Environmental Assessment · Bridger-Teton National Forest All Units · updated 1/15/2026
Conveyance: 340 North Cache; Construction there and Nelson Drive, Jackson, WY and Cottonwood Work Center. · Teton, Wyoming
Convey 10 acres of administrative land in Jackson WY, and construct/remodel buildings on the remainder of the site and other FS admin. sites in the area. EA released October 2009; Supplement to EA released January 2012; Decision made May 2012.
Land ownership management
Comment Period
01/31/2012
Decision
09/2025 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Land Use Adjustments |
| Jackson Administrative Site Land Conveyance and Development | Decision Signed Date: 05/04/2012 Legal Notice Date: 05/08/2012 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
Decision Memo · Jackson Ranger District · updated 12/9/2025
Gros Ventre Road, outside Kelly, WY. · Teton, Wyoming
Livestock trailing activities along Gros Ventre Road to private lands. May include temporary facilities and overnighting of herd on USFS lands. This review covers potential trailing requests from different operators. Each requires specific plan.
Grazing management
Decision
03/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (7) |
| Special Authority | Not Applicable / Other; Trailing And Crossing Of Livestock, Sec. 402 Of Flpma |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 6/30/2025
Greys River District near the bottom of Forest Road 10209 (Wickiup) in Section 8, T.31N., R.118W., 06. · Lincoln, Wyoming
The Osmond Service and Improvement District (OSID) proposed to expand upon their existing water development infrastructure by constructing a 350,000-gallon water tank and replacing an existing water pipeline. Comment period open through May 1, 2025.
Special use management
Comment Period
04/16/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 6/17/2025
About 7 miles south of Jackson, WY · Teton, Wyoming
Silver Star has been funded by a USDA rural grant to install fiber optic line along Game Creek, Porcupine Creek, Henry's Road, Horse Creek Mesa, and Horse Creek. Comment period ended 3/24/25.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Section 26, 34, T.40N., R.116W., Sections 2, 3, 11, 12, 14, T.39N., R.116W., 6th Principal Meridian |
Decision Memo · Bridger-Teton National Forest All Units · updated 6/17/2025
Management Area 41, Jackson Hole South, off of Fall Creek Road · Teton, Wyoming
WYDOT proposes to install a WyoLink telecommunication site near the top of Pritchard Pass to enhance communication in the Snake River Corridor and Hoback area and increase public safety.
Special use management
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Latitude 43 19' 1.81"N / Longitude 110 48' 11.81" W |
Decision Memo · Greys River Ranger District · updated 5/30/2025
T. 33N., R. 118W., portions of section 22, 27, 34, and 35. T. 32N., R. 118W., portions of section 4 and 5. Parallel to RD#10081 and Spruce Hollow · Lincoln, Wyoming
Change the grazing system of the Grover Blaney Allotment from a continuous grazing system to a 3-unit rotational grazing system.
Grazing management
Decision
05/2025 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 5/28/2025
Cache Creek drainage located at the eastern edge of the Town of Jackson. · Teton, Wyoming
The District proposes to upgrade/redesign the entrance road, parking areas, & boardwalk, add accessible parking, create east & west trail entrances, construct a kiosk & shelter and install a gate to manage day use of the area. Comment by 5/21/2024.
Recreation management
Decision
05/2025 (Estimated)
Implementation
05/2027 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Trail Management; Road Maintenance |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kemmerer Ranger District · updated 5/5/2025
The Hams Fork Trailhead relocation area is located on the BTNF approx. 32 miles northwest of Kemmerer in Lincoln County, Wyoming T 26 N, R 117 W Sec. 9 · Lincoln, Wyoming
Relocate the current Hams Fork Trailhead down to the Hams Fork Campground parking area providing better access and improve the current horse corral.
Recreation management
Decision
05/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | T 26 N, R 117 W Sec. 9 |
Decision Memo · Kemmerer Ranger District · updated 5/5/2025
On FS Road 10103 approximately 30 miles from Kemmerer, WY 26 N, 116 W, Section 25 · Lincoln, Wyoming
Relocate current trailhead 200 yards east of its current location, out of a stand of trees, and in an area better suited for a trailhead.
Recreation management
Decision
05/2025 (Estimated)
Implementation
08/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kemmerer Ranger District · updated 5/5/2025
The proposed project area is located on BTNF surface approx. 34 miles north of Kemmerer in Lincoln County, Wyoming: Section 35, T.27N., R.116W., 06 · Lincoln, Wyoming
Provide additional and stock parking area for Roaring Creek Trailhead and build a corral adjacent to the parking area.
Recreation management
Decision
05/2025 (Estimated)
Implementation
08/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kemmerer Ranger District · updated 4/23/2025
T26N, R118W, S12; one mile South of Kelly Guard Station · Lincoln, Wyoming
Expand the current parking area, install picnic shelters with ADA-compliant picnic tables and grill pits. Improve current trail to ADA compliant and build viewing areas/overlooks.
Recreation management
Decision
04/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Scenery Management |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 4/23/2025
The project area is within the special use permit boundary of Jackson Hole Mountain Resort, adjacent to Teton Village, WY. · Teton, Wyoming
JHMR proposes to connect water and sewer lines to existing on mountain facilities, construct a patrol station at the top of the Tram, and add snowmaking infrastructure to the Teewinot Switchback and Rendezvous Trail. Scoping comments by 4/1.
Recreation managementSpecial use management
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 4/17/2025
The site is located on top of Hawks Rest Peak in the northern part of the Teton Wilderness. · Teton, Wyoming
The Bridger-Teton proposes to replace the existing radio repeater shelter on Hawks Rest Peak in the Teton Wilderness. The current structure would be demolished and replaced with a Pepro shelter.
Facility managementProjects that may affect wilderness (for mailing list contacts)
Decision
04/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | T. 48 N. R 110W. section 20, 6th principal meridian |
Decision Memo · Jackson Ranger District · updated 4/3/2025
Confluence of Gros Ventre River and Crystal Creek, east of Kelly, Wyoming. · Teton, Wyoming
the Forest Service will relocate campground infrastructure to higher ground and install bioengineered bank stabilization treatments in along the Gros Ventre Road, and bioengineered streambank restoration work will also occur adjacent to Crystal Creek
Watershed managementClimate change adaptation
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 3/12/2025
About 3 miles south of Moran, WY · Teton, Wyoming
Grand Teton National Park is requesting a permit for an existing weir and pipeline (circa ~1913) that is used by a concessionaire, Triangle X Ranch.
Special use management
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Section 20, T.44N., R.114W., 6th principal meridian |
Decision Memo · Jackson Ranger District · updated 3/10/2025
Gros Ventre Range · Teton, Wyoming
Special use authorization to Kinky Creek Operating Company.
Special use management
Decision
07/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/30/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/10/2025
Jackson Ranger District · Teton, Wyoming
Special use authorization to Swift Creek Outfitters.
Special use management
Decision
07/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/30/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/10/2025
Jackson Ranger District · Teton, Wyoming
Special use authorization to T Lazy T Outfitters.
Special use management
Decision
07/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/30/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/10/2025
Sheep Creek · Teton, Wyoming
Special use authorization to Teton Science School.
Special use management
Decision
07/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/30/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/10/2025
Jackson Ranger District · Teton, Wyoming
Mountain rescue seminar by the University of Utah.
Special use management
Decision
07/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/30/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 12/18/2024
In the Teton Wilderness, 30 miles northeast of Moran, WY. · Teton, Wyoming
WY Game & Fish seeks continued use of the Thorofare cabin, 2 miles NE of Hawks Rest Peak, which was previously authorized in 1956 with an MOU. A special use permit would update the authorization to meet current permitting regulations.
