · Routt, Colorado

The project is designed as a response to the Mountain Pine Beetle (MPB) epidemic. It has been proposed to increase the pace of restoration and resiliency of National Forest System lands and further the goals of the Routt National Forest Plan.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
04/19/2023
Decision
02/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Samuel Hahn · Samuel.Hahn@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 1/23/2025
The Storm Peak Lab is located at the top of Mount Werner off National Forest System Road 321.1 on the Hahns Peak/Bears Ears Ranger District on the Routt National Forest. · Routt, Colorado

The University of Utah acquired the Storm Peak Laboratory and has requested re-issuance of their special use authorization.

Special use management
Scoping Start
11/08/2023
Decision
02/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSection 29, Township 6 North, Range 83 West, 6th Principal Meridian
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/11/2024
Medicine Bow National Forest, Brush Creek/Hayden Ranger District and Douglas Ranger District. · Albany; Carbon, Wyoming

Land-for-land exchange.

Land ownership managementLand acquisition
Scoping Start
03/31/2023
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Robert Robertson · robert.robertson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Douglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 28, 33, 34 T25N R71W. Sec. 3, 4, 8 T24N R71W. Sec. 28, 29 T26N R72W. Sec. 26 T28N R71W. Mineral Survey No. 362 T14N R86W. 6th Principal Meridian.
Decision Memo · Yampa Ranger District · updated 9/23/2024
Approximately 650 feet north of Yampa Ranger District Office,T2N, R85W, Sec 15 · Routt, Colorado

Restore Yampa Pipeline function by reconstructing spring box in a location approximately 100 feet downstream of existing spring box and reconnecting to the existing cistern

Facility management
Scoping Start
05/03/2021
Decision
09/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Kristopher Skinner · Kristopher.Skinner@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 7/23/2024
The proposed project area is located on the Hahns Peak Bears Ears Ranger District of the Medicine Bow-Routt National Forests and Thunder Basin National Grassland in the state of Colorado · Moffat; Routt, Colorado

Reduce wildfire risk to the communities of Wilderness Ranch, Hitch Mountain, and Quaker Mountain and to the Elkhead Reservoir. To enhance efforts to protect watersheds and address threats to forest and rangeland health.

Fuels managementWatershed managementRoad managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
04/15/2022
Objection Period Start
04/23/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Kevin Thompson · kevin.thompson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBiomass; Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/2/2024
The Mt. Werner Complex Communications Site is located at the top of Mount Werner off National Forest System Road 321.1 on the Hahns Peak/Bears Ears Ranger District of the Routt National Forest. · Routt, Colorado

USDA Forest Service Chief Information Office Land Mobile Radio has proposed to replace the existing communications shelter Mt. Werner Facility #4 at the Mt. Werner Complex Communications Site.

Facility management
Scoping Start
12/08/2023
Decision
07/2024 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 6/17/2024
Northern portion of Converse County, north of Interstate Highway 25. Thunder Basin National Grassland. · Converse, Wyoming

Oil and natural gas exploration and development. Approximately 4 percent of project area is on Thunder Basin NG. The lead agency of the EIS is the Bureau of Land Management and the Forest Service is a cooperating agency.

Minerals and geology
NOI in Federal Register
05/16/2014
DEIS NOA in Federal Register
04/27/2019
FEIS NOA in Federal Register
07/31/2020
Objection Period Start
12/2023 (Estimated)
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Kyle Schumacher · Kyle.Schumacher@usda.gov
NEPA / regulatory detail
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionTownships 32 through 40 North, Ranges 67 through 76 West, 6th Principal Meridian
Decision Memo · Laramie Ranger District · updated 6/5/2024
Pole Mountain area of the Medicine Bow/Routt National Forest · Albany, Wyoming

Debenham Energy wishes to install three wind energy testing sites on the Pole Mountain unit of the Laramie District. Initial activities would consist of installing up to three Meteorlogical Towers and one LIDar unit.

Special use management
Scoping Start
04/2024 (Estimated)
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Amber Horne · amber.horne@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 5/31/2024
Sec. 7 T44N R64W · Weston, Wyoming

Right-of-way to install a buried telecommunication conduit and connect to an existing telecommunication line to provide service to a nearby customer.

Special use management
Scoping Start
10/05/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Paige Mainord · Paige.Mainord@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec 7 T44N R64W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 5/31/2024
Thunder Basin NG and Black Hills NF. · Custer; Fall River; Weston, South Dakota; Wyoming

Special use authorization for existing 230-kV and 69-kV electrical powerlines, including Wyodak-Hot Springs and Tekla-Osage-Rapid City lines.

Special use management
Scoping Start
05/30/2018
Decision
06/2018 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Paige Mainord · Paige.Mainord@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsBlack Hills National Forest; Medicine Bow-Routt National Forest
DistrictsHell Canyon Ranger District; Douglas and Thunder Basin Ranger District
Legal Land DescriptionT41N R71W, T42N R71W, T43N R71W, T43N R72W, T44N R69W, T44N R70W; AND T46N R63W, T47N R63W, T47N R64W, T47N R65W, T48N R65W, T48N R66W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 5/30/2024
Between Jenney Trail Road and private land to the east in Section 27. · Converse, Wyoming

Commercial road use of existing non-system road connecting County Road 34 (Jenney Trail Road) with private land.

Special use management
Scoping Start
09/01/2022
Decision
01/2023 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
Paige Mainord · Paige.Mainord@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 27 T39N R73W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 5/29/2024
Near Irwin Ranch Booster Station, M W Ranch site, and Gibson Draw a tributary to Antelope Cr. approx. 3 miles downstream from Porcupine Cr. confluence, 2 miles northeast of Red Hills. · Converse, Wyoming

Installation of several water quality monitoring wells on 4 acres of upland rangeland. Part of remediation of natural gas leak from gas facilities located on adjacent private land to the north of the project area. Proponent is Tallgrass Energy LP.

Special use management
Scoping Start
10/13/2023
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Paige Mainord · Paige.Mainord@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNE Section 6 T40N R69W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/26/2024
40 Miles NE of Douglas. Headwaters of Cheyenne River, Cow Creek, Rat Creek, Dry Creek, Lightening Creek. Thunder Basin NG. · Converse, Wyoming

Geophysical 3-D seismic survey. Proponent is Devon Energy.

Minerals and geology
Scoping Start
04/2024 (Estimated)
Decision
04/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionTownships 37, 38, 39 N Ranges 67, 68, 69 W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/26/2024
Between Sugarloaf Mtn. and Cow Cr. Mtn. access NFS Road 637. Deer Creek south of Gunnysack Peak access by NFS Road 659 and Trail 659. Devil's Pass area south LaBonte Cr./S. Fork access Trail 635. · Albany, Wyoming

Integrated vegetation management, migratory bird habitat improvement, hand crew work in roadless area.

Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Scoping Start
05/08/2023
Decision
03/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Roadless Area Management
Gateway West Mitigation Project - Cow Cr. Mtn. Deer Cr. Devil's PassDecision Signed Date: 03/19/2024
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec 15, 22 T26N R73W. Sec 13, 24 T28N R74W; Sec 18, 19 T28N R73W. Sec 31 T30N R76W.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/24/2024
1 to 2 miles east of County route 7C, Bruce Road. Thunder Basin NG. · Weston, Wyoming

Installation of buried electrical power lines along National Forest System Road 1258 and spur roads, which are not open to motorized public travel, to serve oil well pads in the Clareton Oil Field.

Minerals and geologyFacility managementSpecial use management
Scoping Start
08/11/2022
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Kyle Schumacher · Kyle.Schumacher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Facility Improvements/Construction; Special Use Authorizations; Facility Maintenance; Minerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 8 and 9 T42N R65W
Decision Memo · Yampa Ranger District · updated 4/22/2024
18 miles northeast of Yampa within the Red Dirt Creek watershed. · Grand, Colorado

Planting of lodgepole pine seedlings across 100 acres of fire-killed lodgepole pine forest to create favorable conditions for recruitment and improve watershed conditions and wildlife habitat within the 2018 Silver Creek fire burn scar.

Vegetation management (other than forest products)
Scoping Start
12/22/2023
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Samuel Hahn · Samuel.Hahn@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 4/9/2024
All 19 proposed drill pads will be located on the Laramie District south of Lake Owen. · Albany, Wyoming

Take bedrock core samples from 19 separate locations (drill pads) to map area stratigraphy. Drills will take place on unpatented mineral claims.

Minerals and geology
Scoping Start
03/01/2024
Decision
04/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Amber Horne · amber.horne@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSections 33 & 34, T. 14 N., R. 78 W., 6th P.M. Carbon County, WY. Sections 2 & 3, T. 13 N., R. 78 W., 6th P.M., Carbon County, WY.
Decision Memo · Laramie Ranger District · updated 3/29/2024
Laramie RD and Brush Creek-Hayden RD. · Albany; Carbon, Wyoming

Extend the seasonal wheeled-motorized vehicle closure dates or locations on several high alpine roads.

Watershed managementRoad managementRecreation management
Scoping Start
08/2023 (Estimated)
Decision
12/2023 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Lucie Law · Lucie.Law@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Road Maintenance; Road Improvements/Construction; Travel Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Legal Land DescriptionT16N R80W, T17N R80W, T16N R79W and T15N R79W
Decision Memo · Laramie Ranger District · updated 3/29/2024
Six unpatented mining claims in the Muddy Creek area. · Albany, Wyoming

Reconnaissance survey and mapping in order to plan strategies for accessing mining claims in preparation for gold mining.

Minerals and geology
Scoping Start
07/01/2020
Decision
07/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Amber Horne · amber.horne@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 36, T. 14 N., R. 79 W., 6th P.M., Albany County, Wyoming.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/24/2024
Thunder Basin NG, Lonetree Creek watershed. · Converse, Wyoming

Buried electric power and produced-water lines, for oil and gas operations, and co-located temporary surface water line. Proponent is Devon Energy.

Special use management
Scoping Start
12/31/2019
Decision
02/2020 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 17 T39N R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/22/2024
Southeast of Reno Flats between Little Bates Creek and Spring Creek, Thunder Basin NG. · Campbell, Wyoming

Authorization of a right-of-way and reclamation activities to remove a recently installed crude oil pipeline that was not in operation. The pipeline was initially misaligned onto a parcel of the national grassland.

Special use management
Scoping Start
07/22/2020
Decision
08/2020 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHarzardous Waste Compliance Actions; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 7 and 8 T41N R72W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/22/2024
Thunder Basin NG · Campbell; Crook; Weston, Wyoming

Issuance of new special use authorizations for a new term to replace expired authorizations.

Special use management
Scoping Start
07/22/2019
Decision
09/2019 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT41N R71W, T42N R71W, T43N R71W, T43N R72W, T44N R69W, T44N R70W, T46N R63W, T47N R63W, T47N R64W, T47N R65W, T48N R65W, T48N R66W, 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/22/2024
NFSR 930 (Keeline Road) and other connecting roads, north of Highway 450. · Campbell; Weston, Wyoming

Commercial road use and maintenance and right-of-way authorization of existing system and non-system roads.

Road managementSpecial use management
Scoping Start
07/08/2022
Decision
12/2022 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 18, 19, 20, 29, and 32 T43N R68W, SEC. 1 AND 12 T43N R69W, SEC. 4, 8, 17, AND 31 T44N R68W, 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/22/2024
Thunder Basin NG - Spring Creek Unit, Spring Creek watershed, south of York Road and York Ranch approx. 1 mile. · Campbell, Wyoming

Right-of-way for commercial road use for mineral development of Laramide Fed oil well, operation, improvements, and maintenance of National Forest System Road 1052, 1052.A, and other connected system or non-system road.

Road managementSpecial use management
Scoping Start
06/30/2023
Decision
09/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec 5 T53N R69W, Sec 32 T54N R69W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/22/2024
Thunder Basin NG. · Converse, Wyoming

Commercial road and water line uses and operation. Proponent is Continental Natural Resources.

Special use management
Scoping Start
12/01/2021
Decision
01/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT38N R73W and T39N R73W; non-system road is located in Sec 27 T39N R73W.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/4/2024
Between Antelope Road and Matheson Road west of Teckla, between Horse Creek and Porcupine Creek watersheds. · Campbell, Wyoming

Realignment of an oil and gas pipeline segment to accommodate coal mining operations on the western area of North Antelope Rochelle Mine. Proponent is WES Powder River Holdings LLC.

Special use management
Scoping Start
11/28/2023
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Natural Gas; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 34 T42N R71W, Sec. 3 T41N R71W.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 11/1/2023
Medicine Bow NF; starting from National Forest System Road 610 (Devil's Pass Rd.) junction with Trail 635, proceeding northward approximately 1,000 feet. · Albany, Wyoming

Provision for access to private land across national forest approximately 1,100 feet distance using existing routes.

Special area management
Scoping Start
08/17/2022
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 25 T28N R74W
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 11/1/2023
North Antelope Rochelle Mine · Campbell, Wyoming

Addition of 220 acres to special use area at NARM. Proponent is Peabody Powder River Mining, LLC.

Special use managementMinerals and geology
Scoping Start
01/05/2023
Comment Period
01/05/2023
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT41N R69W, T41N R71W, T42N R69W, T42N R70W, T42N R71W
Decision Memo · Yampa Ranger District · updated 10/2/2023
Gore Pass corridor north of Highway 134. · Grand; Routt, Colorado

On behalf of Tri-State, Western Area Power Administration (WAPA) proposes to conduct routine vegetation management treatment within the 175-foot right-of-way of the Hayden-Gore Pass 230-kV transmission line.

Special use management
Scoping Start
06/22/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/13/2023
Laramie Mountains, along Deer Creek south of Gunnysack Peak, access by NFS Road 659 and Trail 659. · Converse, Wyoming

Integrated vegetation management, migratory bird habitat improvement, hand crew work in roadless area.

Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Scoping Start
05/08/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT30N R76W Sec. 31.
Decision Memo · Laramie Ranger District · updated 8/14/2023
Section 27, T. 14 N., R. 89 W., 6th P.M., Albany County, Wyoming · Albany, Wyoming

The operator is proposing a placer mining operation on an unpatented mining claim owner by the operator. He will continue with short term placer mining activities and proposes to begin long term mining operations.

Minerals and geology
Scoping Start
07/31/2023
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Amber Horne · amber.horne@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 27, T. 14 N., R. 89 W., 6th P.M., Albany County, Wyoming
Decision Memo · Laramie Ranger District · updated 7/31/2023
Approximately 35 miles southwest of Laramie, Wyoming, and immediately south of the community of WyoColo, Wyoming. · Albany, Wyoming

Re-align approximately 450 feet of the Boswell Road (an Albany County Road), from private lands to lands managed by the US Forest Service and State of Wyoming, to simplify management and reduce potential conflicts.

Road management
Scoping Start
06/30/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Amber Horne · amber.horne@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/26/2023
Steamboat Resort in Steamboat Springs, CO · Routt, Colorado

Steamboat Resort intends to implement a previously approved project. This analysis addresses adjustments the permittee has requested.

Recreation managementSpecial use management
Scoping Start
07/10/2023
Decision
07/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Don Dressler · donald.dressler@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDirective Creation/Modification; Developed Site Management; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/24/2023
Steamboat Ski Resort Pioneer/Mahogany Ridge area on the Routt National Forest. · Routt, Colorado

YVEA proposes to install, operate, and maintain buried utility lines and associated infrastructure within the Steamboat Ski Area permit boundary on the Hahns Peak/Bears Ears Ranger District of the Routt National Forest.

Special use management
Scoping Start
06/22/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSections 23 & 24, Township 6 North, Range 84 West, 6TH Principal Meridian, Routt County, Colorado.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/19/2023
Thunder Basin NG, vicinity of Antelope Flat. · Campbell, Wyoming

Right-of-way with oil and gas and water pipelines and buried electric power line installation.

Minerals and geologySpecial use management
Scoping Start
06/09/2023
Decision
07/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas; Oil
Special Use Authorization Pipeline Utility Right-of-Way EOG ResourcesDecision Signed Date: 07/18/2023
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 20, 21 T41N R72W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/18/2023
California Park along Highway 80 in Routt County · Routt, Colorado

The First Creek wet meadow restoration project would occur on approximately 1.5 miles of ephemeral stream in the project area. Work would include Zeedyk structures, one-rock dams and revegetating a small area.

Vegetation management (other than forest products)Climate change adaptationSpecial area management
Scoping Start
04/13/2023
Decision
06/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Rick Henderson · richard.henderson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Special Area Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 6/9/2023
This plan amendment will focus on prairie dog management and could change management across the Thunder Basin National Grassland. · Campbell; Converse; Crook; Niobrara; Weston, Wyoming

The Grassland proposes to amend prairie dog management direction in the Land and Resource Management Plan, including changes to management area boundaries and changes to grassland-wide, geographic area, and management area plan components.

Land management planningWildlife, fish, rare plantsVegetation management (other than forest products)Watershed management
NOI in Federal Register
04/18/2019
DEIS NOA in Federal Register
04/18/2019
FEIS NOA in Federal Register
05/15/2020
Objection Period Start
05/15/2020
Decision
11/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Monique Nelson · monique.nelson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivitySpecies Habitat Improvements; Plan Amendment; Rangeland Vegetation Improvements
Thunder Basin National Grassland 2020 Plan AmendmentDecision Signed Date: 11/06/2020 (In Appeal Period) Legal Notice Date: 12/02/2020
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Medicine Bow-Routt National Forest All Units · updated 6/9/2023
This website houses all NEPA related documents. Please visit the LaVA Implementation Website for project implementation information: https://www.fs.usda.gov/detail/mbr/landmanagement/?cid=FSEPRD572816 · Albany; Carbon, Wyoming

Holistically review the Snowy Range and Sierra Madre mountain ranges to identify strategies to best mitigate the negative effects of the current beetle epidemic to the various resources found within each mountain ranges.

Vegetation management (other than forest products)Fuels managementLand management planningForest products
NOI in Federal Register
07/21/2017
DEIS NOA in Federal Register
07/13/2018
FEIS NOA in Federal Register
04/10/2020
Objection Period Start
04/10/2020
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Casey Campbell · casey.campbell1@usda.gov
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Municipal Watersheds; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics); Hfra Title I: Threatened And Endangered Species Habitat
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Timber Sales (Salvage)
Medicine Bow Landscape Vegetation Analysis (LaVA) Project Record of DecisioDecision Signed Date: 08/13/2020
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 5/16/2023
Approximately 11 miles Northeast of the town of Clark, CO · Routt, Colorado

The purpose is to construct fish barriers, remove non-native brook trout, and allow the reintroduction of genetically pure Colorado River cutthroat trout.

Wildlife, fish, rare plants
Scoping Start
04/20/2022
Decision
05/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Rick Henderson · richard.henderson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 5/16/2023
Township(T) 5N, Range(R) 77W, Sections 2-6; T5N, R78W, Section 1; T6N, R77W, Sections 19, 27-31, 34-35; T6N, R78W, Sections 25 and 36; 6th Principal Meridian; Jackson County, Colorado. Owl Mountain Geographic Area near Rand Colorado. · Jackson, Colorado

The main goals of the project include creating healthy forest structure resilient to insects and disease, increase public safety, reduce fuel loading and wildland fire events around WUI, and recover economic value of degrading lodgepole pine.

Forest productsFuels management
Scoping Start
12/08/2022
Decision
05/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Cassidy Dodds · cassidy.dodds@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 3/30/2023
10 miles east of Yampa on FS road 226.Legal Description- T2N R83W S28 and 29 · Routt, Colorado

Removal of slash piles created during the Muddy Slide fire suppression efforts, by using prescribed fire.

Fuels management
Scoping Start
07/20/2022
Decision
03/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Kevin Thompson · kevin.thompson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/30/2022
Medicine Bow NF - Laramie Peak Unit. Blacktail Peak, approximately 1 to 2 miles south of La Bonte Canyon, approximately 3 miles east of County Road 61. · Albany, Wyoming

Designation of administrative site on Blacktail Peak and installation of government telecommunications radio improvements to administer National Forest System lands.

Facility management
Scoping Start
02/01/2019
Decision
12/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
John Madden · john.madden@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 30 T28N R73W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/30/2022
Medicine Bow NF, Laramie Peak Unit. · Albany, Wyoming

Installation of horse corrals, fence, signs, and meadow protection features at several highly used dispersed recreation sites.

Facility managementRecreation management
Scoping Start
11/01/2022
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
Denise Turner · denise.turner3@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Dispersed Recreation Mgmt.; Facility Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionCow Creek Trailhead in Sec. 15 T26N R73W; Friend Park Trailhead in Sec. 4 T26N R72W near National Forest System Road 671; La Bonte Canyon in Sec. 13 T28N R74W next to La Bonte Road; and Roaring Fork s
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/30/2022
East of Highway 59, Thunder Basin NG. · Campbell, Wyoming

Installation and operation of buried gas pipeline.

Minerals and geologySpecial use management
Scoping Start
11/02/2022
Decision
12/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
David Heath · David.Heath@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas; Oil
BURIED NATURAL GAS PIPELINE AND FLOWLINES FOR THE BOOTS FED AND ROXY FED OIL AND GAS DEVELOPMENTSDecision Signed Date: 12/21/2022
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 24 and 25 T43N R72W.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/28/2022
Thunder Basin NG. · Campbell; Weston, Wyoming

Project entry 61300 was canceled because a duplicate entry was made on the Schedule of Proposed Actions. Refer to project no. 63030 which is the same proposed action.

Special use management
Scoping Start
10/2022 (Estimated)
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT43N R68W, T43N R69W, T44N R68W, T44N R69W.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 10/26/2022
The Mad Creek bridge is located along USF road 128.1 (ML1, Administrative Use) at Mile Post 3.1 approximately 7 miles northwest of Steamboat Springs CO. · Routt, Colorado

The project proposes to replace the approximately 60-year-old existing bridge with a new pedestrian hiking bridge to address deteriorating foundations and abutments and the narrowing of streambed.

Road management
Scoping Start
05/19/2021
Decision
10/2022 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Loren Reimer · Loren.Reimer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 10/21/2022
The Greenhorn Ranch area and existing ski runs located within the Steamboat Ski Area permit area boundary. Section(s) 23, 24, 25, & 26, Township 6 N., Range 84 W., 6TH Principal Meridian. · Routt, Colorado

Yampa Valley Electric Association proposed to install, operate, and maintain underground powerlines and electrical boxes within the Steamboat Ski Area permit boundary. The project will total approximately 4.83 acres.

Special use management
Scoping Start
08/15/2022
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Nicole Cookson · Nicole.Cookson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/30/2022
Thunder Basin NG, west of Hwy 59. · Campbell, Wyoming

Commercial road use on National Forest System Roads 910, 910A, 910B, 910C, 910CA, 910CB, 910D, and 910E. Proponent is Silver Creek Midstream LLC.

Special use management
Scoping Start
01/04/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
Road Use Authorization on NFS Roads 910, 910.B, 910.CB, 910.D, and 910.EDecision Signed Date: 08/31/2022
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT41N R72W, T41N R73W, T42N R72W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/23/2022
East Iron Creek Reservoir, approximately 7 miles east of Upton, and 1.5 miles east of National Forest System Road 913. Thunder Basin NG. · Weston, Wyoming

Recreation facility improvements at the East Iron Creek Reservoir site. Wildlife habitat improvement on areas surrounding the reservoir.

Vegetation management (other than forest products)Facility managementRecreation managementWildlife, fish, rare plants
Scoping Start
07/12/2022
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Denise Turner · denise.turner3@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Species Habitat Improvements; Facility Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 24 T48N R64W
Decision Memo · Brush Creek/Hayden Ranger District · updated 9/16/2022
Twelve miles northeast of Saratoga, WY. · Carbon, Wyoming

Renewal of permit for use and maintenance of a domistic water supply spring development and underground water transmission pipeline.

Land management planning
Scoping Start
02/07/2014
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Melanie Fullman · mfullman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityPlan Creation/Revision
Cherokee Trail Water Transmission Line & Spring Box Special Use Permit RenewalDecision Signed Date: 04/09/2014
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT18N, R82W, Section 10
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/13/2022
Black Thunder Mine area, Thunder Basin NG. · Campbell, Wyoming

Realign two existing powerlines. Proponent is Powder River Energy Corp.

Special use managementFacility management
Scoping Start
06/01/2022
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 11 and 23 T43N R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/2/2022
Medicine Bow NF - Laramie Peak Unit · Albany; Converse, Wyoming

Vegetation management to improve forest conditions and reduce wildfire risk.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
05/16/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Robert Robertson · robert.robertson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5); 32.3 (9)
Special AuthorityHfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/2/2022
Medicine Bow NF - Laramie Peak Unit · Converse; Natrona, Wyoming

Vegetation management to improve forest conditions and reduce wildfire risk.

Forest productsFuels managementVegetation management (other than forest products)
Scoping Start
05/16/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Robert Robertson · robert.robertson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5); 32.3 (9)
Special AuthorityHfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/2/2022
Thunder Basin NG. · Campbell; Converse, Wyoming

Installation of nest platform structures for golden eagle.

Wildlife, fish, rare plants
Scoping Start
11/25/2019
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
Thunder Basin National Grassland Golden Eagle Platform LocationsDecision Signed Date: 08/22/2022
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 8/9/2022
NFSR 441.1, NFSR 441.1B, and NFSR 441.1C are located near Burn Ridge and Floyd Peak, south of the Hinman Campground approximately 26 miles Northeast of Steamboat Springs, Colorado. · Routt, Colorado

Closed roads NFSR 441.1, 441.1B, and 441.1C in the Morgan Creek Fire burn area are at high risk for failure from flash floods. Treatments are needed to remove fill and culverts, reshape slopes, and establish drainages to reduce environmental impacts.

Watershed managementRoad management
Scoping Start
02/04/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Tyler Carleton · tyler.carleton@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/25/2022
California Park, approximately 18 miles north of Hayden Colorado. Legal description Township 9N, Range 87W, Sections 11, 14, and 15 · Routt, Colorado

Installation of hand-built rock structures in approximately 1.5 miles of ephemeral and intermittent drainages to restore degraded wet meadows in sagebrush rangelands occurring within mapped general Greater sage-grouse habitat.

Wildlife, fish, rare plantsWatershed management
Scoping Start
09/17/2021
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Melissa Dressen · melissa.dressen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 7/25/2022
The Carney & Continental ditches point of diversion is located off National Forest System Road 691, just south of the Wyoming/Colorado border. · Jackson, Colorado

Per the State of Colorado Division of Water Resources order, the owners of the Carney and Continental irrigation ditches propose to install headgates and/or measuring devices at the point of diversion on the two ditches.

Special use management
Scoping Start
07/01/2021
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionSection 22, Township 12 North, Range 82 West, 6TH Principal Meridian, Jackson County, Colorado
Decision Memo · Brush Creek/Hayden Ranger District · updated 7/25/2022
Project is located on the Sierra Madre unit of the Brush Creek/Hayden District of the Medicine Bow National Forest by the Verde Mine mining claims. · Carbon, Wyoming

Perpetual reciprocal easement between Forest Service and private property owner of Verde Mine claims. Easement gives legal access to property to owner via NFSR 809.1B (Pipeline Road) and NFST 858 (Verde Mine Trail). NFSR 809.1B is closed to public.

Special use management
Scoping Start
03/27/2019
Decision
03/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSections 27, 28, 29, 32, 33 and 34 T. 14 N., R. 86 W., 6th P.M., Carbon County, Wyoming.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/18/2022
North Walton Peak Communications Site on the Hahns Peak/Bears Ears Ranger District of the Routt National Forest. Section 27, Township 5 North, Range 83 West, 6TH Principal Meridian, Routt County, CO · Routt, Colorado

The FAA has proposed to remove and replace the existing propane engine and fuel storage tank at the existing North Walton Peak Communications Site. The new engine and propane tank will be replaced in-kind and in the same location.

Special use management
Scoping Start
01/28/2022
Decision
07/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 6/10/2022
Project area is located approximately 5 miles south of Riverside, Wyoming. · Carbon, Wyoming

Reclamation (closure) of an abandoned mine that is hazardous to the public. The adit (opening) will be blocked and the surface will be recontoured and revegetated. To begin summer or fall of 2022 with completion before end of the year.

Minerals and geology
Scoping Start
06/01/2021
Decision
06/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Matthew Schweich · Matthew.Schweich@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSection 31, T. 14 N., R. 83 W., 6th P.M., Carbon County, Wyoming
Environmental Assessment · Medicine Bow-Routt National Forest All Units · updated 6/6/2022
Medicine Bow National Forest and the Routt National Forest in Garfield, Grand, Jackson, Moffat, and Rio Blanco counties in Colorado and Albany and Carbon counties in Wyoming · Albany; Carbon; Garfield; Grand; Jackson; Moffat; Rio Blanco; Routt, Colorado; Wyoming

Hazard tree management for public health and safety primarily along roads, trails, and infrastructure.

Vegetation management (other than forest products)Road managementFuels managementForest productsFacility managementRecreation management
Scoping Start
04/2022 (Estimated)
Comment Period
05/2022 (Estimated)
Objection Period Start
06/2022 (Estimated)
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Mark Westfahl · mark.westfahl@usda.gov
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218 (2013) HFRA
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Facility Maintenance; Road Maintenance; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District; Brush Creek/Hayden Ranger District; Hahns Peak/Bears Ears Ranger District; Parks Ranger District; Laramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 6/6/2022
10 miles southwest of Yampa, CO.Sections 23 & 24, T1N, R86W · Routt, Colorado

Project proposes to construct approximately 0.66 miles of fence to exclude livestock from approximately 17 acres of land in and adjacent to Smith Creek and develop a known spring to provide for a reliable water source away from Smith Creek.

Grazing managementWatershed management
Scoping Start
02/04/2022
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Douglas Myhre · douglas.myhre@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 5/27/2022
Muddy Pass Communications Site on the Hahns Peak/Bears Ears Ranger District of the Routt National Forest, Sections 15 & 22, Township 5 North, Range 82 West, 6TH Principal Meridian, Jackson County, CO. · Jackson, Colorado

Union Telephone Company proposes to install 5,085 feet of buried conduit for telecommunications cables at the existing Muddy Pass Communications Site; alongside National Forest System Roads 307.1A, 307.1 and under Highway 40 to a vault directly north

Special use management
Scoping Start
11/30/2021
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 5/27/2022
South Walton Peak Communications Site on the Hahns Peak/Bears Ears Ranger District of the Routt National Forest. · Routt, Colorado

Union Telephone Company has proposed to install, operate, and maintain new facilities at the South Walton Peak Communications Site including a 120-foot self-supporting lattice tower, an electronics and generator building, and a propane tank.

Special use management
Scoping Start
07/26/2021
Decision
04/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 5/27/2022
Buffalo Pass Communications Site off National Forest System (NFS) Road 310.1A. · Routt, Colorado

Description : Union Telephone Company has proposed to install, operate, and maintain new facilities at the Buffalo Pass Communications Site including an 80-foot self-supporting lattice tower, an electronics and generator building, and a propane tank.

Special use management
Scoping Start
07/26/2021
Decision
04/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 4/13/2022
Buffalo Pass Road reconstruction from Dry Lake Campground to Summit Lake Trailhead. Dispersed camping management from Dry Lake Campground to 1.5 miles east of Buffalo Pass. · Jackson; Routt, Colorado

Maintenance and reconstruction to bring NFSR 60 up to standards. The proposal also addresses adverse effects of increased dispersed camping, which may be exacerbated by the road improvement.

Recreation managementRoad management
Scoping Start
09/15/2019
Comment Period
09/15/2019
Objection Period Start
01/26/2022
Decision
04/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/31/2022
Located north of the town of Upton off HWY 116 accessed by NFSR 1252 in an area south of the town golf course. Thunder Basin NG. · Weston, Wyoming

Special use authorization for water monitoring wells associated with a landfill.

Special use management
Scoping Start
03/10/2020
Decision
04/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Renewal of special use authorization for Town of UptonDecision Signed Date: 04/10/2020
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 24, T. 48 N., R. 65 W., 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/23/2022
Project area is located on the Hahns Peak/Bears Ears Ranger District on the HPBE district in Routt County, CO, approximately 27 miles northwest of Steamboat Springs, Colorado. · Routt, Colorado

Various vegetation management treatments would be used within a total project treatment area of approximately, but not exceeding, 250 acres of lodgepole pine and mixed conifer stands which have experienced high levels of mortality.

Vegetation management (other than forest products)Forest products
Scoping Start
01/20/2022
Decision
03/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Samuel Hahn · Samuel.Hahn@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/23/2022
Thunder Basin NG · Converse, Wyoming

Special use authorizations for operation of oil and gas development facilities at sites known as Fulton 1, 2, and 3.

Special use managementMinerals and geology
Scoping Start
12/20/2021
Decision
02/2022 (Estimated)
Implementation
02/2022 (Estimated)
Project documents
Robena Downie · Robena.Downie@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas; Oil; Road Maintenance
Fulton 1, 2, and 3 Oil and Gas Developments and Associated UsesDecision Signed Date: 02/03/2022
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT39N R69W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/17/2022
Primary filming locations include Rabbit Ears Pass, Buffalo Pass, North Routt, and the Bears Ears areas. · Routt, Colorado

TNT Visual proposes to renew their recently expired Temporary Special Use Permit (HBE716) for commercial filming services on the Hahns Peak/Bears Ears Ranger District of the Routt National Forest.

Special use management
Scoping Start
02/01/2022
Decision
03/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 2/4/2022
The Chapman ditch headgate is located off National Forest System Road 60 just West of the Grizzly Creek Guard Station. · Jackson, Colorado

Eagle's Wing Ranch, LLC has proposed to remove and replace the existing headgate structure on the Chapman ditch at the point of diversion on Chedsey Creek per USDA Natural Resources Conservation Service (NRCS) design plans.

Special use management
Scoping Start
07/01/2021
Decision
09/2021 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionSection 28, Township 2 North, Range 82 West, 6TH Principal Meridian, Jackson County, Colorado.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 2/3/2022
Steamboat Springs Ski Resort, Steamboat Springs, CO · Routt, Colorado

Treat up to 40 acres of timber as a result of the wind event in 2020 on National Forest System lands and disturb up to 5 acres for utility, snowmaking, and trail projects.

Vegetation management (other than forest products)Recreation managementSpecial use management
Scoping Start
07/20/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 2/2/2022
Project is located across National Forest System lands in Carbon and Albany counties, Wyoming; and in Jackson and Larimer counties, Colorado. · Albany; Carbon, Colorado; Wyoming

Issuance of a new special use authorization for existing powerline infrastructure for a new term to replace expired authorizations. Changes are administrative only; no physical changes will occur, other than minor required maintenance.

Special use management
Scoping Start
01/01/2017
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Nicholas DiGiacco · nicholas.digiacco@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Legal Land DescriptionMultiple locations across the Forest.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/13/2021
Vicinity of Steamboat Lake. · Routt, Colorado

Fuels reduction around the communities and subdivisions within the Steamboat Lake area. Project would treat up to 3,000 acres.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
02/15/2020
Decision
10/2021 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Kevin Thompson · kevin.thompson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 12/10/2021
Medicine Bow NF - Pole Mountain Unit · Albany, Wyoming

Construction of a trail to connect the Pilot Hill Recreation Area with National Forest System Road 712 parking area.

Recreation management
Scoping Start
07/01/2021
Decision
11/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Matthew Schweich · Matthew.Schweich@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N R72W Sections 2, 3, 13, 14, 23 and 24
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/8/2021
Dull Center Gravel Pit is located within the Thunder Basin National Grassland approximately 13 miles northeast of Bill, Wyoming and is accessed by County Road 38 (Dull Center Road). · Converse, Wyoming

Mineral material contract to the Converse County government authorizing the removal and free-use of 200,000 cu. yds. of scoria gravel from the Dull Center Gravel Pit for the mutual benefit of maintaining county and National Forest System roads.

Minerals and geology
Scoping Start
07/29/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations; Road Maintenance
Mineral Material Contract at Dull Center Gravel Pit for Converse CountyDecision Signed Date: 10/25/2021
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 2 T39N R69W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/30/2021
Medicine Bow NF - Laramie Peak Unit · Albany, Wyoming

Vegetation management to improve forest conditions and reduce wildfire risk.

Vegetation management (other than forest products)Forest productsFuels management
Scoping Start
05/03/2021
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
John Madden · john.madden@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5); 32.3 (9)
Special AuthorityHfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 8/9/2021
Steamboat Ski area and Resort, located in Steamboat Springs, Colorado. · Routt, Colorado

Improvements to terrain, road, lift network. New restaurant. Additional snowmaking. New potable water and utilities. Project specific forest plan amendment.

Regulations, directives, ordersSpecial use managementRecreation management
Scoping Start
07/09/2020
Comment Period
07/09/2020
Objection Period Start
04/28/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDirective Creation/Modification; Developed Site Management; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/22/2021
Surrounding Little Powder Reservoir, accessed by National Forest System Road 908, situated approximately 1 mile east of Highway 59. · Campbell, Wyoming

Construction and reconstruction of improvements for recreation use, interpretive features, and access to recreation site.

Recreation managementFacility managementRoad management
Scoping Start
06/01/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Denise Turner · denise.turner3@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec 19 T54N R70W
Decision Memo · Brush Creek/Hayden Ranger District · updated 7/13/2021
West side of the Sierra Madres · Carbon, Wyoming

Construct four new stock ponds, two new drilled wells, and one new spring development in the Cottonwood Draw and West Sheep Mountain Allotments.

Grazing management
Scoping Start
06/11/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Brad Weatherd · bradley.weatherd@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT12N, R87W, Secs 2, 3, 13; T13N, R87W, Secs 33, 34
Decision Memo · Yampa Ranger District · updated 7/9/2021
Project is located within the Gore Pass area of the Yampa Ranger District, 6.4 miles east of Toponas in Routt County, CO.Treatment polygons are located along the NFSR 269 road. · Routt, Colorado

The removal of beetle-killed lodgepole pine trees on 250 acres of forest using mechanized logging equipment and vehicles

Forest products
Scoping Start
04/05/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Samuel Hahn · Samuel.Hahn@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/9/2021
Hahns Peak/Bears Ears Ranger District of the Medicine Bow-Routt National Forest and Thunder Basin National Grassland in Routt County, Colorado, approximately 35 miles northwest of Steamboat Spring. · Routt, Colorado

Removal of downed or standing dead spruce and fir trees affected by a severe wind event which occurred on September 8, 2020.

