Decision Memo Completed

Burial of 150 ft. of powerline for lot 3B, Turpin Summer Home tract

Bridger-Teton National Forest Teton, Wyoming Buffalo Ranger District

To retire an existing overhead line & replace it with a buried powerline within a conduit. Trench to be dug for the conduit would be 150 ft. long x 36 in. deep x 24 in. wide. Also, a secondary riser would be installed on the exising pole.

Location

Turpin Summer Home Tract, lot 3B

Project timeline

1
Scoping Start
03/26/2014
2
Decision
05/2014 (Estimated)
3
Implementation
07/2014 (Estimated)

NEPA / regulatory detail

Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Lower Valley Energy Powerline Burial, Lot 3B, Turpin Summer Home TractDecision Signed Date: 05/02/2014
ForestsBridger-Teton National Forest
DistrictsBuffalo Ranger District
Legal Land DescriptionSection 14, T45N, R112W
Special use management