Special use management
Decision
12/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Section 16, T.48N., R.110W., sixth principal meridian |
Decision Memo · Bridger-Teton National Forest All Units · updated 12/9/2024
Upper Hoback River Road CR 23-174, Bondurant, WY · Sublette, Wyoming
This project (#66134) will be cancelled because it is a duplicate of a project with the same name - Jackson Fork Ranch Utilities project #66133.
Special use management
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Pinedale Ranger District · updated 12/9/2024
Upper Green River · Sublette, Wyoming
A proposal to reauthorize livestock grazing on six allotments. A final decision was signed on October 11,2019.
Grazing management
NOI in Federal Register
12/01/2009
DEIS NOA in Federal Register
10/07/2016
FEIS NOA in Federal Register
10/27/2017
Objection Period Start
11/22/2017
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Upper Green River Area Rangeland Project | Decision Signed Date: 09/30/2004 (FS Withdrawn) Legal Notice Date: 12/22/2004 |
| Record of Decision Upper Green River Area Rangeland Project | Decision Signed Date: 10/11/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 9/20/2024
Various locations on the Jackson Ranger District. · Teton, Wyoming
Re-issuance of 7 special use authorizations for water pipelines, non-disturbing use, and FLPMA permits.
Special use management
Decision
09/2024 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 09/20/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bridger-Teton National Forest All Units · updated 9/13/2024
Kemmerer Ranger District · Lincoln, Wyoming
Provide an outfitting and guiding services in the form of day use services along with trophy and big game hunting on the Kemmerer Ranger District and Greys River Ranger District
Special use management
Decision
09/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 09/13/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District; Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bridger-Teton National Forest All Units · updated 9/13/2024
Greys River Ranger District · Lincoln, Wyoming
Provides an outfitting and guiding services in the form of day use services as well as trophy and big game hunting on the Greys River Ranger District
Special use management
Decision
09/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 09/13/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 9/12/2024
Along Upper Hoback River Road (CR 23-174), Bondurant, WY · Sublette, Wyoming
Jackson Fork Ranch proposes to bring power, fiber optic, & natural gas from US Highway 189/191 along Upper Hoback Road (CR 23-174) to their property boundary, about 11,000 feet of NFS land. Project would remove 50 power poles and cross 15 culverts.
Special use management
Decision
07/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bridger-Teton National Forest All Units · updated 9/12/2024
Greys River Ranger District · Lincoln, Wyoming
Outfitting and guiding services on the Greys River Ranger District for day use trophy and big game hunting.
Special use management
Decision
09/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 09/12/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | SEC. 31, T. 31 N., R. 117W., 6th Principal Meridian |
Decision Memo · Jackson Ranger District · updated 9/6/2024
About 10 miles southwest of Jackson, WY. · Teton, Wyoming
A-OK Corral requests to make improvements by burying a water line and hardening their parking area at their base camp, and adding horse grazing to their upper camp. Jackson RD proposes to harden the public trailhead area next to the base camp.
Recreation managementSpecial use management
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Sixth principal meridian, T. 39 N., R. 117 W., Sec. 5 & 17 |
Decision Memo · Jackson Ranger District · updated 9/6/2024
On Horse Creek, about 2 miles northeast of Hoback Junction. · Teton, Wyoming
Jackson Ranger District in partnership with Wyoming Game and Fish propose to construct two temporary steel fences to enclose riparian areas and promote revegetation on Horse Creek within the feedground on NFS lands.
Wildlife, fish, rare plantsClimate change adaptationWatershed management
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39N, R115W, Sections 7 and 18, Sixth principal meridian |
Decision Memo · Buffalo Ranger District · updated 9/6/2024
North of US Hwy 26, about 2.5 miles east of Moran, WY. · Teton, Wyoming
Partnership between the Forest Service and Trout Unlimited to improve fish habitat and connectivity by redesigning diversion dams on Lava Creek.
Climate change adaptationWatershed managementWildlife, fish, rare plants
Decision
08/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | T. 45 N., R. 113 W, Sec. 20 & 29, Sixth principal meridian |
Decision Memo · Bridger-Teton National Forest All Units · updated 8/14/2024
The Big Spring day use Site is located off of the Big Spring Scenic Backway, Forest Road #10062 on the Kemmerer Ranger District. · Lincoln, Wyoming
Installation of a vault toilet at the Big Spring day use area.
Recreation management
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction |
| Big Spring Day Use Area Vault Toilet | Decision Signed Date: 08/12/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bridger-Teton National Forest All Units · updated 7/30/2024
Willow Creek · Teton, Wyoming
Horseback rides by A-OK Corral, LLC.
Special use management
Decision
07/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 07/30/2024 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 6/6/2024
Various units along Greys River Road FS10138, Little Greys River Road FS 10124 and Grover Park Road FS10081. · Lincoln, Wyoming
The district proposes various treatments to increase fuel breaks along busy roads. These treatments support fire management that is economically efficient, responsive to land management objectives and provides for public and firefighter safety.
Fuels managementVegetation management (other than forest products)
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kemmerer Ranger District · updated 4/22/2024
East of the Dry Fork of Smiths Fork River and west of Hobble Creek Campground, near Cokeville, Wyoming. · Lincoln, Wyoming
The forest, collaborating with BLM and WGFD, proposes to broadcast burn approx. 1400 acres to reduce conifer overstory and promote Aspen suckering. Desired vegetation conditions include reduced fuel loading and improved desirable wildlife habitat.
Fuels managementVegetation management (other than forest products)
Decision
04/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | T 28N, R118W, Sec 3,11,14,23,26,35 |
Decision Memo · Jackson Ranger District · updated 3/22/2024
Granite Creek corridor, Mosquito Creek corridor, and Dog Creek trailhead areas. · Teton, Wyoming
Granite Creek corridor: construct parking area at Granite Falls, restore, rehab and construct 2.5 mi of trail to bypass Granite Hot Springs, re-design winter parking area. Proposal also includes changes at Mosquito Creek corridor & Dog Creek sites.
Recreation management
Comment Period
02/11/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 3/12/2024
various locations across Greys River District. · Lincoln, Wyoming
The permittees propose to build two drift fences on the Grover- Blaney allotment, a corral extension on Spring Creek Allotment and one wing addition to corrals on Little Greys Allotment to improve livestock distribution and collection during round up
Grazing management
Decision
02/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 1/31/2024
Tributaries to Little Greys River, near the McCain Meadow Guard Station of the Greys River Ranger District. · Lincoln, Wyoming
Forest Service, Trout Unlimited, & WGFD install post assisted log structures & beaver dam analogs in Meadow Creek, a tributary to Steer Creek, to address sedimentation, stream channel issues & restore cutthroat trout habitat.
Watershed managementWildlife, fish, rare plants
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Species Habitat Improvements; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 11/7/2023
About 8.5 airmiles south of Jackson, WY on the Big Munger Trail. · Teton, Wyoming
The Jackson Ranger District proposes to realign sections of the Big Munger Trail to lower grades, as well as furrow in the deep sections of trail and add new drainage to prevent future erosion, in partnership with Crosscut Trails and Forestry.
Recreation management
Decision
11/2023 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39N R116W Sec. 5, 6, 8, 17, Sixth Principal Meridan |
Decision Memo · Jackson Ranger District · updated 11/1/2023
About 3 miles southwest of Hoback Junction. · Teton, Wyoming
The Snake River Sporting Club Improvement and Service District proposes to replace the existing damaged bridge with a new two-lane bridge, about 28 ft wide and 375 ft long.
