To retire an existing overhead line & replace it with a buried powerline within a conduit. Trench to be dug for the conduit would be 150 ft. long x 36 in. deep x 24 in. wide. Also, a secondary riser would be installed on the exising pole.
Location
Turpin Summer Home Tract, lot 3B
Project timeline
1
Scoping Start
03/26/2014
2
Decision
05/2014 (Estimated)
3
Implementation
07/2014 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Lower Valley Energy Powerline Burial, Lot 3B, Turpin Summer Home Tract | Decision Signed Date: 05/02/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Section 14, T45N, R112W |