Forest products
Scoping Start
05/31/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Samuel Hahn · Samuel.Hahn@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 6/5/2021
Sections 20, 28, 29, and 33, T. 18 N., R. 79 W., 6th P.M., Carbon County, WY. · Carbon, Wyoming

Wyoming Fish & Game propose the following to Carlson Auxiliary Ditch: replace headgate/diversion structure, install spill points, replace/reposition culverts at road crossings, and install drop structures at the ditch's end to slow down gullying.

Special use management
Scoping Start
09/13/2019
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSections 20, 28, 29 and 33, T. 18 N., R. 79 W., 6th P.M., Carbon County, WY.
Decision Memo · Parks Ranger District · updated 6/4/2021
Southeast of Walden, near the town of Rand. T5N R77W to 81W; T6N R76W to R79W · Jackson, Colorado

Removal of beetle-killed trees in order to reduce fuels and protect infrastructure.

Forest productsFuels managementVegetation management (other than forest products)
Scoping Start
02/26/2020
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Mark Westfahl · mark.westfahl@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 5/29/2021
Communications site at Fox Park, Laramie Ranger District, Medicine Bow National Forest · Albany, Wyoming

Lease for Union Telephone site at Fox Park is expired, needs a re-issue to continue provision of cellular, internet, and emergency communication services. Generator & electrical buildings & propane tank to be placed inside original site footprint.

Special use management
Scoping Start
09/06/2018
Decision
05/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNE1/4 of Section 4, T.12 N., R. 78 W., 6th Principal Meridian, Albany County, Wyoming
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 5/7/2021
Thunder Basin NG-Spring Cr. Unit · Campbell, Wyoming

Change in trail designation for travel management and other purposes in the Thunder Basin National Grassland-Spring Creek Unit. Multiple activities in coordination with Bureau of Land Management, Buffalo Resource Area.

Recreation management
Scoping Start
05/2021 (Estimated)
Comment Period
05/2021 (Estimated)
Objection Period Start
06/2021 (Estimated)
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Denise Turner · denise.turner3@usda.gov
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management; Travel Management
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 5/3/2021
MPEI plans to install fiber optic cable on the Lake Agnes powerline near NFSR 254.1 (road to the Lake Agnes private inholding) and Grouse Mountain powerline located NW of Hot Sulphur Springs, CO. · Grand, Colorado

MPEI proposal to amend the Special Use Permit (HBE413) to authorize installation of fiber optic cable on the Lake Agnes (Yampa Ranger District) and Grouse Mountain (Parks Ranger District) powerlines.

Special use management
Scoping Start
05/28/2020
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSection 34, Township 5 North, Range 82 west, 6th P.M. and Sec. 18 T.2N., R.78W., 6th P.M., Grand County, Colorado
Environmental Assessment · Laramie Ranger District · updated 4/9/2021
Snowy Range Ski and Recreation Area · Albany, Wyoming

Address deficiencies and improve recreation opportunities though installation of yurt, vault toilet, parking bridge, and snowmaking at Snowy Range Ski Area. Includes hazard tree removal and water impoundment securement.

Special use managementRecreation management
Scoping Start
04/15/2020
Comment Period
04/15/2020
Objection Period Start
01/14/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/5/2021
Sections 9 & 10, T. 13 N., R. 88 W., 6th P.M., Carbon County, Wyoming. · Carbon, Wyoming

Little Snake River Museum in Savery, WY was gifted the historic Divide Sheep Camp buildings and structures located in the Sierra Madre. The Museum will conduct the first phase of needed restoration and repair, to include the fence and cabin interior.

Special use management
Scoping Start
08/23/2017
Decision
02/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 3/1/2021
Hilight Bill Geographic Area · Converse, Wyoming

Antelope Coal LLC has requested an authorization to amend the existing Antelope Mine special use permit to allow expansion of the railroad spur area associated with expansion and increased capacity of the coal loadout facility.

Minerals and geology
Scoping Start
12/15/2010
Comment Period
06/19/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Cloud Peak Energy, LLC Antelope Mine Plant Expansion-Railroad SpurDecision Signed Date: 09/25/2013 Legal Notice Date: 09/27/2013
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionW 1/2, SW 1/4, Section 1; W 1/2, Section 12; W 1/2, Section 13; SE 1/4, SE 1/4, Section 14, T 40 N, R 71 W, Converse County, Wyoming.
Decision Memo · Brush Creek/Hayden Ranger District · updated 2/9/2021
13 Miles SW of Arlington, Wy. or 1 mile north of Turpin Reservoir. Lat/Long is:41.4594 / -106.4015 · Carbon, Wyoming

Public Meeting Info Found on the Scoping Tab or at this link. https://www.fs.usda.gov/nfs/11558/www/nepa/113960_FSPLT3_5449093.pdf

Forest productsFuels management
Scoping Start
10/16/2020
Decision
12/2020 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Keith Brugger · keith.r.brugger@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Elk Park Road Cancelled
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 12/16/2020
Approximately 3 miles north of Steamboat Springs in the Strawberry Park Area. · Routt, Colorado

Develop a plan for the management of Elk Park Road in order to address soil and water resource concerns, while considering issues related to recreational use of the road.

Road managementRecreation managementWatershed management
Scoping Start
09/2020 (Estimated)
Comment Period
09/2021 (Estimated)
Objection Period Start
12/2021 (Estimated)
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Liz Schnackenberg · lschnackenberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Maintenance; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSections 4, 9, 16, 21 T7N R84W, 6th P.M.
Environmental Impact Statement · R2 - Rocky Mt. Region All Units · updated 12/10/2020
Linear transmission lines located in Colorado, Utah, and Nebraska · Dawes; Daggett; Uintah; Chaffee; Delta; Dolores; Eagle; Grand; Gunnison; Jackson; Lake; La Plata; Larimer; Mesa; Montrose; Routt; Saguache; San Juan, Colorado; Nebraska; Utah

Update vegetation management activities along 278 miles of transmission lines located on NFS lands in Colorado, Nebraska, and Utah. These activities are intended to protect the transmission lines by managing for stable, low growth vegetation.

Special use management
NOI in Federal Register
04/08/2010
DEIS NOA in Federal Register
09/27/2013
FEIS NOA in Federal Register
12/10/2020
Objection Period Start
08/10/2020
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Matthew Custer · mscuster@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
WAPA Right-of-Way Maintenance and ReauthorizationDecision Signed Date: 11/17/2020
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Nebraska National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Ashley National Forest
DistrictsGrand Valley Ranger District; Norwood Ranger District; Gunnison Ranger District; Paonia Ranger District; Yampa Ranger District; Hahns Peak/Bears Ears Ranger District; Pine Ridge Ranger District; Boulder Ranger District; Canyon Lakes Ranger District; Sulphur Ranger District; Salida Ranger District; Mancos/Dolores Ranger District; West Zone/Sopris Ranger District; East Zone/Dillon Ranger District; Ashley National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 12/9/2020
Approximately 25 miles NE of Walden, CO · Jackson, Colorado

Up to 3000 acres of mechanical vegetation treatment on the Parks Ranger district of the MBRTB

Fuels managementForest products
Scoping Start
01/25/2020
Decision
12/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionJackson county Colorado
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/2/2020
Project area includes Battle Mountain, an isolated island of Forest Service lands located on the far southwestern portion of the Sierra Madre Range. · Carbon, Wyoming

Prescribed burn to regenerate aspen in conifer-encroached aspen stands, re-introduce fire into a fire adapted ecosystem, and reduce continuous fuels near forest inholdings and perimeter.

Grazing managementFuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
05/19/2008
Comment Period
01/2020 (Estimated)
Decision
02/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Casey Cheesbrough · ccheesbrough@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2); 32.3 (5)
Special AuthorityNot Applicable / Other; Hfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Sierra Madre Sheep Cancelled
Environmental Assessment · Brush Creek/Hayden Ranger District · updated 12/1/2020
West side of the Sierra Madre Mountain Range, Brush Creek/Hayden Ranger District, approximately 17 miles southwest of Encampment, WY. · Carbon, Wyoming

Allotment Management Planning for 7 sheep allotments in the Sierra Madre Mountain Range on the Brush Creek/Hayden Ranger District of the Medicine Bow-Routt National Forest Thunder Basin National Grassland

Grazing management
Scoping Start
01/2014 (Estimated)
Comment Period
06/2014 (Estimated)
Objection Period Start
09/2014 (Estimated)
Decision
11/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Brad Weatherd · bweatherd@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT12N R85W, T13N R85W, T12N R86W, T13N R86W, T14N R86W, T12N R87W, T13N R87W, T14N R87W
Decision Memo · Brush Creek/Hayden Ranger District · updated 11/30/2020
Sec. 16, T. 14 N., R. 78 W. 6th P.M., Albany County, WY. From Albany, WY, travel west on NFSR 500. All three drills are located adjacent to open Forest Rd 513. · Albany, Wyoming

Encampment Minerals to drill three core samples for the purpose of minerals exploration. Cores will be 3.25 inches in diameter and range from 300 to 800 feet in length.

Minerals and geology
Scoping Start
07/28/2017
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSec. 16, T. 14 N., R. 78 W. 6th P.M., Albany County, WY.
Decision Memo · Brush Creek/Hayden Ranger District · updated 11/30/2020
To access project: Hwy 230 east from Riverside, BLM Road 3423/3423.1A north to Forest border. Cores to be located near Forest border adjacent to open Forest Rd 495 and two nearby decommissioned roads. · Carbon, Wyoming

Encampment Minerals proposes to drill six core samples for minerals exploration purposes. Cores will be 3.25 inches diameter and anywhere from 250 - 550 feet in length. Drilling area is accessed by one open public road and two decommissioned roads.

Minerals and geology
Scoping Start
08/21/2017
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSec. 35 & 36, T. 14 N., R. 81 W. 6th P.M. Carbon County, WY
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 11/25/2020
Routt County Road (RCR) 64, Seedhouse Road. · Routt, Colorado

YVEA proposal for a Special Use Permit to authorize installation of fiber optic cable on the Seedhouse powerline.

Special use management
Scoping Start
09/01/2020
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSection 7, 17 and 18, Township 9 North, Range 84 West, 6th Principal Meridian
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 11/19/2020
North Routt Hahn's Peak area. · Routt, Colorado

Winter training operations over snow with motorized equipment.

Special use management
Scoping Start
12/11/2019
Decision
01/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT11N R85W Sec 32 6thPM
Environmental Assessment · Laramie Ranger District · updated 11/19/2020
Snowy Mountain Unit, Medicine Bow NF, in the vicinity of 41.3510066,-106.2191412 · Albany, Wyoming

Build a winter use only parking area to supplement current roadside parking in the Green Rock area of Scenic Byway Wyoming Highway 130.

Road managementRecreation management
Scoping Start
08/2019 (Estimated)
Comment Period
09/2019 (Estimated)
Objection Period Start
11/2019 (Estimated)
Decision
01/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Patricia Bean · patriciadbean@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Facility Maintenance; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 13 T16N R79W
Environmental Assessment · Yampa Ranger District · updated 11/19/2020
Approximately 30 miles southeast of the town of Craig and adjacent to the Indian Run State Wildlife Area. · Routt, Colorado

Possible redesignation of NFSR 970 from Level II road. Options being considered include motorized trail and non-motorized use. Purpose is to protect resources. A parking area is also being considered.

Recreation managementRoad management
Scoping Start
09/2020 (Estimated)
Comment Period
06/2021 (Estimated)
Objection Period Start
09/2021 (Estimated)
Decision
11/2021 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Hannah Rainwater · hannahlrainwater@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityDispersed Recreation Mgmt.; Travel Management
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT3N, R90W, section 9
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 11/19/2020
Routt County, CO · Routt, Colorado

Communications Use Permit to provide wireless internet services on Farwell Mountain Communications Site.

Facility managementSpecial use management
Scoping Start
06/2020 (Estimated)
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R84W, Sec 18, 6thPM
Decision Memo · Douglas and Thunder Basin Ranger District · updated 11/13/2020
Vicinity of Antelope Mine. Thunder Basin NG. · Converse, Wyoming

Issuance of mineral material sale contract for use of material at Antelope Mine for an additional 5-year term to begin in 2021. The applicant and proponent is Navajo Transitional Energy Company, LLC. The existing sale contract period ends in 2020.

Minerals and geology
Scoping Start
08/06/2020
Decision
11/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 1, 2, 12 T40N R71W; Sec. 30, 31 T41N R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 11/13/2020
Thunder Basin National Grassland; approx. 16.5 miles west of Bill, WY. · Converse, Wyoming

Authorization for an existing 1,970-foot 14.4kV distribution electrical overhead power line that provides service to several oil wells. The authorization would be for operation and maintenance of the power line and right-of-way.

Special use management
Scoping Start
01/30/2015
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Cordie Lyon · cordie.lyon@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionW2SE sec. 34 T38N R73W, 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/1/2020
T40N R68W,sections 13 and 24, T40N R67W Sections 18,19 · Converse, Wyoming

Planting of riparian tree and shrub species along a drainage. Plantings will be fenced

Wildlife, fish, rare plants
Scoping Start
07/15/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
William Bailey · william.bailey2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/21/2020
Thunder Basin NG · Campbell, Wyoming

Surface uses for oil and gas development, drilling 15 oil wells from 2 well pad sites. Project includes road access and utilities (temporary water, production fluid, and electricity). Proponent is Anschutz Oil Company LLC.

Minerals and geologySpecial use managementRoad management
Scoping Start
03/16/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Kyle Schumacher · kyle.schumacher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas; Oil; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 23, 24, 25, 26, 27 T43N R72W
Decision Memo · Parks Ranger District · updated 9/8/2020
Parks Ranger District, NFSR 106 · Jackson, Colorado

Per State of Colorado Division of Water Resources (DWR) order to install headgates and/or measuring devices, owner of Rattler ditch proposes to install diversion and headgate structures.

Special use management
Scoping Start
07/27/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionSection 18, Township 5 North, Range 78 West, 6TH Principal Meridian
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/8/2020
From Craig, CO, take hwy 13 north approx 13 miles, turn right onto Moffat CR 27/NFSR 110, continue for approximately 22 miles. Park at the trailhead for NFST 1144. The project area begins 100 meters N · Routt, Colorado

Installation of a fish passage barrier in Upper S Fork Slater Creek to prevent brook trout from moving into a Colorado Cutthroat Trout population that had been isolated by a natural fall, recent surveys have now found brook trout above the falls.

Wildlife, fish, rare plants
Scoping Start
08/27/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
Upper South Fork Slater Fish Barrier Decision MemoDecision Signed Date: 09/04/2020
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10 N, R88W, Sec 20. 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 8/19/2020
Hahns Peak, North Routt, Colorado; unmarked mining road at NFSR 490.1 & 417.1 junction. · Routt, Colorado

Zirkel Wireless, LLC has requested access to an unmarked Forest Service road on Hahns Peak at the junction of NFSR 490.1 & 417.1. Zirkel needs access to construct and maintain a communication site on private property.

Special use management
Scoping Start
07/30/2020
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Kathleen Soulliere · kathleen.soulliere@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSection 9, T.10N., R.85W., 6th P.M., Routt County, Colorado
Decision Memo · Laramie Ranger District · updated 8/4/2020
Medicine Bow National Forest, Pole Mountain Unit, Laramie Ranger District · Albany, Wyoming

Relocate roughly 10 miles of trail on Pole Mountain to address the current resource damaging alignments.

Recreation management
Scoping Start
04/24/2018
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Chad Grossenburg · cgrossenburg@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Wyoming Pathways Pole Mountain Trail ReroutesDecision Signed Date: 08/03/2020
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionR71W T15N S25
Decision Memo · Laramie Ranger District · updated 7/21/2020
Snowy Range Ski and Recreation Area · Albany, Wyoming

Replacement of Chute Lift at Snowy Range Ski and Recreation Area to replace aging parts and make the exit more accessible. Upgrade from a double to triple lift. Repurpose existing motor room into a usable structure.

Recreation managementSpecial use management
Scoping Start
02/01/2020
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 7/13/2020
The new below-ground powerline will be located alongside National Forest System Road (NFSR) 100 (North Brush Creek Road) between the eastern edge of the road and the bottom of the drainage ditch. · Carbon, Wyoming

Carbon Power & Light (CP&L) to install below-ground powerline alongside North Brush Creek Road (National Forest System Road 100) to serve private landowners with property located adjacent to North Brush Creek Road.

Special use management
Scoping Start
06/05/2020
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSection 17, T. 16 N. R. 81 W., 6th P.M., Carbon County, Wyoming.
Decision Memo · White River National Forest All Units · updated 7/2/2020
Tours will occur on NFS lands within multiple districts on the White River, Pike & San Isabel, Arapaho-Roosevelt, Medicine Bow-Routt, GMUG, Shoshone and Rio Grande National Forests · Carbon; Fremont; Sublette; Chaffee; Conejos; Eagle; Fremont; Garfield; Grand; Gunnison; Park; Pitkin; Rio Grande; Routt; Saguache; Summit, Colorado; Wyoming

Issuance of a ten year outfitter and guide permit to Adventure Cycling Association to authorize multiple cycling tours to operate annually on National Forest System Lands across the Rocky Mountain Region.

Special use management
Scoping Start
06/18/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsGrand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; Shoshone National Forest; White River National Forest
DistrictsGunnison Ranger District; Yampa Ranger District; Brush Creek/Hayden Ranger District; Hahns Peak/Bears Ears Ranger District; Rio Grande National Forest All Units; Sulphur Ranger District; Salida Ranger District; South Park Ranger District; Wind River Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Eagle Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/2/2020
Buffalo Pass Communications Site. · Routt, Colorado

Amend communication use lease to authorize the replacement of the communications tower.

Special use management
Scoping Start
12/11/2019
Decision
04/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT7N R83W Sec 35 6thPM
Decision Memo · Brush Creek/Hayden Ranger District · updated 7/1/2020
Union Telephone's communications facility is located on Barrett Ridge, south of the Snowy Range Scenic Byway (Hwy 130), near Ryan Park. · Carbon, Wyoming

Union Telephone to expand current communications facility on Barrett Ridge. Includes removing old cell tower and installing new larger one, adding an additional equipment building, and expanding lease area from 50 ft x 50 ft to 100 ft x 100 ft.

Special use management
Scoping Start
08/08/2019
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNW Section 29, T. 16 N., R. 81 N., 6th P.M., Carbon County, WY.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/29/2020
Private and public lands in sections 11, 13, 14, 23, 24, 25, 26, 27, and 35 T43N R 70W. Thunder Basin NG. · Campbell, Wyoming

Renewal of a mineral material contract for scoria mining.

Minerals and geology
Scoping Start
02/28/2020
Decision
06/2020 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/27/2020
Thunder Basin National Grassland - Spring Creek Unit · Campbell, Wyoming

Drilling one oil well; road construction and reconstruction to access well pad; installation of pipeline and electric utility, and reclamation. Proponent is HD Adams.

Special use managementMinerals and geology
Scoping Start
08/30/2019
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Kyle Schumacher · kyle.schumacher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations; Minerals Or Geology Plans Of Operations; Natural Gas; Oil; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec 6 T54N R70W, 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/27/2020
Thunder Basin NG, approximately 14 miles south of Wright and 1 mile west of Highway 59. · Campbell, Wyoming

Crude oil gathering pipeline, right-of-way, construction, operation, maintenance, associated access, and reclamation. Proponent is Saddle Butte Powder Flats Midstream, LLC.

Special use managementMinerals and geology
Scoping Start
02/03/2020
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Kyle Schumacher · kyle.schumacher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 22, 23 and 27 T42N R72W.
Decision Memo · Laramie Ranger District · updated 6/16/2020
Project sites are located directly adjacent to National Forest System Roads 552 and 552.A on the Laramie Ranger District. · Albany, Wyoming

Take rock core samples from 5 locations near Lake Owen to be used for mapping local geologic stratigraphy. Drill pads are all located on unpatented mining claims and accessed via open National Forest System roads. No new roads will be built.

Minerals and geology
Scoping Start
11/28/2018
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSections 2 and 4, T. 13 N., R. 78 W., 6th P.M. Carbon County, WY.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/3/2020
15 miles southeast of Wright, WY. Campbell County Road 4 (Antelope Road) provides access. Thunder Basin NG. · Campbell, Wyoming

Installation of a surface water pipeline in a right-of-way and amendment of an existing authorization. Proponent is Peabody Powder River Mining, LLC.

Special use managementMinerals and geology
Scoping Start
03/24/2020
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionS2 S2 Section 34, T42N, R71W, 6th Principal Meridian
Decision Memo · Douglas and Thunder Basin Ranger District · updated 5/15/2020
North of Osage, WY. Thunder Basin NG. · Weston, Wyoming

Vegetation management for timber stand improvement and wildlife habitat management among ponderosa pine and juniper stands in riparian and upland sites, including prescribed fire and mechanical treatments of fuels.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Scoping Start
02/03/2020
Decision
03/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Rachel McGee · rachel.mcgee@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 4/3/2020
See proposal description. · Jackson, Colorado

Replace the temporary bridge on NFSR 792 with a permanent crossing structure. The project area is located approximately 2 miles south of Gould, CO. The project meets road management objectives, accommodates high flows, and allows aquatic passage.

Watershed managementRoad managementWildlife, fish, rare plants
Scoping Start
01/30/2020
Decision
02/2020 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionWithin Township 6 North, Range 77 West, Section 10.
Decision Memo · Yampa Ranger District · updated 3/28/2020
Near Lake Agnes and adjacent to Highway 40. · Grand, Colorado

This project proposes powerline maintenance,including the removal of 5 poles off of NFS lands and installation of 4 new poles on NFS lands. All work will be conducted over 12 inches or more of compacted snow.

Special use management
Scoping Start
11/21/2019
Decision
01/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Janet Faller · janet.faller@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 5 North, Range 82 West, Sections 34 and 35, 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/25/2020
Steamboat Mountain area, adjacent to Fish Creek. · Routt, Colorado

Special use permit authorizing an existing water diversion facility and 125 feet of water pipeline/access to the facility.

Special use management
Scoping Start
12/11/2019
Decision
01/2020 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N R84W Sec 14, 6pm
Decision Memo · Yampa Ranger District · updated 3/24/2020
Accesss to Dunkley-Dubuea Reservoir via private land. · Routt, Colorado

Cross Mtn Ranch road access to Duncklye-Dubuea Reservoir. Permitted road access is along NFSR 952.1 from private property to reservoir.

Special use management
Scoping Start
05/10/2019
Decision
01/2020 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT4N, R88W, sec1&2,6th PM
Decision Memo · Brush Creek/Hayden Ranger District · updated 2/21/2020
Area accessed from Arlington, WY on FS road 111. Drill #1 is on FS road 114. Drills #2 & #3 are on decommissioned 111.1C. Drill #4 is on decommissioned 125.1D. Drills are directly adjacent to roadbed. · Carbon, Wyoming

Mineral exploration and sampling conducted through boring four (4) geologic cores for analysis. Cores will be removed and remaining holes plugged with concrete.

Minerals and geology
Scoping Start
03/30/2018
Decision
02/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSections 28, 31 and 32 of T. 18 N., R. 79 W., 6th P.M.
Decision Memo · Brush Creek/Hayden Ranger District · updated 1/31/2020
Area of use is located adjacent to National Forest System Road (NFSR) 550 (Hog Park Road) approximately 6 miles south of State Highway 70 (Battle Highway). · Carbon, Wyoming

Requesting an Amendment to Brush Creek Ranch's current Outfitter Guide permit that would add shuttle services for accessing the ranch's newly-acquired Green Mountain retreat.

Recreation managementSpecial use management
Scoping Start
10/29/2019
Decision
12/2019 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Travis Owens · travis.owens@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSection 36, T. 14 N., R. 85 W., 6th P.M., Carbon County, Wyoming.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/31/2020
Private lands inside the administrative outer boundary for the Thunder Basin NG. · Campbell, Wyoming

Re-issue a mineral material contract to Dan Hart Patrol Service, LLC for federal mineral material, sand and gravel, at the Urban Groves Pit.

Minerals and geology
Scoping Start
11/19/2019
Decision
01/2020 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Mineral Material Contract Renewal for Dan Hart Patrol Service, LLCDecision Signed Date: 01/16/2020
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 5 T43N R73W
Decision Memo · Brush Creek/Hayden Ranger District · updated 1/31/2020
Canyon Trail and Hartt Creek allotments are located on the western slope of the Sierra Madre Range and Sixmile Allotment is located on the western slope of the Snowy Range. · Carbon, Wyoming

Pond development on 3 grazing allotments to improve livestock distribution.

Grazing management
Scoping Start
12/18/2019
Decision
01/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Wendy Haas · whaas@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT13,14,&15N, R87&88W,and T12&13N & R80W, 6th PM.
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/30/2019
Carlson Auxiliary Ditch crosses under National Forest System Road (NFSR) 111 through a culvert flowing westward. The short ditch segment west of NFSR 111 is where the soil boring will occur. · Carbon, Wyoming

WG&F to drill 6 to 10 bore holes 4" diam. and 10' to 25' deep using truck-mounted drill. Location is alongside Carlson Auxiliary Ditch, also dependent on access granted by Forest Service. Holes to be drilled within a 35-ft radius of ditchline.

Special use management
Scoping Start
09/13/2019
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSection 20, T. 18 N., R. 79 W., 6th P.M., Carbon County, WY.
Environmental Assessment · Brush Creek/Hayden Ranger District · updated 12/16/2019
West side of the Snowy Range · Carbon, Wyoming

Analysis of the motorized road and trail system on the west side of the Snowy Range. Analysis includes addition and removal of roads from the current road system and addition of ORV trails.

Recreation management
Scoping Start
12/12/2013
Comment Period
03/18/2015
06/2018 (Estimated)
Objection Period Start
06/2018 (Estimated)
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT19N, - T15N, R82W - R79W
Decision Memo · Laramie Ranger District · updated 12/10/2019
Snowy Range and Sierra Madre Range · Albany; Carbon, Wyoming

5 year temporary permit to operate a snowmobile guide service on the Laramie and Brush Creek/Hayden Districts of the Medicine Bow NF.

Special use management
Scoping Start
09/22/2012
Comment Period
09/22/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
3Cs Guiding, LLCDecision Signed Date: 12/03/2012 Legal Notice Date: 12/14/2012
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Decision Memo · Parks Ranger District · updated 12/10/2019
T5N, R79W, Sec 25: Intersection of NFSR 106 and 715 · Jackson, Colorado

This project consists of the installation of a physical rock barrier to restrict access to a dispersed campsite at the intersection of NFSRs-106 and 715. The rock barrier will be installed for resource protection.

Recreation managementWatershed management
Scoping Start
04/28/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Jon Myers · jcmyers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Albany Lodge Completed
Decision Memo · Laramie Ranger District · updated 12/10/2019
Snowy Range unit of the Laramie Ranger District · Albany; Carbon, Wyoming

Albany Lodge is applying for continued use as a winter snowmobiling guiding and retrieval service, as well as expanding their business to summer operations including Jeep, motorcycle and ATV guiding.

Special use management
Scoping Start
02/08/2013
Comment Period
02/08/2013
Decision
04/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT12N-18N through R77W-81W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
Situated north or northwest side of Antelope Coal Mine Road (County Highway 4). · Converse, Wyoming

Renewal of existing 5-year term authorization to mine and remove federal mineral material within the Antelope Mine permit boundary, which ensures supply of material for road maintenance and infrastructure support for mining of federal coal lease.

Minerals and geology
Scoping Start
04/19/2016
Decision
07/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Mineral Material Contract Renewal for Antelope Coal, LLCDecision Signed Date: 07/22/2016
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionS1 and 12 T40N R71W, 6th P.M.
Avid 4 Adventures Completed
Decision Memo · Laramie Ranger District · updated 12/10/2019
Sheep Mountain and Platte River Wilderness · Albany, Wyoming

Avid 4 Adventure currently has a guiding permit for 75 service days for rock climbing at Vedauwoo. They would like to add 150 days of guided backpacking trips on Sheep Mountain and Platte River Wilderness trailheads Pike Pole and Pelton Creek.

Special use management
Scoping Start
12/15/2012
Comment Period
12/15/2012
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Avid 4 AdventureDecision Signed Date: 04/19/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSheep Mountain: T14N, R77W, Sec 33 & 20; Pike Pole T14N, R80W, Sec 32; Pelton Creek – T13N, 79W, Sec 19
Decision Memo · Laramie Ranger District · updated 12/10/2019
Northeast of Centennial, WY · Albany, Wyoming

Prescribed fire would be used to treat National Forest System lands to improve vegetation conditions for big-game winter range.

Vegetation management (other than forest products)
Scoping Start
01/25/2013
Comment Period
01/25/2013
Decision
02/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Aaron Swallow · aswallow02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16N, R78W, Section 24
Decision Memo · Parks Ranger District · updated 12/10/2019
Township(T)11North(N)Range(R)79West(W)Sections 3,4,5,6 and T12N R79W Sections 20,21,28,29,31,32,33,34 · Jackson, Colorado

The Bear Draw Vegetation Management Project proposes the silvicultural treatment of up to 3000 acres of National Forest System Lands in Jackson county Colorado. Treatments are primarily tied to Mountain Pine Beetle Management.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
08/17/2017
Comment Period
08/17/2017
Decision
02/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionTownship(T)11North(N) Range(R)79West(W)Sections 3,4,5,6 and T12NR79W Sections 20,21,28,29,31,32,33,34
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 12/10/2019
Approximately 20 NE Steamboat Springs, CO · Routt, Colorado

Proposal to manage timber stands through various silvicultural harvest systems for forest health and other management needs.

Forest productsFuels management
Scoping Start
01/01/2015
Comment Period
07/19/2015
Objection Period Start
07/03/2016
Decision
08/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Mark Cahur · mcahur@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Special Products Sales; Timber Sales (Salvage)
Decision Notice Big Red Timber Management AnalysisDecision Signed Date: 08/25/2016
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT11N, R85W, 23, 24, 25, 26, 27, 34, 35, 36. T11N, R84W, 19, 20, 29, 30, 31.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
NFS lands in parts of T42-43N, R70-71W, Campbell County, WY, at Black Thunder Mine. · Campbell, Wyoming

Consolidate two existing Special Use Permits (SUP), numbers DGL406201 and DGL406202, into a new SUP (DGL401). Adjust the SUP acreage from 1,064 acres to 561 acres to reflect current, active SUP areas at Black Thunder Mine.

Special use management
Scoping Start
06/30/2015
Decision
09/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
SUP Consolidation and Acreage Adjustment at Black Thunder MineDecision Signed Date: 09/18/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT42-43N, R70-71W
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 12/10/2019
East/ northeast of Steamboat Springs, Colorado, in the Buffalo Mountain and Buffalo Pass areas. · Routt, Colorado

Develop approximately 40 miles of trails near Steamboat Springs in the Buffalo Pass area

Recreation management
Scoping Start
04/01/2015
Comment Period
04/19/2015
Objection Period Start
05/22/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N 83W Sections 3-5, 8; T6N 84W Sections 1, 2, 11; T7N 83W Sections 27-29, 32-35; T7N 84W Sections 25-26, 35-36
Decision Memo · Yampa Ranger District · updated 12/10/2019
T. 3N., R. 86W., Sections 5, 8, 9, & 15 · Garfield, Colorado

Use the piscicide rotenone to remove all non-native trout from the upper four miles of Coal Creek. Native Colorado River cutthroat trout will then be reintroduced.

Wildlife, fish, rare plants
Scoping Start
07/01/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
Coal Creek Reclamation Decision MemoDecision Signed Date: 08/12/2016
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
SE corner of the project area approximately 9 miles west of Bill, WYO · Campbell; Converse, Wyoming

NOI to conduct 3D O&G geophysical operations on TBNG across ca. 6188 acres including limited use of shotholes in inaccessible terrain.

Minerals and geology
Scoping Start
02/04/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT39-41N, R72-75W
EOG Bolt Re-Route Completed
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
Approximately 12 miles south of the town of Wright, Wyoming and 3 miles west of Hwy. 59. · Converse, Wyoming

EOG Resources, Inc. (EOG) has submitted a Sundry Notice of Intent requesting the BLM and USFS authorize a proposed alternate road access re-route to the Bolt #15-33H well and to abandon and reclaim the existing unauthorized road on NFS land.

Minerals and geology
Scoping Start
01/14/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
Decision Memo EOG Resources, Inc.-Access Road Re-Route to Bolt #15-33H WellDecision Signed Date: 05/30/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT42N R72W Sec. 33
Decision Memo · Laramie Ranger District · updated 12/10/2019
Albany County St Albans Chapel · Albany, Wyoming

Operate and maintain an open air chapel known as St. Alban’s Chapel used for religious services and wedding ceremonies.

Special use management
Scoping Start
10/03/2012
Comment Period
10/03/2012
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16N.R79W sec 11
Decision Memo · Laramie Ranger District · updated 12/10/2019
Crow Creek Hill, Laramie Ranger District · Albany, Wyoming

Reissue the Federal Aviation Administration a communications use lease for a private mobile radio service.

Special use management
Scoping Start
09/22/2012
Comment Period
09/22/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
FAA Communications UseDecision Signed Date: 01/30/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N, R72W, Section 27, SE1/4
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 12/10/2019
First Creek and Circle Creek in the Elkhead Creek watershed. · Routt, Colorado

Stream and riparian restoration projects on First Creek to benefit watershed, riparian, and aquatic resources.

Wildlife, fish, rare plantsWatershed management
Scoping Start
09/17/2017
Comment Period
09/17/2017
Objection Period Start
11/05/2017
Decision
12/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
First Creek Restoration Project Final Decision NoticeDecision Signed Date: 12/29/2017
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N R87W Sections 3, 17, 20, 21 and 22
Decision Memo · Laramie Ranger District · updated 12/10/2019
Laramie Ranger District by Wold tract · Albany, Wyoming

The purpose is to improve timber stand conditions and reduce the amount and continuity of fuels within the project areas.

Vegetation management (other than forest products)Fuels management
Scoping Start
06/20/2012
Comment Period
06/20/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Timothy Douville · trdouville@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT12N., R78W, sections 5 and 8
Decision Memo · Laramie Ranger District · updated 12/10/2019
Approximately 30 miles southwest of Laramie, WY. · Albany, Wyoming

Up to 3000 Acres of Treatment in Mountain Pine Beetle Infested stands of Lodgepole Pine.

Forest productsFuels management
Scoping Start
02/23/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Michael Salazar · mjsalazar@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionTownship(T) 13 N North(N) Range(R) 7 8 West(W)
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/10/2019
Treatment is proposed in six previous timber sale areas, all located north of Steamboat Springs, CO, on the Hahns Peak/Bears Ears R.D., from the Seedhouse Road to the Wyoming state line. · Routt, Colorado

Using chainsaws, thin overstocked, naturally regenerated harvest units totaling approximately 220 acres. Precommercial thinning would occur in stands dominated by lodgepole pine saplings.

Forest products
Scoping Start
01/01/2016
Decision
12/2017 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Rick Ondrejka · rondrejka@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R84W, Sec. 29, 31, 32; T10N, R85W, Sec. 2; T10N, R86W, Sec. 2, 3, 4, 5; T11N, R85W, Sec. 2, 3, 23, 26, 34, 35, 36; T11N, R86W, Sec. 32, 33, 36; T12N, R85W, Sec. 19
Decision Memo · Laramie Ranger District · updated 12/10/2019
Pole Mountain; Base of Operations near Headquarters Trailhead on Forest Service Road 707D · Albany, Wyoming

The Happy Jack Endurance Ride is a two-day series of endurance horse rides with 10, 25 and 50 mile loops.

Special use management
Scoping Start
11/02/2012
Comment Period
11/02/2012
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Mountain Region Endurance RidesDecision Signed Date: 02/05/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14 R71, Section 5 NW 1/4
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
T40N R73W Section 26 and 35 · Converse, Wyoming

Authorize by Road Use Permit the use and maintenance of 2,740 feet of National Forest System Road 1501 as 16-foot width crowned road and install a new cattle guard.

Special use management
Scoping Start
10/24/2014
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Memo to File, Hiland Crude LLC, Road Use Permit for Unnamed Road NFSR 1501Decision Signed Date: 08/14/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT40N R73W Section 26 and 35
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/10/2019
Approximately 6.5 roads miles southwest of the town of Encampment, Wyoming. · Carbon, Wyoming

Request from neighboring landowner to remove hazard trees that are on USFS lands that could hit a power line on his property.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
07/08/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Joshua Peck · jpeck@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Hughes Power Line Decision MemoDecision Signed Date: 07/15/2019
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionN1/2,S32 T14N R84W,6th P.M.
Decision Memo · Laramie Ranger District · updated 12/10/2019
The project is approximately 3 miles west of Foxpark, WY at the junction of Forest Service roads 512 and 504. · Albany, Wyoming

The District proposes to masticate 60 acres of dead lodgepole pine and replant with native coniferous seedlings following mastication.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
02/12/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Timothy Douville · trdouville@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
Illinois Creek Fire Re-vegetation ProjectDecision Signed Date: 07/09/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT13N R 78W Sections 7 and 18; T 13N R 79W Section 13
Jones Outfitting Completed
Decision Memo · Laramie Ranger District · updated 12/10/2019
Snowy Range Mountains · Albany; Carbon, Wyoming

Jones Outfitting has requested a renewal of their current authorization to guide hunting excursions on Sheep Mountain and the Snowy Range. This new authorization would be for a 5-year term expiring in 2017.

Special use management
Scoping Start
09/22/2012
Comment Period
09/22/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Decision Memo · Laramie Ranger District · updated 12/10/2019
Snowy Range Ski & Recreation Area · Albany, Wyoming

Journeyman Adventures would like to hold a 5K, 10K, 25K snowshoe race starting and finishing out of the Snowy Range Ski and Recreation Area. The permit would be for a 5-year term.

Special use management
Scoping Start
10/03/2012
Comment Period
10/03/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Journeyman Adventures, LLCDecision Signed Date: 01/29/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16N, R78W, Sec 20 NW ¼
Environmental Assessment · Laramie Ranger District · updated 12/10/2019
From Foxborough north to Brooklyn Lake · Albany, Wyoming

Vegetation treatments around WUI areas and municipal watersheds on the Laramie Ranger District. Treatment emphasis is on fuels reduction across the northern part of the District including Foxborough, Rob Roy/Rambler and north to Brooklyn Lake.

Vegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
11/24/2010
Objection Period Start
10/20/2012
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Sara Alberts · salberts@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Municipal Watersheds; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Roadless Area Management; Timber Sales (Salvage)
North WUI Fuels Reduction and Watershed Improvement ProjectDecision Signed Date: 02/11/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT13 - 16N, R78 - 79W, 6th Principle Meridian
Laramie Enduro Completed
Decision Memo · Laramie Ranger District · updated 12/10/2019
Pole Mountain Unit · Albany, Wyoming

The Laramie Enduro is applying for a five year permit to hold a 72.5 mile mountain bike race on the Pole Mountain unit for the end of July.There is a potential reroute from the course that has been used since 2006. Race start/finish at Hidden Valley.

Special use management
Scoping Start
02/09/2013
Comment Period
02/09/2013
Decision
05/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Laramie Enduro Inc.Decision Signed Date: 05/22/2013 Legal Notice Date: 05/24/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N-15N, R71-72W
Decision Memo · Laramie Ranger District · updated 12/10/2019
Laramie Ranger district · Albany, Wyoming

Conducting school sponsored activities on existing trails in the Happy Jack/Tie City area

Special use management
Scoping Start
09/06/2011
Comment Period
09/22/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Laramie Junior and Senior High SchoolsDecision Signed Date: 11/29/2012 Legal Notice Date: 12/10/2012
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14 R71W Section 29 – Vedauwoo, T15 N., R72W Sec 23 Tie City, T13N.R78W sec 24 Chimney Park
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
Vicinities of Esterbrook and Harris Park and tributary watersheds of Horseshoe Creek and LaBonte Creek. · Albany; Converse, Wyoming

Vegetation management to reduce wildfire risk and improve forest conditions. Includes wildlife and plant habitat management, commercial timber sales, other uses of timber, timber stand improvement, fuels management, and prescribed fire.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
08/30/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
John Madden · john.madden@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5); 32.3 (9)
Special AuthorityHfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Special Products Sales; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT28N R70W; T28N R71W; T28N R72W.
Decision Memo · Laramie Ranger District · updated 12/10/2019
Laramie Ranger District Snowy Range area · Albany, Wyoming

The Laramie Ranger District is reviewing potential thinning needs outside of Lynx analysis units. No road building/reconstruction will be necessary.

Vegetation management (other than forest products)
Scoping Start
02/12/2014
Decision
02/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Timothy Douville · trdouville@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT 14,13,12 R 77, 78, 79, 80
Decision Memo · Laramie Ranger District · updated 12/10/2019
Laramie Ranger District · Albany, Wyoming

Conducting school sponsored activities on existing trails in the Happy Jack/Tie City area.

Special use management
Scoping Start
09/06/2011
Comment Period
09/22/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Laramie Junior and Senior High SchoolsDecision Signed Date: 11/29/2012 Legal Notice Date: 12/12/2012
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT 14N, R71W, sec 29 Vedauwoo, T15N., R72W, sec 23 Tie City, T13N.,R78W, sec 24 Chimney park
Long Park AMP Completed
Environmental Assessment · Yampa Ranger District · updated 12/10/2019
Southeast of Yampa, CO approximately 15 miles. · Routt, Colorado

Grazing Management, revision update for allotment management plan

Grazing management
Scoping Start
03/06/2013
Comment Period
08/24/2014
Objection Period Start
03/01/2015
Decision
04/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Douglas Myhre · dmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
Rangeland Management in the Long Park Analysis AreaDecision Signed Date: 04/30/2015 Legal Notice Date: 05/10/2015
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 1 North, Range 83 West, Sections 17-21 and 28-34
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
Approximately 4 miles north of Upton, WY. · Weston, Wyoming

Use of National Forest System Road (NFSR) 909 for accessing private property.

Special use management
Scoping Start
02/24/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Road 909 Use for Legal Access to Private PropertyDecision Signed Date: 06/25/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT48N R64W Section 7; T48N R65W Sections 1 and 12.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
North of Bill, Wyoming · Converse, Wyoming

Powerline to North Bill Disposal Facility 9,609 feet in length with short term construction corridor of 20 feet and long term ROW width of 16.5' with initial disturbance of 4.29 acres and a long term ROW of 2.15 acres.

Special use management
Scoping Start
06/30/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
North Bill Power LineDecision Signed Date: 08/14/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 17, 18, 21 in T 38 N, R 70 W.
Environmental Impact Statement · Brush Creek/Hayden Ranger District · updated 12/10/2019
Northwest Sierra Madre mountains · Carbon, Wyoming

Signed Record of Decision now available! Up to 6,834 acres hazard tree clearing, precommercial thinning & timber harvest; associated road proposals to improve motorized public access to the forest while minimizing road impacts to other resources.

Forest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
NOI in Federal Register
11/23/2015
DEIS NOA in Federal Register
07/28/2017
FEIS NOA in Federal Register
03/21/2018
Objection Period Start
03/23/2018
Decision
05/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Municipal Watersheds; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics); Hfra Title I: Threatened And Endangered Species Habitat; Hfra Title Vi: Insect And Disease Projects
Notice and Comment Regulation218 (2013) HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green)
North Savery Project Vegetation and Travel Management Actions RODDecision Signed Date: 05/25/2018
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT14-16N R86-88W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
Around the town of Esterbrook Wyoming. · Albany, Wyoming

This project proposes to burn or mechanically treat approximately 2,754 acres in the eastern half of the Laramie Peak unit. Much of the vegetation within the the project units has not experienced fire in past 50 years.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Scoping Start
11/06/2014
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Clay Westbrook · cwestbrook01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements
Northeast Laramie Range Fuels and Vegetation ProjectDecision Signed Date: 06/03/2016
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT28N R71W, T28N R72W, T27N R71W, T27N, R72W
Environmental Assessment · Laramie Ranger District · updated 12/10/2019
Pole Mountain unit · Albany, Wyoming

This is a multi-phase project that would prescribe burn or mechanically treat approximately 8,600 acres on the Pole Mountain unit over 7-10 years. Proposed activities would improve habitat and reduce fuels.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
08/09/2013
Comment Period
08/09/2013
Objection Period Start
02/18/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Daron Reynolds · dsreynolds@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N R71W Sections 1-3, 10-15, 22-30; T15N R71W Sections 1-24, 25-27, 34-36; T15N R72W Sections 1-2, 11-14
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
Thunder Basin National Grassland · Campbell, Wyoming

Authorization to Powder River Energy Corp. to upgrade and maintain an existing powerline supply, less than 33-kV, within the right-of-way to supply electricity to an oil well for Petro-Hunt.

Special use management
Scoping Start
07/05/2016
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Amendment to Special Use Authorization, PRE Corp. 14.4 and 24.9kVDecision Signed Date: 01/30/2017
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionS11 T43N R71W, 6th P.M.
Progeny II Completed
Decision Memo · Parks Ranger District · updated 12/10/2019
1/2 mile south of intersection between HWY 125 and FSR 106 · Jackson, Colorado

The proposed action is for a sanitation (green mistletoe trees) and salvage (dead trees) harvest to prevent Dwarf Mistletoe from infecting the North Park Progeny Site (superior tree seed source).

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
01/31/2013
Comment Period
01/31/2013
Decision
03/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Sarah Bridges · sarahbridges@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
Decision Memo - Progeny IIDecision Signed Date: 03/06/2013 Legal Notice Date: 03/14/2013
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT5N., R78W., Sec. 23
Environmental Assessment · Yampa Ranger District · updated 12/10/2019
Analysis area located approximately 15 miles south of Hayden, CO · Rio Blanco; Routt, Colorado

Grazing Management, Allotment Plan Revision

Grazing management
Scoping Start
12/19/2016
Comment Period
12/19/2016
Objection Period Start
08/06/2017
Decision
09/2017 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Douglas Myhre · dmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations
Pagoda AMPDecision Signed Date: 09/27/2017
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 12/10/2019
Vicinity of Rob Roy Reservoir. · Albany, Wyoming

Vegetation management to reduce wildfire risk and improve forest conditions.

Forest productsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
09/11/2019
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Brooke Owens · brooke.d.owens@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5); 32.3 (9)
Special AuthorityHfra Title Vi: Insect And Disease Projects; Hfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements
Rob Roy Vegetation and Fuels Management Decision MemoDecision Signed Date: 10/28/2019
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N R78W, T14N R79W, T15N R78W.
Rocky Top Guides Completed
Decision Memo · Laramie Ranger District · updated 12/10/2019
Vedauwoo Recreation Area · Albany, Wyoming

Rocky Top Guides would like to outfit and guide rock climbers. They are a new applicant and if authorized, the term of the permit would be for 2 years, expiring in 2014.

Special use management
Scoping Start
09/22/2012
Comment Period
09/22/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14, R71W, Section 29
Environmental Assessment · Parks Ranger District · updated 12/10/2019
The project area is located in Jackson and Grand Counties approximately 25 miles south of the town of Walden, Colorado · Grand; Jackson, Colorado

The primary purpose of this project is to improve forest health, reduce threats to public safety, and provide forest products while minimizing environmental effects in the project area. A variety of silvicultural treatments are proposed.

Recreation managementForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Scoping Start
03/26/2015
Comment Period
03/26/2015
Objection Period Start
11/19/2015
Decision
03/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Improvements/Construction; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
Slack Weiss Project Decision NoticeDecision Signed Date: 03/22/2016
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT4N 80W Sections 1-18; T4N 81W Sections 1-3, 11-14; T5N 79W Sections 19, 29-32;T5N 80W Sections 1-4, 9-36; and T5N 81W Sections 13, 23-27, 34-36
Decision Memo · Laramie Ranger District · updated 12/10/2019
Gap Trail; Brooklyn Lake/Sheep Lake; Vedauwoo; Mirror Lake; Savage Run Trailhead; Pelton Creek Trailhead; Pike Pole Trailhead · Albany, Wyoming

SROM is a May-October outfitting and guiding service focused around rock climbing, back-packing, hiking, utilizing various areas of the forest for day-use and overnight camping.They would like to renew their permit for a five year term.

Special use management
Scoping Start
12/15/2012
Comment Period
12/15/2012
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16N R79W, Sec 8, 11, 19; T14N R71W, Sec 29; T14N R80W, Sec 14, 27 ; T13N R79W, Sec 19
Decision Memo · Laramie Ranger District · updated 12/10/2019
S34 T13N R79W, 6th P.M. · Albany, Wyoming

1100' temp road and salvage of associated hazard trees

Forest products
Scoping Start
11/06/2019
Decision
11/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Brooke Owens · brooke.d.owens@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 12/10/2019
Tie City Summer Trails, west side of Pole Mountain off Happy Jack Hwy · Albany, Wyoming

Trail reroutes, reconstruction, and installation of water control features in the Tie city summer trail system; specific locations to be determined. Resources available for implementation in 2017 as a result of Wyoming Pathways grant to fund WYYCC.

Recreation managementWatershed management
Scoping Start
07/14/2015
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Dave Gloss · dgloss@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 12/10/2019
Snowy Range, Pole Mountain, and Laramie Peak areas · Albany, Wyoming

UW Outdoor Adventure Program is currently permitted to outfit and guide University of Wyoming students, faculty and staff on various areas of the forest. They have been a permittee since 2006. If authorized, this permit renewal would expire in 2017.

Special use management
Scoping Start
09/22/2012
Comment Period
09/22/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District; Douglas and Thunder Basin Ranger District
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/10/2019
7 miles east of Hwy. 59 in the Spring Creek Unit of the Thunder Basin National Grassland. · Campbell, Wyoming

Vast Oil, Inc. has the need to access existing roads on USFS to access Wildhorse Federal well 2-18 and Wildhorse Federal well 31-19. A change in the company name of the existing permit will be used to access these areas.

Special use management
Scoping Start
06/02/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Angela Bulla · ambulla@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Memo to File-Vast Oil, Inc Road Use PermitDecision Signed Date: 06/17/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 2, 11, 13, 14, 18, 24 T54N R69W
Decision Memo · Laramie Ranger District · updated 12/10/2019
Various locations on the Laramie Ranger District · Albany, Wyoming

The WY Military Dept. currently has a special use permit to use 6 landing sites on the MBRNF for medical evacuation trainings. They have applied for reissuance of the permit with the addition of 35 new landing sites.

Special use management
Scoping Start
12/01/2011
Comment Period
05/15/2012
Decision
10/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Wyoming Military DepartmentDecision Signed Date: 10/11/2012 Legal Notice Date: 10/22/2012
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District; Douglas and Thunder Basin Ranger District
Decision Memo · Laramie Ranger District · updated 12/10/2019
Laramie Ranger District, Pole Mountain · Albany, Wyoming

Hazard tree clearing and/or removal within existing right-of-way easement and along right-of-way fences for Interstate-80, Wyoming Hwy 210, Old US Hwy 30, and Summit rest area.

Vegetation management (other than forest products)Special use management
Scoping Start
11/07/2012
Comment Period
11/07/2012
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Sara Alberts · salberts@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16N, R78W, S 17-21, 28,33; T16N, R79W, S 11, 13-17, 19, 20; T16N, R80W, S25-30, 35.
Decision Memo · Laramie Ranger District · updated 12/9/2019
Pole Mountain · Albany, Wyoming

Replacement of and existing guyed tower with a Guy-less tower in the same location and of the same height

Special use management
Scoping Start
10/18/2017
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Nicholas Collard · ncollard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N,R72W,sec.10
Decision Memo · Laramie Ranger District · updated 12/9/2019
Unauthorized route off of NFSR 504. · Albany, Wyoming

Rehabilitation of approximately 0.5 acres of wetland, damaged by an unauthorized route, to restore soil productivity, hydrologic function, and wetland vegetation.

Watershed managementVegetation management (other than forest products)
Scoping Start
10/2016 (Estimated)
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Katharine Haynes · katharinemhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionS22, 23 T13N R79W 6th P.M.
Environmental Assessment · Laramie Ranger District · updated 10/31/2019
Muddy Creek road (553) and Lake Creek Road (588) and associated watersheds in the Snowy Range. · Albany, Wyoming

The final environmental assessment and draft decision will be available soon! This project would improve wetlands, stream and watershed conditions, and habitat for fish and wildlife in the Muddy Creek and Lake Creek watersheds (NFSRs 553 and 588).

Watershed managementRoad managementWildlife, fish, rare plantsRecreation managementVegetation management (other than forest products)
Scoping Start
07/01/2014
Comment Period
07/27/2014
Objection Period Start
07/26/2019
Decision
10/2019 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Dave Gloss · dgloss@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements; Travel Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 10/22/2019
25 miles SE of Walden, CO · Jackson, Colorado

Up to 3000 acres of mechanical vegetation treatment.

Fuels managementForest products
Scoping Start
02/27/2019
Decision
06/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionTownship(T) 5N North(N) Range(R) 79West(W) Sections, 2, 3, 4, 10, 11, T5N R78W Sections 7, 13, 14, 17, 18, 20, 21, 23, 24, 25, 26, 27, 28, 29, 32, 33, 35, 36, and T5N R77W Sections 18, 19, and 30.
Decision Memo · Laramie Ranger District · updated 10/17/2019
Beginner area at Snowy Range Ski and Recreation Area · Albany, Wyoming

Snowy Range is proposing to repair and replace a "magic carpet" style surface conveyor lift.

Special use managementRecreation management
Scoping Start
04/24/2019
Decision
07/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 9/27/2019
Gill Reservoir is located approximately 22 miles northwest of Yampa, CO near Dunckley Pass. · Routt, Colorado

The proposal is to issue a Special Use Permit for the operation and maintenance of Gill Reservoir which will be used by the public for recreation, livestock watering, and wildlife habitat. The permit will be issued for a 30 year term.

Special use management
Scoping Start
12/14/2018
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT. 3N., R. 88W., Sec. 14 NW1/4NE1/4, Sec. 11 SW1/4SE1/4, and SE1/4SW1/4, 6th PM, Routt County, Colorado
Decision Memo · Yampa Ranger District · updated 9/27/2019
Ditch is located approximately 9 miles southwest of Oak Creek, CO near Rio Blanco Road 16 · Rio Blanco, Colorado

The proposal is to re-issue a Special Use Permit for the use and maintenance of the Rich Ditch for diversion of water from Trout Creek to Oak Creek for the Towns municipal water system purposes. The permit will be issued for a 20 year term.

Special use management
Scoping Start
12/13/2018
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNW 1/4 Section 30, T3N, R86 W, and Sections 25 and 36, T3N, R87W, 6th PM, Rio Blanco County, Colorado
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/20/2019
Approximately 7 miles east of Highway 59, south of Reno Road. Thunder Basin NG. · Campbell, Wyoming

Surface use operations by a proponent for two new oil and natural gas developments on two drill sites and associated activities for utilities, roads, pipelines, and reclamation.

Minerals and geology
Scoping Start
07/01/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
John Wise · john.wise@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 12 T42N R71W; T42N R72W; T43N R71W; and T43N R72W.
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 9/18/2019
All 6 pits to be in the north-central area of the Pole Mountain unit of the Laramie District just off of Forest Road 702.B. Three pits to be north of the road, and three pits to be south of the road. · Albany, Wyoming

NRCS to dig 6 soil test pits as a training exercise to study soil profiles. Pits are all located on Pole Mountain. Pit dimensions are 6 ft deep x 70 in long x 30 in wide. Excavated soil will be replaced in pit upon completion. Pits will be hand-dug.

Special use management
Scoping Start
07/12/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 17, T. 15 N., R. 71 W., 6th P.M., Albany County, WY.
Decision Memo · Laramie Ranger District · updated 9/10/2019
NW1/4 SE1/4 Section 27, T. 14 N., R. 89 W., 6th P.M., Albany County, Wyoming. · Albany, Wyoming

Proposed excavated trench measuring 51 feet wide by 80 feet long by 4 feet deep to locate gold. Trench will be placed adjacent to Douglas Creek. Trench will be backfilled.

Minerals and geology
Scoping Start
03/05/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Hahns Peak/Bears Ears Ranger District · updated 9/5/2019
Within the Steamboat Ski Area permit boundary · Routt, Colorado

Analyze the impacts of approving selected projects identified in the 2011 Steamboat Ski & Resort Corporation Master Development Plan Amendment, which was accepted by the U.S. Forest Service on January 2, 2013.

Special use managementRecreation management
NOI in Federal Register
08/29/2016
DEIS NOA in Federal Register
01/19/2018
FEIS NOA in Federal Register
09/05/2018
Objection Period Start
06/02/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Steamboat Ski Area Improvements Final RODDecision Signed Date: 09/10/2018
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N R83W S5; T5N R84W S1; T6N R 83W S20, 29, and 32; T6N R84W S13, 14, 22-27, and 36
Decision Memo · Laramie Ranger District · updated 8/28/2019
Hill 8821 Communications Site, Pole Mountain Unit, Laramie Ranger District, Medicine Bow National Forest. · Albany, Wyoming

The facility is comprised of one 15 ft x 20 ft, one story concrete block building and two towers: one 80 ft high and one 100 ft high, each anchored with guy wires. Located on Hill 8821 communications site on the Pole Mountain Unit.

Special area management
Scoping Start
03/08/2019
Decision
04/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Area Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 10, T. 15 N., R. 72 W., 6th P.M., Albany County, Wyoming.
Decision Memo · Parks Ranger District · updated 8/21/2019
Approx. 15 miles northeast of Kremmling, Colorado, commonly referred to as the Troublesome area. · Grand, Colorado

Prescribed fire treatments to restore ecological function and future resilience to areas that have experienced insect and disease infestations.

Fuels managementVegetation management (other than forest products)
Scoping Start
02/25/2019
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Kevin Thompson · kkthompson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2); 32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT4N R79W Sections: 10, 11, 12, 13, 14, 15, 16, 20, 21, 22, 23, 24, 26, 27, 28, 29, 30, 31, 32, 33, 34, 35, 36. T3N R79W Sections: 1, 2, 3, 4, 5, 6.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/12/2019
Thunder Basin NG · Converse, Wyoming

Geophysical survey for fluid minerals. Proponent is Devon Energy.

Minerals and geology
Scoping Start
05/13/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionTownships 37, 38, and 39 North by Ranges 68, 69, 70, and 71 West
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/12/2019
Thunder Basin NG · Campbell; Converse, Wyoming

Geophysical survey for oil and natural gas.

Minerals and geology
Scoping Start
04/18/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
James McKay · james.mckay@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionTownships 40, 41, 42, and 43 North by Ranges 71, 72, and 73 West
Decision Memo · Laramie Ranger District · updated 6/28/2019
Douglas Creek between the bridge to the Bobby Thompson Campground and the campground itself. · Albany, Wyoming

Proposed mineral exploration using a dredge with a 5 inch diameter nozzle to reach deeper into holdes in the creekbed. Original proposal included use of a 3-inch diameter nozzle. Project may include off-system motorized access to mining claim.

Minerals and geology
Scoping Start
01/02/2017
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Nicholas Collard · ncollard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N, R79W, Section 34, 6th P.M.
Decision Memo · Laramie Ranger District · updated 6/20/2019
Project is located on Gilmore Ridge, Pole Mountain Unit, Laramie Ranger District, Medicine Bow National Forest. · Albany, Wyoming

Re-issue of communications use lease for communications facility on Gilmore Ridge of the Pole Mountain Unit of the Laramie District. Laramie Plains Antenna TV Association was first issued a lease for this same use by the Forest Service in 1997.

Special use management
Scoping Start
03/27/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 27, T. 15 N., R. 72 W., 6th P.M., Albany County, WY.
Decision Memo · Yampa Ranger District · updated 6/17/2019
Elk River near Clark, CO · Routt, Colorado

Priority Permit Amendment for rafting on the Elk River

Special use management
Scoping Start
05/06/2019
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/17/2019
Within the Steamboat Ski Area operating boundary · Routt, Colorado

Ground disturbing activities may occur within the Thunderhead zone; projects proposed in this zone will be subject to specialist design criteria. Replacement and extension of Spur Run snowmaking.

Special use managementRecreation management
Scoping Start
05/06/2019
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/14/2019
HP/BE bunkhouse and boneyard. · Routt, Colorado

Special Use Permit (5 years or less) for temporary construction on Forest Service property (Hahns Peak/Bears Ears District bunkhouse and boneyard) and removal of existing road encroachment on Forest Service property within city limits.

Special use managementFacility management
Scoping Start
03/11/2019
Decision
03/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
City of Steamboat Springs Special Use Permit Decision MemoDecision Signed Date: 03/19/2019
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land Description6TN, R84W, Sec11, 6th PM
Environmental Assessment · Yampa Ranger District · updated 6/14/2019
Gore Pass Area · Routt, Colorado

Vegetation restoration and harvest, fuels treatment, habitat improvement, watershed health activities.

Fuels managementWildlife, fish, rare plantsWatershed managementForest productsVegetation management (other than forest products)
Scoping Start
08/2019 (Estimated)
Decision
03/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Artemisia Turiya · aturiya@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 4/22/2019
Project is located on the Beacon Hill North communications site of the Pole Mountain Unit, Laramie Ranger District, Medicine Bow National Forest.1.0 · Albany, Wyoming

Reissue of expired communications use lease for University Amateur Radio, Inc. based out of the University of Wyoming in Laramie. This is a non-profit public benefit corporation that provides free-of-charge emergency and information-sharing services.

Special use management
Scoping Start
02/15/2019
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 14, T. 15 N., R. 72 W., 6th P.M., Albany County, Wyoming.
Decision Memo · Laramie Ranger District · updated 3/27/2019
Snowy Range in Medicine Bow NF · Albany, Wyoming

Management of unauthorized routes and rehabilitation of soil and vegetation.

Watershed managementRecreation management
Scoping Start
02/11/2019
Decision
03/2019 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
Katie Buchan · kbuchan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSec. 3 T18N R78W
Pushover Project Completed
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/26/2019
The project is in Routt County, Colorado, approximately 22 miles northwest of Hayden, CO. The project occurs within the Slater Creek Geographic Area near NFSR 42 & 49 · Routt, Colorado

Project would mechanically push over or cut 300 sub-alpine fir or engelmann spruce trees less than 12 inches in diameter to be used in implementing stream restoration actions.

Wildlife, fish, rare plants
Scoping Start
05/18/2018
Decision
03/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Pushover Project - First Creek RestorationDecision Signed Date: 03/21/2019
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionTownship 10 North, Range 87 West, Sections; 13, 23, 24, 25, and Township 10 North, Range 86 West, Section 18
Decision Memo · Laramie Ranger District · updated 3/6/2019
Project is located on Pilot Hill, on the Pole Mountain area of Medicine Bow National Forest. · Albany, Wyoming

VRE Towers, LLC owns a pre-existing communications tower on Pole Mountain for which the lease needs to be re-issued. There will be no physical alterations to the tower itself; changes are administrative only.

Special use management
Scoping Start
07/09/2018
Decision
10/2018 (Estimated)
Implementation
03/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSec. 10, Township 15 North, Range 72 West, 6th P.M., Albany County, Wyoming.
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 2/13/2019
Thunder Basin National Grassland, vicinity is southwest of the Red Hills, within the M Creek watershed, approximately 13 miles north of Bill. · Converse, Wyoming

Road use authorization for a segment of NFSR 1414 with reconstruction and improvements for a proponent; travel management changes to make segments of NFSR 1414 available for motorized public use and to close NFSR 1414.G.

Special use managementRoad management
Scoping Start
12/12/2018
Comment Period
12/15/2018
Decision
01/2019 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Special Use Authorizations; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Travel Management
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT40N R70W Sec. 20 and 29.
Environmental Assessment · Parks Ranger District · updated 2/5/2019
Approximately 10 miles west of the town of Cowdrey, Colorado. · Jackson, Colorado

Decommission and reroute portions of National Forest System Roads 660.1, 669.1, and 609.1 to reduce impacts to wetlands, streams, and watershed health.

Recreation managementRoad managementWatershed managementWildlife, fish, rare plants
Scoping Start
03/31/2016
Comment Period
03/31/2016
Objection Period Start
02/15/2018
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Marti Aitken · maitken@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Trail Management; Travel Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionTownships 11N, Range 82W, and Sections 24, 25, 26, & 27
Decision Memo · Yampa Ranger District · updated 2/5/2019
Approximately 20 miles southeast of Yampa,Colorado, near Gore Pass. · Grand, Colorado

Harvest treatments of up to 3000 acres in mostly beetle killed conifers. This project was formally known as "Red Vista Vegetation Management".

Forest productsFuels managementVegetation management (other than forest products)
Scoping Start
12/18/2018
Decision
02/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Kevin Thompson · kkthompson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
Red Vista Fuels Reduction Project Decision MemoDecision Signed Date: 02/01/2019
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 1/31/2019
Pole Mountain unit. · Albany, Wyoming

Replace existing guyed tower with guy-less taller tower on same site.

Special use management
Scoping Start
07/20/2017
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Nicholas Collard · ncollard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N,R72W,sec.14
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/21/2018
Sec. 21, T. 13 N., R. 88 W., 6th P.M., Carbon County, WY. Located appx 1.2 miles northwest of Hwy 70 and accessible by open Forest Road 814. · Carbon, Wyoming

C & C Cattle Co. has requested a re-issue of their Forest Service Special Uses Permit for livestock grazing for a 16-ac parcel. The permit expired 12/31/2017. There are no changes in the use of the pasture; action is administrative only.

Special use management
Scoping Start
02/12/2018
Decision
11/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSNW1/4 SW1/4 Sec. 21, T. 13 N., R. 88 W., 6th P.M., Carbon County, WY.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/20/2018
Medicine Bow NF; near Esterbrook Campground. · Albany, Wyoming

Habitat improvement for ferruginous hawk.

Wildlife, fish, rare plants
Scoping Start
06/29/2018
Decision
09/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Tim Byer · tbyer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Raptor Nesting Platform Establishment Project - Esterbrook CGDecision Signed Date: 09/21/2018
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 1 T28N R70W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/20/2018
Thunder Basin NG - Spring Creek Unit · Campbell, Wyoming

Installation of a hawk nest structure.

Wildlife, fish, rare plants
Scoping Start
06/29/2018
Decision
11/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Tim Byer · tbyer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNESE Sec 2 T55N R70W
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/19/2018
Located off Continental Divide Road (NFSR 412) in Sec. 15 · Carbon, Wyoming

Access driveway across National Forest lands to private property through issuance of FLPMA Easement: 30 years, renewable. Using existing unclassified road 0.7 miles/20 feet either side of centerline (~3.39 acres). No additional construction to road.

Special use management
Scoping Start
10/02/2017
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/19/2018
To be located completely within existing road rights-of-way: Highway 130 (Snowy Range Road), NFSR 210, and NFSR 232.1A. · Carbon, Wyoming

Union Telephone Co. to install below-ground fiber optic cable to provide high-speed data communications to support broadband network and communications for emergency services in rural areas, traveling public, and properties along the route.

Special use management
Scoping Start
04/24/2018
Decision
11/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSections 7, 17, 18, 20, 28 and 29, T. 16 N., R. 81 W., 6th P.M., Carbon County, Wyoming.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/13/2018
Thunder Basin National Grassland. Adjacent to NARM, east of County Road 4, and generally west of Teckla electrical substation. · Campbell, Wyoming

Realignment of existing power lines to accommodate coal mining operations.

Special use management
Scoping Start
10/22/2018
Decision
12/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 3 T41N R71W; Sec. 34 T42N R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/13/2018
Kraft Allotment, within Lassen Cr. watershed area, Thunder Basin NG. · Weston, Wyoming

Installation of a new livestock water well, tank, and trough.

Grazing management
Scoping Start
11/09/2018
Decision
12/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Rachel McGee · ramcgee@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Birkley Well and Johnson WellDecision Signed Date: 12/07/2018
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 30 T45N R64W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/13/2018
Hanson Allotment - Thunder Basin NG · Weston, Wyoming

Installation of a new livestock water well, tank, and trough.

Grazing management
Scoping Start
11/09/2018
Decision
12/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
Rachel McGee · ramcgee@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Birkley Well and Johnson WellDecision Signed Date: 12/07/2018
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 20 T41N R63W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/7/2018
Approx. 6 miles southeast of Wright, WY, on Thunder Basin NG. · Campbell, Wyoming

Oil and gas development that includes access road, well pad, and wells.

Minerals and geology
Scoping Start
01/07/2018
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
John Wise · jwise@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 21, 22, 27 and 28 T43N R71W, 6th P.M.
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 11/9/2018
Thunder Basin NG, southwest of Wright, WY · Campbell, Wyoming

Amendment of existing permit to add 334.5 acres for overstrip of topsoil and overburden and stockpile material for reclamation and other mining activities at Black Thunder Mine. And USFS administrative actions or orders to manage public land use.

Special use management
Scoping Start
09/13/2017
Comment Period
09/13/2017
Objection Period Start
09/14/2018
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
SUA Amendment for Use and Occupancy of NFS Lands at Black Thunder MineDecision Signed Date: 11/09/2018
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSec. 1 and 2 T42N R71W, 6th P.M.
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 10/29/2018
The area around and/or near the existing Dry Lake campground and parking lot. · Routt, Colorado

Campground expansion, parking improvement.

Recreation management
Scoping Start
06/10/2018
Comment Period
06/10/2018
Objection Period Start
09/02/2018
Decision
10/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 10/25/2018
Project is located off of National Forest System Road 850.1A. · Carbon, Wyoming

Install a headgate, measuring flow box, 991 feet of 24-inch diameter pipe along existing ditch right-of-way. In addition to installation of in-channel diversion and in-stream structures.

Special use management
Scoping Start
02/23/2018
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
William Baer · wbaer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8); 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSW1/4SE1/4 Sec. 30 T. 13 N., R. 87 W., 6th Principal Meridian, Carbon County, Wyoming.
Decision Memo · Brush Creek/Hayden Ranger District · updated 10/25/2018
T13N, R87W, Section 30, SE1/4 SW1/4 · Carbon, Wyoming

The proposed action is to install a headgate, measuring flow box, 991 feet of 24 inch diameter pipe along the existing right-of-way, and instream structures in Battle Creek. Project has been cancelled. See Project #54006.

Wildlife, fish, rare plantsSpecial use managementWatershed management
Scoping Start
03/06/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
William Baer · wbaer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Special Use Authorizations; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 10/25/2018
Sec. 2, T. 12 N., R. 83 W., 6th P.M. Blackhall Mountain Quadrangle. Top of Blackhall Mountain. Radio equipment is installed on Blackhall Lookout Tower. · Carbon, Wyoming

Blackhall Lookout Tower houses mobile radio service communications (repeater) for Carbon County first responders. Permit/Lease is expired and needs re-issued. New permit to be for recommended 30 years. Administrative change only, footprint unchanged.

Special use management
Scoping Start
10/06/2017
Decision
05/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionSec. 2, T. 12 N., R. 83 W., 6th P.M.
Decision Memo · Brush Creek/Hayden Ranger District · updated 10/24/2018
Near Overlook Retreat Subdivision on the Snowy Range · Carbon, Wyoming

Proposed springbox and water transmission line for domestic use. This project has been cancelled as it did not pass the NEPA process. Application returned to proponent.

Special use management
Scoping Start
01/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Melanie Fullman · mfullman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT17N, R80W, Section 15
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/22/2018
Thunder Basin NG · Converse, Wyoming

Amend an existing special use authorization, named DGL344, to include construction and operation of a new power line segment at Antelope Mine within a new right-of-way in order to provide electricity to an existing entrance guard facility.

Special use management
Scoping Start
06/20/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNW Sec 12 T40N R71W
Decision Memo · Brush Creek/Hayden Ranger District · updated 9/30/2018
Project is located about 1000 ft north of Battle Highway. Parcel is directly adjacent to Battle Pass Subdivision on its northern edge. Parcel is oblong and narrow in shape and measures 9 acres. · Carbon, Wyoming

Private citizen is considering whether to pursue purchase parcel of National Forest System land or not. Project is on hold until citizen decision is made. Parcel is eligible for purchase under the Small Tracts Act for several reasons.

Land ownership management
Scoping Start
12/14/2012
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT14N, R85W, Sec. 20 & 21.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/21/2018
15 miles NE of Craig, CO. · Moffat, Colorado

Construction of a wing wall to protect a native Colorado cutthroat trout population.

Wildlife, fish, rare plants
Scoping Start
09/12/2018
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R89W, Section 25.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/20/2018
Coulton Creek and Hinman Park areas, north of Seedhouse Road (NFSR400). · Routt, Colorado

A proposal for minor reroutes of NFS Trails 1190, 1188, and 1188.1A are cancelled. These may be reconfigured into other trails work.

Watershed managementRecreation management
Scoping Start
08/2017 (Estimated)
Decision
04/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSections 6, 7 T9N R84W, Sec. 13 T9N R85W, Sections 31, 32 T10N R84W, 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/20/2018
Trail sections near Fishhook Lake, east of Steamboat Springs, Colorado, and north of State Highway 40. · Routt, Colorado

Parts of this proposal to reroute sections of NFS Trail 1101, part of the designated Continental Divide Trail may be incorporated in later proposals. This project would reduce impacts to wetlands and improve overall watershed and trail conditions.

Recreation managementWatershed management
Scoping Start
01/01/2015
Decision
05/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/19/2018
T9N, R84W · Routt, Colorado

Pre-commercial thinning of approximately 240 acres of lodgepole pine.

Vegetation management (other than forest products)
Scoping Start
03/07/2010
Decision
12/2011 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Andy Cadenhead · acadenhead@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSeedhouse Corridor, northeast of Clark, Colorado.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/19/2018
District-wide · Grand; Jackson; Moffat; Routt, Colorado

Planning and analysis of motorized trail opportunities will be directed into future specific proposals.

Recreation management
Scoping Start
07/01/2017
Decision
12/2018 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 9/19/2018
Located approximately 7 miles NW of Yampa on Whitney Creek. · Rio Blanco, Colorado

Use of the existing Last Chance Ditch to divert additional water from Whitney Creek to private property.

Special use management
Scoping Start
07/22/2013
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/19/2018
Buffalo Pass Winter Recreation Area · Routt, Colorado

Adding approximately 2 miles of new snow trails; modifying alignment of existing snow trails.

Special area management
Scoping Start
04/02/2017
Decision
05/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Steamboat Powdercats 2018 CEDecision Signed Date: 05/11/2018
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/18/2018
Forest Service Road 400 (Seedhouse Road) and Forest Service Road 110 (Black Mountain Road) · Moffat; Routt, Colorado

OHVs would be allowed on FSR 400 from Seedhouse Campground east to FSR 443 (South Fork Rd). On FSR 110, OHVs would be allowed on the road from June 15 through December 1. Minor mapping errata corrections across the District will also be made.

Road managementRecreation management
Scoping Start
07/01/2017
Decision
01/1970 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTravel Management
Decision Decided Date07/01/2026
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/29/2018
Thunder Basin National Grassland · Converse, Wyoming

Two-dimensional, or 2D, geophysical exploration for geologic information associated with oil and natural gas. The proponent is Devon Energy Production Company, L.P.

Minerals and geology
Scoping Start
07/31/2018
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionTownships 37, 38, 39 N. and Ranges 67, 68, 69 W. 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 8/28/2018
Routt NF, HPBE RD. Line runs from the town of Columbine along Co Rd 129 to the Summit Creek Guard Station. · Routt, Colorado

Permit amendment to authorize installation of 4553 feet of new underground powerline.

Special use management
Scoping Start
06/07/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
David Watke · dwatke@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSections 30 and 31, T 11N, R 85W. And Section 25, T 11N, R 86 W.
Decision Memo · Parks Ranger District · updated 8/24/2018
facilities are located on Parks District within the Platte River drainage. Contact primary project contact for information on locations of individual facilities. · Jackson, Colorado

Conditioning of O&M Plans for six water facilities with Ditch Bill Easements.

Special use management
Scoping Start
08/26/2008
Decision
01/1970 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date07/01/2026
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Yampa Ranger District · updated 8/23/2018
Approximately 17 miles east of Yampa, CO, along NFSR 272.1. · Routt, Colorado

Convert 1.5 miles of NFSR 272 to non-motorized trail. Currently .6 miles is Level 1 rd., .9 miles is Level 2 rd. Conversion will reduce impacts to wildlife habitat, water quality, and riparian areas while maintaining non-motorized opportunities.