Special use management
Decision
09/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39N R166W Sec. 32 Sixth Principal Meridian |
Decision Memo · Greys River Ranger District · updated 9/26/2023
Afton, Wyoming, across Salt River Range, Grayback Ridge, Hoback Junction to Jackson, WY. · Lincoln; Teton, Wyoming
100 mile point-to-point ultramarathon footrace in July, from Afton, WY to Jackson, WY via Forest system roads & trails & county roads. Several routes would be analyzed in case of fire or washout conditions to be avoided. No comments were submitted.
Special use management
Decision
09/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 09/26/2023 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 9/26/2023
3.3 miles east of Bondurant Post Office and north of the HWY 189 and Forest Road 30650 junction. · Sublette, Wyoming
Sublette County Road & Bridge Department requests a permit renewal for a gravel pit used for ongoing public road maintenance in the Bondurant area. The existing gravel pit is approximately 9 acres with 4 acres of new disturbance.
Minerals and geologySpecial use management
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Maintenance |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | SW1/4 of Section 21, T.37N., R.112.W, 6th PM |
Decision Memo · Kemmerer Ranger District · updated 8/2/2023
NW1/4 of the NW1/4 of Section 21, Township 29 N. Range 118 W · Lincoln, Wyoming
Union Telephone requested authorization to add facilities and equipment to WyDOT's existing Salt River Pass Communication Site. Two prefabricated structures, propane tank, & equipment would be installed on cement pads. The site is less than 1 acre.
Special use management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 8/1/2023
About 7.5 miles south of Jackson, WY. · Teton, Wyoming
Special use permit for temporary staging related to the replacement of existing "Swinging Bridge" with a new structure by WDOT. There will also be realignment and/or reconstruction of the roadway at the bridge approach.
Special use management
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39N R116W Sec.3 Sixth Principal Meridian |
Decision Memo · Pinedale Ranger District · updated 7/31/2023
Fremont Lake Road from its junction with Skyline Drive to the road's intersection with the boat ramp and parking area and Skyline Drive (FSR #740) 4.2 mi to the upper parking area of Elkhart Trailhead · Sublette, Wyoming
Federal Highway Administration and Forest Service will rehabilitate deteriorating pavement conditions, correct drainage issues, and improve safety on 4.2 mi of Skyline Drive to upper parking area of Elkhart trailhead and 1.5 mi of Fremont Lake Road.
Road management
Decision
05/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 40 Cfr 1506.3(D) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Sections 23 - 25, T34NS, R109W; Sections 16, 17, 20 and 29, T35N, R108W; 6th PM |
Decision Memo · Pinedale Ranger District · updated 7/28/2023
Behind the Kendall Guard Station in the Upper Green River area. · Sublette, Wyoming
Temporary Forest gravel pit (7 ac) would be developed to provide material for resurfacing the Union Pass and Green River Lakes Rds, then reclaimed. Material would be crushed & gravel stockpiled at Kendall Guard Station by contract or county agreement
Special use managementRoad managementMinerals and geology
Decision
07/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations; Road Maintenance |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | SW of Section 14, T.38.N, R.110.W, 6th PM |
Decision Memo · Jackson Ranger District · updated 6/16/2023
T39N, R117W, Sec.5, NE1/4 · Teton, Wyoming
A-OK Corral proposes to move its guided horseback ride operation from Horse Creek to the North Fork of Fall Creek area. A-OK would operate within the existing base camp and existing permit area. Several improvements are proposed. Comment by 5/5/23.
Watershed managementSpecial use management
Decision
06/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (20), 36 Cfr 220.6(E)(20); 32.12 (12), 36 Cfr 220.6(D)(12); 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Special Use Authorizations; Trail Management; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/28/2023
Within the special use permit boundary of Snow King Mountain Resort west of the Rafferty lift mid-station (demo zipline reconstruction) and east of gondola unload station (demo zipline reclamation). · Teton, Wyoming
Snow King Resort proposes to relocate the demonstration zipline from the summit to the Raftery lift mid-station area to allow guests a more gradual progression in zipline difficulty. SKMR would reclaim the area at the summit.
Special use management
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T41N R116W Sec 34, Sixth Principal Meridian |
Decision Memo · Jackson Ranger District · updated 3/23/2023
Located within the special use permit boundary at Jackson Hole Mountain Resort near the north of the Thunder lift unload terminal and east of the Sublette lift load terminal. · Teton, Wyoming
JHMR proposes to increase skier/staff safety and grooming efficacy by recontouring 18 acres of ski runs. The proposed action includes blasting, grading, tree removal, road construction, and snowmaking pipeline installation. Scoping ended 1/31/23.
Special use management
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T42N R117W Sec 14, 23, 6th Principal Meridian |
Decision Memo · Big Piney Ranger District · updated 3/17/2023
NW of Section 21, Township 36 North, Range 113 West, 6th PM · Sublette, Wyoming
Hoback Ranches Service Improvement District (HRSID), proposes to extract, crush, and stockpile gravel at the northern end of the North Fork Fisherman Creek gravel pit. Total surface disturbance would be 5 acres.
Special use managementMinerals and geology
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 3/7/2023
Near top of Wyoming Range on the west slope above Greys River, accessed by Blind Bull Road, FS 10123. · Lincoln, Wyoming
WY Dept of Environmental Quality, Abandoned Mine Land Division, has proposed remediation work at the Blind Bull Mine, to include closure of an adit under FS Road 10123,removal of surface coal slack piles from the drainage bottom and burial onsite.
Minerals and geology
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Abandoned Mine Land Clean-Up |
| Decision Memo Blind Bull Abandoned Mine Remediation | Decision Signed Date: 03/01/2023 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | T34N, R116W, S6 |
Decision Memo · Jackson Ranger District · updated 3/7/2023
Cache Creek, Nelson Drive, and Teton Pass Summit trailheads. · Teton, Wyoming
The Jackson Ranger District is continuing the leash law requirements enacted in 2016 in the Cache Creek, Nelson Drive and Teton Pass areas. Special Order 04-03-334 was signed on February 28, 2023.
Recreation management
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (2), 36 Cfr 220.6(D)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/7/2023
Snow King East communication site on the easternmost peak of Snow King Mountain, south of Jackson, WY. · Teton, Wyoming
Two local SKE facility owners are requesting to upgrade their outdated tower equipment and respective facility buildings.
Special use management
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 12/9/2022
FS Rd 10001 junction with Greys River Road FS 10138 downriver to Bridge Day Use Area. · Lincoln, Wyoming
Authorizing a 1-day kayak slalom event on the lower Greys River, using existing hardened areas for participants and spectators. Gates would be removed immediately following race. This is a long-standing event. A permit was issued for 5 years: 8/2027
Special use management
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 9/20/2022
Confluence of Gros Ventre River and Crystal Creek, east of Kelly, Wyoming. · Teton, Wyoming
the Forest Service will relocate campground infrastructure to higher ground and install bioengineered bank stabilization treatments in along the Gros Ventre Road, and bioengineered streambank restoration work will also occur adjacent to Crystal Creek
Climate change adaptationWatershed management
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/25/2022
South of Jackson in Teton County, east of Hwy 89. · Teton, Wyoming
Hereford-Bally Ranch LLC is requesting to install a solar pump and pipeline from the Hereford-Bally Stock Water Well No. 1 to supply stock water bins on its adjacent property approximately 100 feet northwest of the well site.
