Cathodic protection stations are needed in three locations along the El Paso Natural Gas Line outside of the existing Right-of-Way. Installation involves drilling a 10-inch bore 500-600 feet into the ground to place anodes and metallic rods.
Location
CPS 2469: 35.2978, -112.1908; CPS 2474: 35.2741, -112.3073, CPS 2475: 35.2706, -112.3159
Project timeline
1
Scoping Start
07/06/2022
2
Decision
10/2022 (Estimated)
3
Implementation
10/2022 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Natural Gas |
| El Paso Natural Gas Cathodic Protection Station and Right Of Way Modification | Decision Signed Date: 10/31/2022 |
| Forests | Kaibab National Forest |
| Districts | Williams Ranger District |
| Legal Land Description | Not Applicable |