Recreation managementWildlife, fish, rare plantsWatershed managementRoad management
Scoping Start
11/12/2017
Comment Period
11/12/2017
Objection Period Start
04/01/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Melissa Dressen · mdressen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Trail Management; Travel Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSec 12 and 14 T2N R83W
Decision Memo · Parks Ranger District · updated 8/23/2018
Parks RD, under NFSR 715. · Jackson, Colorado

Installation of 30 inch pipe to line 2 sections of the Darcy Ditch, 800 feet in Section 1 and 600 feet in Section 2.

Special use management
Scoping Start
08/20/2018
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Darcy Ditch Pipe InstallationDecision Signed Date: 08/22/2018
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land Description1.2 acres in Sec. 15, T. 5 N., R. 79 W., 6TH PRINCIPAL MERIDIAN, and Sec. 10, T. 5 N., R. 79 W., 6TH PRINCIPAL MERIDIAN
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 8/23/2018
Routt NF on Hahns Peak/Bears Ears DR. Farwell Mountain. · Routt, Colorado

Installation of an small electrical power producing wind turbine provide back up power for a communications sike.

Special use management
Scoping Start
06/07/2018
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT 10, R 84, S 18.
Decision Memo · Parks Ranger District · updated 8/17/2018
Routt NF, Parks RD, Jack Creek, NFSR 740 · Jackson, Colorado

Replacement of currently non-functional headgate on Jack Creek, on Teller Ditch.

Special use management
Scoping Start
08/01/2018
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
Decision Decided Date08/17/2018
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT 5N, R 77W, S 4
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 8/14/2018
The analysis area is approximately 20 miles north of Craig, west of Black Mountain. · Moffat, Colorado

Conduct an environmental analysis of livestock grazing on three domestic sheep allotments to fulfill Rescission Act requirements and provide guidance for future management.

Grazing managementWildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)
Scoping Start
08/21/2016
Comment Period
08/21/2016
Objection Period Start
10/29/2017
Decision
01/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Erik Taylor · estaylor@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Noxious Weed Treatments; Grazing Structural Improvements
Rangeland Management in the Black Mountain Planning Area DNDecision Signed Date: 01/18/2018
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionAll or portions of: T9N,R90W,Sec.1;T9N,R89W,Sec.6;T10N,R90W,Secs.13,14,23,24,25,26,36;T10N,R89W,Secs.5,6,7,8,9,16,17,18,19,20,21,28,29,30,31,32.
Decision Memo · Laramie Ranger District · updated 7/27/2018
Sections 8 and 9 T15N R78W, 6th P.M.; Centennial Ridge. · Albany, Wyoming

Decommission approximately 4.5 miles of unauthorized routes in the eastern Snowy Range.

Recreation managementSpecial area managementRoad management
Scoping Start
01/09/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Sean Harkins · seanpharkins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Special Area Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/19/2018
Throughout the Routt National Forest · Routt, Colorado

Issuance of recreation event permits that meet the Forest Plan.

Special use management
Scoping Start
05/03/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/16/2018
General vicinity is between the communities of Newcastle, Osage, and Upton. · Weston, Wyoming

Reauthorization and continuation of use and maintenance by Black Hills Power Corp. of two 230kV and one 69kV electrical transmission power lines.

Special use management
Scoping Start
02/22/2016
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
Reauthorization of 230-kV and 69-kV Power Lines and Rights-of-WayDecision Signed Date: 06/14/2018
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionWithin portions of T44N R62W, T45N R62W, T45N R63W, T47N R64W, T47N R65W, T48N R64W, T48N R65W, T48N R66W, 6th P.M.
Decision Memo · Yampa Ranger District · updated 6/27/2018
The project area is located approximately 7 miles southeast of Yampa, CO · Routt, Colorado

Reconstruction/deconstruction of two interconnected water improvements. Project will propose decommissioning two existing stockpits and constructing a dual tank setup inlieu of stockpits.

Grazing management
Scoping Start
06/04/2018
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Douglas Myhre · dmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 2 North, Range 84 West, Section 24
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/27/2018
Approximately 20 miles southwest of Newcastle to the Mush Creek Pumping Station along Hwy 450 · Weston, Wyoming

Proposes to authorize Wyoming Pipeline Company to occupy NFS land to construct and maintain an additional 361 feet of natural gas line to the Mush Creek Pumping Station, connect to an existing line, and renewal of 20-year term Special Use Permit.

Special use management
Scoping Start
06/24/2014
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT44N, R63W, section 15 SW¼.
Decision Memo · Parks Ranger District · updated 6/26/2018
Jack Creek Area · Jackson, Colorado

Project seeks to treat up to 3000 acres of mountain pine beetle effected timber stands through appropriate silvicultural methods

Vegetation management (other than forest products)Fuels managementForest products
Scoping Start
02/23/2018
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionTownship(T) 5N North(N) Range(R) 77West(W) Sections 7, 8, 9, 10, 15, 16, 17, 18, 19, 20, 21, 22, 29, 30, 31 and T5N R78W Sections 24,25.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 5/23/2018
Within the Steamboat Ski Area permit boundary · Routt, Colorado

The Steamboat Ski Area proposes several projects which may include: water lines and pipes, roads, building renovations and/or additions, changes to ski runs which may include grading, or realignment, and snowmaking pipeline and blockhouse.

Special use management
Scoping Start
11/15/2017
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 5/1/2018
3000 acres within the district. · Albany; Carbon, Wyoming

Proposal to treat up to 3,000 acres of vegetation in the vicinity of Ryan Park, WY to decrease hazardous fuels and increase resiliency of timber stands. Proposed action map has been improved, check it out!

Vegetation management (other than forest products)Fuels managementForest products
Scoping Start
02/08/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Joshua Peck · jpeck@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityNot Applicable / Other; Hfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionTownship(T) 16North(N) Range(R) 81West(W) Sections 18-36, Township(T) 16N North(N) Range(R) 80 West(W) Sections 29,30, and 31,and T15N R81W Sections 1-6, 8-12, 14-17, 20-23, 24-28, 34, and 35.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/17/2018
10 miles south and 3 miles west of Upton, WYO · Weston, Wyoming

Proposal to authorize the Surface Use Plan of Operations for Application for Permit to Drill (APD) for WFCU#22 and WFCU#84 re-entry wells. The earlier wells were plugged and abandoned in 2002 and 1995.

Minerals and geology
Scoping Start
06/28/2016
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Jacob Eckhardt · jacobeckhardt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionWFCU#22: SWNE Sec 28, T46NR65W, Weston County, WY WFCU#84: NWSW Sec 30, T46NR65W, Weston County
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 4/9/2018
Southern Campbell County, WY and northern Converse County, WY. · Campbell; Converse, Wyoming

Proposed oil and gas project for 1,500 oil and gas wells, on 100 well pads, drilled over the course of 10 years in southern Campbell and northern Converse Counties, with roads, utilities and pipelines for transport of materials are included.

Minerals and geology
NOI in Federal Register
10/26/2015
DEIS NOA in Federal Register
04/2018 (Estimated)
FEIS NOA in Federal Register
01/2019 (Estimated)
Objection Period Start
01/2019 (Estimated)
Decision
05/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
John Madden · johnmadden@fs.fed.us
NEPA / regulatory detail
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityElectric Transmission; Facility Improvements/Construction; Minerals Or Geology Plans Of Operations; Natural Gas; Oil; Road Maintenance; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT42N R74W through T42N R71W; T41N R74W through T41N R71W; T40N R72W through T40N R71W; and T39N R72W.
Dewey Lode Access Completed
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/30/2018
North of Hwy 70 at existing pull-out in Section 24. · Carbon, Wyoming

Easement across Forest Service land to connect private property to Battle Highway.

Special use management
Scoping Start
01/01/2016
Decision
03/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT14N, R86W Section 24
Decision Memo · Laramie Ranger District · updated 3/30/2018
Vicinity of Lake Owen, in prior North WUI project area; additional acres are located within 1.25 miles of the Lake Owen facility. · Albany, Wyoming

Remove hazardous fuels in vicinity of Lake Owen to reduce risk of adverse watershed impacts in catchments for City of Cheyenne Municipal Water Supply.

Vegetation management (other than forest products)Forest productsFuels management
Scoping Start
10/10/2017
Decision
01/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Michael Salazar · mjsalazar@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/30/2018
NE1/4 Section 23, T. 17 N., R. 84 W. 6th P.M. · Carbon, Wyoming

SourceGas Distribution, LLC has a Forest Service permit to operate/maintain a 2" polyethylene natural gas mainline located on the Brush Creek/Hayden Ranger District administrative site in Saratoga, WY. Permit is expired and needs to be renewed.

Special use managementFacility management
Scoping Start
10/16/2017
Decision
03/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations; Facility Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/30/2018
Barrett Ridge near Ryan Park. · Carbon, Wyoming

Issue a new lease for the Union Wireless cellular tower located on Barrett Ridge. Tower services Ryan Park subdivision. Changes are administrative only; facility footprint, character and capacity remains the same. New lease is for 30 years.

Special use management
Scoping Start
08/30/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNW1/4 Section 29 T. 16 N., R. 81 W., 6th P.M.
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/30/2018
Section 10, T. 16 N., R. 80 W., 6th P.M. · Carbon, Wyoming

Re-issue of a Special Use permit for a 5-ft-long, 4-inch-wide pipeline that diverts water from a natural spring on National Forest lands onto private property.

Special use management
Scoping Start
03/03/2017
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Amber Horne · ahorne@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 3/29/2018
Warbonnet Peak Area in the Laramie Mountains · Converse, Wyoming

Proposal to exchange lands in the Warbonnet Peak area of the Laramie Mtns.

Land ownership management
Scoping Start
04/2015 (Estimated)
Comment Period
06/2015 (Estimated)
Objection Period Start
08/2015 (Estimated)
Decision
10/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Exchanges
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT28-29N R74-75W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/23/2018
5 miles from Steamboat Springs, Colorado. · Routt, Colorado

Steamboat Powdercats trail work for modifications to less than 0.01 miles of snow trail to increase sight distances through tree removal or slight realignment of snow trails.

Recreation management
Scoping Start
08/31/2016
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N R83W Sec (4,5,8), T6N R84W Sec (1,2,11), T7N R83W Sec (27,28,29,32,33), T7N R84W Sec(22,23,24,25,26,27,35,36)
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/21/2018
Routt NF, approximately 15 North Hayden, CO. · Routt, Colorado

Annual closure of California Park from May 1 through July 1, to protect wildlife in the spring calving, lek, or nest seasons.

Wildlife, fish, rare plants
Scoping Start
02/15/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Melissa Dressen · mdressen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N R87W Sections 22, 23, 26, 27, 33, 34, 35, 36. T9N R87W Sections 1, 2, 3, 4, 9, 10, 11, 12, 13, 14, 15, 16, 17, 19, 20, 21, 22, 23, 24, 25, 26, 27, 28, 33, 34, 35.
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 3/21/2018
Across the Hahns Peak/Bears Ear Ranger District · Moffat; Routt, Colorado

Conduct an environmental analysis on the effects of issuing additional commercial recreation use permits on the District.

Special use managementRecreation management
Scoping Start
11/2017 (Estimated)
Comment Period
01/2018 (Estimated)
Objection Period Start
03/2018 (Estimated)
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/21/2018
Location: Hahns Peak Bears Ears district wide for multiple permits. Use on the Yampa and Parks Ranger Districts are also included if lead unit administers the permit. · Grand; Moffat; Routt, Colorado

Reissuance of existing permits for new terms. Any modifications to permits do not increase the scope or intensity of authorized activities.

Special use management
Scoping Start
08/16/2017
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 3/21/2018
Approximately 1.25 miles south of Gould, Colorado · Jackson, Colorado

Replace existing culvert with a larger culvert or a bridge to address engineering structural and safety concerns and improve aquatic passage and hydrologic conditions.

Wildlife, fish, rare plantsWatershed management
Scoping Start
04/01/2015
Decision
01/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT6N, R77W, Sec 10
Decision Memo · Parks Ranger District · updated 3/21/2018
Permitting outfitting and guiding occurs in capacity compartments on the Parks Ranger District in Grand and Jackson Counties, Colorado. · Grand; Jackson, Colorado

Identify and allow continued use of Temporary Use Pools on first-come, first-served basis for permitted outfitting and guiding on the Parks Ranger District in Grand and Jackson County, Colorado.

Special use management
Scoping Start
10/01/2015
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Heather Westfahl · hwestfahl@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 3/21/2018
Parks Ranger District · Jackson, Colorado

Expose mineral vein on the Ram Claim, work would include using a D6 dozer to trench a 120 X 130 feet it to expose the mineral vein on the Ram Claim (CMC276636)

Minerals and geology
Scoping Start
06/2014 (Estimated)
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT.8N., R82W., sec 4, 5 & 9
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/21/2018
Elk River Tract includes 4 lots approximately 1/4 mile south of Hinman Campground · Routt, Colorado

Re-issue special use permits to continue recreation residence use, with some modifications to the operating plan for the Elk River Tract includes 4 lots on the Hahns Peak-Bears Ears Ranger District of the Medicine Bow-Routt National Forests.

Special use management
Scoping Start
11/2014 (Estimated)
Decision
11/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N R84W SEC 8
Decision Memo · Yampa Ranger District · updated 3/21/2018
Dunckley Geographic Area of the Yampa Ranger District, Routt NF. · Routt, Colorado

Reissuance of a Special Use Permit for a 10-year term for use and maintenance of an existing water supply spring development (Homer Groesbeck Spring) and pipeline.

Special use management
Scoping Start
12/15/2016
Decision
08/2017 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSESW S18 T3N R86W, 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/14/2018
Rabbit Ears Pass and Dry Lake Area on Buffalo Pass. · Routt, Colorado

Designate existing non-system trail routes as system trails. Snowshoe routes will be designated as trails on Rabbit Ears Pass. A snowshoe/skiier loop near Dry Lake will be designated at Buffalo Pass.

Recreation management
Scoping Start
08/2017 (Estimated)
Decision
09/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N R83W - sections 15, 16, 17, 20, 21, 22, 23; T7N R84W - Sections 25, 26.
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 3/8/2018
Little Thunder Creek watershed, approximately 2 miles southeast of Black Thunder Mine, south of Highway 450. · Campbell, Wyoming

Assess and incorporate any changes to terms or conditions applicable to mineral materials mining into an existing sale contract for scoria or clinker.

Minerals and geology
Scoping Start
07/26/2017
Comment Period
07/26/2017
Decision
01/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
Amendment for Modification of Stipulations to Mineral Material ContractDecision Signed Date: 01/31/2018
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 11, 13, 14, 23, 24, 25, 26, 27, 35 T43N R70W, 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/8/2018
LaBonte Canyon, Laramie Peak Unit of Medicine Bow NF. · Albany, Wyoming

Management of road and trail use such as sign improvements for public safety and compliance with Wyoming State laws applicable to La Bonte Road 658. Project analysis, description, and name has changed.

Recreation management
Scoping Start
04/2018 (Estimated)
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
John Madden · johnmadden@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.; Trail Management; Travel Management
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 8 T28N R73W Section 17 T28N R73W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 1/30/2018
W1/4 of the White Hound Allotment, Laramie Peak Unit of Douglas RD E2, NE, Section 35, T24N, R70W · Albany, Wyoming

Proposal to improve existing water system at Government Spring on Laramie Peak Unit of Medicine Bow National Forest. System provides water to wildlife and livestock. Improvements will be pipe replacement, fence repairs, and tank installation.

Grazing management
Scoping Start
10/02/2017
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Grazing Structural Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/21/2017
Appoximately 9 miles South of Wright Wyoming just off of Hwy. 59. · Campbell, Wyoming

Proposal is to conduct surface use operations associated with accessing, drilling, testing, and completion for two horizontal oil wells located on Thunder Basin National Grassland, with approx. 0.1 miles of road construction.

Minerals and geology
Scoping Start
04/29/2013
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
Jacob Eckhardt · jacobeckhardt@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityOil
Ballard Petroleum Holdings LLC APDs for USFS Fed 14-22TH and 14-23TH WellsDecision Signed Date: 12/21/2017
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSW ¼ SW ¼ of Section 22, T42N, R72W (USFS Fed 14-22 TH), SW ¼ SW ¼ of Section 23, T42N, R72W (USFS Fed 14-23 TH)
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 12/21/2017
Thunder Basin National Grassland · Campbell; Converse, Wyoming

Analysis of several federal coal lease readjustments associated with lease periods.

Minerals and geology
Scoping Start
04/18/2017
Comment Period
04/19/2017
Objection Period Start
10/2017 (Estimated)
Decision
11/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/21/2017
Upton Osage Geographic Area. · Weston, Wyoming

Road access to a new subdivision between Osage and Upton. Proposed roadway would be approximately 3,900 feet in length and utilize a previously constructed roadway. Project name change from Hartland Subdivision Right-of-Way.

Special use managementRoad management
Scoping Start
03/11/2016
Decision
11/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments; Special Use Authorizations; Road Maintenance; Road Improvements/Construction
Special Use Authorization - Use of NFSR 1325.E for Access to SubdivisionDecision Signed Date: 11/20/2017
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT47N R64W Sec 21, 22
Environmental Assessment · Yampa Ranger District · updated 12/20/2017
Tonopas Creek, Routt NF · Routt, Colorado

Construction of a fish barrier in Toponas Creek to protect a native trout population from invasion by non-native trout.

Wildlife, fish, rare plants
Scoping Start
04/02/2017
Comment Period
04/02/2017
Objection Period Start
07/28/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT1N R83W S5
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/8/2017
Thunder Basin National Grassland · Campbell, Wyoming

3-D seismic exploration of petroleum would include shothole drilling situated along existing roads to approximately 70 feet depth at intervals over an 88.5 acre area and use of explosive charges in shotholes. Drill holes would be plugged afterward.

Minerals and geology
Scoping Start
11/09/2017
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
John Wise · jwise@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Paragon Geophysical Services, Inc. North York 3D Seismic SurveyDecision Signed Date: 12/08/2017
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 32 T54N R69W, 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/17/2017
50 miles north of Douglas, WY · Converse, Wyoming

Proposal to authorize Antelope Coal, LLC for use of lands under a new Special Use Permit (SUP) DGL423for facilities ancillary to coal mining on approximately 299.5 NFS acres to replace the current authorization (DGL294) which expires on 12/31/2017.

Minerals and geologySpecial use management
Scoping Start
07/13/2017
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/17/2017
Southeast of Wright, WY in T41-42N, R69-71W, 6th Principal Meridian, Campbell County, Wyoming · Campbell, Wyoming

An amendment to the existing Special Use Permit (SUP) to consolidate DGL313 for School Creek Mine into the NARM SUPDGL314 adjust the acreage from 90.7 acres to 315.17 acres No new encumbrance of lands.

Special use management
Scoping Start
06/20/2017
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 9/28/2017
Big Creek Lakes Geographic Area, in a tributary watershed to Big Creek, Routt NF. · Jackson, Colorado

Reissuance of a Special Use Permit for a 10-year term, for use and maintenance of an existing spring development and water pipeline for domestic water use.

Special use management
Scoping Start
12/15/2016
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNESW S2 T11N R82W, 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/28/2017
Middle Yampa Geographic Area of the Hahns Peak-Bears Ears Ranger District, Routt NF. · Routt, Colorado

Issuance of a Special Use Permit for a 20-year term for use and maintenance of an existing water supply spring development and pipeline (Wood Spring and Pipeline).

Special use management
Scoping Start
12/15/2016
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNW S26 T5N R84W, 6th P.M.
Environmental Assessment · Parks Ranger District · updated 9/28/2017
Southeast corner of the Parks Ranger District near Grouse Mountain. · Grand, Colorado

Approximately 1,849 ac of silvicultural treatments including clearcuts, overstory removal, seed tree, shelterwood, and thinning. Objectives include forest regeneration, fuel load reduction, and wildlife habitat improvement

Vegetation management (other than forest products)Fuels managementForest products
Scoping Start
01/05/2016
Comment Period
02/07/2017
Objection Period Start
06/22/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
Wheatley Vegetation Management ProjectDecision Signed Date: 08/08/2017
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 9/26/2017
Gore Pass · Routt, Colorado

Project proposal is to complete progeny site maintenance including; thinning, pile burning, fence repair, and/or inventory in this genetically tracked lodgepole pine plantation developed to produce superior trees for seed source reforestation needs.

Vegetation management (other than forest products)
Scoping Start
01/31/2014
Decision
07/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Rick Ondrejka · rondrejka@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT2N R82W Section 30
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 9/11/2017
East of Wright, WY · Campbell, Wyoming

This project will analyze the applications for coal leases in the Wright Area for continuing coal mining for the Jacobs Ranch, Black Thunder and North Antelope Rochelle Mines.

Minerals and geology
NOI in Federal Register
07/03/2007
DEIS NOA in Federal Register
03/31/2011
FEIS NOA in Federal Register
07/30/2010
Decision
11/2011 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
Record of Decision South Hilight Field Lease by ApplicationDecision Signed Date: 06/01/2011 (Reversed in Appeal (215)) Legal Notice Date: 06/03/2011
Record of Decision South Porcupine Field Lease by ApplicationDecision Signed Date: 07/14/2011 Legal Notice Date: 07/19/2011
Record of Decision North Porcupine Field Lease by ApplicationDecision Signed Date: 09/30/2011 Legal Notice Date: 10/04/2011
Record of Decision North Hilight Field Lease by ApplicationDecision Signed Date: 11/22/2011 Legal Notice Date: 12/01/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Inyan Kara Enduro Completed
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/28/2017
in the Upton, Osage and Clay Spur areas · Weston, Wyoming

Issue an authorization for a 5 yr term for an annual one day motorcycle enduro on a weekend in September or October and to use the approximately 45 miles of single-track trail in the Upton and Osage, or Clay spur Area of TBNG

Special use management
Scoping Start
02/13/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Inyan Kara Riders Motorcycle Enduro EventDecision Signed Date: 07/27/2017
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/20/2017
T6N R84W, within Ski Area Permit Boundary · Routt, Colorado

FY15 Ski Area Projects including ropes courses and infrastructure improvements.

Recreation managementSpecial use management
Scoping Start
06/01/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
2015 SSRC Improvements Decision MemoDecision Signed Date: 08/21/2015
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N R84W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/20/2017
Fish Creek Falls Recreation Area · Routt, Colorado

Provide opportunities for drop-off and pick-up shuttle service to the Fish Creek Falls Recreation Area.

Special use managementRecreation management
Scoping Start
03/23/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Special Use Authorizations
Fish Creek Falls Transportation ServicesDecision Signed Date: 05/24/2017
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionTownship 6 North, Range 84 West, Section 14
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/19/2017
Three sites on private land near coal mines, 2 are adjacent to North Antelope Rochelle Mine in Porcupine Creek watershed, and 1 is adjacent to School Creek Mine in tributary watersheds to School Cr. · Campbell, Wyoming

Renewal of 5-year term contract for mining of Federal mineral material (scoria), on private lands within the North Antelope Rochelle Mine permit boundary, located within the administrative boundary of the Thunder Basin National Grassland.

Minerals and geology
Scoping Start
08/01/2016
Decision
05/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations; Special Products Sales
Mineral Material Contract Renewal for Peabody Powder River Mining, LLCDecision Signed Date: 05/02/2017
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionS10, 21 T41N R70W; S13, 14 T42N R70W, 6th P.M.
Morrison II Completed
Decision Memo · Yampa Ranger District · updated 7/19/2017
Morrison Creek Geographical Area · Routt, Colorado

The action proposed by the Forest Service is to change the prescribed treatments designated in the Morrison Creek EA, and amend the analysis area map. This would include harvesting of live trees.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
10/01/2015
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Lucas Glick · lglick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Timber Sales (Salvage); Timber Sales (Green)
Re-issued Morrison IIDecision Signed Date: 04/06/2017
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 2 North, Range 83 West, Township 2 North, Range 84 West, Township 3 North, Range 83 West, Township 3 North, Range 84 West. (6th Prime Meridian), within Routt County, Colorado.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/19/2017
Thunder Basin National Grassland approximately 17 miles southwest of Newcastle, WY on the south side of Highway 450. · Weston, Wyoming

Special use authorization for year-round private use for a 20-year term of an approximate 500-foot segment of existing National Forest System Road 1240.C which is not open to motorized public use.

Special use management
Scoping Start
01/10/2017
Decision
02/2017 (Estimated)
Implementation
02/2017 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 24 T44N R64W, 6th P.M.
Environmental Assessment · Laramie Ranger District · updated 7/18/2017
All of the Pole Mountain unit · Albany, Wyoming

This project analyzed the complete road system on Pole Mountain. The analysis examined both the existing road system and user-created routes. The Pre-decisional EA and DRAFT Decision Notice recommend road system additions and closures.

Recreation managementRoad managementWatershed management
Scoping Start
04/01/2015
Comment Period
09/27/2016
Objection Period Start
04/18/2017
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management; Watershed Improvements
Pole Mountain Travel Management Decision NoticeDecision Signed Date: 07/18/2017
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Blackhall TSI Cancelled
Decision Memo · Parks Ranger District · updated 12/16/2016
T. 11&12N., R. 81-85W. · Jackson, Colorado

The Parks Ranger District is reviewing potential thinning needs within the Blackhall TSI project area. Density control through thinning will be completed by hand tools. No mechanical equipment or road building/reconstruction will be necessary.

Vegetation management (other than forest products)
Scoping Start
07/2014 (Estimated)
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT. 11&12N., R. 81-85W.
Decision Memo · Laramie Ranger District · updated 12/16/2016
Collins Creek, located approximately 1.5 miles northwest of Fox Park and approximately 0.5 mi southeast of the NFSR 512 and 524 junction. Accessed by NFS Road 524A. · Albany, Wyoming

Riparian area wetland restoration involving removal of fill material of an old road which is not a National Forest System Road, reclamation of riparian soils and hydrologic function, and revegetation management.

Vegetation management (other than forest products)Watershed management
Scoping Start
11/17/2016
Decision
12/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Katie Buchan · kbuchan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSection 17 T31N R78W, 6th P.M.
Decision Memo · Yampa Ranger District · updated 12/6/2016
The project area is located ~5 miles east of Toponas, Colorado near State Highway 134. · Routt, Colorado

Construct a fish barrier using native material to stop the invasion of hybrid fish and whirling disease.

Wildlife, fish, rare plants
Scoping Start
08/29/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Deadman Gulch Fish Barrier ProjectDecision Signed Date: 09/09/2016
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT2N R83W section 32
Decision Memo · Laramie Ranger District · updated 9/30/2016
Near the headwaters area of Douglas Creek, in the Pole Mountain Unit. · Albany, Wyoming

Manage recreation use and rehabilitate soil, vegetation, and surface water resources of an area impacted by unauthorized off-highway vehicle use of routes that are not part of the National Forest System designated travel routes.

Recreation managementWatershed management
Scoping Start
09/20/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Katharine Haynes · katharinemhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Scenery Management; Travel Management; Watershed Improvements
Douglas Creek Unauthorized ATV Route RehabilitationDecision Signed Date: 09/23/2016
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSections 21, 22, 27 T15N R79W 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/30/2016
Laramie Peak Unit · Albany, Wyoming

Maintenance of two existing surface water developments that are used primarily for livestock, including source protection measures and water lines and trough replacements.

Grazing management
Scoping Start
06/13/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Charlie Bradshaw · cbradshaw@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Water Development Maintenance in Haystack Allotment No. 622Decision Signed Date: 09/14/2016
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSENE Sec 21 and NWSW Sec 28 T27N R71W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/28/2016
Approximately 20 miles southeast of Steamboat Springs, CO, near Rabbit Ears Pass. · Routt, Colorado

Project Canceled: No NEPA review required. It was determined that this project falls under Maintenance of Recreation Sites (replaced former assets); and it was also determined that there are no resource concerns associated with the project.

Recreation managementFacility management
Scoping Start
01/01/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Facility Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/28/2016
Within the Cottonwood Creek watershed approximately a mile east of Haystack Peak. · Albany, Wyoming

Name changed from McClain Spring Number 1 Water Development for Judd, and now incorporates project 47173 - McClain Spring No. 1 Water Development for Papa's Land Trust. Permit renewal for 10-year term for an existing, buried water pipeline and well.

Special use management
Scoping Start
09/01/2015
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Use Authorization Judd and Grout Spring DevelopmentDecision Signed Date: 08/16/2016
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionS28 T27N R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/28/2016
Within the Cottonwood Creek watershed approximately a mile east of Haystack Peak. · Albany, Wyoming

This project is now incorporated into Judd and Grout Spring Development project number 47172.

Special use management
Scoping Start
09/01/2015
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNWSW S28 T27N R71W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/28/2016
Steamboat Ski Area, approximately 1 mile from Steamboat Springs, Colorado. · Routt, Colorado

Storm Peak Hang Gliding Association has launched from the Steamboat Ski Area for several decades. This action renews their permit to continue utilizing this area for another 10 years.

Special use management
Scoping Start
08/31/2016
Decision
09/2016 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (9), 36 Cfr 220.6(D)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo 2016 Storm Peak Hang Gliding Association Permit ReissuanceDecision Signed Date: 09/21/2016
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N R84W Sec (23, 25, 26), T6N R83W Sec 29
Decision Memo · Yampa Ranger District · updated 9/28/2016
17 miles southwest of Yampa on Forest Road 900. · Garfield, Colorado

Renew Special Use permit for operation and maintenance of Yamcolo Reservoir for up to 30 Year Term.

Special use management
Scoping Start
06/01/2015
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Re-issue of Yamcolo Reservoir Special Use PermitDecision Signed Date: 07/11/2016
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land Description6 PM, T1N, R 86 W, Sec. 16, 17 and 20.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/28/2016
Relay race from Ft Collins, Colorado to Steamboat Springs, Colorado. · Routt, Colorado

A running relay race from Fort Collins, Colorado to Steamboat Springs, Colorado, which occurs on an annual basis. This race has been run for 17 years and this action would reauthorize the event for an additional 5 years.

Special use management
Scoping Start
08/31/2016
Decision
09/2016 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo 2016 Wild West Relay Event 5 Year PermitDecision Signed Date: 09/21/2016
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N, R82W (Sec 15, 16, 17, 18, 20, 21, 22) T5N, R83W (Sec 13, 14, 20, 21, 22, 23, 29, 32) and T5N, R84W (Sec 25, 26, 36)
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/28/2016
Mad Creek area of the HPBE RD, Routt National Forest · Routt, Colorado

Removal of existing overhead power line to a building on the Routt National Forest that has previously been removed. All existing power poles will be cut off at 1 foot below grade and the hole filled. Each pole will be removed whole or cut to length.

Special use management
Scoping Start
10/01/2015
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
Decision Decided Date09/28/2016
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT7N, R85W, Sec 11, 6th PM
Decision Memo · Yampa Ranger District · updated 9/26/2016
Approx. 8 mi west of Yampa. · Rio Blanco, Colorado

Authorize the replacement of the Crosho Lake dam outlet pipe to meet the requirements of Colorado Dept. of Water Resources.

Special use management
Scoping Start
03/21/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Facility Maintenance
Decision Memo Crosho Lake(Simon #1) Outlet Replacement Special Use PermitDecision Signed Date: 09/16/2016
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT. 2 N., R. 86 W., Sec. 4, 6th P.M.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/20/2016
Approximately 1 mile southwest of Steamboat Springs, Colorado, within the Steamboat Ski area boundary. · Routt, Colorado

PROJECT CANCELLED: After the NEPA was initiated we learned that there was an existing barrier downstream. Using this barrier would increase the length of stream occupied by fish more than the proposed site thereby better meeting project objectives.

Wildlife, fish, rare plants
Scoping Start
04/01/2015
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N, R84W, Sec 23
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/30/2016
Approximately 16.5 miles southeast of Wright, WY. · Campbell, Wyoming

Issuance of a public road easement to Campbell County for operation and maintenance of the relocated Mackey Road for five road segments.

Road management
Scoping Start
03/15/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Travel Management
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 6, 7, 8, 17, 21, 28, 33 of T42N R69W; Section 29, 30, 31 of T43N R69W, 6th P.M.
Decision Memo · Laramie Ranger District · updated 6/29/2016
Southeast area of Pole Mountain. Map included in project description. · Albany, Wyoming

Unauthorized routes in the Middle Crow Creek watershed on the southeast side of Pole Mountain will be decommissioned and restored to improve watershed conditions. This project was planned for FY15 but had to be moved to FY16 due to limited resources.

Wildlife, fish, rare plantsWatershed managementRecreation managementVegetation management (other than forest products)Road management
Scoping Start
04/01/2015
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Katharine Haynes · katharinemhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements; Travel Management; Watershed Improvements
Vedauwoo Unauthorized Route RestorationDecision Signed Date: 06/02/2016
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 5/16/2016
Approximately 25 miles north of Steamboat Springs, Colorado · Routt, Colorado

Replace nine culverts with new structures to provide for aquatic passage and improve hydrology. This project would restore connectivity on approximately 23 miles of perennial stream.

Wildlife, fish, rare plantsWatershed management
Scoping Start
04/01/2015
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
LSR Culvert Replacements ProjectDecision Signed Date: 05/15/2016
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT11N, R85W, Sec 4,12,26,and 27; T12N, R85W, Sec22
Decision Memo · Parks Ranger District · updated 5/12/2016
Camp Creek area meadow near the junction of National Forest System Roads 891 and 895 · Jackson, Colorado

Stabilize headcut in a headwater channel tributary to Camp Creek. Work will recover the degraded channel and adjoining meadow and improve watershed conditions.

Wildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)
Scoping Start
01/01/2016
Decision
05/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Tyler Carleton · tylercarleton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Rangeland Vegetation Improvements; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionSE1/4 of sec.28, T12N R79W
Decision Memo · Parks Ranger District · updated 4/29/2016
Outfitted and guided uses occur on capacity compartments across the Parks RD in Jackson and Grand Counties, Colorado. · Jackson, Colorado

Issue special use authorizations to existing priority permittees for outfitting and guiding during summer and fall seasons on Parks RD. No changes to terms and conditions of permits are anticipated, and permitted levels will be no more than capacity

Special use management
Scoping Start
10/01/2015
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Heather Westfahl · hwestfahl@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Permit Issuance for Priority Outfitter-Guide Summer and Fall OperationsDecision Signed Date: 04/11/2016
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 4/27/2016
Crucial Deer and Elk Winter Range Management Area in the southeast Snowy Range from near Lake Owen south to the Colorado border. · Albany, Wyoming

This project proposes to add seasonal closures to about 8.6 miles of roads and to extend seasonal road closure dates from 11/15-4/31 to 10/1-6/15 in Crucial Deer and Elk Winter Range in the Southeast Snowy Range Mountains.

Wildlife, fish, rare plantsRoad management
Scoping Start
06/01/2015
Comment Period
03/01/2016
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Sean Harkins · seanpharkins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Travel Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 4/25/2016
Approximately 8 miles south of Rabbit Ears Pass · Grand, Colorado

Replace a culvert on Forest Road 100 and a tributary of Frantz Creek to provide for aquatic passage and improve hydrology.

Watershed managementWildlife, fish, rare plants
Scoping Start
06/01/2015
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
NFSR 100/ Tributary of Franz Creek Culvert Replacement ProjectDecision Signed Date: 04/18/2016
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT4N, R82W Sec 19
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 4/24/2016
Black Thunder Mine permit area. · Campbell, Wyoming

PRECorp proposal: installation of new 69kV 5-wire overhead powerline (treated wood poles, H-frame design, with raptor protection) and removal of old powerline to accommodate mine operation within the Black Thunder Mine permit area.

Special use management
Scoping Start
01/12/2015
Comment Period
08/26/2015
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityElectric Transmission; Special Use Authorizations
69-kilovolt Powerline Relocation at Black Thunder MineDecision Signed Date: 04/15/2016
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNE1/4 NW1/4, W1/2 W1/2 of Section 11 and NW1/4 NW1/4 of Section 14 in T43N, R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/24/2016
Parts of Sections 11, 13, 14, 23-26, & 35, T43N, R70W, Campbell County, WY · Campbell, Wyoming

Issue a new Minerals Materials (Scoria) contract to TBCC (Black Thunder Mine) to replace MM-DGL-2800-08-06-09 and three Amendments (expires 12-31-2015)

Minerals and geology
Scoping Start
09/15/2015
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Thunder Basin Coal Company, LLC Mineral Materials Contract RenewalDecision Signed Date: 04/22/2016
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionParts of Sections 11, 13, 14, 23-26, and 35, T43N R70W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 4/15/2016
Approximately 1.5 miles southwest of Steamboat Springs, Colorado, within the Steamboat Ski area boundary. · Routt, Colorado

Replace two culverts on Burgess Creek to provide for aquatic passage and improve hydrology. This project will benefit Colorado River cutthroat trout.

Wildlife, fish, rare plantsWatershed management
Scoping Start
04/01/2015
Decision
04/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
Burgess Creek Culvert Replacements ProjectDecision Signed Date: 04/15/2016
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N, R84W, Sec.2
Decision Memo · Yampa Ranger District · updated 3/29/2016
Outfitter & Guide permit will located throughout the Yampa Ranger District · Garfield; Grand; Rio Blanco; Routt, Colorado

Renewal of 1 temporary outfitter guide permit. No changes to previous activities.

Recreation managementSpecial use management
Scoping Start
03/12/2014
Decision
03/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 3/25/2016
Project area is located approximately 16 miles southeast of Yampa, CO on Forest Service Road 206 & 225. · Routt, Colorado

This authorization will cover the commercial use of NFSR 206 and 225 for the transportation of livestock to and from a loading chute facility located on the Rock Creek SWA. In addition a backup lane and turn around will be maintained/constructed.

Special use managementRoad management
Scoping Start
12/04/2014
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Douglas Myhre · dmyhre@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land Description6TH PM, T. 1N., R. 83W., Sec.13
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/18/2016
Freeman Reservoir, HPBE Ranger District, Routt National Forest, · Moffat, Colorado

Issue a Special Use Permit for the operation and maintenance of the Freeman Dam and Reservoir to the Colorado Department of Parks and Wildlife.