Special use management
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | 4322'34.4"N 11043'10.2"W SE , NE Section 2, T.39N., R.116W., 06 |
Decision Memo · Big Piney Ranger District · updated 7/18/2022
Upper Hoback River, east of Bondurant, Wyoming and south of highway 189. · Sublette, Wyoming
Maintain in-stream irrigation diversion and ditch realignment from Phase I and add more bank stabilization measures on the upper Hoback River.
Climate change adaptationWatershed management
Decision
07/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | 37N113W Sec 23,26,35 |
Decision Memo · Greys River Ranger District · updated 7/12/2022
Afton, WY to Jackson, WY primarily via forest roads and trails. · Lincoln; Teton, Wyoming
Limber Pine Outdoors, LLC, proposes to hold a 100-mile footrace from the antler arch in Afton, WY to the antler arches in Jackson, WY primarily via forest roads and trails.
Special use management
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District; Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 6/10/2022
At junction of Mosquito Creek and Cottonwood Creek Rd, FS 10375, south of Wilson, WY in the Jackson Ranger District. · Teton, Wyoming
Add 1 small, wide kids' loop using mini-excavator and trail dozer, plus 3 technical expert loops using hand tools to construct and sign one-way single-track routes. Partners include Crosscut Trails & Forestry & AMPL.
Recreation management
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 6/9/2022
Section 24, NWNE, T34N R109W · Sublette, Wyoming
Pinedale Ranger District received a request for an access road to private property along the Fremont Lake Road (FS RD 741). The right of way would be 14'x 90' and constructed in the summer of 2022. Comments requested by 10/29/21 using comment link.
Special use management
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 6/8/2022
Half-Moon Lake outside Pinedale, Wyoming. · Sublette, Wyoming
Improvements and upgrades to resort facilities, including event and storage barns, 3 new prefab cabins, water lines, septic and power.
Special use management
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Sections 9 & 10, T34N, R108W, 6th Principal Meridian |
Decision Memo · Jackson Ranger District · updated 5/22/2022
All projects are within existing footprint of the Jackson Hole Mountain Resort at Teton Village. · Teton, Wyoming
JHMR has proposed 5 projects for summer 2022 to improve operations: Laramie Traverse widening at Flip Point; Thunder lift replacement with run upgrades; North view platform installation; road realignment at Ready-Mix Corner; water sewer lines
Recreation management
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 4/19/2022
Jackson and Blackrock Ranger Districts, comprising the North Zone of the Bridger-Teton National Forest. · Teton, Wyoming
Eliminate the gap in early winter and early spring regulations by making the entire Teton Division Winter Travel Map effective 12/1 - 5/1 (6:00 am). Designate area open to snowmobiles til 12/15 for bison hunting on Blackrock Ranger District.
Recreation management
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (2), 36 Cfr 220.6(D)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bridger-Teton National Forest All Units · updated 3/7/2022
Within footprint of Big Sandy Resort and Lodge, southeast of Pinedale, Wyoming. · Sublette, Wyoming
Expand existing tack shed roof by 50 ft. (and 20 ft. in width) which will be held up by wooden posts with concrete footings. In addition, a 10' roof overhang to the west side is proposed to allow horses to be tied up out of the weather and mud.
Special use management
Decision
03/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Section 5, T31N, R100W, 6th PM |
Decision Memo · Bridger-Teton National Forest All Units · updated 3/7/2022
Southern end of Fremont Lake along the resort boundary for Lakeside Lodge. · Sublette, Wyoming
Extend one existing rock breakwater by 235 ft. and installing a new rock breakwater to the west which would be 309 ft. long to accommodate 39 additional boat slips approved in 2005 Master Development Plan.
Special use management
Decision
03/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Section 23, T.34N., R109W., 6th P.M., Sublette County, Wyoming |
Decision Memo · Pinedale Ranger District · updated 3/2/2022
Kendall Warm Springs, 30 air miles North of Pinedale on the Green River Lake road · Sublette, Wyoming
District proposes to utilize hand grubbing to remove non-native watercress in Kendall Warm Springs in three phases: pilot, treatment, maintenance, to improve habitat for endangered fish species.
Wildlife, fish, rare plants
Decision
02/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 3/1/2022
20 miles northwest of Pinedale, WY, in the Bridger Wilderness Area. · Sublette, Wyoming
The Pinedale Ranger District would replace a deficient 80-foot long trail bridge in the Bridger Wilderness, approximately 13 miles north of Elkhart Trailhead on the Continental Divide National Scenic Trail. A MRA has approved helicopter use.
Recreation management
Decision
02/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pinedale Ranger District · updated 3/1/2022
southern Wind River Range · Fremont; Sublette, Wyoming
Proposed reauthorization of grazing on the Sweetwater, Blucher Creek, and East Squaw Creek Cattle and Horse Allotments. The final decision is available.
Grazing management
Comment Period
12/12/2019
Objection Period Start
07/29/2021
Decision
02/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | T29, 30 and 31N; R101, 102, 103 and 104W |
Decision Memo · Greys River Ranger District · updated 1/24/2022
Up to 20 small aspen clones across the Greys River Ranger District. · Lincoln, Wyoming
Rejuvenate small (1/4 to 1/2 ac.) patches of aspen to improve wildlife habitat by cutting encroaching mature conifers. Work will be done by hand with chainsaws; no motorized travel through roadless areas.
Wildlife, fish, rare plants
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 1/24/2022
Wickiup Ridge, east of Osmond, WY, near trail #3191. · Lincoln, Wyoming
To add an 80 ft. tower capable of 20 ft. extension, propane tank, 8x16 ft emergency power generator building and 11x20 foot equipment shelter within current site footprint. Would use xcountry access from private on south. Geotech survey needed first.
Special use management
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Section 20, T31N, R118W |
Environmental Impact Statement · Bridger-Teton National Forest All Units · updated 1/12/2022
Forest-wide · Lincoln; Sublette; Teton, Wyoming
Control of noxious and other invasive plants through the integration of manual, mechanical, biological, and ground and aerial herbicide control methods. The final Record of Decision is available.
Vegetation management (other than forest products)
NOI in Federal Register
01/18/2018
DEIS NOA in Federal Register
04/05/2019
FEIS NOA in Federal Register
09/27/2019
Objection Period Start
09/27/2019
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Noxious Weed Treatments |
| Invasive Plant Management for the Bridger-Teton National Forest | Decision Signed Date: 06/09/2020 |
| Forests | Bridger-Teton National Forest |
| Districts | Bridger-Teton National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · Bridger-Teton National Forest All Units · updated 12/14/2021
Bridger-Teton National Forest in Teton, Sublette, Lincoln, and Fremont counties, Wyoming. · Fremont; Lincoln; Sublette; Teton, Wyoming
This project proposal to update the Forest Plan with the "Bighorn Sheep Conservation Standard" has been cancelled and will be revisited when the Bridger-Teton National Forest revises the Forest Plan.
Wildlife, fish, rare plants
Comment Period
04/21/2021
Objection Period Start
03/2022 (Estimated)
Decision
05/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Bridger-Teton National Forest |
| Districts | Bridger-Teton National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Bridger-Teton National Forest All Units · updated 11/9/2021
Four miles east on the Dell Creek Road (Forest Service Road 30600) from Hwy 191/189, in Bondurant, Sublette County, Wyoming · Sublette, Wyoming
Wyoming Game & Fish Commission requests continued use of the Dell Creek feedground facilities for winter elk management activities. FS proposes authorizing temporary use while developing an EIS to analyze environmental effects of long term use.
Special use management
Comment Period
10/13/2021
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision letter dated 11/8/2021 | Decision Signed Date: 11/08/2021 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | N and SW of Section 14, Township 33N, Range 113W, Sixth Principal Meridian |
Decision Memo · Big Piney Ranger District · updated 9/20/2021
Throughout the North and South Cottonwood Creek watersheds on the Big Piney Ranger District. · Sublette, Wyoming
Improve hydrologic connectivity and aquatic organism passage throughout the North and South Cottonwoods watersheds. Habitat improvements including culvert replacement/removal will occur where road network is impeding or impounding natural flow path.
Watershed managementWildlife, fish, rare plants
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 9/9/2021
On same site as former White Pine Lodge, approximately 13 miles from Pinedale, WY. · Sublette, Wyoming
Reconstruction of ski lodge following a structure fire, to include installation of underground water tank to better support sprinkler system, and upgraded underground electric supply line for powering it.
Special use management
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 9/8/2021
Directly east of the Town of Afton on hillslope just north of Swift Creek Canyon. · Lincoln, Wyoming
The Town of Afton is proposing to become the entity responsible for the historic Afton Star structure on a hillside above town, replacing existing structure, installing power for lighting and fiberoptic for a webcam. Project in inventoried roadless.
Special use management
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Memo Afton Star | Decision Signed Date: 06/03/2021 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | T32 N R118 W Section 29 42.730348N 110.911740W |
Decision Memo · Jackson Ranger District · updated 6/14/2021
across Jackson Ranger District · Teton, Wyoming
Thirteen trails projects would include 1 new non-motorized route (Granite Falls), 4 non-motorized reconstruction projects, 1 motorized trail reconstruction , and 7 maintenance projects, including widening Shadow Mountain motorized system to 64".
Recreation management
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 6/14/2021
Jackson Hole Mountain Resort, Teton Village, WY · Teton, Wyoming
Jackson Hole Mountain Resort submitted a proposal to increase the number of guided backcountry skiing user days within the boundary of its current outfitter guide permit area, from 1,200 to 2,400 user days.
Recreation managementSpecial use management
Decision
06/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (12), 36 Cfr 220.6(D)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 5/24/2021
Blackrock Creek, near ranger district office · Teton, Wyoming
Replace and realign dilapidated headgate on Hatchet Ditch; Replace riprap along levee with bioengineered bed and bank stability structures, install fish screen, consistent with Blackrock Creek's Wild and Scenic River designation.
Watershed management
Decision
05/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | 45 N 112 W Sec 31 |
Decision Memo · Jackson Ranger District · updated 5/3/2021
Jackson Hole Mountain Resort Ski Area, adjacent to Teton Village, WY · Teton, Wyoming
Five improvements to existing ski runs: Rendezvous Trail widening,Bird-In-The-Hand upgrade, Hoback Trail entrance upgrade,Cheyenne Gulley exit upgrade, and Lower Sublette Ridge trail upgrade. One summer trail: North Ridge hiking trail.
Special use management
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | 43 35%u2019 50%u201D N, 110 52%u2019 13%u201D W |
Decision Memo · Jackson Ranger District · updated 5/3/2021
Jackson Hole Mountain Resort, Teton Village, WY · Teton, Wyoming
Five infrastructure additions: A new ski patrol station under the top Tram dock. A new garage for the Rendezvous Peak snowcat. A new kids play zone at Solitude Station. Viewing platforms on Rendezvous Peak. Relocation of an Avalanche Pipe Cannon.
Special use management
Decision
04/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | 43 35%u2019 50%u201D N, 110 52%u2019 13%u201D W |
Decision Memo · Buffalo Ranger District · updated 4/27/2021
OHV trail connecting the Togwotee Mountain Lodge to the Hatchet/Flagstaff Road system (via FS Rd #30100)away from Hwy 26/287. · Teton, Wyoming
A bridge would be constructed on FS Trail #6072 allowing 64 inch wide motorized vehicles to cross Blackrock Creek, winter and summer to connect with FS road #30100, protecting the designated Wild and Scenic Blackrock Crk.
Recreation management
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Jackson Ranger District · updated 4/5/2021
Snow King Mountain Resort, Jackson, Teton County, WY 83001 · Teton, Wyoming
Snow King Resort proposes to update facilities and develop winter & summer recreation opportunities- includes permit boundary expansion, guest service building at summit, additional lifts & ski runs, bike park and trails. FEIS & Final ROD available.
Special use management
NOI in Federal Register
08/03/2018
DEIS NOA in Federal Register
01/31/2020
FEIS NOA in Federal Register
10/09/2020
Objection Period Start
10/09/2020
Decision
03/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 3/2/2021
115 ft to the west of the existing ditch and parallel to Highway 287 near Moran, WY. · Teton, Wyoming
The Gaffney Irrigation Ditch would be realigned away from actively eroding Buffalo Fork River bank to limit potential for infrastructure damage and maintain water delivery systems, and include fully re-grading and re-planting with native vegetation.
Special use management
Decision
03/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | 12T 550059mE 4853236mN |
Decision Memo · Buffalo Ranger District · updated 12/15/2020
Designated snowmobile trail between Heart 6 and Fir Creek Ranches, in Buffalo Valley near Moran, WY. · Teton, Wyoming
For the winter 2020-2021 season, the Forest is evaluating a Heart 6 Ranch proposal to utilize a portion of their existing snowmobile service days for sled dog rides on the currently approved designated route upstream along Buffalo Fork River.
Special use management
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 9/30/2020
Buffalo Fork River, Buffalo Fork River to Turpin and Turpin to Togwotee Pass. · Teton, Wyoming
Remove existing overhead power poles and install electric underground distribution lines in 3 areas on Blackrock Ranger District.
Special use management
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Lower Valley Energy Powerline Burial: Buffalo Valley to Togwotee Mountain L | Decision Signed Date: 08/17/2020 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pinedale Ranger District · updated 9/1/2020
East of Pinedale inside the Bridger Wilderness Area · Sublette, Wyoming
Silver Lake Irrigation District proposes to use a tracked drill rig and a tracked excavator to perform geotechnical tests on the dam and borrow sites to determine potential actions and complete short-term repairs.
Special use management
Comment Period
04/15/2020
Objection Period Start
07/11/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | T.32.N R.5.W 6th PM |
Decision Memo · Jackson Ranger District · updated 7/30/2020
Along Leeks Canyon Road #30451 just south of the town of Jackson, accessed from Highway 89. · Teton, Wyoming
Four borings would be drilled in Leeks Canyon bottom area to 35-45 feet, requiring a track-mounted rotary rig, and 2 monitoring wells installed to collect measurements. Installation 2020: 5-7 work days; monitoring during 6 days the following summer.
Special use management
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/30/2020
Mount Glory summit above Teton Pass, Highway 22. · Teton, Wyoming
Wyoming Department of Transportation (WYDOT) Avalanche Hazard Mitigation Program has proposed installation of a non-permanent, seasonally placed, wind speed measurement station and tower near the summit of Mount Glory, north of Teton Pass.
Special use management
Decision
07/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 7/30/2020
Head of Green River, in Bridger Wilderness Area · Sublette, Wyoming
Capturing and radio collaring 20 adult female sheep within the Bridger Wilderness via helicopter in hunt area 8 during months of December and March; capture and collar neonate lambs by foot/horseback. Study duration 5 years.