Special use management
Scoping Start
05/28/2012
Decision
12/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSW1/4NW1/4 & N1/2SW1/4 Sec. 6, T. 9 N., R. 89 W., 6TH PM.
Decision Memo · Yampa Ranger District · updated 3/18/2016
Project is located approximately 13 west of Yampa, CO near the Bunker Basin area · Rio Blanco, Colorado

Re-Issue the Special Use Permit for the aerator on Haley Reservoir

Special use management
Scoping Start
07/22/2014
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Haley Reservoir Fish AeratorDecision Signed Date: 02/24/2015
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 2 North, Range 87 West, Section 4
Decision Memo · Yampa Ranger District · updated 3/18/2016
Project is located approximately 30 miles west of Yampa, CO on Rio Blanco County Road 8. · Rio Blanco, Colorado

Re-Issue the Special Use Permit for the aerator on Vaughn Lake.

Special use management
Scoping Start
07/22/2014
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Vaughn Lake Fish AeratorDecision Signed Date: 02/24/2015
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 2 North, Range 88 West, Section 22
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 3/17/2016
Southeast of Columbine, CO in Routt County · Routt, Colorado

Boundary fuel treatments along and adjacent to private in-holdings containing structures.

Fuels management
Scoping Start
01/2014 (Estimated)
Comment Period
01/2014 (Estimated)
Objection Period Start
02/2014 (Estimated)
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Mark Cahur · mcahur@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land Description6th PM, 10N, R85W, Sec 7
Decision Memo · Yampa Ranger District · updated 3/14/2016
Bear River, Dunckley Pass, Gore Pass · Garfield; Grand; Rio Blanco; Routt, Colorado

New temporary outfitter guide fishing permit.

Special use managementRecreation management
Scoping Start
06/01/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 3/11/2016
4 locations in the Laramie Peak area, 13 in the Pole Mountain area, 7 in the Snowy Range · Albany; Carbon; Converse, Wyoming

Permit reissuance to authorize specific helicopter landing zones on the Laramie Peak, Snowy Range, and Pole Mountain units for training use by the US Air Force.

Special use management
Scoping Start
04/01/2015
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Department of the Air ForceDecision Signed Date: 03/01/2016
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District; Douglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 12/22/2015
Section 6, T44N, R62W; Sections 11, 12, 15, T44N, R63W; Weston County, WY · Weston, Wyoming

Wyoming Pipeline Co.'s crude oil pipeline system became Dept. of Transportation jurisdiction 10/1/2012. The conversion of service requires pipeline tests for safety in several locations on the Thunder Basin National Grassland.

Minerals and geologySpecial use management
Scoping Start
10/06/2015
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Oil
Memo to File Wyoming Pipeline Co. WRC Line DOT Change of ServiceDecision Signed Date: 11/12/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 6, T44N, R62W; Sections 11, 12, 15, T44N, R63W
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 12/18/2015
Thunder Basin National Grassland · Campbell; Weston, Wyoming

Placement of 10 bird nest boxes in several locations on Thunder Basin National Grassland.

Wildlife, fish, rare plants
Scoping Start
10/01/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Cristi Painter · cpainter@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Wildlife Habitat Improvement Bird Nest Boxes InstallationDecision Signed Date: 12/11/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 12/18/2015
Rocky Point Road (Campbell County Road 85); south of Gilette, WY on the Thunder Basin National Grassland-Spring Creek Unit. · Campbell, Wyoming

Replacement of existing crude oil pipeline using horizontal directional drilling under Rocky Point Road, to include staging area, drilling rig landing area, and bell holes (pits) on both sides of the road. Was misnamed Belle Fourche Pipeline Co.

Special use managementMinerals and geology
Scoping Start
09/22/2015
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNWNW Sec 7 T54N R70W
Decision Memo · Yampa Ranger District · updated 12/15/2015
Located adjacent to Yampa Ranger District in administrative pasture · Routt, Colorado

Reissuance of special use permit to Town of Yampa,CO for 4th of July Fireworks and lighted star in administrative pasture located adjacent to Yampa Ranger District

Special use management
Scoping Start
11/12/2015
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSE1/4 of Sec. 10, T2N, R85W
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 11/20/2015
From the Butte Junction station to the soutwest side of Beaver Creek, west of Newcastle, WY · Weston, Wyoming

The USFS is proposing to authorize Wyoming Pipeline Co to replace 3.2 miles of is existing crude oil pipeline. The work would require an additional 10 ft outside of the existing 20 ft ROW to complete construction activities.

Special use management
Scoping Start
08/20/2014
Comment Period
08/20/2014
Objection Period Start
06/2015 (Estimated)
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT44N, R63W Sec11, SE1/4 to T44N, R63W Sec 5 NE1/4
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/7/2015
The land exchange examined in this feasibility analysis will consolidate federal holdings within the southernmost part of the Laramie Peak Unit of the Medicine Bow-Routt National Forests. · Albany, Wyoming

120 acres of Non-Federal to Federal and 200 acres of Federal to Non-Federal.

Land ownership management
Scoping Start
05/2015 (Estimated)
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionPvt to Fed: T. 27 N., R. 71 W; Sec. 32, S½NW¼, NE¼NW¼ Fed to Pvt:T. 26 N., R. 71W; Sec. 14 SW¼, SW¼NE¼
Steamboat Front Completed
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 10/5/2015
Steamboat Springs city limits and surrounding valley · Routt, Colorado

Fuels treatments & habitat improvements. Mastication, prescribed burning of shrubs and aspen, treatment/ removal of beetle-killed pine. Project is near Steamboat Springs (WUI). A seasonal closure for big game winter range would also be implemented.

Fuels management
Scoping Start
01/27/2014
Comment Period
01/27/2014
Objection Period Start
06/07/2015
Decision
10/2015 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Sam Duerksen · sduerksen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels)
Steamboat Front Hazardous Fuels Reduction ProjectDecision Signed Date: 10/01/2015
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N, R84W, Sections 2,11,14,23,26,& 35; T5N, R84W, Sections 2, 11, 14, 23, & 26.
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 10/2/2015
Rabbit Ears Pass along US HWY 40 · Grand; Routt, Colorado

Improvement of winter parking along US HWY 40 on Rabbit Ears Pass providing for adequate parking opportunities and improving safety.

Recreation managementFacility management
Scoping Start
12/20/2012
Comment Period
11/04/2013
Decision
09/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Dispersed Recreation Mgmt.; Scenery Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N, R82-84W
Environmental Impact Statement · Medicine Bow-Routt National Forest All Units · updated 9/30/2015
Medicine Bow National Forest and Thunder Basin National Grassland · Albany; Campbell; Carbon; Converse; Crook; Laramie; Natrona; Niobrara; Platte; Weston, Wyoming

The purpose of this project is to prepare an environmental impact statement to incorporate Greater Sage-grouse conservation measures into Bureau of Land Management Land Use Plans and Forest and Grassland Plans.

Wildlife, fish, rare plantsLand management planning
NOI in Federal Register
12/09/2011
DEIS NOA in Federal Register
12/24/2013
FEIS NOA in Federal Register
05/29/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Glen Stein · gstein@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityPlan Amendment
Greater Sage-grouse Record of Decision for Northwest Colorado and WyomingDecision Signed Date: 09/16/2015
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District; Douglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 9/30/2015
Thunder Basin National Grassland · Campbell; Converse; Crook; Niobrara; Weston, Wyoming

The purpose of this project is to prepare an environmental impact statement to incorporate greater sage-grouse conservation measures into Bureau of Land Management Land Use Plans and Forest and Grassland Plans.

Wildlife, fish, rare plantsLand management planning
NOI in Federal Register
12/09/2011
DEIS NOA in Federal Register
12/24/2013
FEIS NOA in Federal Register
05/29/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation219 (1982)
Project ActivityPlan Amendment
Greater Sage-grouse Record of Decision for Northwest Colorado and WyomingDecision Signed Date: 09/16/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Medicine Bow-Routt National Forest All Units · updated 9/30/2015
Routt National Forest · Jackson; Moffat; Routt, Colorado

The purpose of this project is to prepare environmental impact statements (EISs) and supplemental environmental impact statements to incorporate greater sage-grouse conservation measures into Bureau of Land Management land use plans and Forest Plans.

Land management planningWildlife, fish, rare plants
NOI in Federal Register
12/09/2011
DEIS NOA in Federal Register
08/14/2013
FEIS NOA in Federal Register
05/29/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Glen Stein · gstein@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (1982)
Project ActivityPlan Amendment
Greater Sage-grouse Record of Decision for Northwest Colorado and WyomingDecision Signed Date: 09/16/2015
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District; Hahns Peak/Bears Ears Ranger District; Parks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/30/2015
East of Jenney Trail · Converse, Wyoming

The USFS proposes to authorize Samson and Finley to use and maintain 470 feet of an unnamed road off of Jenney Trail.

Road management
Scoping Start
09/15/2014
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
Memo to File Samson Resources Co. and Finley Resources Inc. Road Use PermitDecision Signed Date: 08/14/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT39N, R73W Section 27 NE1/4NW1/4
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 9/28/2015
Select areas of prairie dog habitat within the TBNG centered around Management Area 3.63. East of state highway 59 and south of state highway 450. · Campbell; Converse; Niobrara; Weston, Wyoming

The Forest Service proposes to amend the 2001 Grassland Plan to modify Categories 1 and 2 of the 2009 Prairie Dog Management Strategy based on continuing management concerns raised by the State of Wyoming.

Land management planning
NOI in Federal Register
09/13/2013
DEIS NOA in Federal Register
08/2015 (Estimated)
FEIS NOA in Federal Register
09/2015 (Estimated)
Objection Period Start
10/2015 (Estimated)
Decision
11/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Michael Walker · mswalker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Amendment
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Black Hills National Forest All Units · updated 9/11/2015
On the Black Hills NF, running approximately from the SD/WY border to Pactola substation to Lange substation NW of Rapid City, SD · Pennington; Campbell; Weston, South Dakota; Wyoming

TECKLA-OSAGE-LANGE 230Kv Transmission line

Special use management
NOI in Federal Register
08/26/2011
DEIS NOA in Federal Register
12/27/2013
FEIS NOA in Federal Register
12/05/2014
Objection Period Start
12/06/2014
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Edward Fischer · efischer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Teckla-Osage-Rapid City 230 kV Transmission Line ProjectDecision Signed Date: 05/18/2015
ForestsBlack Hills National Forest; Medicine Bow-Routt National Forest
DistrictsMystic Ranger District; Douglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White River National Forest All Units · updated 8/19/2015
Aug 18th: Steamboat Springs - Arapahoe Basin Aug 19th: Copper Mountain ski area - Aspen Aug 20th: Aspen - Breckenridge Aug 22nd: Loveland - Fort Collins · Chaffee; Grand; Lake; Larimer; Park; Pitkin; Routt; Summit, Colorado

Classic Bicycle Racing LLC makes temporary use of NFS lands during 4 of the total 7 stages on four National Forests within Colorado for ancillary facilities such as staging areas with portable toilets, signs, barricades, message boards, and filming.

Special use managementRecreation management
Scoping Start
02/26/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Hillary Santana · hsantana@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date08/19/2015
ForestsMedicine Bow-Routt National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsHahns Peak/Bears Ears Ranger District; Canyon Lakes Ranger District; Sulphur Ranger District; Leadville Ranger District; Salida Ranger District; South Park Ranger District; West Zone/Aspen Ranger District; West Zone/Sopris Ranger District; East Zone/Dillon Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Medicine Bow-Routt National Forest All Units · updated 8/19/2015
Medicine Bow-Routt National Forests, Thunder Basin National Grassland · Albany; Campbell; Carbon; Converse; Crook; Natrona; Niobrara; Platte; Weston; Garfield; Grand; Jackson; Moffat; Rio Blanco; Routt, Colorado; Wyoming

This proposal would continue an integrated approach to treatment of noxious weeds and invasive species such as annual bromes to manage critical wildlife habitats and fuels treatments on the Medicine Bow - Routt NFs and Thunder Basin NG.

Fuels managementWildlife, fish, rare plantsGrazing managementWatershed managementVegetation management (other than forest products)
NOI in Federal Register
12/01/2010
DEIS NOA in Federal Register
03/21/2014
FEIS NOA in Federal Register
06/12/2015
Objection Period Start
06/12/2015
Decision
08/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Noxious Weed Treatments; Rangeland Vegetation Improvements
Record of Decision Invasive Plant Management MBRTBDecision Signed Date: 08/19/2015
ForestsMedicine Bow-Routt National Forest
DistrictsMedicine Bow-Routt National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/18/2015
Medicine Bow National Forest, Laramie Peak Unit, generally within the Horseshoe Creek watershed in the vicinities of Castle Rock and Rock Mountain and Harris Park Road. · Albany; Converse, Wyoming

The Forest Service is proposing to issue a commercial permit to Backcountry Bonsai to harvest live trees including common juniper, limber pine, ponderosa pine, Douglas fir, lodgepole pine, spruce, and possibly mountain maple.

Forest products
Scoping Start
06/02/2014
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Backcountry Bonsai Commercial Forest Products PermitDecision Signed Date: 05/29/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT28N R71W
Environmental Assessment · Parks Ranger District · updated 8/3/2015
The project area is located approximately 22 miles south of the town of Walden, Jackson County, Colorado. · Jackson, Colorado

Reoffer timber sales and implement silvicultural and hazardous fuels treatments in areas affected by the mountain pine beetle. Approximately 14.0 miles of non-system roads would be decommissioned to improve watershed conditions.

Forest products
Scoping Start
01/09/2014
Comment Period
04/03/2014
Objection Period Start
06/11/2015
Decision
07/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
Adam Bromley · abromley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTimber Sales (Salvage); Timber Sales (Green)
Willow Creek AnalysisDecision Signed Date: 07/31/2015
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT. 4-6N., R. 77-80W.
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 7/30/2015
North of Columbine on RCR 129, includes Shield Mountain, Crane Park & King Solomon Creek. · Routt, Colorado

Environmental Analysis of livestock grazing on three sheep/cattle allotments, one cattle allotment and two horse pastures in Routt County.

Grazing managementWatershed managementVegetation management (other than forest products)
Scoping Start
03/24/2014
Comment Period
03/24/2014
Objection Period Start
01/18/2015
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Erik Taylor · estaylor@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations; Noxious Weed Treatments
Rangeland Management in the Whiskey Creek analysis areaDecision Signed Date: 07/30/2015
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT11N, R86 & 85W; T12N, R86W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/16/2015
Approximately 8 miles south of Wright, WYoming · Campbell, Wyoming

SUPO for proposed Tuit Draw Fed 11-2PH well. The APD SUPO includes operations associated with accessing, drilling, testing, and completing a horizontal oil/gas well. Approx 886 feet of new road, 400' x 400' wellpad; total disturb 6.4ac

Minerals and geology
Scoping Start
02/20/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNW 1/4 NW 1/4 of Section 2, T42N, R72W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/16/2015
Access to the proposed undertaking is an existing PVT road (Bridle Bit Ranch) to the north of Edwards Road (Co Road 30) ca. 1.3 miles east of state hwy59. Follow the PVT road north and east 2.9 miles · Campbell, Wyoming

Proposal to authorize SUPO of APDs submitted for the proposed Porcupine Fed 44-19PH and 44-19TH wells. SUPO includes operations assoc with access, drilling, testing, and completing horizontal O/G wells. 151ft of new road and one 400ft square wellpad

Minerals and geology
Scoping Start
02/20/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSESE Sec 19, T43NR71W, Campbell County
Decision Memo · Brush Creek/Hayden Ranger District · updated 7/5/2015
T12N, R83W, Sections 7 and 8, within the Encampment River addition Inventoried Roadless Area. · Carbon, Wyoming

This project will remove two weirs and associated infrastructure from Coon Creek and the Upper East Fork Encampment River. The access road will be decommissioned, and a culvert will be removed from Forest road 416.1C to allow aquatic organism passage

Wildlife, fish, rare plantsWatershed management
Scoping Start
08/04/2014
Decision
02/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
William Baer · wbaer@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 6/30/2015
Project is corridored along Matheson Road and Basin Electric 230 Kv powerline in Campbell County, WY. · Campbell, Wyoming

Construction of new overhead 69kV powerline (5-wire; single, treated wood poles), originating from PRECorp Tekla substation and crossing 4,935 feet Federal lands, providing service for DCP Midstream to a natural gas pump station off federal land.

Special use management
Scoping Start
07/2015 (Estimated)
Comment Period
08/2015 (Estimated)
Objection Period Start
11/2015 (Estimated)
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityElectric Transmission; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSNE, NWNE, NNW of Sec 3, T41N R71W
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 6/27/2015
Northeast of Columbine, Colorado · Routt, Colorado

Re-routing of existing snowmobile trail east of current route and construction of approximately 3 acre parking area near trail head.

Recreation management
Scoping Start
06/09/2009
Comment Period
07/26/2009
Decision
03/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
Columbine Access ProjectDecision Signed Date: 03/03/2011
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R85W, Section 32 & 33
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/26/2015
To access the project area drive south from Wright WYO on Hwy59 for ca. 11 miles. Turn right (west) on NFSR 910C to enter the project area · Campbell, Wyoming

3-Part Proposal: 1.Use of ca.1995ft of NFSR910C west from HWY59 2.Use and reconstruct ca.4717ft of NFSR910C to a 24ft wide road (C&D; gravel surface) within a ca.40ft construction ROW 3.Use of ca.298ft of exist O&G access road south of NFSR910

Minerals and geology
Scoping Start
12/17/2014
Decision
03/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityNatural Gas; Oil
Ballard Petroleum Holdings, LLC, RUP For NFS Road 910-CDecision Signed Date: 03/26/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSWSW S14 and S2S2 S15, T42NR72W
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 6/26/2015
Hahns Peak/Bears Ears Ranger District, National Forest System Trail 1169 (Hot Springs Trail) near Hot Springs Creek · Routt, Colorado

Reconstruct and relocate approximately 1,100 feet of the Hot Springs Trail. Adjacent to Hot Springs Creek, this portion of trail washed out in the spring of 2015. This project will assure safe passage and a more sustainable trail.

Watershed managementRecreation management
Scoping Start
06/01/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 6/26/2015
Thunder Basin National Grassland · Albany, Wyoming

This proposal has been cancelled. The Inyan Kara Assembled Land Exchange project may be planned to incorporate some of the formerly planned Irwin Land Exchange.

Land ownership management
Scoping Start
05/2015 (Estimated)
Comment Period
05/2015 (Estimated)
Objection Period Start
06/2015 (Estimated)
Decision
07/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityLand Exchanges
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionPvt to Fed:T40N R69W;Part Sec27, Sec28, Half Sec29, Half Sec32, Half Sec33, Part Sec34-T41N R68W;Sec16-Fed to Pvt:T41N R69W;Part Sec27, Half Sec29, Half Sec30, Part Sec31, Sec32, Half Sec34, Half Sec
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/24/2015
Black Mountain Road & Area · Moffat; Routt, Colorado

Change in travel management on NFSR 110 (Black Mountain Road) to allow OHV use where currently prohibited. Other minor changes to the HPBE MVUM map may be included in this analysis.

Recreation management
Scoping Start
01/01/2015
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTravel Management
OHV Use on Black Mountain RoadDecision Signed Date: 06/12/2015
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, T10N, R88W, R89W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/9/2015
Approximately, 12 miles east of Hwy 59 in the Hilight Bill Geographic Area. · Converse, Wyoming

The United States Forest Service (USFS) has a need to authorize Charger Resources, LLC (Charger) to use National Forest System (NFS) lands for operations associated with accessing, drilling and producing oil/gas from a proposed horizontal well.

Minerals and geology
Scoping Start
06/10/2014
Decision
03/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390); Forest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Charger Resources LLC SUP DGL385 for School Creek Fed43-27-22-THDecision Signed Date: 03/24/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 26, T41N, R70W
Samson Powerline Completed
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/9/2015
Approximately 6 miles SE of Hwy 34 and 31 junction. · Converse, Wyoming

Install 34.5kV, 3-Phase, single, overhead power line across FS for approximately 2621.33 feet. The ruling span is approximately 230 feet so 12 poles will be installed on FS. Construction and permanent right of way width will be 30 feet.

Special use management
Scoping Start
06/24/2014
Decision
03/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Samson Resources, IncDecision Signed Date: 03/27/2015
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT38N, R73W sec. 34
Decision Memo · Yampa Ranger District · updated 4/8/2015
Southwest of Yampa, CO approximately 7 miles · Garfield, Colorado

This project would involve notching 20 beaver dams along East Coal Creek to help plan a native fish reclamation project. Notching would allow estimates of the change in habitat complexity and the timing and volume of flows.

Wildlife, fish, rare plants
Scoping Start
05/06/2013
Decision
03/2014 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 1 North, Range 86 West, Section 5
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/31/2015
Approximately, 8 miles Northwest up Highway 16 from the town of Upton. · Weston, Wyoming

The USFS has identified a need to authorize RT Communications to occupy NFS land for the construction and maintenance of an additional 1,250 feet of phone line to the BNSF building for year round services. RT will be tapping into their existing line.

Special use management
Scoping Start
06/24/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
RT Communications, Inc.Decision Signed Date: 09/18/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT48N, R66W sec. 4 NE1/4
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/25/2015
Approximately, 4 miles NE of county roads 31 and 34 junction. · Converse, Wyoming

SUP DGL56 includes allowing Berenergy Corp. to use approx. 0.6 miles of National Forest System (NFS) Road 935, within an eighteen foot right-of-way, for year round access to their existing oil and gas lease operations in the Manning Oil Field.

Special use management
Scoping Start
04/29/2013
Decision
11/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Berenergy Corporation - Road Reconstruction SUPDecision Signed Date: 11/20/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionN ½ NW ¼ of Section 27, T39N, R73W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/25/2015
Section 11 of Township 41 North, Range 67 West, Weston County, WY · Weston, Wyoming

BHPP is proposing to construct and install approximately 3,700 feet of pipeline adjacent to an existing access road from the Murphy B-11 oil well to an existing KN gas gathering pipeline to capture and use natural gas vented at the well site.

Minerals and geology
Scoping Start
03/2015 (Estimated)
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityNatural Gas; Oil
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 11 of Township 41 North, Range 67 West
Decision Memo · Laramie Ranger District · updated 3/3/2015
Snowy Range Ski and Recreation Area, located in the Snowy Range Mountains approximately 35 miles west of Laramie, WY. · Albany, Wyoming

The Snowy Range Ski Area would like to (1) expand its secondary parking lot area (2)increase the length and width of the Pioneer tubing hill and (3) complete building upgrades such as new coverings, improved egress, and adding wood boilers.

Recreation management
Scoping Start
07/10/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Snowy Range Ski and Recreation Area: Parking Lot ExpansionDecision Signed Date: 10/29/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Yampa Ranger District · updated 2/12/2015
Near the forest boundary traveling east on Colorado Highway 134. · Routt, Colorado

This project is to authorize this use for the existing spring development, with no changes to the structures proposed, and the only changes are administrative with the renewal of the special use permit.

Special use management
Scoping Start
04/08/2014
Decision
10/2014 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Keesha Cary · keeshamcary@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM - Krauss Spring Development Special Use Permit ReissueDecision Signed Date: 10/29/2014
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land Description6TH PM, T.1N., R.83W., sec. 5, SW¼NW¼, NW¼SW¼,
Decision Memo · Yampa Ranger District · updated 2/12/2015
3rd Street and Roselawn, Yampa CO · Routt, Colorado

Install buried pipeline along North boundary of Yampa Ranger District Administrative Site.

Special use management
Scoping Start
10/12/2014
Decision
11/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Keesha Cary · keeshamcary@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Town of Yampa Water Pipeline Installation Decision MemoDecision Signed Date: 11/04/2014
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land Description6PM, 2N, 85 W, sec. 10.
Decision Memo · Laramie Ranger District · updated 1/30/2015
1/4 mile north (upstream) from the bridge across Douglas Creek that goes to Bobbie Thompson CG · Albany, Wyoming

Analyze a Plan of Operation to allow mineral exploration by digging a trench between NFSR 543 and Douglas Creek

Minerals and geology
Scoping Start
01/27/2006
Decision
04/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Jeff Wallace · jwallace@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N, R79W, Section 27
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/17/2014
Laramie Peak Unit · Albany, Wyoming

Federal to private approximately 240 acres, private to federal approximately 320 acres (formerly part of the Combined Bear Creek Land Exchange).

Land ownership management
Scoping Start
10/10/2012
Decision
11/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Hillary Shirley · hillarykshirley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
Harris Park Land Exchange Decision MemoDecision Signed Date: 11/25/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionPvt to Fed T26N, R72W, Section 26; Harris Park-Fed to Pvt T26N, R72W, portions of Section 12; T27N, R72W portions of Section 3
Environmental Assessment · Laramie Ranger District · updated 11/20/2014
Laramie Ranger District, Snowy Range Mountains along Hwy 130 · Albany, Wyoming

Hazard tree clearing and/or removal along Carbon Power & Light's overhead powerline from approximately Snowy Range Ski Area to just west of Brooklyn Lake.

Vegetation management (other than forest products)Special use management
Scoping Start
03/11/2014
Comment Period
03/11/2014
Objection Period Start
09/23/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Sara Alberts · salberts@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
Carbon Power and Light Powerline Clearing Along Highway 130Decision Signed Date: 11/17/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT 16 N, R 78 W, Sections 17-20; T 16 N, R 79 W, Sections 13-14, 6th principal meridian
Decision Memo · Douglas and Thunder Basin Ranger District · updated 11/4/2014
Far west side of the Laramie Peak unit on the Douglas Ranger District. · Natrona, Wyoming

The treatment units total 913 acres of Forest Service and private land within the Forest boundary. Improve the condition of aspen and associated meadow communities. Improve habitat for wildlife species.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
05/30/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Thomas Whitford · twhitford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
Bates Creek Aspen Restoration Decision MemoDecision Signed Date: 10/28/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT30N R78W, Sections 13 and 24; T30N R77W, Sections 18 and 19
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/27/2014
Approximately, 3-10 miles south to southwest of the town of Wright. · Campbell, Wyoming

Devon Energy has submitted a Notice of Intent to the Douglas Ranger District (DRD) to conduct oil and gas geophysical exploration operations on the Thunder Basin National Grassland (TBNG).

Minerals and geology
Scoping Start
04/28/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390); Forest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
DEVON ENERGY %u2013 PORCUPINE CREEK 3D SEISMIC SURVEYDecision Signed Date: 09/24/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT.42-44N., R.71-72W
Environmental Impact Statement · Yampa Ranger District · updated 10/20/2014
Gore Pass Area · Grand; Routt, Colorado

The Yampa Ranger District is proposing a variety of actions in the Gore Pass area to improve watershed health and reduce potential erosion issues.

Watershed managementRoad managementVegetation management (other than forest products)
NOI in Federal Register
04/11/2012
DEIS NOA in Federal Register
07/15/2013
FEIS NOA in Federal Register
07/09/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Jamie Krezelok · jkrezelok@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Road Improvements/Construction; Travel Management; Watershed Improvements
Record of Decision Gore Creek RestorationDecision Signed Date: 10/06/2014
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT1N, R82W, Sec. 1-36; T1N, R83W, Sec. 1-36; T2N, R82W, Sec. 1-36; T2N, R84W, Sec. 22-24; T3N, R82W, Sec. 31-36, T2N, R83W, Sec. 1, 10-14, 22-36
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 10/2/2014
The AA is located on the HPBE RD of the MBRTB in Routt County, Colorado approximately 20 miles north of the town of Steamboat Springs, Colorado. · Routt, Colorado

Commercially & non-commercially manage timber stands to establish regeneration, growth, & vigor to beetle killed stands expediting the establishment of the next forest.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
08/12/2013
Comment Period
08/12/2013
Decision
10/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Mark Cahur · mcahur@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
Coulton Floyd II Timber & Fuels Management AnalysisDecision Signed Date: 10/02/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N R84W Sections 4, 5, 6, 7, 8, 9, 16, 17, 18, 19, 20, 21, 29, 30, 31, 32 and T9N R85W Sections 1, 12, 13, 24, 25, 36 and T10N R84W Sections 29, 30, 31, and T10N R85W Section 36
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/22/2014
Steamboat Ski Area · Routt, Colorado

Develop summer activities near Thunderhead which includes a disc golf course and slight variations to the current trail system near Thunderhead.

Special use managementRecreation management
Scoping Start
03/04/2013
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
SSRC Thunderhead Disk Golf CourseDecision Signed Date: 06/13/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSec 23, 25, 26, T 6N, R 84W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/22/2014
Areas on National Forest near Long Lake, Steamboat Ski Area, and Rabbit Ears Pass · Routt, Colorado

Renewing an existing permit for the Steamboat Springs Running Series to conduct running races on the National Forest.

Special use management
Scoping Start
03/21/2014
Decision
05/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Steamboat Springs Running Series Permit IssuanceDecision Signed Date: 05/05/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N R82W & R83W, T6N R83W & 84W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/22/2014
Project area is most easily accessed via US HWY 40 approximately 0.5 miles northeast the West Summit Trailhead. · Routt, Colorado

A portion of abandoned roadbed from the old US Highway 40 is impairing wetland function and quality at the headwaters to a Walton Creek Tributary. The Forest Service is proposing to remove fill from the abandoned roadbed and restore the wetland.

Watershed managementVegetation management (other than forest products)
Scoping Start
08/12/2013
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Marti Aitken · maitken@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
West Rabbit Ears Restoration ProjectDecision Signed Date: 07/14/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N., R83W., Sections 20 & 21
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/22/2014
Routt County, 6th PM, T7N, R83W, Sec 35 · Routt, Colorado

Proposal to replace existing communication building at the Buffalo Pass Communication Site with a new building and issue a new authorization for 30 years to replace the existing Memorandum of Understanding.

Special use management
Scoping Start
07/01/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
WESTERN AREA POWER ADMINISTRATION SPECIAL USE PERMIT AND BLDG REPLACEMENTDecision Signed Date: 07/14/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/19/2014
Hilight Bill Geographic Area. · Campbell, Wyoming

Use of existing water line.

Special use management
Scoping Start
04/04/2014
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Black Bear Oil Corp Decision MemoDecision Signed Date: 08/27/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT39N, R73W SE1/4NE1/4, NW1/4SE1/4, E1/2SW1/4 sec. 3 T40N, R73W SE1/4SW1/4, SW1/4SE1/4, sec. 27 W1/2NE1/4, sec. 34
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/19/2014
Approximately 12 miles south of the town of Wright, Wyoming and 3 miles west of Hwy. 59. · Campbell, Wyoming

The proposed action is to issue a Road Use Permit for EOG Resources to use the existing road (0.4 mile in length). Also, to authorize EOG Resources to construct and maintain an access road would be a 269 foot long by 40 foot wide construction ROW.

Minerals and geology
Scoping Start
06/24/2014
Decision
08/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Angela Bulla · ambulla@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
EOG Resources, Inc Road Use PermitDecision Signed Date: 08/12/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 14 T42N R72W and Section 15 T42N R72W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/19/2014
North of Seedhouse Road, NFSR 400, CR64. · Routt, Colorado

Renewal for Elk River Guest Ranch Recreaiton Special Use Permit. Activities are primarily trail rides, but also include other outfitting and guiding activities.

Recreation managementSpecial use management
Scoping Start
04/22/2012
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Elk River Guest Ranch Permit IssuanceDecision Signed Date: 05/05/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSections 1, 2, 3, 10, 11, 12, 13 14, T9N; R85W, Sections 6, 7, of T9N: R84W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/19/2014
The proposed project is within the administrative boundary of the Thunder Basin National Grassland, Douglas Ranger District, approximately 20 miles southwest of Newcastle, Weston County, Wyoming. · Weston, Wyoming

The USDA Forest Service (USFS) proposes to authorize RT Communications to occupy NFS land for the construction and maintenance of an additional 726 feet of fiber optic phone line to the Mush Creek Pumping Station.

Special use management
Scoping Start
12/05/2013
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
RT Communications-Mush Creek Pumping Station Decision MemoDecision Signed Date: 08/27/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT44N, R63W, section 15 SW¼.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/19/2014
Steamboat Ski Area, Steamboat Springs, CO · Routt, Colorado

Two existing springs will be upgraded to increase flow within existing water rights.

Special use managementRecreation management
Scoping Start
04/21/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
FY14 Four Points Springs ProjectDecision Signed Date: 09/17/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N R84W Sections 23, 24, 25, 26
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/19/2014
On the Lynch and Dull Center roads and continue south on the Cow Creek Road. · Converse, Wyoming

The USDA Forest Service (USFS) proposes to authorize Wyoming Army National Guard to occupy NFS land for training operations on the Thunder Basin National Grassland on August 3-5, 2014 on the Lynch and Dull Center Roads and south on the Cow Creek Rd.

Special use management
Scoping Start
07/21/2014
Decision
09/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Cordie Lyon · clyon@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/19/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Laramie Ranger District · updated 9/18/2014
Foxpark, Boswell & Sheep Mountain Management Plan · Albany, Wyoming

Reauthorization of livestock grazing and issuance of new allotment management plans for the Foxpark and Boswell livestock grazing allotments and the Sheep Mountain wildlife area.

Vegetation management (other than forest products)Grazing management
Scoping Start
02/28/2012
Comment Period
02/28/2012
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Corey Ertl · certl@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
Rangeland Mgt in the Boswell, Foxpark, and Sheep Mountain Analysis AreaDecision Signed Date: 09/12/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT12-15N., R77-79W.
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 9/18/2014
Several locations on the Brush Creek/Hayden, Laramie, and Douglas Ranger Districts. See Decision Memo. · Albany; Carbon; Converse; Natrona, Wyoming

Authorize the Natural Resource Conservation Service to operate and maintain 17 SNOTEL sites, 10 Snow Course sites, and 3 access routes to private property under a special use permit issued for up to 30 years.

Special use management
Scoping Start
07/01/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Master Special Use Permit to the NRCS for SNOTEL and Snow Course SitesDecision Signed Date: 08/25/2014
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District; Douglas and Thunder Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 9/18/2014
NFSR 517 at Dry Park, west to Forest Service parking lot on the west side of Albany, WY · Albany, Wyoming

Designate the last two (2) miles of the Rail Trail from Dry Park (NFSR 517) to Albany. This portion of trail goes through State, BLM, and private lands.

Recreation management
Scoping Start
03/2014 (Estimated)
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Mary Sanderson · msanderson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Decision Memo · Laramie Ranger District · updated 9/18/2014
T13N R78W, Section 16; accessed from National Forest System Road 517 · Albany, Wyoming

The Laramie Ranger District proposes to issue a Right-of-Way permit to the Wyoming State Forestry Division to allow construction of a temporary road to access State forest land.

Special use management
Scoping Start
04/01/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Wyoming State Forestry Division Fox Park 40 Salvage SaleDecision Signed Date: 09/03/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 9/16/2014
Motorized trail 1186 at Jack Park. · Jackson, Colorado

This project would re-route approximately 0.3 miles of the Jack Creek single-track motorized trail from a wet meadow to a drier location upslope.

Recreation managementWatershed management
Scoping Start
04/28/2014
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Jon Myers · jcmyers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
Jack Park Trail Reroute Decision MemoDecision Signed Date: 08/08/2014
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 9/16/2014
From Walden, Colorado, take HWY 125 south approximately 30 miles. Turn west on NFSR 106. The three culverts are located on NFSR 106 at mile points (MP) 7.2, 7.5, and 9.5. · Jackson, Colorado

The proposed action is to replace culverts that are currently undersized, not functioning properly, or aquatic passage barriers. Each culvert location has been assessed, surveyed, and a design package developed.

Watershed managementRoad management
Scoping Start
03/27/2014
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
Culvert Replacements NFSR 106 Project DMDecision Signed Date: 06/26/2014
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT5N, R79W, Sec 25 & T4N, R79W, Sec 2
Decision Memo · Laramie Ranger District · updated 9/11/2014
Barber Lake, Snowy Range Mountains · Albany, Wyoming

This project proposes to rehabilitate the Barber Lake fishery by cleaning and repairing the ditch and outlet to Barber Lake and rehabilitating the lake bed.

Recreation management
Scoping Start
07/2014 (Estimated)
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Mary Sanderson · msanderson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 9/11/2014
T. 14 N., R. 71 W., sec. 30 · Albany, Wyoming

High West Energy requests to take out 14 power poles and replace them with 16 new power poles along the 1-80 corridor on the Pole Mountain unit.

Special use management
Scoping Start
04/24/2014
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
High West Energy Power Line ReconstructionDecision Signed Date: 07/01/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/11/2014
20 Sites on the Routt National Forest · Grand; Jackson; Routt, Colorado

Renewal of a SUP for the operation and maintenance of 11 existing SNOwpack TELemetry (SNOTEL) sites and 8 snowcourse sites on the Routt NF. This project will also include the installation of 1 new site called the Elkhead Divide SNOTEL.

Special use management
Scoping Start
07/22/2013
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Keesha Cary · keeshamcary@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ROUTT NF MASTER SPECIAL USE PRMT TO THE NRCS FOR SNOTEL & SNOW COURSE SITESDecision Signed Date: 07/01/2014
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District; Hahns Peak/Bears Ears Ranger District; Parks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 9/11/2014
A network of user routes east of the 700 road in Sections 13, 14, 23 and 24, T14N, R 71W, 6th PM. · Albany, Wyoming

Route restoration will consist of soil de-compaction, drainage structure improvement, erosion control, seeding, mulching, and hand-tool work. Access to all routes will be obstructed using fencing, tree falling, posts, and boulders.

Recreation managementWatershed managementVegetation management (other than forest products)Road managementWildlife, fish, rare plants
Scoping Start
08/01/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Katharine Haynes · katharinemhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Rangeland Vegetation Improvements; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSections 13, 14, 23 and 24, T14N, R 71W, 6th PM
Decision Memo · Laramie Ranger District · updated 9/11/2014
Laramie Ranger District · Albany, Wyoming

Issue Jamie Egolf and David Egolf a new authorization to operate the Snowy Range Lodge as a resort

Special use management
Scoping Start
05/15/2012
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Snowy Range LodgeDecision Signed Date: 07/24/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16 N. R78W., sec 29
Decision Memo · Laramie Ranger District · updated 9/11/2014
NFSR 544.AB west of Wold, south to NFSR 501 west of WyCOLO · Albany, Wyoming

Relocate a winter use snowmobile trail off of the State Highway 230 Right-of-Way between WyCOLO and Wold.