Wildlife, fish, rare plants
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Kemmerer Ranger District · updated 7/28/2020
Between Commissary Ridge and Salt Creek on the Kemmerer Ranger District · Lincoln, Wyoming
Reauthorization of grazing on 17 sheep allotments on the Kemmerer Ranger District. The Forest Service withdrew its NOI to prepare an EIS on 7/28/2020 with a notice published in the Federal Register. This project is cancelled.
Grazing management
NOI in Federal Register
11/17/2008
DEIS NOA in Federal Register
06/26/2017
FEIS NOA in Federal Register
03/2021 (Estimated)
Objection Period Start
03/2021 (Estimated)
Decision
06/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/10/2020
Eight trails all located within Jackson Ranger District. · Teton, Wyoming
Trail reconstruction projects including potential trail reroutes around problem sections and bridge replacement. Trails: Crystal Creek, Upper Cache Cr, Horse Cr, Fuzzy Bunny, Jimmy's Mom, Powerlines, Crankshaft, Horsetail, Big Munger, Slate Creek.
Recreation management
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/9/2020
Jackson Hole Mountain Resort, adjacent to Teton Village in Teton County. · Teton, Wyoming
Three elements of existing infrastructure are proposed for relocation, 2 mountain bike trails are proposed, and slope stabilization for adjacent private hotel would utilize underground soil nail installation.
Recreation management
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/9/2020
S. Hwy 89 immediately south of Ross Plateau Road. · Teton, Wyoming
Construction of a 450-foot long by 5-foot wide drainage ditch using a track hoe, to mitigate the Munger Mountain landslide that is affecting South Highway 89.
Special use management
Decision
07/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | NE1/4 SW1/4 of Sec. 11, T.39N, R.116W. 6th Principal Meridian |
Decision Memo · Jackson Ranger District · updated 6/30/2020
The Moran Face of the Jackson Hole Mountain Resort in Teton Village, WY. · Teton, Wyoming
Jackson Hole Mountain Resort has proposed to enhance the Moran Face area with minimal tree removal, and wooden jumps and landings; along with installation of a vault or composting toilet. Construction would be during summer 2020.
Recreation management
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 6/10/2020
Pinedale RD, Skyline Drive Corridor, Sweeney Creek area, FS roads #744 and #744A Sublette County, T34N, R108W, Sections 3 & 4 · Sublette, Wyoming
The proposed trail is in the Sweeney Creek area just off of Skyline Drive, 8 miles east of Pinedale. The 64-inch Sweeney Creek Connector would be 1.5 miles in length and would connect Forest Service Roads #744 and #744A.
Recreation management
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 6/10/2020
The Timber stand is adjacent to the Tepee Creek Cow Camp which is located at the end of FS Rd 621 and the road realignment for access to the project is adjacent to Retel's private property. · Sublette, Wyoming
Tepee Creek Timber/Fuels project includes the thinning of timber and reduction of fuels on approximately 100 acres adjacent to the Tepee Creek Cow Camp, and realignment of up to 0.5 mile of the Union Pass Road for access.
Fuels management
Decision
06/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Tepee Creek (Cow Camp) Fuels Reduction and Timber Thinning | Decision Signed Date: 06/10/2020 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | T39N R110W sec 22 |
Decision Memo · Jackson Ranger District · updated 5/14/2020
FS Road 30994 is at the base of Teton Pass, west of Wilson, WY, off Old Pass Road. · Teton, Wyoming
Allow for snow clearing on FS Rd. 30994 and installation of signage limiting use to homeowners in order to accommodate existing winter recreational trail activities.
Special use management
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 5/14/2020
Snyder Basin/South Piney Creek and Forest Service Road #10128A, approximately 25 miles west of Big Piney, Wyoming · Sublette, Wyoming
Relocate southern trailhead of the Wyoming Range National Recreation Trail located in Snyder Basin/South Piney Creek Drainage along Forest Service Road #10128A. Construct parking lot and 2.5 miles of trail connecting the new trailhead to the trail
Recreation management
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T29, R115, Sec. 16,17,18 |
Decision Memo · Kemmerer Ranger District · updated 4/27/2020
Kemmerer Ranger District about 23 miles west-northwest of LaBarge, WY via County Road 315 (LaBarge Creek Road). · Sublette, Wyoming
Site for long-term gravel extraction, processing, and stockpiling. The gravel would be used in part for maintenance of a proposed public agency right-of-way for the LaBarge Creek Road where it crosses private lands adjacent to the Bridger-Teton NF.
Road management
Decision
04/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | T28N, R115W, Sec. 31 |
Decision Memo · Big Piney Ranger District · updated 2/14/2020
Project area is northwest of Merna, Wyoming, largely accessed by Forest roads 10359 (Beaver-Chall Creek) and 10143 (Middle Beaver). · Sublette, Wyoming
Commercial timber harvest to remove dead/dying trees >3 inch DBH; regenerate to lodgepole seedlings naturally or via planting.
Forest productsFuels managementVegetation management (other than forest products)
Decision
02/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T35N, R114W, Secs 1 & 2, plus T36N, R114W, Sec. 36 |
Decision Memo · Jackson Ranger District · updated 12/17/2019
Alkali Creek, about 12 miles east of Kelly, Wyoming and adjacent to the Gros Ventre Road. · Teton, Wyoming
The Wyoming Game and Fish Commission requests authorization to operate and maintain the elk feedground at Alkali Creek for emergency feeding only. District Ranger Moore signed her decision on 12/13/2019.
Special use management
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Memo Alkali Creek Feedground Five Year Permit | Decision Signed Date: 12/13/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Sec. 23, T. 42 N., R. 113 W., 6th Principal Meridian |
Decision Memo · Big Piney Ranger District · updated 12/12/2019
Mostly west and south of Bondurant, Wyoming · Sublette, Wyoming
Relocation of Clarks Draw Trailhead and associated trail work; various vegetation treatments on and around Monument Ridge. Project developed with Sublette County Collaborative group.
Recreation managementFuels managementVegetation management (other than forest products)
Decision
10/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 12/12/2019
Project area is within 2018 Roosevelt Fire area, primarily accessed from Old Hwy 191, FS 30686, east of Bondurant, plus a unit just south of Hwy 191 at The Rim. · Sublette, Wyoming
Recover value of fire-killed trees and remove excessive fuel loading in an area under 250 acres through a commercial timber sale with less than a half mile of new temporary road. Improve aspen stands through resprouting and conifer removal.
Vegetation management (other than forest products)Fuels managementForest products
Decision
11/2019 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 12/11/2019
South of Bondurant, WY along the Middle Beaver Creek area, primarily accessed by FS Rd 10143. · Sublette, Wyoming
After the 2018 Roosevelt Fire, commercial overstory removal of dead and/or dying trees in an area of approximately 100 acres, with no more than a half mile of new temporary road construction. Regeneration will be either natural or planted lodgepole.
Fuels managementForest productsVegetation management (other than forest products)
Decision
11/2019 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Middle Beaver Salvage | Decision Signed Date: 11/13/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T36N, R114W, Sec. 35 & 36 |
Environmental Assessment · Kemmerer Ranger District · updated 9/30/2019
4 miles of Salt Creek, running parallel to Highway 89, 25 miles north of Cokeville · Lincoln, Wyoming
Restore and reconnect 15 miles of Salt Creek and tributaries by adjustment or removal of structures, connecting floodplains and riparian areas, and improving in-stream fish habitat and connectivity.
Watershed managementWildlife, fish, rare plants
Comment Period
05/06/2018
Objection Period Start
06/14/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | R119, T29,portions of S26, S23, S27, and S34 |
Decision Memo · Jackson Ranger District · updated 9/20/2019
Jackson Hole Mountain Resort, Teton Village, Teton County, Wyoming. Power line would be installed from a building at the base of the resort to air compressor building adjacent to Antelope Flats run · Teton, Wyoming
The existing primary power system feeding the snowmaking compressor building is near capacity. LVE and JHMR propose to install an additional buried power line from a building at the base to the existing air compressor building near Antelope Flats run
Special use management
Decision
07/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T42N R17E S24 |
Decision Memo · Jackson Ranger District · updated 9/20/2019
Jackson Hole Mountain Resort,adjacent to Teton Village, Teton County, Wyoming. Location of project is below the aerial tram to the top of Rendezvous Mountain. · Teton, Wyoming
To reduce the size and height of the snow drift that forms under the travel path of the tram, JHMR proposes to remove vegetation from less than 1 acre, harvest weathered rocks, recontour the terrain, dispose excess material and reclaim the site.
Facility managementSpecial use management
Decision
07/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| DM for Jackson Hole Mountain Resort Tram Snow Drift Mitigation Project | Decision Signed Date: 07/11/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Jackson Ranger District · updated 9/20/2019
BTNF administered lands west of the Snake River from Teton Village/GTNP to Alpine. May also include some CTNF administered lands & lands on east side of the river. · Lincoln; Teton, Wyoming
Fuels management, such as, prescribed fire and cutting and thinning of vegetation for fire hazard reduction and restoration/maintenance of fire adapted ecosystems. DEIS, August 2015. Final EIS, draft decision and objection filing, Feb. 2017.
Fuels management
NOI in Federal Register
02/27/2013
DEIS NOA in Federal Register
08/07/2015
FEIS NOA in Federal Register
02/13/2017
Objection Period Start
02/17/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Teton to Snake Fuels Management Project | Decision Signed Date: 07/21/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 8/16/2019
Horse Creek area south of Jackson. · Teton, Wyoming
Authorize use and maintenance of an existing cabin, 9000 feet of access roadway, 2000 feet of fencing, and 6.6 acres of sub-irrigated hayfield.
Facility managementSpecial use management
Comment Period
02/19/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39, R115W, Sec. 7, 18; T39, R116W, Sec. 13 |
Decision Memo · Bridger-Teton National Forest All Units · updated 8/9/2019
Northeast of Jackson, Wyoming in the Jackson Ranger District, Bridger-Teton National Forest adjacent to the Gros Ventre Wilderness. · Teton, Wyoming
Authorize Wyoming Game and Fish Commission to continue to operate and maintain the elk feedground at Alkali Creek for one year, the 2018-2019 season.
Special use management
Comment Period
11/14/2018
Decision
11/2018 (Estimated)
Implementation
12/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Letter to File--Alkali Creek Feedground: 2018-2019 Special Use Permit | Decision Signed Date: 11/28/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T. 42 N., R. 113 W., Sec. 23, 6th Principle Meridian |
Decision Memo · Greys River Ranger District · updated 8/7/2019
FS 10081 · Lincoln, Wyoming
To permit a half marathon foot race with up to 375 participants on Saturday, July 13, 2019, with 2.1 miles on FS road 10081 (Bedford-Turnerville Rd), beginning at top of Grover Park and ending in Thayne, WY off of FS land.
Special use management
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Big Piney Ranger District · updated 7/30/2019
Approximately 20 miles west of Big Piney, Wyoming · Sublette, Wyoming
Authorization of one existing gas well & construction of approximately 1,200 feet of buried pipeline. The final decision on the FS portion is available.
Minerals and geology
Comment Period
03/12/2014
Objection Period Start
05/19/2017
Decision
07/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 7/1/2019
Upper Greys River--Spring Creek watershed area · Lincoln, Wyoming
Remove 4 culverts in the Upper Greys River watershed that are creating barriers for aquatic organism passage: three will be replaced with concrete box culverts and one near Shale Creek will be replaced with a bridge.
Watershed managementWildlife, fish, rare plants
Decision
06/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | T30N R116W Sections 8, 20, 32 |
Decision Memo · Buffalo Ranger District · updated 6/25/2019
Located within the recreation resort permit area of Heart 6 Guest Ranch in the Buffalo Valley. The address is 16985 Buffalo Valley Road, Moran, WY 83013. · Teton, Wyoming
Blackrock Ranger District is evaluating a proposal by Heart 6 Ranch, a Recreation Resort Permittee, to construct 1 new barn and 4 guest cabins. These would replace 1 hay barn, 2 small saddling barns, and 2 larger cabins. Area disturbed is 0.22 acres.
Special use management
Decision
06/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Heart 6 Ranch, LLC - Barns and Cabins Replacement | Decision Signed Date: 06/19/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | NE section 21 and NW section 22, T. 45 N., R. 113 W |
Decision Memo · Jackson Ranger District · updated 6/24/2019
Game Creek Road · Teton, Wyoming
To authorize a special use permit (SUP) for an irrigation water ditch for an existing use that is tied to water rights from 1910 and associated with a horse pasture that is located on WGFD land.
Special use management
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T40N, R116W, Section 27 |
Decision Memo · Jackson Ranger District · updated 6/13/2019
3100 N. Fish Creek Road, Wilson WY · Teton, Wyoming
To authorize a special use permit (SUP) for a sign for use associated with an existing easement. The sign is necessary for emergency services and mail delivery to efficiently recognize the property.
Special use management
Decision
05/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| D4 Anchor Ranch Sign | Decision Signed Date: 05/10/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | SEC. 10, TWP. 41, RNG. 117 |
Decision Memo · Jackson Ranger District · updated 6/13/2019
Located in the Snake River Canyon south of Jackson, Wyoming. This trail leaves from the designated motorized trailhead off of the Fall Creek Road and eventually reaches the summit of Munger Mountain. · Teton, Wyoming
Reroute of Big Munger Trail (#4205) to create a sustainable multi-use trail to the top of Munger Mountain (7.2 miles).
Recreation management
Decision
04/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Decision Memo Big Munger Trail Reroute | Decision Signed Date: 04/15/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 6/13/2019
Between Sheridan Pass and Togwotee Pass east of Moran, Wyoming. · Teton, Wyoming
Re-location of approximately 15 miles of the Continental Divide National Trail (CDNT) from open roads on the Shoshone National Forest to the Bridger-Teton National Forest to meet the intend of the CDNT to provide a non-motorized experience.
Recreation management
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Decision Memo Continental Divide National Scenic Trail Relocation Project | Decision Signed Date: 04/15/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 6/11/2019
Approximately 22 miles west/ southwest of Daniel, Wyoming · Sublette, Wyoming
The Forest Service proposes to construct a bridge for both recreation use and livestock crossing on the Old Indian Trail at the Maki Creek stream crossing.
Recreation managementWildlife, fish, rare plants
Scoping Start
07/2019 (Estimated)
Decision
10/2019 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Township 33N, Range 115W, Section 16 |
Environmental Assessment · Kemmerer Ranger District · updated 5/1/2019
The Labarge Creek allotment is located in the northeast corner of the Kemmerer District within Lincoln County, Wyoming. · Lincoln, Wyoming
Continue to authorize livestock grazing within the Labarge Creek allotment in a manner that will continue to meet or move forest resources toward desired conditions. The NEPA analysis for this project has been cancelled.
Grazing management
Comment Period
06/2018 (Estimated)
Objection Period Start
06/2018 (Estimated)
Decision
05/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Greys River Ranger District · updated 3/21/2019
Approximately 8 miles east of Alpine, Wyoming · Lincoln, Wyoming
The September 2009 Decision to reauthorize livestock grazing on the allotment was reversed on appeal. The reauthorization project is cancelled; grazing continues.