Recreation management
Scoping Start
07/2014 (Estimated)
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Mary Sanderson · msanderson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Decision Memo · Laramie Ranger District · updated 9/11/2014
Pole Mountain unit, adjacent to FR 701 · Albany, Wyoming

Mineral exploration would involve 1-3 drill sites in the Upper North Crow prospect area. Drill holes would be 5-6 inches in diameter and would be plugged following use. Staging, drilling, and clean-up would occur between Sept 1 and Nov 30 2014.

Minerals and geology
Scoping Start
04/15/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Wolf Energy, Inc. Mineral ExplorationDecision Signed Date: 09/03/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N, R71W, Sections 27,34,35
Decision Memo · Laramie Ranger District · updated 9/4/2014
The Crow Creek and Hill 8821 Communication Sites are located in the northwest corner of the Pole Mountain unit on the Laramie Ranger District. · Albany, Wyoming

Replaced with project #44516: Laramie Ranger District Communication Site Permits at Hill 8821 and Crow Creek Hill, which completed 5 communication permits during 4th quarter 2014.

Special use management
Scoping Start
05/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionCrow Creek: T 15N, R 72 W, Sections 27 and 34; Hill 8821: T 15N, R72W, Section 10
Decision Memo · Brush Creek/Hayden Ranger District · updated 8/19/2014
Battle Creek Allotment, Brush Creek/Hayden Ranger District · Carbon, Wyoming

The District proposes to allow construction of two stock ponds on the Battle Creek allotment.

Grazing management
Scoping Start
03/13/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Brad Weatherd · bweatherd@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Battle Creek AllotmentDecision Signed Date: 08/18/2014
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/19/2014
Approximately, 10 miles south of the town of Wright just west of Hwy. 59. · Campbell, Wyoming

Peak Powder River Resources is proposing to use the NFSR 910.C road for approximately .41 miles. They are proposing to rebuild the road to a crowned and ditched graveled road with an 20%u2019 driving surface with culverts.

Road management
Scoping Start
06/21/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Robin Brooks · rjbrooks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
Peak Resources LLC Decision Memo Road Use PermitDecision Signed Date: 07/07/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT42N R72W Sections 14 & 15
Decision Memo · Laramie Ranger District · updated 8/4/2014
Pole Mountain communication sites at Hill 8821 and Crow Creek Hill · Albany, Wyoming

The Forest Service proposes to issue new leases and extend existing leases for several permittees at the Hill 8821 and Crow Creek Hill communication sites.

Special use management
Scoping Start
05/19/2014
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Communication Site Permits at Hill 8821 and Crow Creek HillDecision Signed Date: 06/25/2014
SourceGas LLC, Versatel, Western Area Power AssociationDecision Signed Date: 07/11/2014
Southern Star, Hill 8821Decision Signed Date: 07/25/2014
Mauna Towers, LLC: Crow CreekDecision Signed Date: 07/29/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 7/9/2014
Crow Creek Hill Communication Site · Albany, Wyoming

Issuance of a communication site lease for an existing cell tower and equipment building

Special use management
Scoping Start
05/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N., R72W., sec 34
Decision Memo · Laramie Ranger District · updated 7/1/2014
Offgrid Outdoors: all of the Medicine Bow NF; Colorado Mountain School: Vedauwoo; Laramie Valley Chapel: Mirror Lake, Lake Marie, Vedauwoo, Lewis Lake TH, Libby Flats; High Plains Harriers: Tie City · Albany, Wyoming

The District is scoping to approve 3 outfitter/guide permits for Offgrid Outdoors moose hunting, Colorado Mountain School rock climbing, and Laramie Valley Chapel activities, and a recreation event permit for High Plains Harriers.

Recreation managementSpecial use management
Scoping Start
05/19/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Parks Ranger District · updated 6/23/2014
Take HWY 14 to HWY 40, follow HWY 40 until it turns back to the east and turn north on County road 112.6 which turns into NFSR 112.6. · Grand, Colorado

The purpose of this project is to remove and/or replace failing culverts on level one roads that are not open to the public and receive limited use by the Forest Service.

Road managementWatershed management
Scoping Start
03/27/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Liz Schnackenberg · lschnackenberg@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT2N, R78W, Sec 4-6, 7, 8, 17, 18, T2N, R79W, Sec 1 & 12, T3N, R78W, Sec 20, 28-30, 31-33, T3N, R79W, Sec 36
Decision Memo · Parks Ranger District · updated 6/23/2014
T5N, R77W, Section 13: NFSR 758.1A at Jack Creek crossing. · Jackson, Colorado

This project would replace washed out culverts with a hardened low water crossing. The project would restore the stream bank at the original creek crossing and prevent further erosion and sediment deposit into Jack Creek.

Watershed managementRoad managementWildlife, fish, rare plants
Scoping Start
04/28/2014
Decision
06/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Jon Myers · jcmyers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Maintenance; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/20/2014
Bears Ears area, north of the Elkhead Mountains. · Routt, Colorado

Construct operate and maintain a 1,100 foot natural gas gathering line from a well on the APW private in-holding across National Forest System Lands. The line will be constructed in and/or adjacent to the existing road easement.

Special use management
Scoping Start
07/22/2013
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Carmony Exploration, LLC Special Use PermitDecision Signed Date: 04/04/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R89W, 6PM Sections 1&2,
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/20/2014
Routt County, South Walton Peak, 6th PM T5N, R83W, Section 34. · Routt, Colorado

Proposal to replace an existing communication building built in 1954, located on south Walton Peak and part of the Walton Peak Communication Site. The old building will be removed along with two propane tanks.

Special use management
Scoping Start
04/01/2014
Decision
04/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Colorado Information Technology Bldg Replacement Ammend to Comm Use LeaseDecision Signed Date: 04/23/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/19/2014
Grand County, 6th PM, T5N, R82W, Sec. 18 · Grand, Colorado

Reissue of CDOT Maintenance Facility authorization for 5 years and authorize rehabilitation of site around existing buildings.

Special use management
Scoping Start
04/2014 (Estimated)
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 6/17/2014
Pole Mountain: All classes and races are accessed through the Tie City parking lot and trailhead. · Albany, Wyoming

The Medicine Bow Nordic Association would like to renew their permit for a 5-year term to conduct about 2 weekend races and 6 evening races per winter season and to provide instruction for classic and skate skiing on groomed trails at Tie City.

Special use management
Scoping Start
03/07/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
MBNA Recreation Event and Outfitter Guide PermitDecision Signed Date: 06/10/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land Description6th principal meridian, T 15 N, R 71 W, secs. 23, 24, 25, and 26
Decision Memo · Laramie Ranger District · updated 4/23/2014
Variable, Local landmarks: Summit rest area, Old Highway 30 and Vedauwoo Road · Albany, Wyoming

The Cheyenne Track Club would like to renew their recreation event permit for a five year term to conduct foot races. The races include 5k, half-marathon, marathon, and double marathon that will take place annually on the Sunday before Memorial Day.

Special use management
Scoping Start
03/07/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pole Mountain Long Term Recreation EventsDecision Signed Date: 04/22/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 4/23/2014
Pole Mountain/Vedauwoo, NFSR 708 and Highway 210 · Albany, Wyoming

The High Plains Archery 3-D Tournament would like to renew their recreation event permit for a five year term. The tournament takes place during the third weekend in July and has been authorized on the Medicine Bow NF since 1992.

Special use management
Scoping Start
03/07/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pole Mountain Long Term Recreation EventsDecision Signed Date: 04/22/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 4/23/2014
Various established and maintained mountain biking trails on Pole Mountain · Albany, Wyoming

The Laramie Bicycling Network would like to renew their recreation event permit for a five year term for their six-race mountain bike series at Tie City. Races will take place on Tuesday evenings in the summer. There will be about 110 participants.

Special use management
Scoping Start
03/07/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pole Mountain Long Term Recreation EventsDecision Signed Date: 04/22/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 4/23/2014
Variable, Pole Mountain/Vedauwoo · Albany, Wyoming

The Laramie Range Orienteering Club would like to renew their recreation event permit for a five year term for a series of running orienteering races from July 28 %u2013 August 14 on Pole Mountain with one race per day.

Special use management
Scoping Start
03/07/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pole Mountain Long Term Recreation EventsDecision Signed Date: 04/22/2014
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 4/22/2014
Eastern portion of the North Laramie Range · Albany; Converse, Wyoming

This project would include treating the Project Area to reduce fire hazard and encourage stand health. An Adaptive Management Option would be created. Treatments would be selected by using the appropriate design criteria.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
03/15/2011
Comment Period
03/15/2011
Decision
05/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Clay Westbrook · cwestbrook01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other; National Fire Plan - Healthy Forests Initiative Alternative Consultation Arrangements
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Creation/Revision; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 24 N, R 70-71 W; T 25 N, R 70-71 W; T 26 N, R 70-72 W; T 27 N, R 70-72 W; T 28 N, R 70-72 W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 4/2/2014
Approximately 3 miles east of the intersections of county road #54 and county road #5. · Weston, Wyoming

Baytex Energy is proposing to use and improve an existing 2 track NFSR for approximately 0.70 miles from the intersection with Weston County Road – Cheyenne County Road (#54) to the north in the Section 35 T 42N, R 64W on the TBNG.

Road managementSpecial use management
Scoping Start
04/01/2013
Decision
01/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Robin Brooks · rjbrooks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Baytex Energy Road Use PermitDecision Signed Date: 01/28/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 35, T 42N, R 64W
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/27/2014
The project area is approximately 20 miles southwest of Saratoga, Wyoming. · Carbon, Wyoming

The purpose of this project is to improve wildlife habitat and lower fuel loads to reduce fire hazards. There is a need to re-introduce fire through prescribed burns to improve age class distribution.

Vegetation management (other than forest products)Fuels management
Scoping Start
12/16/2013
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Mick Hood · mhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Divide Peak Habitat Improvement CEDecision Signed Date: 03/27/2014
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT14N R85W Sec. 5-8, T14N R86W Sec. 1-6, 8-12, 14, 15, T15N R85W Sec. 6, 7, 17-20, 28-33, T15N R86W T15N R.87W Sec. 1-7, 9-17, 20-27, 35, 36, T16N R86W Sec. 26-36, T.16N R87W Sec. 14, 15, 21-36
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/27/2014
North of Hwy 40, north of Ferndale picnic area. · Routt, Colorado

Reissue of special use permit for existing structures for year round domestic use by the Josfan property.

Special use management
Scoping Start
10/31/2013
Comment Period
11/01/2013
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
Keesha Cary · keeshamcary@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N R84W, Section 23, SW quarter, Section 26 NW Quarter
Big Creek Spring Completed
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/20/2014
Approximately three miles west of Clark, CO on FSR 471. · Routt, Colorado

Develop water source on the Barbey Livestock Grazing Alotment.

Grazing managementWatershed managementVegetation management (other than forest products)
Scoping Start
02/04/2013
Comment Period
02/04/2013
Decision
03/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Peter Sargent · pbsargent@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Rangeland Vegetation Improvements; Grazing Structural Improvements; Watershed Improvements
Big Creek Spring DevelopmentDecision Signed Date: 03/14/2014
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, R84W, section 6
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/20/2014
Buffalo Pass, NFSR 60 & 310.1B northeast of Steamboat Springs, Colorado. · Routt, Colorado

The proposed project would include the development of one new gravel pit, and extracting materials from an existing borrow pit and an existing gravel pit located near Fish Creek Reservoir along NFSR 60.

Road management
Scoping Start
06/18/2012
Comment Period
06/18/2012
Decision
04/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance
Buffalo Pass Road Improvement ProjectDecision Signed Date: 04/04/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionBorrow pit: T7N, R84W, Sec 36; existing gravel pit : T6N, R83W, Sec 15; proposed new gravel pit :T7N, R83W, Section 32.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/3/2014
Approximately 2.5 miles west of the Hwy 59 and Steckley Road (NFSR 942)junction. · Converse, Wyoming

The Steckley Road (NFSR 942) is the primary access to a proposed well pad. They would like to upgrade approximately 750 feet of an existing 2 track road to a 20%u2019 running surface all weather road that will provide year round access.

Road management
Scoping Start
12/23/2013
Comment Period
12/23/2013
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Robin Brooks · rjbrooks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
Devon Energy RUPDecision Signed Date: 02/25/2014 Legal Notice Date: 03/03/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 33, 34, & 35 T40N, R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 2/24/2014
Approximately thirty five (35) miles northeast of Gillette, Wyoming, within the administrative boundary of the Medicine Bow-Routt National Forests and Thunder Basin National Grassland, Douglas Ranger · Converse, Wyoming

Change in ownership from Ballard Petroleum Holdings, LLC (Ballard) to Elysium Natural Resources, LLC.

Special use management
Scoping Start
11/12/2013
Comment Period
11/12/2013
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Elysium Natural Resources, LLC-Pipeline SUPDecision Signed Date: 02/12/2014 Legal Notice Date: 02/24/2014
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT54N, R70W: NW 1/4 of Section 3 and NE 1/4 of Section 4 T55N, R70W: SE 1/4 of Section 33 and SW 1/4 of Section 34 All located within the 6th P.M., Campbell County, Wyoming
Environmental Impact Statement · Medicine Bow-Routt National Forest All Units · updated 2/6/2014
Medicine Bow-Routt National Forests · Albany; Carbon; Converse; Natrona; Platte; Grand; Jackson; Moffat; Routt, Colorado; Wyoming

This project was canceled. It is a duplicate of projects 38914, 38134 and 38172.

Wildlife, fish, rare plantsLand management planning
NOI in Federal Register
12/09/2011
DEIS NOA in Federal Register
12/24/2013
FEIS NOA in Federal Register
08/2014 (Estimated)
Decision
10/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Melissa Martin · mmmartin@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation219 (Converting)
Project ActivityPlan Amendment
ForestsMedicine Bow-Routt National Forest
DistrictsMedicine Bow-Routt National Forest All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 12/23/2013
Antelope Creek · Converse, Wyoming

Mitigate wetlands lost during railroad construction.This includes shallow excavations at 3 sites along Antelope Creek to create wetland habitat. Includes temporary work sites, and uses existing roads. A total of 16 acres would be excavated.

Special use management
Scoping Start
03/07/2008
Comment Period
03/07/2008
Objection Period Start
12/2013 (Estimated)
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT40N, R69W, Sections 5, 8, 9, and 15; T40N, R68W, Section 20
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/23/2013
Steamboat Ski Area · Routt, Colorado

The Steamboat Ski and Resort Corporation is applying for an amendment to their Communication Use Lease to operate scellular DAS systems in the Thunderhead, Rendezvous Saddle and Four Points buildings located on the Steamboat ski area.

Land management planningSpecial use management
Scoping Start
10/31/2013
Comment Period
10/31/2013
Decision
12/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Steamboat Ski & Resort Corporation Special Use Permit Ammendment - DASDecision Signed Date: 12/19/2013 Legal Notice Date: 12/21/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land Description6thPM, T6N, R84W, Sec 25, 26, and 36
Snowy Range Tours Completed
Decision Memo · Laramie Ranger District · updated 12/19/2013
Snowmobile outfitting and guiding operation with a designated site off of Highway 130 at the Snowy Mountain Lodge. · Albany, Wyoming

The Laramie RD proposes to issue a special use permit to an existing outfitter and guide for snowmobile tours. Snowy Range Tours would like to continue with current use levels with a new permit that would expire in 2018.

Recreation managementSpecial use management
Scoping Start
09/04/2013
Comment Period
09/04/2013
Decision
12/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16N R79W Section 13 NW 1/4
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/13/2013
Western slope of the Snowy Range · Carbon, Wyoming

Prescribed burn approximately 60 acres to regenerate/restore ponderosa pine populations and regenerate aspen where it exists.

Vegetation management (other than forest products)
Scoping Start
06/2013 (Estimated)
Decision
01/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Mick Hood · mhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT17N R82W NE 1/4 Sec 25
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/10/2013
North Routt County approximately 1 mi east of Clark, CO. · Routt, Colorado

Reissue a special use permit for existing structures, used for domestic and livestock purposes by The Home Ranch Company Operations.

Special use management
Scoping Start
07/21/2013
Comment Period
07/22/2013
Decision
11/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
Keesha Cary · keeshamcary@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N R85W, Section 26, SW quarter.
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/4/2013
In the Long Park area along the CDNST · Carbon, Wyoming

Reroute approximately .51 miles of the CDNST. There are sections of the trail that are in hazardous bog areas at certain times of the year. The reroute would move the trail out of the bog areas to a dry location allowing for safe use by packsaddle.

Recreation management
Scoping Start
04/28/2012
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
Brian Waugh · bwaugh@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT13N, R85W, section 6
Decision Memo · Brush Creek/Hayden Ranger District · updated 12/3/2013
Near Forest Boundary at Tenmile, NFSR 100 and WY State Highway 130 · Carbon, Wyoming

Issuance of new special use authorization to replace expired permit. No change in authorized use.

Special use management
Scoping Start
04/28/2012
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNE1/4 SE1/4 Sec 7, T16N R81W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 10/30/2013
Steamboat Ski Area - Base of Bashor Bowl · Routt, Colorado

Upgrade Bashor Pavilion food service facilities.

Special use management
Scoping Start
01/06/2013
Comment Period
01/07/2013
Decision
10/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
SSRC Bashor Pavilion FY13Decision Signed Date: 10/24/2013 Legal Notice Date: 10/27/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N, R84W, Sec 23
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 10/30/2013
Steamboat Ski Area · Routt, Colorado

Completion of minor projects on the Steamboat Ski Area to maintain and improve infrastructure such as snowmaking lines, minimal regrading, technology improvements and other marginal actitivites not previously analyzed.

Special use managementRecreation management
Scoping Start
01/06/2013
Comment Period
01/06/2013
Decision
07/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Use Authorizations
Snowmaking Lines Heavenly Daze Lower BoulevardDecision Signed Date: 07/01/2013 Legal Notice Date: 09/29/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSection 23, 25, 26. T6N; R84W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 10/30/2013
Hinman Park off of NFSR 400 (Seedhouse Road) · Routt, Colorado

Re-issue special use permit of existing spring and pipeline for domestic use.

Special use management
Scoping Start
07/29/2012
Comment Period
07/30/2012
Decision
10/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Keesha Cary · keeshamcary@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Vista Verde Spring and Pipeline Permit ReissueDecision Signed Date: 10/17/2013 Legal Notice Date: 10/23/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, R84W, Sec 5
Decision Memo · Laramie Ranger District · updated 10/22/2013
Pole Mountain Unit, Hill 8821 Communications site · Albany, Wyoming

New Cingular Wireless, on behalf of ATT, would like to amend their lease to move equipment and infrastructure from their current tower site to the VRE tower 300 feet away. VRE would like to amend their lease to add 20 feet to their tower.

Special use management
Scoping Start
08/29/2013
Comment Period
08/29/2013
Decision
10/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Communications Site Lease AmendmentsDecision Signed Date: 10/17/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT 15 N, R 72 W, Section 10
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/30/2013
Steamboat Ski Area · Routt, Colorado

The 2006 decision for the Four Points Hut Expansion identified a leach field for waste water treatment; now a sewer line is identified as the best tool. Addtional square footage and road re-alignment are two other modifications from the 2006 decision

Special area managementRecreation management
Scoping Start
01/06/2013
Comment Period
01/06/2013
Decision
07/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Use Authorizations
Four Points Lodge Sewer LineDecision Signed Date: 07/01/2013 Legal Notice Date: 09/29/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSection 23, 25, 26. T6N; R84W
Bud Project Completed
Environmental Assessment · Brush Creek/Hayden Ranger District · updated 9/27/2013
BUD Analysis Area is located in Carbon County, Wyoming at the western boundary Brush Creek/Hayden District, Medicine Bow-Routt National Forests. · Carbon, Wyoming

This project includes vegetation management for timber salvage, fuels reduction, and wildlife habitat as well as travel management in the Northwest Sierra Madre. The proposal is based on scoping completed for the larger Savery analysis area in 2010.

Forest productsRoad managementVegetation management (other than forest products)Fuels managementWatershed managementWildlife, fish, rare plants
Scoping Start
07/09/2013
Comment Period
07/09/2013
Decision
09/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Melanie Fullman · mfullman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Facility Maintenance; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Grazing Structural Improvements; Timber Sales (Salvage); Travel Management; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionBUD Analysis Area is roughly defined by National Forest Lands west of Sage Creek Road (NFSR 801) and north of Wyoming Highway 70, in Township Range Sections
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 9/27/2013
Hilight Bill and Broken Hills Geographic Areas · Campbell, Wyoming

Powder River Coal, LLC has requested an authorization to vacate and re-locate portions of CR 69 Mackey (large segment) and temporary CR 83 Reno (small segment) on to Forest Service land.

Minerals and geology
NOI in Federal Register
12/16/2011
DEIS NOA in Federal Register
05/24/2013
FEIS NOA in Federal Register
09/20/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
Peabody Powder River Mining, LLC Mackey Road RelocationDecision Signed Date: 09/25/2013 Legal Notice Date: 09/27/2013
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 42 N, R 69 W, Section 6, 7, 8,17, 21, and 22; T 43 N, R 69 W, Section 29, 30, and 31
Decision Memo · Laramie Ranger District · updated 9/27/2013
Snowy Range Ski and Recreation Area is a special use permit area located along Highway 130 approximately 35 miles West of Laramie, WY. · Albany, Wyoming

The Snowy Range Ski and Recreation Area would like to install lighting in order to offer lighted night time skiing and tubing opportunities.

Special use managementRecreation management
Scoping Start
07/26/2013
Comment Period
07/26/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Use Authorizations
Night Lighting for Skiing and TubingDecision Signed Date: 09/20/2013 Legal Notice Date: 09/26/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Douglas and Thunder Basin Ranger District · updated 9/27/2013
South Hilight · Campbell, Wyoming

The Forest Service is proposing to authorize Thunder Basin Coal Company to acquire an adequate supply of aggregate construction material to support required maintenance and changes in infrastructure necessary for mining activities.

Minerals and geology
NOI in Federal Register
06/17/2011
DEIS NOA in Federal Register
05/17/2013
FEIS NOA in Federal Register
09/27/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Thunder Basin Coal Company, LLC Clinker Mining Addition ProjectDecision Signed Date: 09/25/2013 Legal Notice Date: 09/27/2013
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Environmental Impact Statement · Medicine Bow-Routt National Forest All Units · updated 9/26/2013
Montpelier District, CTNF - northern most corridor designated in the Caribou NF Plan, Doulgas Distict MBRNF northern most corridor designated in the MBR Plan. · Bear Lake; Albany; Converse; Natrona, Idaho; Wyoming

Idaho Power and Rocky Mountain Power propose to construct electric transmission lines from the proposed Windstar Substation near the Dave Johnston Power Plant at Glenrock, WY to the proposed Hemingway substation near Melba, Idaho

Special use management
NOI in Federal Register
05/16/2008
DEIS NOA in Federal Register
07/29/2011
FEIS NOA in Federal Register
04/26/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Gateway West 230/345/500-kV Transmission Line Project Record of DecisionDecision Signed Date: 09/18/2013 Legal Notice Date: 09/26/2013
Gateway West 230/345/500-kV Transmission Line ProjectDecision Signed Date: 09/23/2013 Legal Notice Date: 09/26/2013
ForestsMedicine Bow-Routt National Forest; Caribou-Targhee National Forest
DistrictsDouglas and Thunder Basin Ranger District; Montpelier Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/25/2013
Buffalo Pass Recreation Area · Routt, Colorado

Minor reroute and relocation involving segments of the snow trails in the Buffalo Pass Recreation Area. These changes are proposed to increase the safety of the trail system.

Recreation managementSpecial use management
Scoping Start
01/06/2013
Comment Period
01/06/2013
Decision
07/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
Erica Dickerman · edickerman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Special Use Authorizations
Yampa Valley Electric Assoc Permit AmendmentDecision Signed Date: 07/22/2013 Legal Notice Date: 08/14/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT7 R84W Sec 1, 2, 25-27, 34-36 and T7 R83W Sec 4, 5, 8, 27-29, 32, 33
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/16/2013
Approximately 2.5 miles west of the town of Upton. · Weston, Wyoming

The USFS has identified a need to authorize Rare Elements to occupy NFS land for the construction, maintenance and monitoring of a water well.

Special use management
Scoping Start
06/08/2013
Comment Period
06/08/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT48N, R53W, section 33
Environmental Assessment · R2 - Rocky Mt. Region All Units · updated 9/10/2013
Bighorn, San Juan, Pike and San Isabel and CC, Medicine Bow and Routt, Shoshone, Black Hills, White River, Rio Grande, Arapaho and Roosevelt and Pawnee · Adams, Colorado; Kansas; South Dakota; Wyoming

The US Forest Service is preparing an environmental analysis for cave and abandoned mine management options for the bat disease commonly known as white-nose syndrome (WNS).

Wildlife, fish, rare plantsMinerals and geologyRecreation management
Scoping Start
11/20/2012
Comment Period
12/21/2012
Decision
03/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Trey Schillie · tschillie@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Species Habitat Improvements
Cave and Abandoned Mine Management for WNS - ARPDecision Signed Date: 03/27/2013 Legal Notice Date: 03/30/2013
Cave and Abandoned Mine Management for WNS - BighornDecision Signed Date: 03/26/2013 Legal Notice Date: 03/31/2013
Cave and Abandoned Mine Management for WNS - Black HillsDecision Signed Date: 03/26/2013 Legal Notice Date: 04/05/2013
Cave and Abandoned Mine for WNS - GMUGDecision Signed Date: 03/26/2013 Legal Notice Date: 03/30/2013
Cave and Abandoned Mine Management for WNS - MBRDecision Signed Date: 03/27/2013 Legal Notice Date: 03/31/2013
Cave and Abandoned Mine Management for WNS - PSICCDecision Signed Date: 03/27/2013 Legal Notice Date: 04/04/2013
Cave and Abandoned Mine Management for WNS - Rio GrandeDecision Signed Date: 03/25/2013 Legal Notice Date: 03/28/2013
Cave and Abandoned Mine Management for WNS - San JuanDecision Signed Date: 03/27/2013 Legal Notice Date: 03/29/2013
Cave and Abandoned Mine Management for WNS - ShoshoneDecision Signed Date: 03/26/2013 Legal Notice Date: 04/01/2013
Cave and Abandoned Mine Management for WNS - White RiverDecision Signed Date: 03/28/2013 Legal Notice Date: 04/01/2013
ForestsBighorn National Forest; Black Hills National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; Shoshone National Forest; White River National Forest
DistrictsBighorn National Forest All Units; Black Hills National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; Shoshone National Forest All Units; White River National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Brush Creek/Hayden Ranger District · updated 9/6/2013
Irrigation ditches are located on the BCH district within the Platte River drainage. Facilities are located on the east side of the Sierra Madre Range and west side of the Snowy Range. · Carbon, Wyoming

Issue FLPMA easements for irrigation ditches and reservoirs meeting CO Ditch Bill criteria located in the Platte River drainage on the Brush Creek Hayden District. Batch #3 includes three water facilities.

Land management planning
Scoping Start
07/2013 (Estimated)
Decision
10/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/6/2013
Routt County Road 129, near Mad Creek Trail Head. · Routt, Colorado

Relocate a distribution line along Routt County Road 129 in Routt County, Colorado and remove the existing line.

Special use management
Scoping Start
04/29/2013
Comment Period
04/29/2013
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Yampa Valley Electric Association Special Use Permit AmendmentDecision Signed Date: 07/22/2013 Legal Notice Date: 08/14/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionTownship 8 North, Range 85 West, Section 33, 6th Principal Meridian.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/5/2013
Approximately 3 miles South West of the junction to county road 4 and county road 69 · Campbell, Wyoming

Lance Oil & Gas Company is proposing to use the NFSR 1121.E1 road for approximately 0.52 miles from the intersection of Antelope Road Campbell County RD 17-4 to the south in Section 3 T. 41 N., R. 71 W. on the TBNG.

Special use managementRoad management
Scoping Start
03/30/2013
Comment Period
03/30/2013
Decision
08/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Robin Brooks · rjbrooks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance
Lance Oil & Gas Antelope Fed 4171-10-21 Road Use and Access PermitDecision Signed Date: 08/30/2013 Legal Notice Date: 09/05/2013
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 3 T. 41 N., R. 71 W
Environmental Assessment · Parks Ranger District · updated 8/1/2013
Parks Ranger District, · Jackson, Colorado

Range analysis and allotment management plan update

Grazing management
Scoping Start
10/18/2012
Comment Period
10/25/2012
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Mike Alpe · malpe@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
DN&FONSI Northgate Allotment Management Plan Revsision ProjectDecision Signed Date: 07/31/2013 Legal Notice Date: 08/01/2013
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT10 N to T 12 N., R78W to R83W
Bar-Nunn Hunting Completed
Decision Memo · Laramie Ranger District · updated 7/22/2013
Permit covers all of the Snowy Range. · Albany; Carbon, Wyoming

Bar-Nunn hunting is requesting a reauthorization of the 50 service days they have been permitted on the Douglas, Brush Creek/Hayden and Laramie Ranger Districts. Permit includes elk, deer, mountain lion, black bear, and moose.

Special use management
Scoping Start
06/08/2013
Comment Period
06/08/2013
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Laramie Ranger District · updated 7/22/2013
Trips at Vedauwoo and leaving from the Happy Jack, Little Laramie, Corner Mountain, and Green Rock Trailheads. · Albany, Wyoming

Laramie County Community College has held a special use permit with the Laramie Ranger District for 10 years for rock climbing, snowshoeing and cross country skiing. Their permit has expired and they would like to renew it.

Special use managementRecreation management
Scoping Start
06/08/2013
Comment Period
06/08/2013
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N R71W, Sec 29 %u2013 Vedauwoo; T15N R72W, Sec 24 %u2013 Happy Jack TH; T16N, R78W, Sec 21 %u2013 Little Laramie TH; T16N, R78W, Sec 28 %u2013 Corner Mountain TH; T16N, R79W, Sec 13 %u2013 Green Rock TH
Decision Memo · White River National Forest All Units · updated 7/11/2013
White River NF; Pike-San Isabel NF and Cimarron-Comanche National Grasslands; Medicine Bow-Routt NF and Thunder Basin National Grassland; Arapaho-Roosevelt NF and Pawnee Nat'l Grassland · Eagle; Grand; Lake; Larimer; Park; Pitkin; Routt; Summit, Colorado

The proposed special use authorization is for Classic Bicycle Racing LLC to make temporary use of NFS lands on 4 National Forests within CO for ancillary facilities such as staging areas with portable toilets, signs, barricades, message boards.

Recreation management
Scoping Start
05/08/2013
Comment Period
05/08/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Mike Kenealy · mkenealy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2013 U.S. Pro Cycling Challenge RaceDecision Signed Date: 07/08/2013
ForestsMedicine Bow-Routt National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; White River National Forest
DistrictsHahns Peak/Bears Ears Ranger District; Canyon Lakes Ranger District; Leadville Ranger District; Salida Ranger District; South Park Ranger District; West Zone/Aspen Ranger District; East Zone/Holy Cross Ranger District; East Zone/Dillon Ranger District
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 7/2/2013
Coulton creek and Reed creek area · Routt, Colorado

Salvage of approximately 3240 acres of lodgepole pine and some spruce blowdown, 140 acres of fuel reduction treatments and 1185 acres of pre-commericial thinning and site specific Forest Plan amendment.

Fuels management
Scoping Start
03/07/2010
Project documents
Mark Cahur · mcahur@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9 & 10N, R84W
Decision Memo · Yampa Ranger District · updated 6/21/2013
Located approximately 15 miles south of Steamboat Springs, CO in the Sarvis Creek Wilderness. · Routt, Colorado

Issues 10 year special use permit. No changes to previous activities

Recreation managementSpecial use management
Scoping Start
02/18/2013
Comment Period
02/18/2013
Decision
05/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2013 Recreation Special Uses ReissuanceDecision Signed Date: 05/03/2013 Legal Notice Date: 05/05/2013
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT4N, R83W
ABC Kids Completed
Decision Memo · Laramie Ranger District · updated 6/21/2013
Rock climbing at Vedauwoo, camping at Pole Mountain campgrounds and dispersed camp sites. · Albany, Wyoming

ABC Kids would like to offer 60 service days of guided rock climbing at Vedauwoo with up to 10 people at a time and a 1:5 guide:patron ratio. They will utilize campgrounds or dispersed campsites at Pole Mountain. Permit would be for a 2-year term.

Special use managementRecreation management
Scoping Start
04/03/2013
Comment Period
04/06/2013
Decision
06/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14, R71W, Section 29 (Vedauwoo)
Decision Memo · Laramie Ranger District · updated 6/21/2013
Vedauwoo recreation area · Albany, Wyoming

The Department of the Army Family and Morale, Welfare and Recreation program would like to offer guided rock climbing and camping at Pole Mountain to families of servicemen and women. They are requesting 40 service days under a 2-year permit.

Special use managementRecreation management
Scoping Start
04/03/2013
Comment Period
04/06/2013
Decision
06/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DFMWR Outdoor RecreationDecision Signed Date: 06/04/2013 Legal Notice Date: 06/08/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14, R71W, Section 29
Decision Memo · Laramie Ranger District · updated 6/21/2013
Crow Creek Hill communications site is located on Pole Mtn. and is accessed via NFSR 724. · Albany, Wyoming

GCR Electronics, LLC (GCR) operates a communication facility at the Crow Creek Hill communication site. GCR has held an authorization for their facility since 2006 that will expire on 12/31/13. They have applied for the authorization to be reissued.

Special use management
Scoping Start
02/03/2013
Comment Period
02/03/2013
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
GCR Communications UseDecision Signed Date: 04/05/2013 Legal Notice Date: 06/02/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N, R72W, Section 27, SE1/4
Decision Memo · Laramie Ranger District · updated 6/21/2013
Snowy Range and Pole Mountain · Albany, Wyoming

TWM is a year round outfitting and guiding service based in Centennial, Wyoming. They would like to renew their permit for a 5-year term for a variety of activities in the Snowy Range and Pole Mountain Areas.

Special use managementRecreation management
Scoping Start
04/03/2013
Comment Period
04/06/2013
Decision
06/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Table in the Wilderness MinistriesDecision Signed Date: 06/04/2013 Legal Notice Date: 06/08/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionSee scoping maps: Lakes, trailheads, and recreation areas on Snowy Range and Pole Mountain units
Decision Memo · Yampa Ranger District · updated 6/21/2013
Located throughout the Yampa Ranger District Administrative Boundaries · Garfield; Grand; Rio Blanco; Routt, Colorado

Renewal of 2 Temporary outfitter guide permits. No change to previous activities.

Special use managementRecreation management
Scoping Start
02/18/2013
Comment Period
02/18/2013
Decision
05/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Area Management
2013 Recreation Special Uses ReissuanceDecision Signed Date: 05/03/2013 Legal Notice Date: 05/05/2013
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Decision Memo · Laramie Ranger District · updated 6/21/2013
Hill 8821 communication site, located near National Forest System road 703F · Albany, Wyoming

Verizon currently operates a cellular communications system at the Hill 8821 communication site. Their current authorization will expire in December 2013, and they have applied for a new 30-year permit.

Special use management
Scoping Start
04/05/2013
Comment Period
04/06/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Verizon Communications UseDecision Signed Date: 05/29/2013 Legal Notice Date: 06/02/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT 15 N, R 72 W, Section 10
Decision Memo · Laramie Ranger District · updated 6/20/2013
Laramie, Brush Creek/Hayden, and Douglas Ranger Districts · Albany; Carbon; Converse; Platte, Wyoming

Issue a Special Use Permit for 100 service days to Keil Outdoor Adventures to guide mountain lion, elk and deer hunts on the Laramie, Douglas, and Brush Creek/Hayden Ranger Districts. Hunts would be guided on foot.

Special use management
Scoping Start
02/08/2013
Comment Period
02/08/2013
Decision
06/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Keil Outdoor Adventures, LLCDecision Signed Date: 06/04/2013
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT12N-18N through R77W-82W; T14-15N through R71W-72W; T24-31N through R70W-78W
Decision Memo · Brush Creek/Hayden Ranger District · updated 6/20/2013
Encampment River, Sierra Madre Range · Carbon, Wyoming

USGS proposal to reconstruct stream gage cableway used to measure stream flow and water quality. Current cableway is secured to beetle-killed trees and is unsafe.

Research
Scoping Start
03/17/2010
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Dave Gloss · dgloss@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT12N R84W Section 10
Decision Memo · Yampa Ranger District · updated 6/18/2013
Located approximately 29 miles to the west of Yampa, CO on Forest Service Road 952. · Routt, Colorado

Authorize repair work on Shaffer Reservoir Dam to replace existing outlet and repair a large breech in the dam.

Special use management
Scoping Start
07/30/2012
Comment Period
07/30/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 3 North, Range 88 West, Section 2
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/17/2013
California Park Special Interest Area · Routt, Colorado

Due to general maintenance and weather factors, the old fence will be removed and replaced with a lay down fence. Reconstruction of the boreal toad fence is necessary to protect this sensitive area.

Watershed managementGrazing managementWildlife, fish, rare plantsSpecial area management
Scoping Start
02/17/2013
Comment Period
02/17/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Robert Skorkowsky · rskorkowsky@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Species Habitat Improvements; Special Area Management
California Park Special Interest Area Boreal Toad Fence Project 2012Decision Signed Date: 06/13/2013 Legal Notice Date: 06/16/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, R87W, Section 3
Decision Memo · Brush Creek/Hayden Ranger District · updated 6/10/2013
Bow River Adminstrative Site Brush Creek/Hayden Ranger District · Carbon, Wyoming

Sale of Administrative Site Facilities.

Land ownership management
Scoping Start
05/02/2008
Decision
07/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Tom Florich · tflorich@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT18N., R80W., sec 21 NE1/4NW1/4
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/10/2013
Burgess Creek Road adjacent to Burgess Creek and within the Steamboat Ski Area permit boundary. · Routt, Colorado

Re-issue special use authorization for the operations and maintenance of a water storage facility.

Special use management
Scoping Start
04/29/2013
Comment Period
04/29/2013
Decision
06/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Mt. Werner Water and Sanitation Special Use Permit ReissueDecision Signed Date: 06/03/2013 Legal Notice Date: 06/09/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionTownship 6 North, Range 84 West, Section 23, SW 1/4, NW 1/4, 6PM
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/6/2013
North Routt off of 129, near Willow Creek Pass · Routt, Colorado

Develop a spring and pipeline on National Forest Service lands for a domestic water supply to area with no water.

Special use management
Scoping Start
05/20/2012
Comment Period
05/21/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Eagle Trace 1 Spring DevelopmentDecision Signed Date: 04/22/2013 Legal Notice Date: 06/06/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, R85W, SE 1/4 Sec. 15
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/5/2013
Primarily North and East of Bill, WY · Natrona, Wyoming

The project will encompass approximately 634 square miles with approximately 120,480 acres of the Thunder Basin National Grassland included in the project area. The project is proposed as a multi-source geophysical vibroseis with some shot holes.

Minerals and geology
Scoping Start
08/22/2011
Comment Period
08/22/2011
Decision
12/2011 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Decision Memo Geokinetics Alta Creek 3D (Phase I) Geophysical ProjectDecision Signed Date: 12/21/2011 Legal Notice Date: 12/25/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionTownships 37 to 41 N and Ranges 68 to 73 W
Weston Store Cancelled
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/5/2013
East side of Highway 59 in Weston, WY · Weston, Wyoming

The Bethea's would like to build a convenience store at Weston, WY. This is the most convenient location for a store as it is accessible to Highway 59 and Heald County Road. This would cover approximately 5 acres.

Special use management
Scoping Start
05/01/2011
Decision
11/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNE 1/4, NE 1/4, Section 25, T 54 N, R 71 W
Decision Memo · Brush Creek/Hayden Ranger District · updated 6/4/2013
Brush Creek/Hayden Ranger District, Snowy Range, South Brush Creek and Barrett Creek · Carbon, Wyoming

Issue special use authorization to WSEO to operate and maintain two existing stream gages.

Special use management
Scoping Start
11/16/2012
Comment Period
11/16/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
WY State Engineers Office Stream GagesDecision Signed Date: 05/30/2013
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT16N R81W Section 20
A Bar A Ranch Completed
Decision Memo · Laramie Ranger District · updated 5/28/2013
Medicine Bow National Forest trails near A Bar A Ranch Headquarters · Albany; Carbon, Wyoming

Reissue outfitting and guiding permit to A Bar A Ranch for hiking, fishing and horseback riding on national forest and Savage Run Wilderness trails.

Special use management
Scoping Start
02/08/2013
Comment Period
02/08/2013
Decision
05/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N, R82W Sections 1, 12-13, 24-26, 35-36, T14N, R80W, Sections 1-20
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 5/20/2013
Medicine Bow -Routt National Forests and Thunder Basin National Grassland · Albany; Campbell; Carbon; Converse; Crook; Natrona; Niobrara; Platte; Weston; Garfield; Grand; Jackson; Moffat; Rio Blanco; Routt, Colorado; Wyoming

Issue the University of Wyoming an Institutional authorization for research across the Medicine Bow Routt National Forests and Thunder Basin National Grassland

Special use management
Scoping Start
09/22/2012
Comment Period
09/22/2012
Decision
05/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
University of Wyoming ResearchDecision Signed Date: 05/02/2013 Legal Notice Date: 05/08/2013
ForestsMedicine Bow-Routt National Forest
DistrictsMedicine Bow-Routt National Forest All Units
Environmental Assessment · Yampa Ranger District · updated 5/16/2013
Project area is located approximately 8 miles west of Yampa, CO · Garfield; Rio Blanco; Routt, Colorado

Grazing Management, revision update for allotment management plan

Grazing management
Scoping Start
01/16/2012
Comment Period
02/03/2013
Decision
05/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Josh Voorhis · jvoorhis@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Rangeland Management in the Bear River/Watson Creek Analysis AreaDecision Signed Date: 05/09/2013 Legal Notice Date: 05/12/2013
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 1 North, Range 86 West, Sections 1, 2, 3, 4, 9, 10, 11, 12, 13, 14, 15, 16, 19, 20, 21 and 22 and Township 2 North, Range 86 West, Sections 22, 23, 26, 27, 28, 33, 34 and 35
Decision Memo · Douglas and Thunder Basin Ranger District · updated 5/6/2013
Approximately, 16 miles south west of Newcastle Wyoming. · Weston, Wyoming

The project consists of running a pipeline from private land to private land across two adjoining corners (corner hop) of Forest Service land.

Grazing management
Scoping Start
03/19/2013
Comment Period
03/19/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Rachel McGee · ramcgee@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Structural Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT44N, R64W, Sections 11 and 14
Environmental Assessment · Parks Ranger District · updated 5/2/2013
Approximately 30 miles northwest of Cowdrey, CO in Jackson and Routt Counties, Colorado · Jackson; Routt, Colorado

The proposed action is to relocate all or a portion of NFSR 499 (Ellis Trail) and close/obliterate a portion of FST 1101 (Whiskey Creek Trail). A new four-wheel drive route may be completed using a combination of existing roads and trails.

Road managementRecreation management
Scoping Start
10/11/2012
Comment Period
10/25/2012
Decision
05/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Liz Schnackenberg · lschnackenberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management
DN/FONSI Ellis Trail Relocation Analysis Area ProjectDecision Signed Date: 05/01/2013 Legal Notice Date: 05/02/2013
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionTownships 11N & 12N, and Ranges 84W & 85W
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/25/2013
Ditch is located on the BCH District within the Platte River drainage on the west side of the Snowy Range. · Carbon, Wyoming

Issue a special use permit to valid water right holders for use of the Johnson-Takala ditch, an existing facility used for agricultural irrigation purposes on BCH District.

Special use management
Scoping Start
11/16/2012
Comment Period
11/16/2012
Decision
03/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT18N, R81W, Section 26
Matt Harskey Cancelled
Decision Memo · Laramie Ranger District · updated 3/22/2013
Several locations in the Snowy Range · Albany, Wyoming

Matthew Harsky is a new applicant for outfitting and guiding. He would like to start a small outfitting and guiding business for non-motorized recreation in both winter and summer months.

Special use management
Scoping Start
12/15/2012
Decision
04/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Kassidy Kern · kkern02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/22/2013
Brush Creek/Hayden Ranger District, Snowy Range. · Carbon, Wyoming

Renew Ryan Park Tract B Water Company Special Use Permit for existing water storage and delivery system.

Special use management
Scoping Start
11/16/2012
Comment Period
11/16/2012
Decision
01/2013 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT16N R81W Section 33
Savery Cancelled
Environmental Impact Statement · Brush Creek/Hayden Ranger District · updated 3/22/2013
Sierra Madre portion of Brush Creek/Hayden Ranger District, north of Battle Highway. · Carbon, Wyoming

Vegetation management to salvage timber/regenerate forests, reduce increasing fuel loads/decrease potential fire hazard, remove dead and dying trees posing a public safety hazard in high priority areas. Includes travel mgmt and recreation mgmt.

Road managementFuels managementForest productsRecreation managementVegetation management (other than forest products)
NOI in Federal Register
04/16/2010
DEIS NOA in Federal Register
04/2013 (Estimated)
FEIS NOA in Federal Register
05/2013 (Estimated)
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Melanie Fullman · mfullman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Travel Management
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT12-16N, R85-88W
USGS Stream Gages Completed
Decision Memo · Brush Creek/Hayden Ranger District · updated 3/22/2013
Brush Creek/Hayden Ranger District, Encampment River and North Brush Creek · Carbon, Wyoming

Issue special use authorization to USGS to operate and maintain two existing stream gages that have been in existence since the 1960s.

Special use management
Scoping Start
11/16/2012
Comment Period
11/16/2012
Decision
01/2013 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT16N R81W Section 8 and T12N R84W Section 10
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/20/2013
Routt County, Steamboat Ski Area - End of Burgess Creek Road · Routt, Colorado

Reissue Special Use Permit for 20 years to Atmos Energy Corporation for the operation and maintenance of a natural gas transmission line and meter to serve the Steamboat Ski Area maintenance shop.

Special use management
Scoping Start
05/28/2012
Comment Period
05/28/2012
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionTownship 6 North, Range 84 West, Section 23, 6th Principal Meridian
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/20/2013
Located near Columbine, north of Steamboat Springs, CO · Routt, Colorado

This is an existing Spring Box and Pipeline that is developed on National Forest System land and is used for the purpose of domestic water on a private property. The proposal is to re-issue the permit allowing this use.

Special use management
Scoping Start
07/29/2012
Comment Period
07/29/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Eaton Spring Development & Pipeline Re-IssueDecision Signed Date: 01/03/2013 Legal Notice Date: 03/19/2013
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R85W, Sections 5 & 6
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/20/2013
Hinman Park area · Routt, Colorado

Issue a special use permit to use an existing road to access private property year round

Special use management
Scoping Start
07/29/2012
Comment Period
07/29/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N., R84W., Section7, SE¼SE¼.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 3/15/2013
Steamboat Ski Area · Routt, Colorado

Completion of minor projects on the Steamboat Ski Area to maintain and improve infrastructure, such as snow making lines, minimal regrading, technology access improvements and other marginal activities not previously analyzed.

Special use managementRecreation management
Scoping Start
04/22/2012
Decision
02/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSection 23, 25, 26. T6N; R84W
Decision Memo · Yampa Ranger District · updated 3/13/2013
Project located approximately 15 miles east of Yampa, CO along Forest Service Road 212 · Grand, Colorado

Issue a Forest Private Road Authorization to provide access to private land completely surrounded by National Forest, and relinguish an old easement and access road that was never transferred properly and includes lands that are not owned by the LLC.

Special use management
Scoping Start
05/21/2012
Comment Period
05/21/2012
Decision
09/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Memo Blacktail Ranch Company, LLC Private Road AccessDecision Signed Date: 09/19/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 1 North, Range 82 West, Section 21
Decision Memo · Yampa Ranger District · updated 3/13/2013
Headgate is located approximately 1 mile southwest of FSR 950 · Rio Blanco, Colorado

Properly control the waters in the Last Chance Ditch and install a suitable and proper headgate at the point of diversion of the Last Chance Ditch from Whitney Creek.

Special use management
Scoping Start
04/23/2012
Comment Period
04/23/2012
Decision
08/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Memo Headgate Installation on Last Chance Ditch and Whitney CreekDecision Signed Date: 08/10/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 3 North, Range 87 West, Section 24
Decision Memo · Yampa Ranger District · updated 3/13/2013
Located approximately 26 miles south of Steamboat Springs, CO on Routt County Road 16. · Routt, Colorado

Reissue of special use permit for use and enlargement of existing road to private property.

Special use management
Scoping Start
07/30/2012
Comment Period
07/30/2012
Decision
03/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Memo, MAKI Private Property AccessDecision Signed Date: 03/04/2013
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Decision Memo · Yampa Ranger District · updated 3/13/2013
Approximately 4 miles east of Yampa, CO, off Routt County Road 8, behind the Eagle Rock Ranch. · Routt, Colorado

Issue a special use permit for the use of an existing non-system road that goes approximately 1,970 feet on National Forest Lands to access the most easterly portion of the ranch, which is surrounded on three sides by the Forest.

Special use management
Scoping Start
05/21/2012
Comment Period
05/21/2012
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Memo Somes Properties, LLC Road AccessDecision Signed Date: 02/06/2013
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSE 1/4, Section 8, Range 84 W, Township 2 North
Decision Memo · Yampa Ranger District · updated 3/13/2013
Located approximately 9 miles west of Yampa, CO on Forest Service Road 930. · Rio Blanco, Colorado

Reissuance of special use permit for use of existing road to Crosho Summer Homes and use of existing spring development.

Special use management
Scoping Start
07/30/2012
Comment Period
07/30/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Memo Crosho Summer Homes Road and Spring Re-IssueDecision Signed Date: 01/03/2013
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
VRE Towers, LLC Completed
Decision Memo · Douglas and Thunder Basin Ranger District · updated 2/13/2013
Communication site on Laramie Peak of the Medicine Bow National Forest · Albany; Converse; Natrona; Platte, Wyoming

J&L Leasing has applied for a name change for the lease of the communications site on Laramie Peak

Special use management
Scoping Start
09/22/2010
Comment Period
09/22/2010
Decision
01/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 27 N, R 72 W, NE 1/4, SE 1/4 Section 35
Decision Memo · Laramie Ranger District · updated 2/12/2013
Albany South Twin Lake · Albany, Wyoming

Forest Service habitat improvement project in partnership with Wyoming Game & Fish Department. The habitat improvements will alter the inlet to improve spawning conditions.

Wildlife, fish, rare plants
Scoping Start
03/2013 (Estimated)
Decision
05/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Shawn Anderson · sanderson03@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT16N., R79W., sec 2
Decision Memo · Brush Creek/Hayden Ranger District · updated 1/28/2013
Sierra Madre Range, Huston Park Wilderness, Brush Creek/Hayden Ranger District · Carbon, Wyoming

Reclamation of seven abandoned mine sites located within the Sierra Madre/Encampment Mining District. Project is part of WY Abandoned Mines Safety Program.

Minerals and geology
Scoping Start
11/10/2012
Comment Period
01/28/2013
Decision
01/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityAbandoned Mine Land Clean-Up
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Jack Creek II Completed
Decision Memo · Parks Ranger District · updated 1/10/2013
The project area is approximately 25 miles south and east of Walden, CO and approximately 6 miles east of Rand, CO. · Jackson, Colorado

This project would remove dead timber adjacent to Jack Creek Ranch which is surrounded by US Forest Service property. The timber has been affected by Mtn Pine Beetle and the potential for fire due to increased fuel loads is of concern.

Fuels management
Scoping Start
05/24/2012
Comment Period
05/24/2012
Decision
01/2013 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Felix Valdez · fvaldez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
Decision Memo Jack Creek IIDecision Signed Date: 01/07/2013 Legal Notice Date: 01/10/2013
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT5N, R77W, Sec. 4 & 5
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/20/2012
Located on the west side of Rabbit Ears Pass. · Routt, Colorado

Modification of an existing easement through private property.

Special use management
Scoping Start
09/01/2011
Decision
11/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT4N, R84W, Section 22
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 12/7/2012
Sand Point · Routt, Colorado

Salvage and silvicultural actions within wildland urban interface areas adjacent to the subdivision. Also areas along forest/private boundaries that could have mastication and prescribed fire used to treat for hazard fuels.

Fuels management
Scoping Start
06/2014 (Estimated)
Decision
01/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Mark Cahur · mcahur@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, W1/2 R89 and R90W; T10N, W1/2 R89 and R90W
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 10/30/2012
14 miles southeast of Wright, WY · Campbell, Wyoming

The project would amend Peadbody Powder River Mining LLCs Special Use Permit to authorize drilling approximately 230 test holes on NFS lands totalling 567 acres outside of NARM's lease boundary, but within the mine's permit boundary.

Special use management
Scoping Start
11/11/2011
Comment Period
11/11/2011
Decision
10/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
North Antelope Rochelle Coal Mine Dewatering ProjectDecision Signed Date: 10/25/2012 Legal Notice Date: 10/30/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT42N, R71W Section 25 NW1/4, NE1/4; Section 26 NE1/4; Section 35 NW1/4, SW1/4
Decision Memo · Laramie Ranger District · updated 10/16/2012
Hog Park Reservoir (Sierra Madre portion of Brush Creek/Hayden RD), Rob Roy Reservoir and Lake Owens (Laramie RD), Stage II Pipelines · Albany; Carbon, Wyoming

Permit renewal for operation and maintenance of an existing water supply system located on USFS lands that provides water to the City of Cheyenne; includes three reservoirs and 60 miles of pipeline on Brush Creek/Hayden and Laramie Ranger Districts.

Special use management
Scoping Start
01/13/2011
Comment Period
04/20/2012
Decision
10/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Special Use Permit City of Cheyenne Board of Public UtilitiesDecision Signed Date: 10/15/2012
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Decision Memo · Brush Creek/Hayden Ranger District · updated 10/9/2012
Sierra Madre Range, Brush Creek/Hayden Range District · Carbon, Wyoming

Reclamation of two abandoned mine sites located within the Sierra Madre/Encampment Mining District. Project is part of WY Abandoned Mines Safety Program.

Minerals and geology
Scoping Start
06/28/2012
Comment Period
06/28/2012
Decision
10/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityAbandoned Mine Land Clean-Up
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Decision Memo · Laramie Ranger District · updated 10/9/2012
Pole Mountain work center · Albany, Wyoming

Planting of approximately 1000 limber and bristlecone pines to verify blister rust resistance

Research
Scoping Start
08/10/2012
Comment Period
08/10/2012
Decision
10/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Timothy Douville · trdouville@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityResearch And Development
Southern Rockies Five Needle Pine RestorationDecision Signed Date: 10/02/2012
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N.,R72W, sec 35
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/5/2012
Approximately, 12 miles South of Esterbrook Wyoming. · Albany, Wyoming

Clifton Grout, trustee for Papa’s Land Trust, has requested authorization to cross NFS land to access his private land in the Laramie Peak area.

Special use management
Scoping Start
10/2012 (Estimated)
Decision
11/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT27N, R71W, Parts of Sections 21 and 28
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/1/2012
Yankee Flats Area · Albany, Wyoming

The contractor constructing this project on private land inadvertently placed it on Forest Service land. The project developed a spring, installed a water pipeline and water tank for the allotment.

Grazing management
Scoping Start
11/30/2007
Comment Period
11/30/2007
Decision
10/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Charlie Bradshaw · cbradshaw@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
South Tepee Pasture Spring and Water tankDecision Signed Date: 10/01/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT26N, R73W, Section 35
Decision Memo · Brush Creek/Hayden Ranger District · updated 9/27/2012
The project is located SW of Encampment WY, South of Highway 70, off of the 809 road, west of Harrison Creek · Carbon, Wyoming

Move portion of NFST 858 that lies north of NFSR 809.1B approximately 1/2 mile to the northwest. Easement will be obtained across the private land portion of the relocated trail.

Recreation management
Scoping Start
04/28/2012
Comment Period
04/29/2012
Decision
07/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT.13 N. R85 W. Sections 29 and 32
Environmental Assessment · Yampa Ranger District · updated 9/24/2012
Project located 5-7 miles west of Oak Creek, CO · Rio Blanco, Colorado

Closing, decommisioning and change of use for portions of National Forest System Roads 943, 949.1A, 949 1.B and 986 for public safety, wildlife, hydrology and travel management purposes.

Watershed managementWildlife, fish, rare plantsRoad managementRecreation management
Scoping Start
12/05/2009
Comment Period
12/08/2009
Decision
09/2012 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Jeremiah Zamora · jeremiahzamora@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Road Maintenance; Travel Management; Watershed Improvements
Decision Notice and FONSI for Oak Creek RoadsDecision Signed Date: 09/23/2012 Legal Notice Date: 09/23/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 3 North, Range 86 West, Sections 20, 21, 30, 32, 33
Decision Memo · Laramie Ranger District · updated 9/24/2012
Pilot Hill area at 8821 communication site · Albany, Wyoming

Installation of a new phone line to replace an existing phone line between two communication towers at Hill 8821

Special use management
Scoping Start
06/21/2011
Decision
10/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Issuance SU Permit construction, operation, maintenance buried phone lineDecision Signed Date: 10/14/2011
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT.15N., R72W., section 10 NENE
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 9/24/2012
The Hilight Bill Geographic Area on the Thunder Basin National Grassland · Campbell, Wyoming

West Roundup Resources, Inc. (WRR) has requested an authorization to amend the existing School Creek Mine special use permit (SUP) to include an additional (approximately) 663 acres of National Forest Service (NFS) land.

Minerals and geology
Scoping Start
12/15/2010
Comment Period
12/15/2010
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityBoundary Adjustments; Minerals Or Geology Plans Of Operations
Peabody School Creek Mining, LLC. School Creek Mine Ancillary FacilitiesDecision Signed Date: 09/18/2012 Legal Notice Date: 09/22/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 11, T 42 N, R 71 W; Section 23, Section 21, Section 22; Section 26-27 T 42 N, R 70 W; Section 18, T 42 N, R 69 W, Campbell County, Wyoming
Decision Memo · Yampa Ranger District · updated 9/21/2012
Approximately 15 miles southwest of Yampa, CO, located on Forest Service Road 900 · Garfield, Colorado

Re-issuance of 30 year term permit to Upper Yampa Water Conservancy District for Yamcolo Reservoir and related structures.

Special use management
Scoping Start
04/23/2012
Comment Period
04/23/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Re-Issue of Yamcolo Reservoir Special Use PermitDecision Signed Date: 08/09/2012 Legal Notice Date: 08/12/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 1 North, Range 86 West, Sections 16, 17 and 20
Decision Memo · Yampa Ranger District · updated 9/21/2012
Gore Pass Monument is located 20 miles east of Yampa, CO on Colorado HWY 134. Rabbits Ears Monument is located 22 miles east of Steamboat Springs, CO on Colorado HWY 40. · Grand; Jackson, Colorado

Re-Issue the Special Use Permits for the historical markers on Gore Pass and Rabbit Ears Pass

Special area management
Scoping Start
04/23/2012
Comment Period
04/23/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionTownship 1 North, Range 82 West, Sections 3 and 10; Township 5 North, Range 82 West, Section 8
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 9/20/2012
East of Steamboat Ski Area, Steamboat Springs, CO. · Routt, Colorado

Request for designation of new snowmobile trail by a special use permit holder (Routt Powder Riders).

Recreation management
Scoping Start
02/17/2012
Comment Period
02/17/2012
Decision
08/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N, R83W, Sec 28, 32, 33
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 9/18/2012
Black Thunder Mine approximately 9 miles east of HWY 59 and HWY 450 Junction · Campbell, Wyoming

The Forest Service is proposing to authorize Thunder Basin Coal Company’s Black Thunder Mine (BTM) to occupy National Forest System (NFS) lands for the purpose of constructing and storing topsoil and overburden stockpiles.

Special use management
Scoping Start
12/14/2011
Comment Period
12/17/2011
Decision
10/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionW½, Section 22, W½, Section 27,T. 43 N., R. 71 W., Campbell County, Wyoming, 6th P.M.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/17/2012
Approximately 2 miles northeast of Bill, Wyoming. · Converse, Wyoming

BNSF has requested authorization to build two snow fences to protect their rail road easement on NFS land. There will be two locations with two rows of fences at each location.

Special use management
Scoping Start
07/27/2012
Comment Period
07/27/2012
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
BNSF Railway Co Snow FencesDecision Signed Date: 09/12/2012 Legal Notice Date: 09/16/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT38N, R70W sec. 17 and 20 and T39N, R71W, sec. 24
Environmental Assessment · Yampa Ranger District · updated 9/11/2012
10 miles southwest of Yampa in the Bear River Geographic Area · Garfield; Routt, Colorado

Project proposal will address travel management issues in the Bear River Corridor.

Road managementWatershed managementWildlife, fish, rare plants
Scoping Start
02/27/2011
Comment Period
05/24/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Melissa Dressen · mdressen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Road Maintenance; Travel Management; Watershed Improvements
Bear River Travel Management ProjectDecision Signed Date: 09/09/2012 Legal Notice Date: 09/09/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/7/2012
North Antelope Rochelle Mine · Campbell, Wyoming

Peabody Powder River Mining, LLC, has requested an amendment to their current Special Use Permit. Activity to authorize construction of three light-duty road segments on National Forest System (NFS) lands.

Special use management
Scoping Start
06/24/2012
Comment Period
06/24/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
NARM Power Line Access RoadsDecision Signed Date: 08/30/2012 Legal Notice Date: 09/06/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT42N R70W, Parts of sections 20, 22, 27
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/27/2012
Approximately 4 miles SE of the town of Upton · Weston, Wyoming

Luke Dowdy has requested authorization to cross NFS land to access his private land in the Upton area. Mr. Dowdy owns the private land in the same quarter section. The right-of-way will be for approximately 15 feet in length and 20 feet wide.

Special use management
Scoping Start
04/17/2012
Comment Period
04/17/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Dowdy Road Permit DGL 347Decision Signed Date: 08/15/2012 Legal Notice Date: 08/26/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT47N, R64W, sec 17
Pacificorp DGL344 Completed
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/27/2012
Approximately 6 miles east of Hwy 59 and Hwy 34 junction. · Converse, Wyoming

Authorization of special use permits to Pacificorp. These are re-issuances of permits that will expire. They are for the operation and maintenance of electric powerlines and powerlines around coal mines and railroads.

Special use management
Scoping Start
04/17/2012
Comment Period
04/17/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Pacificorp DGL 344Decision Signed Date: 08/21/2012 Legal Notice Date: 08/26/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT38N, R70W Sec. 20, 18, 17; T39N, R70W Sec. 19, 18, 7, 6; T40N, R70W Sec. 31, 6; T40N, R71W Sec. 25, 24, 13, 12, 1; T41N, R70W Sec. 31, 30
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/27/2012
Approximately 3 miles east of Bill Wyoming off of HWY 59. · Converse, Wyoming

The USDA Forest Service (USFS) proposes to authorize Thunder Basin Pipeline, LLC to operate and maintain an exisiting pipeline. The pipeline is associated with a small refinery north of Douglas, WY.

Special use management
Scoping Start
04/17/2012
Comment Period
04/17/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Thunder Basin Pipeline, LLC DGL 348Decision Signed Date: 08/21/2012 Legal Notice Date: 08/26/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT38N, R69W: Sec. 18, lots 2-4; sec. 19, lots 1-4; and sec. 30, lots 1-2
Decision Memo · Douglas and Thunder Basin Ranger District · updated 8/27/2012
Upton Airport, Upton Wyoming · Weston, Wyoming

The Town of Upton is requesting to renew the special use permit for the airport. This permit was first issued in 1955. The permit will cover 80 acres for operating and maintaining a public airport.

Special use management
Scoping Start
04/17/2012
Comment Period
04/17/2012
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Upton Airport Permit Renewal DGL 320Decision Signed Date: 08/15/2012 Legal Notice Date: 08/26/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT. 47 N., R. 65 W.,
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 8/23/2012
Hilight Bill · Campbell, Wyoming

The proposed dewatering wells are located on National Forest System lands, and consist of two areas. The FS has identified a need to authorize Thunder Basin Coal Company, LLC to construct the dewatering wells and overstrip activities.

Minerals and geology
Scoping Start
05/01/2011
Comment Period
05/01/2011
Decision
08/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
Black Thunder Coal Mine Dewatering and Overstripping ProjectDecision Signed Date: 08/16/2012 Legal Notice Date: 08/21/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 43 N, R 71 W, Sec. 10; T 43 N, R 71 W, Sec. 23, 26, and 35; T 42 N, R 71 W, Sec. 1 & 2; T 43 N, R 71 W, Sec. 23, 26, and 35
Environmental Assessment · Yampa Ranger District · updated 8/13/2012
T 2N., R. 88W., Sec. 14 · Rio Blanco, Colorado

The culver on County Road 8 currently blocks upstream movement of native Colorado River cutthroat trout. A fish ladder will be constructed to facilitate passage

Wildlife, fish, rare plants
Scoping Start
03/19/2012
Comment Period
03/19/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/31/2012
Approximately 10 to 12 miles west of the Jenny Trail and HWY 59 Junction. · Converse, Wyoming

The project will encompass 2,800 acres (4.375 square miles) located on the Thunder Basin National Grassland. Conducted utilizing vibroseis as the energy source and will provide data to develop a three dimensional image of the geological structure.

Minerals and geology
Scoping Start
03/02/2012
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionTownships 39 & 40 North, Range 73 West
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/30/2012
Township 5 North, Range 82 West, Section 8, 6PM, Grand County, Colorado. · Grand, Colorado

Re-issue Special Use Permit to Colorado Parks & Wildlife and authorize the repair to the outlet.

Special use management
Scoping Start
05/28/2012
Comment Period
05/28/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Muddy Creek (Dumont Lake) Dam RepairDecision Signed Date: 07/24/2012 Legal Notice Date: 07/29/2012
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Kings Canyon Completed
Environmental Assessment · Parks Ranger District · updated 7/30/2012
14 miles North of Walden. · Jackson, Colorado

Salvage and remove dead and dying trees to reduce fuels hazards, reduce threats to public safety and infrastructure; promote reforestation to regenerate forests.

Recreation managementMinerals and geologyWatershed managementRoad managementFuels managementForest productsVegetation management (other than forest products)
Scoping Start
08/25/2011
Comment Period
08/25/2011
Decision
07/2012 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Mark Westfahl · mwestfahl@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Rangeland Vegetation Improvements; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
DN & FONSI Kings Canyon Fuels Analysis Area ProjectDecision Signed Date: 07/17/2012 Legal Notice Date: 07/26/2012
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT10-12N, R78-80 W.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/30/2012
Pearl Lake, Lester Creek Dam · Routt, Colorado

CO Dept of Parks & Wildlife proposal for the installation of 200 LF of toe drain pipe, 45 tons of riprap bedding and 130 tons of riprap, to increase the stability of the right abutment and dewater the left abutment.

Special use management
Scoping Start
04/21/2012
Comment Period
04/21/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSection 35, SW1/4 T10N, R85W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 7/30/2012
Numerous locations in the Routt National Forest · Routt, Colorado

Permit renewal for the operation and maintenance of electric transmission lines on the Routt National Forest.

Special use management
Scoping Start
04/21/2012
Comment Period
04/21/2012
Decision
07/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
YVEA Master Permit Re-IssueDecision Signed Date: 07/19/2012 Legal Notice Date: 07/29/2012
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/26/2012
Sensebaugh Canyon area · Natrona, Wyoming

Idaho Power and Rocky Mountain Power (the Companies) are conducting investigation and permitting activities necessary to construct transmission lines from the planned Windstar Substation in Converse County, Wyoming.

Special use management
Scoping Start
05/25/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Misty Hays · mahays@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT30N, R78W Sec 13, NW1/4SE1/4 and Sec 23SE1/4SW1/4
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 7/23/2012
18 miles north of Hayden, CO in Routt County · Routt, Colorado

Past management activities have degraded Armstrong Creek and its associated riparian area. This project will focus on reducing sediment, realligning degraded reaches and improving access to the floodplain using active and passive techniques.

Watershed management
Scoping Start
03/12/2012
Comment Period
03/12/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Watershed Improvements
Arstrong Creek RestorationDecision Signed Date: 07/22/2012 Legal Notice Date: 07/22/2012
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land Description6th PM, 9N,87W, Sec 13,14,15
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 7/23/2012
East of Clark, Routt County, CO · Routt, Colorado

Environmental Analysis of livestock grazing on four cattle allotments in Routt County.

Grazing management
Scoping Start
01/30/2012
Comment Period
01/30/2012
Decision
07/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Erik Taylor · estaylor@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Seedhouse Rangeland ManagementDecision Signed Date: 07/12/2012 Legal Notice Date: 07/22/2012
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT7N; R84W, R85W: T9N; R83W, R84W, R85W: T10N; R84W.
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/11/2012
North and West of the junction to Hwy 59 and Hwy 34. · Campbell; Converse, Wyoming

Tidelands Geophysical Company (Tidelands) has submitted a Notice of Intent and Plan of Action (POA) to conduct geophysical exploration operations for the Coal Draw 3D Seismic Survey project on behalf of Seitel, Inc.

Minerals and geology
Scoping Start
06/10/2012
Decision
10/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionPortions of Townships 40-42 North, Range 72-73 West, Campbell & Converse Counties, Wyoming
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Decision Memo · Brush Creek/Hayden Ranger District · updated 7/3/2012
The project is located west of Encampment, Wyoming, north of Highway 70, and the east side of Silver Lake. · Carbon, Wyoming

Close approx .14 miles of NFSR 429 to motorized use to provide short-term resource protection/protect public health and safety; original proposal to change long term management status from Level 2 to Level 1 will be analyzed in a future EA.

Road managementRecreation management
Scoping Start
04/28/2012
Comment Period
04/28/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
NFSR 429 Road Management/Health & SafetyDecision Signed Date: 06/29/2012
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT.14 N., R. 85 W. Section 18
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/27/2012
Weston County · Weston, Wyoming

This project would authorize the conversion of a number of existing crown and ditch roads. This project was put on the SOPA list in error and has been cancelled from SOPA but is still being processed under a category that does not require a DM.

Road management
Scoping Start
04/24/2011
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 41 N, R 67 W & T 43-47 N, R 63-67 W, Weston County
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/26/2012
1.5 miles north of Campbell Creek Campground · Converse, Wyoming

To impose a special order closing the Twin Peaks Trail to motorized use from 11:00 p.m. until 11:00 a.m. every day from September 1 through November 20.

Recreation management
Scoping Start
06/06/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Marcia Rose-Ritchie · mroseritchie@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT29N, R75W Sec. 15, 16, and 17
Ed Sigel Completed
Decision Memo · Laramie Ranger District · updated 6/25/2012
Laramie Ranger District · Albany; Carbon, Wyoming

Outfitting and guiding by horseback on Sheep Mountain and the Snowy Range

Special use management
Scoping Start
07/27/2011
Comment Period
05/04/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionLaramie and Brush Creek/Hayden districts lands
Decision Memo · Yampa Ranger District · updated 6/22/2012
Located in the Morrison Creek Drainage · Routt, Colorado

Issues 10 year permit. No changes to previous activities.

Recreation managementSpecial use management
Scoping Start
03/20/2012
Comment Period
04/30/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2012 Recreation Special Uses ReissuanceDecision Signed Date: 06/20/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT3N, R83W
Environmental Assessment · Brush Creek/Hayden Ranger District · updated 6/22/2012
Roughly 20 miles southwest of Encampment, Wyoming, south of the Battle Highway (Hwy 70) · Carbon, Wyoming

Reconstruct a 4.0 mile segment of NFSR 807 between the Battle Creek CG and NFSR 851. Reconstruct a 1.0 mile segment of NFSR 879 between the NFSR 807 junction and NFSR 879.1E. Reconstruction is needed to fix roadway design and drainage deficiencies.

Road management
Scoping Start
10/05/2010
Comment Period
10/05/2010
Decision
04/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance; Road Improvements/Construction
NFSR 807/879 ReconstructionDecision Signed Date: 04/16/2012 Legal Notice Date: 04/17/2012
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Decision Memo · Yampa Ranger District · updated 6/22/2012
District Wide · Garfield; Grand; Rio Blanco; Routt, Colorado

Renewal of 3 temporary outfitter guide permits. No changes to previous activities.

Special use managementRecreation management
Scoping Start
03/20/2012
Comment Period
04/30/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2012 Recreation Special Uses ReissuanceDecision Signed Date: 06/20/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 6/21/2012
Grousse Mountain and South Walton Peak, Routt National Forest · Jackson; Routt, Colorado

Reissue three communication use leases for 30 year terms. Replace existing communication tower with a stronger tower on state site at Grousse Mtn.

Special use management
Scoping Start
04/21/2012
Comment Period
04/21/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Rick CookseyDecision Signed Date: 06/01/2012
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District; Parks Ranger District
Legal Land DescriptionT2N R78W, Section 8, T5N R83W, Section 34
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/20/2012
Miller - N. Routt County, Columbine; Coutny Line - S. Routt County, Near Crosho Lake. · Rio Blanco; Routt, Colorado

Reissuance of a special use permit for the purpose of maintaining an existing water supply system which provides water for domestic use, specifically Miller Spring on the HPBE Ranger District and County Line Spring on the Yampa Ranger District.

Special use management
Scoping Start
04/22/2012
Comment Period
04/23/2012
Decision
05/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Keesha Clay · kmclay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Rick CookseyDecision Signed Date: 05/24/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District; Hahns Peak/Bears Ears Ranger District
Legal Land DescriptionMiller-6PM, 10N, 85W, Sec 8, NW4, NW4; County Line-T2N, R86W, Sec 4, SE1/4, NE1/4
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/20/2012
Located withing the Steamboat Ski Area Boundary · Routt, Colorado

Renewal of communication use lease for operating and maintaining a microwave tower.

Special use management
Scoping Start
04/21/2012
Comment Period
04/21/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Rick CookseyDecision Signed Date: 05/24/2012
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land Description6th PM, T6N, R83W, Sec. 30
Environmental Assessment · Yampa Ranger District · updated 6/18/2012
Wheeler Creek at USFS boundary · Routt, Colorado

Construction of a fish barrier in Wheeler Creek at the US Forest Service boundary. The barrier will prevent non-native rainbow trout from downstream from hybridizing with native Colorado River cutthroat trout upstream of the barrier.

Wildlife, fish, rare plants
Scoping Start
03/12/2012
Comment Period
03/12/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT. 2N., R. 84W., Sec. 17
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 4/11/2012
National Forest System Road 501 · Albany, Wyoming

Exchange of rights-of-ways between USA and C.S. Johnston on NFS Road 501

Land ownership managementSpecial use management
Scoping Start
03/02/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Diana Hood · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT12N., R78 W sections 17 and 18
Decision Memo · Laramie Ranger District · updated 4/10/2012
Laramie Ranger District Pole Mountain Work Center · Albany, Wyoming

Issue the WCC a permit to occupy the Pole Mountain Work Center

Special use management
Scoping Start
04/2012 (Estimated)
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT15N., R72W., sec 35
Decision Memo · Laramie Ranger District · updated 3/29/2012
Near the Chimney Park Ski Trails · Albany, Wyoming

Issue a road permit to construct roughly 150' of new road to private property off of NFSR 522.E . Issue a road easement for NFSRs 533, 522, 522.A, and 522.E. Year-round access would include use of the Chimney Park Ski Trails via snowmobiles.

Special use management
Scoping Start
03/19/2010
Decision
10/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT13N, R77W, NE 1/4, NW 1/4, Section 21. The ski trail portion is located in Section 25.
Environmental Assessment · Brush Creek/Hayden Ranger District · updated 3/29/2012
. The project is located in Carbon County within the Medicine Bow/Routt National Forest, 30 miles east of Baggs, 27 miles west of Encampment. · Carbon, Wyoming

The Wyoming Department of Transportation (WYDOT) is proposing to realign a portion of WYO Highway 70 between Baggs and Encampment, at reference marker (RM) 30.

Special use management
Scoping Start
02/15/2011
Comment Period
02/15/2012
Decision
03/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Diana Hood · dlhood@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
WYO 70 Dry Sandstone SlideDecision Signed Date: 03/29/2012
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT. 87 W., R. 13 N. Section 9
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/29/2012
Upton area of the Thunder Basin National Grassland · Weston, Wyoming

The Forest Service (FS) proposes to develop two mineral material pit sites on National Forest Service (NFS) land in the Upton area. The proposed pit developments after further review are less than 5 acres.

Minerals and geology
Scoping Start
03/15/2010
Decision
03/2012 (Estimated)
Implementation
04/2012 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Decision Memo Upton Mineral Material PitsDecision Signed Date: 03/16/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionNW 1/4, SW 1/4, Section 13, T 47 N, R 64 W; SE 1/4, NW 1/4, Section 30, T 47 N, R 63 W, 6th P.M. Weston County, WY
Decision Memo · Laramie Ranger District · updated 3/29/2012
T14N, R71W, Section 12, SW1/4SE1/4, 6th Principle Meridian · Albany, Wyoming

Creation of less than one acre of wetlands and improvement of the off-highway parking area on the Vedauwoo Road.

Special use management
Scoping Start
12/09/2011
Decision
02/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
William Munro · wmunro@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction
WYDOT Wetlands MitigationDecision Signed Date: 02/07/2012
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Decision Memo · Laramie Ranger District · updated 3/23/2012
Pole Mountain (Horse Creek; Green Mountain ; Cow Creek Stream Ford; North Pasture Stream Ford) · Albany, Wyoming

Rangeland improvements including installation of new water developments and repair/replacement of existing developments. This will improve habitat for Preble's meadow jumping mouse (Zapus hudsonicus) and increase water quality on Pole Mountain Unit.

Wildlife, fish, rare plantsWatershed management
Scoping Start
08/19/2011
Decision
02/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
William Munro · wmunro@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT 15N., R78W., S3 SW 1/4; T15N., R71W., S11 NE 1/4; T14N., R71W., S14 SW 1/4; T14N., R71W, S22 NE 1/4; T14N., R71W, S10; T15N., R71W., S33 NE 1/4; T15N., R71W., S2 NW1/4
Environmental Assessment · Yampa Ranger District · updated 3/21/2012
Project located 15 miles south of Steamboat Springs, CO in the Morrison Creek drainage · Routt, Colorado

A combination of mechanical fuel reduction treatments (salvage, full tree mastication, hand cutting and piling) along the wildland urban interface within the Morrison Creek drainage.

Fuels management
Scoping Start
06/30/2010
Objection Period Start
12/18/2011
Decision
01/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Sam Duerksen · sduerksen@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
DN & FONSI Morrision Creek Fuels Reduction ProjectDecision Signed Date: 01/25/2012
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT2N, R83W Sec. 6, 7, 17, 18, 20, 21, 27, 28, 29 T2N, R84W Sec. 1, 2, 12 T3N, R84W Sec. 17, 20, 28, 34
Decision Memo · Douglas and Thunder Basin Ranger District · updated 3/20/2012
Approximately 6 miles north of the Jenny Trail Hwy 59 Junction then approximately 3 miles east of Hwy 59. · Converse, Wyoming

DCP will construct two 4inch natural gas pipelines; one high pressure steel line, one low pressure poly pipe, to the EOG-Arbalest 53-33H well to tie into their existing 4inch high pressure line. Less than 5 acres of NFS lands.

Minerals and geology
Scoping Start
12/09/2011
Decision
01/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityOil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
DCP Douglas, LLC Proposed Natural Gas Pipeline To EOG Arbalest 53-33H WellDecision Signed Date: 01/17/2012
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT41N, R72W, Sec 34 NW1/4NW1/4
Decision Memo · Parks Ranger District · updated 1/4/2012
Town of Walden · Jackson, Colorado

Sale of administrative site facilities in the Town of Walden

Facility management
Scoping Start
04/21/2011
Comment Period
04/21/2011
Decision
12/2011 (Estimated)
Implementation
04/2012 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Use Adjustments
Walden Residence #1 & #2 Sites ConveyanceDecision Signed Date: 12/15/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT9N., R79W., sections 20 & 21
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 1/2/2012
Highways 450, 59, and 387. · Campbell; Weston, Wyoming

New fiber optic line would be placed in the right-of-way of Wyoming highway 450, 90, and 387. This would be on 4.13 miles of National Grassland.

Special use management
Scoping Start
03/27/2009
Comment Period
03/28/2009
Decision
12/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
Geri Proctor · gproctor@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
RT Communications, Inc Keeline to Wright Fiber Optic UpgradeDecision Signed Date: 12/16/2011 Legal Notice Date: 12/22/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT43N, R69W; T43N, R70W; T43N, R71W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/19/2011
Starts approximately 15 miles east of the HWY 59 and HWY 450 Junction. · Campbell, Wyoming

The Forest Service is proposing to authorize Peabody Powder River Mining, LLC (PPRM) to conduct geotechnical boring on National Forest System (NFS) lands to explore subsurface soil and sediment properties.

Special use management
Scoping Start
12/01/2011
Comment Period
12/01/2011
Decision
12/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Peter Rose · pjrose@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Mackey Road Geotechnical Drilling Decision MemoDecision Signed Date: 12/14/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land Description30-31, T. 43 N., R. 69 W. and Sections 6-8, 17, 21-22, T. 42 N., R. 69 W., 6th P.M.
Decision Memo · Parks Ranger District · updated 12/19/2011
Jackson County, Colorado - 6 miles south of Rand · Jackson, Colorado

The North Park Progeny Test Site was established in Sept. 1986 to and this project proposal intends to complete overdue site maintenance and return the test site to the schedule of maintenance originally outlined in the initial project proposal.

Vegetation management (other than forest products)
Scoping Start
10/27/2011
Decision
12/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Sarah Bridges · sarahbridges@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
North park Progeny Maintenance ProjectDecision Signed Date: 12/19/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT. 5N., R. 78W., Sec. 23
Decision Memo · Douglas and Thunder Basin Ranger District · updated 12/19/2011
York Road in the Spring Creek Area of the Thunder Basin National Grassland · Campbell, Wyoming

This project would allow the installation of <2 miles of <33kV line to the Wildhorse Federal well 14-18. The proposed route would utilize the existing road corridor.

Minerals and geology
Scoping Start
05/01/2011
Decision
12/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
PRECorp Electrical Line to Ballard Wildhorse Creek Federal WellsDecision Signed Date: 12/14/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 54 N, R 70 W, Sections 13 and 24
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 12/9/2011
Multiple locations on the Brush Creek and Laramie Ranger Districts · Albany; Carbon, Wyoming

Continuation of cloud seeding operations in the Medicine Bow/Sierra Madre Ranges of Wyoming

Special use management
Scoping Start
09/08/2011
Comment Period
09/08/2011
Decision
12/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Special Use Permit Wyoming State Weather Modification ProjectDecision Signed Date: 12/07/2011
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/14/2011
North of Bill, WY on Hwy 59 approximately 8.5 miles and west of Hwy 59 · Converse, Wyoming

The Forest Service is proposing to authorize Chesapeake Energy to reconstruct and use approximately 10,113 ft of NFSR 964 to access three proposed oil wells in the Robbins Unit and one proposed well in the Cottonwood Unit.

Special use managementRoad management
Scoping Start
07/27/2011
Decision
10/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Hilaire Peck · hwpeck@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
Chesapeake Energy Corporation, NFSR Road 964 ReconstructionDecision Signed Date: 10/11/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSections 19, 20 and 21, T39N, R71W 6th PM
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/14/2011
Approximately 21 miles north of Bill, WY along Hwy 59 and west of Hwy 59 approximately 4 miles · Campbell, Wyoming

The Forest Services proposes to authorize EOG Resources, Inc to use portions of NFSRs 910, 910.D and 910.A and construct approximately 719 feet of new road in Section 18, and 190 feet in Section 15, T41N, R72W 6th PM to access proposed wells

Road managementSpecial use management
Scoping Start
07/27/2011
Decision
10/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Hilaire Peck · hwpeck@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
EOG Resources, Inc. Road Construction and Reconstruction PermitDecision Signed Date: 10/11/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionSection 15, 17, 18, T41N R72W 6th PM
Decision Memo · Douglas and Thunder Basin Ranger District · updated 10/6/2011
Rangelands with Diverse Natural-Appearing Landscapes · Campbell, Wyoming

The Forest Service is proposing to authorize the construction of a road by the Chesapeake Energy Corporation. Chesapeake Energy Corp. is proposing to build 784 feet of new road to access an oil well.

Special use managementRoad management
Scoping Start
07/27/2011
Decision
09/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Hilaire Peck · hwpeck@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
Chesapeake Energy Road Use PermitDecision Signed Date: 09/15/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 39 N, R 69 W, Sec. 15
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 9/29/2011
Routt and Moffat Counties · Routt, Colorado

Analysis of livestock grazing on the Stewardship allotment.

Grazing management
Scoping Start
04/03/2011
Comment Period
04/03/2011
Decision
09/2011 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Erik Taylor · estaylor@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
DN/FONSI Rangeland Management in the Stewardship Analysis AreaDecision Signed Date: 09/29/2011 Legal Notice Date: 09/29/2011
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R87W, R88W & R89W
Decision Memo · Brush Creek/Hayden Ranger District · updated 9/26/2011
Snowy Range area. · Albany; Carbon, Wyoming

Issue permit to establish soil test pits to monitor soil and climate changes in the Snowy Range area.

ResearchSpecial use management
Scoping Start
09/17/2008
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Laramie Ranger District
Decision Memo · Medicine Bow-Routt National Forest All Units · updated 9/26/2011
Parks Ranger District - Walden CO, · Jackson, Colorado

NOI to conduct geophysical exploration operations

Minerals and geology
Scoping Start
05/2011 (Estimated)
Decision
06/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT5N., R77W, sec 7, 8, 9, 15, 16, 22, 23, 25, 26 and 27
Decision Memo · Yampa Ranger District · updated 9/22/2011
Located in the Indian Run Geographic area · Routt, Colorado

Reissues priority permit. No changes to previous activities.

Special use management
Scoping Start
03/20/2011
Comment Period
04/01/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2011 Recreation Special Uses ReissuanceDecision Signed Date: 07/20/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT3N, R89W
Decision Memo · Yampa Ranger District · updated 9/22/2011
Located in the Wheeler Basin area · Routt, Colorado

Reissues priority permit. No changes to previous activities.

Special use management
Scoping Start
03/20/2011
Comment Period
04/01/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2011 Recreation Special Uses ReissuanceDecision Signed Date: 07/20/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSec. 33, T3N, R84W
Decision Memo · Yampa Ranger District · updated 9/22/2011
Located in the Wheeler Basin area · Routt, Colorado

Reissues priority permit. No changes to previous activities.

Special use management
Scoping Start
03/20/2011
Comment Period
04/01/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2011 Recreation Special Uses ReissuanceDecision Signed Date: 07/20/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSec. 33, T3N, R84W
Decision Memo · Yampa Ranger District · updated 9/22/2011
Sarvis Creek Area and the Bear River Area · Routt, Colorado

Issues 10 year Outfitter Guide permit. No changes to previous activities

Special use management
Scoping Start
03/20/2011
Comment Period
04/01/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2011 Recreation Special Uses ReissuanceDecision Signed Date: 07/20/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT3N, R83W and T2N, R86W
Decision Memo · Yampa Ranger District · updated 9/22/2011
Located in the Dunkley Flat Tops area · Routt, Colorado

Reissues priority permit. No changes to previous activities

Special use management
Scoping Start
03/20/2011
Comment Period
04/01/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2011 Recreation Special Uses ReissuanceDecision Signed Date: 07/20/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT3N, R88W
Grizzly Completed
Environmental Assessment · Parks Ranger District · updated 9/22/2011
East side of Park Range, 15 miles west of Walden. · Jackson, Colorado

Salvage and remove dead and dying trees to reduce fuels hazards, reduce threats to public safety and infrastructure; promote reforestation to regenerate forests.

Road managementFuels managementWatershed managementMinerals and geologyRecreation managementVegetation management (other than forest products)Forest products
Scoping Start
09/18/2009
Comment Period
09/18/2009
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Timber Sales (Salvage); Travel Management; Watershed Improvements
Grizzly Analysis Alt. 2 - Dec. 1 Implement Actions Outside of Inventoried RDecision Signed Date: 08/02/2011 Legal Notice Date: 08/04/2011
Grizzly Analysis Alt. 2 -Dec.2 - Implement Actions Assoc. w/Roadless AreasDecision Signed Date: 09/19/2011 Legal Notice Date: 09/22/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT5-9N, R82-83W
Decision Memo · Yampa Ranger District · updated 9/22/2011
Yampa Ranger District, District Wide · Garfield; Grand; Rio Blanco; Routt, Colorado

Renewal of Temporary Outfitter Guide Pemits. No changes to previous activities.

Special use management
Scoping Start
03/20/2011
Comment Period
04/01/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
John Anarella · janarella@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
2011 Recreation Special Uses ReissuanceDecision Signed Date: 07/20/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Decision Memo · Douglas and Thunder Basin Ranger District · updated 9/21/2011
Northwest of Longreach Buffalo Ranch · Campbell, Wyoming

This project includes accessing, drilling, testing and completing two conventional oil wells including construction of .9 miles of new road.

Minerals and geology
Scoping Start
06/20/2010
Decision
12/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT54N, R70W, Section 4; T55N, R70W, Section 33
Decision Memo · Brush Creek/Hayden Ranger District · updated 9/14/2011
One mile east of western winter closure gate · Carbon, Wyoming

Installation of solar unit with underground wire running to cabin to run lighting system.

Facility management
Scoping Start
07/02/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Heather Schultz · hmschultz@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
Snow Survey Cabin Solar Power System DMDecision Signed Date: 08/25/2011
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT16N, R80W Section 28
Decision Memo · Parks Ranger District · updated 9/14/2011
Rabbit Ears Range, Long lake area · Routt, Colorado

Complete actions required at termination of recreation residence permit, including removal of private structures and improvements from NFS lands and restoration of disturbed areas.

Special use management
Scoping Start
06/25/2010
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Vohs Cabin Recreation Residence Removal & Restoration ProposalDecision Signed Date: 09/14/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT5N, R79W, Section 35.
Decision Memo · Parks Ranger District · updated 9/6/2011
Parks Ranger District · Jackson, Colorado

Move the reserved camp for Red Feather Outfitters outside of the Mount Zirkel Wilderness. In addition, the new location will better meet the requirements for distance from water and trails.

Special use management
Scoping Start
05/10/2011
Comment Period
05/10/2011
Decision
09/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Red Feather Outfitters Camp Move ProposalDecision Signed Date: 09/01/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT. 10 N., R 82 W., sec 26
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 8/23/2011
Rabbit Ears Pass - Dumont Lake Area-Long Park Roadless Area · Routt, Colorado

Rehabilitation of approximately 1 mile of an old ditch on Forest Service land that has several large breaches and gullies. Located in roadless.

Special area management
Scoping Start
12/21/2009
Comment Period
01/31/2010
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Four Counties Ditch Rehabilitation ProjectDecision Signed Date: 08/22/2011
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N, R82W, Sec. 7 & 8
Decision Memo · Parks Ranger District · updated 8/23/2011
Platte River, Parks Ranger District, Jackson County, Colorado · Jackson, Colorado

Customized digital SLR remote camera systems will be installed at key locations throughout the basin to record time-lapse images of the river’s cycles to record the pulse of the Platte River over days, months, and years

Special use management
Scoping Start
06/21/2011
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Jamie Krezelok · jkrezelok@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Farrel Camera InstallationsDecision Signed Date: 07/25/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionE1/2 Sec. 11, T5N, R77W; SW1/4 Sec. 9, T5N, R77W; NW1/4 Sec. 16, T5N, R77W
Environmental Assessment · Yampa Ranger District · updated 8/19/2011
Approximately 15 miles west of Yampa, CO · Rio Blanco; Routt, Colorado

Grazing Management, revision update for allotment management plan

Grazing management
Scoping Start
05/24/2010
Comment Period
05/28/2010
Decision
07/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Douglas Myhre · dmyhre@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Rangeland Management in the Ute/Middle Creek Analysis AreaDecision Signed Date: 07/11/2011 Legal Notice Date: 07/17/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionThe proposed project is located in Township 3 North, Range 87 West, Sections 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 16, 17, 18, 21
Decision Memo · Parks Ranger District · updated 8/18/2011
Parks Ranger District · Jackson, Colorado

Authorize geophysical surveys on the Parks Ranger District of FSR 750. Would utilize vibroseis as the energy source to provide data on potential minerals. All equipment and operations will be completed on the existing road.

Special use managementMinerals and geology
Scoping Start
06/13/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
EL Paso E&P Corp. N. Park 2D Siesmic ExplorationDecision Signed Date: 07/21/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT.5N., R 77 W., Sections 7, 8, 9, 15, 16, 22, 23, 25, 26 & 27
Decision Memo · Parks Ranger District · updated 8/3/2011
Parks Ranger District Big Creek campground · Jackson, Colorado

Fuels reduction by way of timber stand improvement. Provide trees to the North park School by transplanting trees from campground area. Regeneration of the recently harvested east loop of Big Creek Campground in native tree species.

Vegetation management (other than forest products)
Scoping Start
05/26/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Sarah Bridges · sarahbridges@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels)
Big Creek thinning & Planting ProposalDecision Signed Date: 08/03/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT 11 N., R 82 W., sections 9 and 16
Decision Memo · Douglas and Thunder Basin Ranger District · updated 7/29/2011
Spring Creek · Campbell, Wyoming

The Forest Service is proposing to authorize the WY DOT to mine and remove approximately 45,000 cubic yards of material from National Forest System lands, over a period of 2 years. There is a need for a source of materials for road construction.

Special use management
Scoping Start
05/01/2011
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Peter Rose · pjrose@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Wyoming DOT Contract for Sale of Mineral MaterialsDecision Signed Date: 07/28/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 54 N, R 70 W, Sec. 31; T 54 N, R 71 W, Sec. 24, SE 1/4, SW 1/4; T 54 N, R 71 W, Sec. 24, SW 1/4, SE 1/4
Decision Memo · Parks Ranger District · updated 7/25/2011
The routes that they will be using include; Colorado State Highway 14, 125, 127, Wyoming State Highway 130,230, and 10, Jackson County Roads 25, 27, 28, 26, 24, 22, 5, 20, 16, 12W, 21,and 18, Larimer · Albany; Carbon; Grand; Jackson; Larimer, Colorado; Wyoming

Larimer County National Youth Project Using Minibikes (NYPUM) program is holding an event to raise money for the program. This event will not be a race, or a timed event such as an enduro, riders will travel at their own pace.

Special use management
Scoping Start
05/10/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Jon Myers · jcmyers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
National Youth Project Using Minibikes - Moose Run Dual-sport RallyDecision Signed Date: 07/07/2011
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District; Parks Ranger District; Laramie Ranger District
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 7/19/2011
Laramie Peak Unit of the Douglas Ranger District, Medicine Bow-Routt National Forests · Albany; Converse; Natrona; Platte, Wyoming

The project would incorporate treatments aimed at regenerating select aspen stands and associated habitat on the Laramie Peak Unit of the Douglas Ranger District. Treatments will focus on improving the health and condition of aspen stands.

Vegetation management (other than forest products)
Scoping Start
03/17/2010
Comment Period
03/17/2010
Decision
07/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Danielle Reboletti · dreboletti@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Grazing Allotment Management; Grazing Authorizations; Species Habitat Improvements; Special Products Sales; Species Population Enhancements; Rangeland Vegetation Improvements; Grazing Structural Improvements; Timber Sales (Salvage); Timber Sales (Green)
Decision Notice and FONSI for North Laramie Range Aspen RestorationDecision Signed Date: 07/15/2011 Legal Notice Date: 07/19/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 28 - 31 N, R 70 - 78 W; T 24-27 N, R 70-74 W
Decision Memo · Brush Creek/Hayden Ranger District · updated 6/30/2011
Headquarters Park, Brush Creek/Hayden Ranger District · Carbon, Wyoming

Issuance of a special use permit for historic buildings

Special use management
Scoping Start
03/18/2011
Comment Period
03/18/2011
Decision
06/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Patricia Hesch · phesch@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issuance of a Special Use Permit for the Headquarters Park CabinDecision Signed Date: 06/28/2011
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Legal Land DescriptionT.16 N, R 80 W, section 23
Decision Memo · Brush Creek/Hayden Ranger District · updated 6/28/2011
East Fork Encampment River, Sierra Madre portion of the Brush Creek/Hayden Ranger District · Carbon, Wyoming

Remove hydrology weir constructed by the USFS in 1960s that is preventing fish movement upstream and restore approximately 800' of stream channel. Removal of weir will provide access to eight miles of stream.

Wildlife, fish, rare plants
Scoping Start
02/01/2010
Decision
05/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Shawn Anderson · sanderson03@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
East Fork Encampment River Weir Removal ProjectDecision Signed Date: 05/13/2011
ForestsMedicine Bow-Routt National Forest
DistrictsBrush Creek/Hayden Ranger District
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/27/2011
Hilight Bill · Campbell; Converse, Wyoming

The Forest Service proposes to authorize geophysical surveys on the Thunder Basin National Grassland. The Lightening Creek and Mary's Draw 2D swath seismic project would utilize vibroseis as the energy source to provide data on potential minerals.

Special use managementMinerals and geology
Scoping Start
03/17/2011
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
James McKay · jmckay02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
EOG Resources Decision MemoDecision Signed Date: 04/04/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 40- 41 N, R 72 W
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/27/2011
Fuel breaks will reach 100'-200' on each side of the Harris Park, Fletcher Park, and Cottonwood roads. · Albany, Wyoming

The project would integrate National Forest System Roads (NFSR) 633 (Harris Park Rd.), 716 (Fletcher Park), and County Road 71 (Cottonwood Rd.) into fuel breaks. Fuel breaks would include thinning and removal of ladder fuels along the road.

Vegetation management (other than forest products)Special area managementFuels managementRoad management
Scoping Start
03/17/2010
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Clay Westbrook · cwestbrook01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNational Fire Plan - Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Harris and Fletcher Park Road Side Fuel Break Decision MemoDecision Signed Date: 06/27/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 28 N, R 71 W, Sections 1, 2, 10, 11, 23, 26, 27, and 34; T 27 N, R 71 W, Sections 15 and 22; T 26 N, R 71 W, Sections 14, 15, and 17
Environmental Assessment · Yampa Ranger District · updated 6/24/2011
Project located 6 miles east of Toponas, CO in the Long Park area · Routt, Colorado

Re-routing, change of use and decommisioning portions of National Forest System Road 225 for wildlife, hydrology and travel management purposes.

Road managementWildlife, fish, rare plantsRecreation managementWatershed management
Scoping Start
12/12/2008
Comment Period
04/14/2009
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Chad Kurtenbach · cmkurtenbach@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Road Improvements/Construction; Travel Management; Watershed Improvements
Travel Management in the NFSR 225 Analysis AreaDecision Signed Date: 06/02/2011 Legal Notice Date: 06/05/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT1N, R83W Sec. 13, 14, 22, 23, 27, 28, 29, 32, 33,
Environmental Assessment · Yampa Ranger District · updated 6/24/2011
South of Sheriffs Reservoir at the inlet of Trout Creek. · Rio Blanco, Colorado

Prevent whirling disease infected fish from entering the Trout Creek drainage thereby spreading the disease to native Colorado Cutthroat Trout.

Wildlife, fish, rare plants
Scoping Start
03/01/2010
Comment Period
03/18/2010
Decision
05/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
Trout Creek Fish Barrier DN/FONSIDecision Signed Date: 05/10/2011 Legal Notice Date: 05/22/2011
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionSW, NW, S14, T2N, R87W
Decision Memo · Laramie Ranger District · updated 6/20/2011
Bald Mountain and South Fork Mill Creek · Albany, Wyoming

Prescribed burn to reduce natural fuel buildup and improve plant vigor

Fuels managementVegetation management (other than forest products)
Scoping Start
03/10/2011
Comment Period
03/10/2011
Decision
04/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Aaron Swallow · aswallow02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT 16N., R78., section 14 and 24
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/20/2011
Hahns Peak/Bears Ears Ranger District · Routt, Colorado

Minor changes and updates to travel management based on management needs on the ground. Road decomissioning, road closure improvements, maintenance level adjustments, and road openings.

Road management
Scoping Start
12/2010 (Estimated)
Decision
02/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTravel Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionDistrict-wide
Decision Memo · Laramie Ranger District · updated 6/17/2011
Near the end of National Forest System Road (NFSR) 500.EA · Albany, Wyoming

The Laramie Ranger District would issue a Road Use Permit to Mr.Dobson to constuct up to 1,000 feet of single purpose, gated road from the end of NFSR 500.EA to the Jupiter #4 mining claim.

Special use management
Scoping Start
08/12/2010
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Nathan Haynes · nhaynes@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District
Legal Land DescriptionT14N, R79W, Sec 5, SE 1/4 of NW 1/4 of SE 1/4, 6th P.M.
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 6/16/2011
The Project will take place on the Routt National Forest from the Eastern summit of Rabbit Ears Pass west to the forest boundary east of Steamboat Springs. · Routt, Colorado

Salvage of lodgepole pine on Rabbit Ears Pass, fuels reduction (enhanced protection of communication tower and various structures in and around Rabbit Ears Pass and Walton Peak), and wildlife habitat improvement.

Fuels managementForest productsVegetation management (other than forest products)
Scoping Start
08/2011 (Estimated)
Comment Period
08/2011 (Estimated)
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Andy Cadenhead · acadenhead@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionTownships 5N - 7N, and Ranges 82W - 84W.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/15/2011
South of California Park · Routt, Colorado

Issue a road easement across about 1/4 mile of Forest Service land to access a private inholding.

Special use management
Scoping Start
04/01/2004
Decision
'/ (Estimated)
Implementation
'/ (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, R87W, Section 35
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 6/13/2011
Steamboat Ski Area · Routt, Colorado

Construction of additional summer trails to the existing summer trail system

Recreation management
Scoping Start
09/26/2010
Comment Period
03/27/2011
Decision
06/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Steamboat Ski Area Summer Trails ProjectDecision Signed Date: 06/10/2011
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N, R84W
Decision Memo · Parks Ranger District · updated 6/8/2011
North end of Grizzly-Helena Trail immediately south of Helena Trailhead at North Fork North Platte River crossing on Parks Ranger District. · Jackson, Colorado

Improve the stability and safety of the North Fork North Platte River crossing by reconstructing trail tread and boardwalk bridges and revegetating wetland areas.

Watershed managementRecreation management
Scoping Start
03/26/2010
Decision
01/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Paula Guenther · pguenther@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
Grizzly Helena Trail Crossing: Trail Improvements and Watershed RestoratioDecision Signed Date: 01/04/2011
ForestsMedicine Bow-Routt National Forest
DistrictsParks Ranger District
Legal Land DescriptionT11N, R82W, Sec 26
Decision Memo · Douglas and Thunder Basin Ranger District · updated 6/8/2011
Inyan Kara portion of the Thunder Basin National Grassland · Crook; Weston, Wyoming

The Inyan Kara Motorcycle Enduro operates under a Recreation Event - 5 year permit in the Inyan Kara area of the Thunder Basin national grassland. The permit expires 12/31/2010; this action is to renew their permit for another term.

Recreation management
Scoping Start
12/03/2010
Comment Period
12/03/2010
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Marcia Rose-Ritchie · mroseritchie@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Inyan Kara Enduro Permit Decision MemoDecision Signed Date: 04/28/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 47-48 N, R 63-65 W
Environmental Assessment · Douglas and Thunder Basin Ranger District · updated 4/13/2011
Hilight Bill Geographic Area · Campbell, Wyoming

The existing permitted clinker mining area encompasses approximately 600 acres of NFS land. The requested expansion comprises 40 acres, which would result in a total of approximately 640 impacted acres.

Minerals and geology
Scoping Start
09/05/2009
Comment Period
09/05/2009
Decision
03/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
Amy Ormseth · aormseth@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityBoundary Adjustments; Minerals Or Geology Plans Of Operations
Thunder Basin Coal Company - Black Thunder Mine Clinker Mining ExpansionDecision Signed Date: 03/23/2011 Legal Notice Date: 04/09/2011
ForestsMedicine Bow-Routt National Forest
DistrictsDouglas and Thunder Basin Ranger District
Legal Land DescriptionT 43 N, R 70 W, Section 26, Lot 4; 6th P.M.
Environmental Assessment · Medicine Bow-Routt National Forest All Units · updated 4/5/2011
All authorized power lines that cross the Arapaho, Roosevelt, Routt, and White River National Forests. · Boulder; Clear Creek; Eagle; Garfield; Gilpin; Grand; Jackson; Jefferson; Lake; Larimer; Park; Pitkin; Routt; Summit, Colorado

The Arapaho and Roosevelt, Medicine Bow-Routt, and White River National Forests are proposing to remove all dead and dying trees (i.e., hazard trees) along power lines crossing National Forest system lands in Northern Colorado.

Special use managementFuels managementVegetation management (other than forest products)
Scoping Start
08/19/2009
Objection Period Start
05/25/2010
Decision
11/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
Jamie Kingsbury · jkingsbury@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Use Authorizations
ForestsMedicine Bow-Routt National Forest; Arapaho and Roosevelt National Forests; White River National Forest
DistrictsYampa Ranger District; Hahns Peak/Bears Ears Ranger District; Parks Ranger District; Boulder Ranger District; Canyon Lakes Ranger District; Clear Creek Ranger District; Sulphur Ranger District; White River National Forest All Units
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/14/2010
Bears Ears · Routt, Colorado

Reissuance of snowmobile grooming permit

Special use management
Scoping Start
09/25/2009
Decision
11/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Steve McCone · smccone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9-19N, R87-89W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/14/2010
Rabbit Ears Pass · Routt, Colorado

Reissuance of snowmobile grooming permit

Special use management
Scoping Start
09/25/2009
Decision
11/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Steve McCone · smccone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5, 6, 7N, R82, 83, 84W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 12/14/2010
North Routt · Routt, Colorado

Reissuance of snowmobile grooming permit

Special use management
Scoping Start
09/25/2009
Decision
11/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Steve McCone · smccone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9-12N, R84 and 85W
Environmental Impact Statement · Hahns Peak/Bears Ears Ranger District · updated 9/28/2010
East of Willow Creek Pass subdivision off of Routt County Road 129 · Routt, Colorado

Vegetation management on approximately 81 acres of beetle infested timber adjacent to the Willow Creek Pass subdivision to reduce fuel loading and decrease crown fire potential.

Fuels management
NOI in Federal Register
04/07/2009
DEIS NOA in Federal Register
08/21/2009
FEIS NOA in Federal Register
07/16/2010
Objection Period Start
07/18/2010
Decision
08/2010 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Mark Cahur · mcahur@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
Willow Creek Pass Fuel Reduction ProjectDecision Signed Date: 08/16/2010
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT9N, R85W, Sections 10, 11, & 15
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/27/2010
Creek west of Rock Cr, Farwell Mtn Mine, Upper King Solomon Mine, Mine NW of Columbine, 1st Gold Mine, Upper Independence Peak, Master key mine, Little red park, Uraniun, Gore Creek, and Lynx Pass Min · Routt, Colorado

Close hazardous adits and shafts on the Forest that present a danger to the public

Minerals and geology
Scoping Start
09/17/2002
Decision
09/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Brian Waugh · bwaugh@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
Abandoned Mine Safety ClosuresDecision Signed Date: 09/02/2010
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT.9N., R.85W.,T.10N., R.85W., T.11N., R.85W., T.6N.,R.84W, T2N, R83W, S27, and T2N, R82W, S28
Recreation Events Completed
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/27/2010
Steamboat Ski Area to Dumaont Lake along NFSTs 1101, 1102, and 1032. · Routt, Colorado

Recreation events on system trails including the Continental Divide National Scenic Trail

Recreation management
Scoping Start
06/01/2010
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT5N, T6N, R83W, and 84W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/27/2010
Steamboat Ski Area · Routt, Colorado

Implement vegetation management prescriptions: primarily hazard tree removal

Vegetation management (other than forest products)
Scoping Start
03/31/2010
Decision
05/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Janet Faller · jfaller@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT6N, R84W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/27/2010
Whiskey Creek · Routt, Colorado

New ATV trail connecting the end of NFSR 412 to the Wyoming trail 1101. The trail will be approximately 1/8 mile, 300 feet of old logging road and 300 feet of new trail.

Recreation management
Scoping Start
09/26/2008
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Steve McCone · smccone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT12N, R84W, Section 19
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/22/2010
Mouth of Circle Cr. in California Park, 20 miles North of Hayden, Colorado. · Routt, Colorado

This project will temporarily modify an exisiting fish barrier in Circle Cr. The modification would prevent non-native trout in Elkhead Cr. from entering Circle Cr. during non-native removal efforts.

Wildlife, fish, rare plants
Scoping Start
03/17/2010
Decision
07/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionSW, NW, S3, T9N, R87W.
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 9/22/2010
North Routt County · Routt, Colorado

Analysis of livestock grazing on the Big Red Park, Little Red Park, Summit Creek and Middle Fork Circle Bar Allotments.

Grazing management
Scoping Start
01/22/2010
Comment Period
04/04/2010
Decision
09/2010 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Erik Taylor · estaylor@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Rangeland Management in the Red Parks Analysis AreaDecision Signed Date: 09/03/2010 Legal Notice Date: 09/05/2010
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R84W; T11N, R84W; T10N, R85W; T11N, R85W; and T11N, R86W.
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 6/30/2010
Project: Master Key. Claim Name: Last Hope and Copper Mask #2. Located on Farwell Mountain, northeast of Clark, Colorado. · Routt, Colorado

Close two hazardous mine adits and shafts on the Forest that represent a potential danger to the public.

Minerals and geology
Scoping Start
04/25/2010
Comment Period
04/25/2010
Decision
04/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Gary Gray · gagray01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityAbandoned Mine Land Clean-Up
Abandoned Mine Saftey Closure II ProjectDecision Signed Date: 04/25/2010 Legal Notice Date: 04/25/2010
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionProject: Master Key. Claim Name: Last Hope - T10N, R85W, S11. Claim Name: Copper Mask #2 - T10N, R85W, S11.
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 12/16/2009
North of Columbine, Colorado extending north close to he Wyoming border. · Routt, Colorado

7600 acres of commercial timber sale and fuel reduction treatments.

Fuels management
Scoping Start
10/05/2008
Objection Period Start
09/21/2009
Decision
12/2009 (Estimated)
Implementation
02/2010 (Estimated)
Project documents
Andy Cadenhead · acadenhead@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityForest Vegetation Improvements
Little Snake North Timber Sale and Fuels Reduction ProjectDecision Signed Date: 12/16/2009
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT11N, R84, 85, 86W and T12N, R84 and 85W
Environmental Assessment · Hahns Peak/Bears Ears Ranger District · updated 12/14/2009
Routt and Moffat Counties · Routt, Colorado

Analysis of livestock grazing on three allotments: Boulder Creek, and Mount Oliphant

Grazing management
Scoping Start
12/22/2008
Comment Period
05/05/2009
Decision
09/2009 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Erik Taylor · estaylor@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Slater Creek Rangeland Managment AnalysisDecision Signed Date: 09/30/2009 Legal Notice Date: 11/01/2009
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Legal Land DescriptionT10N, R87W, R88W, & R89W
Environmental Assessment · Medicine Bow-Routt National Forest All Units · updated 9/29/2008
Medicine Bow and Routt National Forests · Albany; Carbon; Converse; Natrona; Platte; Jackson; Routt, Colorado; Wyoming

Determine vegetation treatments that reduce the existing, potentially hazardous, dead and dying trees along National Forest System Roads, developed recreation sites, and administrative sites.

Fuels managementVegetation management (other than forest products)Facility management
Scoping Start
10/28/2007
Objection Period Start
06/08/2008
Decision
08/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Melissa Martin · mmmartin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityDeveloped Site Management; Trail Management
Forest-wide Hazardous Tree Removal and Fuels Reduction ProjectDecision Signed Date: 08/12/2008
ForestsMedicine Bow-Routt National Forest
DistrictsMedicine Bow-Routt National Forest All Units
Environmental Assessment · Yampa Ranger District · updated 9/26/2008
Culvert at entrance to FS RD 906 · Routt, Colorado

Prevent whirling disease infected fish from entering the coal creek drainage thereby spreading the disease to native colorado cutthoat trout.

Wildlife, fish, rare plants
Scoping Start
03/03/2008
Comment Period
05/13/2008
Decision
09/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Rick Henderson · rhenderson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionNW, NE,S16,T1N, R86W
Decision Memo · Hahns Peak/Bears Ears Ranger District · updated 9/23/2008
Seedhouse Road area, just northeast of Clark, Colorado. · Routt, Colorado

Fuel reduction in wildland urban interface using a combination of mechanical and prescribed burning treatments to reduce natural fuel loading on about 1,500 acres. Agency has been enjoined from using CE#10 and project fits the newly selected categor

Fuels management
Scoping Start
06/04/2006
Decision
03/2007 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Kent Foster · kfoster@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Seedhouse Fuel Reduction ProjectDecision Signed Date: 03/14/2007
ForestsMedicine Bow-Routt National Forest
DistrictsHahns Peak/Bears Ears Ranger District
Williams Fork AMP Completed
Environmental Assessment · Yampa Ranger District · updated 8/7/2008
South of Hayden · Rio Blanco; Routt, Colorado

Grazing management, revision update for allotment management plan

Grazing management
Scoping Start
01/16/2007
Comment Period
02/10/2008
Decision
07/2008 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Josh Voorhis · jvoorhis@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
ForestsMedicine Bow-Routt National Forest
DistrictsYampa Ranger District
Legal Land DescriptionT3N.R88W., T3N., R87 W, T2N., R88W, T2N., R87W
Environmental Assessment · Medicine Bow-Routt National Forest All Units · updated 12/18/2007
Laramie District's portion of the Snowy Range Mountains · Albany; Carbon, Wyoming

Analyze proposal to close apx. 207 miles of user-created routes, designate apx. 17 miles of user-created routes as NFSRs, designate apx. 67 miles of single-track motorcycle trails, and designate apx. 45 miles of ATV trails.

Road managementRecreation management
Scoping Start
03/04/2005
Comment Period
11/14/2006
Decision
09/2007 (Estimated)
Implementation
08/2007 (Estimated)
Project documents
Melissa Martin · mmmartin@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Trail Management; Road Maintenance; Road Improvements/Construction; Travel Management
Decision 1: Proposed Action with ModificationsDecision Signed Date: 06/21/2007 Legal Notice Date: 07/03/2007
Re-issued Decision 2: Albany TrailDecision Signed Date: 09/28/2007 Legal Notice Date: 10/02/2007
ForestsMedicine Bow-Routt National Forest
DistrictsLaramie Ranger District