Grazing management
Comment Period
03/27/2008
Decision
09/2009 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Authorizations |
| Reauthorization of Livestock Grazing and Allotment Management Plan Review.. | Decision Signed Date: 09/11/2009 (Reversed in Appeal (215)) Legal Notice Date: 11/13/2009 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/12/2019
Sheep Gulch boat ramp in the Snake River Canyon, Lincoln County, Wyoming · Lincoln, Wyoming
Reroute of the Sheep Gulch Trail (#4072C) located in Snake River Canyon. The trail is part of the river facility which serves as a take-out for river use.
Recreation management
Decision
03/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Sheep Gulch Trail Reconstruction, Snake National Wild & Scenic River | Decision Signed Date: 03/11/2019 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 3/8/2019
Adjacent to Togwotee Mountain Lodge, north of Hghway 26/287, 15 miles east of Moran. · Teton, Wyoming
Harvest of dead and dying trees infested with spruce beetle in the wildland urban interface zone to prevent the spread of infestation and subsequent increase in fuel loading adjacent to the resort.
Fuels management
Decision
02/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 3/1/2019
Near the headwaters of the Greys River, approximately 40 miles southeast of Afton, Wyoming · Lincoln, Wyoming
Commercial harvest of timber suffering mortality and decline due to insect and disease infestation.
Forest products
Decision
02/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 2/27/2019
Phillips Canyon Area utilizing Turnerville- Grover Road (FS road 10810) · Lincoln, Wyoming
The Star Valley Ridge Riders, a volunteer group operating under the Rocky Mountain Snowmobile Hill Climb Association (RMSHA), is proposing to continue hosting its annual three-day public event, once each winter when sufficient snow is available.
Special use management
Decision
01/2019 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Greys River Ranger District · updated 2/21/2019
West of the Greys River Rd. on the east slope of the Salt River Range from Meadow Ck. on the north to South Three Forks on the south. · Lincoln, Wyoming
Improve management of motor vehicle use within the Middle Greys River area by designing a system that provides quality trail riding opportunities while also reducing resource impacts and encouraging citizen stewardship to maintain the system.
Recreation management
Comment Period
01/02/2016
Objection Period Start
06/12/2018
Decision
02/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management; Travel Management |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kemmerer Ranger District · updated 12/12/2018
The Commissary Ridge area; approximately 20 mile west of LaBarge, Wyoming · Lincoln, Wyoming
Three miles of trail reconstruction and trailhead reconstruction of the Bear Trap Trail as part of a larger Commissary Ridge Trail maintenance project.
Recreation management
Decision
06/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 12/11/2018
Spread Creek and Toppings Lake Rd., Shadow Mountain, Curtis Canyon/Flat Creek, and Lower Gros Ventre Drainages. · Teton, Wyoming
Improve management of dispersed camping and update the Motor Vehicle Use Map in selected locations of the Blackrock and Jackson Ranger Districts to prevent expansion of campsite impacts and improve the quality of visitor experience. Comments due 7/20
Recreation management
Comment Period
06/28/2018
Decision
09/2018 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Travel Management |
| Decision Memo Forest Road and Camping Project | Decision Signed Date: 09/20/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 11/20/2018
White Pine Ski Area approximately 9 miles northeast of Pinedale, Wyoming located in NWNE Section 33, T35N, R108W, 6th PM. · Sublette, Wyoming
The proposed site upgrade will replace the existing 60-foot tower with a 150-foot self-supporting tower in support of the new Sublette County Interoperable Public-Safety Radio Communication System.
Special use management
Comment Period
09/21/2018
Decision
10/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| White Pine Communication Site Upgrade- Sublette County Sheriff's Office | Decision Signed Date: 10/15/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 9/5/2018
Buffalo Valley area, just east of Moran, Wyoming. · Teton, Wyoming
Placement of approximately 4.5 miles of buried and 2.5 miles of aerial fiber optic cable by Silver Star Communications in the Buffalo valley area; aerial cable will be on existing utility poles.
Special use management
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Buffalo Valley Fiber Optic | Decision Signed Date: 08/17/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pinedale Ranger District · updated 8/29/2018
Beginning approximately two miles northeast of Pinedale, east of Fremont Lake, and adjacent to the highly utilized Skyline Drive National Forest Service Road 134. · Sublette, Wyoming
Fuels reduction treatments with equipment & prescribed burning. The treatments will reduce the risk of high severity wildfire and increase public and firefighter safety.
Fuels management
Comment Period
07/19/2015
Objection Period Start
08/07/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Portions of T. 34S R. 108E. Sections 2,3,4,5,6,9,10,11 T. 35S R. 108E Sections 16,17,20,21,22,29,28,27,26,32,33,34,35 |
Environmental Assessment · Jackson Ranger District · updated 8/24/2018
The federal parcel is south of the Gros Ventre Rd. approximately 8 miles east of the Forest Boundary (which is just east of Kelly, WY); the private parcel is approximately another 15 miles southeast. · Teton, Wyoming
Exchange of approximately 45 acres of federal land in the Gros Ventre River drainage for approximately 95 acres of private land further up the drainage. The EA and Draft Decision are available. Final Decision was signed on 6/15/2018.
Land ownership management
Comment Period
09/02/2017
Objection Period Start
04/17/2018
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Land Exchanges |
| Final DN and FONSI Bridge Creek Land Exchange | Decision Signed Date: 06/15/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Jackson Ranger District · updated 8/9/2018
Jackson Hole Mountain Resort, Teton Village, Wyoming · Teton, Wyoming
Creation/improvement of mountain features/facilities including ski runs, lifts, snow making, avalanche control and summer trails, all of which have received conceptual approval as part of the updated Master Development Plan.
Special use management
Comment Period
01/11/2015
Objection Period Start
07/09/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Jackson Hole Mountain Resort Recreation Enhancements Project | Decision Signed Date: 08/31/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Kemmerer Ranger District · updated 8/9/2018
LaBarge Creek area, west of LaBarge, Wyoming · Lincoln, Wyoming
Combination of mechanical treatments and prescribed fire to improve the health of forested stands, salvage dead and dying trees, enhance wildlife habitat, reduce fuels, and remove hazard trees along roads. It also adds six miles of existing routes.
Vegetation management (other than forest products)
Comment Period
11/30/2014
Objection Period Start
05/22/2015
Decision
12/2015 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements; Timber Sales (Salvage) |
| LaBarge Vegetation Restoration Project | Decision Signed Date: 12/14/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kemmerer Ranger District · updated 8/9/2018
Approximately 25 miles west of Big Piney, Wyoming · Lincoln, Wyoming
The Kemmerer Ranger District proposes to replace two culverts in the LaBarge Creek Watershed for the purpose of improving fish passage, flood capacity and road infrastructure
Watershed managementWildlife, fish, rare plantsRoad management
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance; Watershed Improvements |
| Shafer Creek and LaBarge Creek Fish Passage Culvert Replacement Project | Decision Signed Date: 12/15/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Township 28 N, Range 116 W, Section 13 and Township 29 N, Range 116 W, Section 7, |
Environmental Assessment · Big Piney Ranger District · updated 7/27/2018
20 miles west of Big Piney, Wyoming · Lincoln, Wyoming
Authorize a Surface Use Plan of Operation to drill one natural gas exploratory well on an existing unit and lease.
Minerals and geology
Scoping Start
07/2018 (Estimated)
Comment Period
07/2018 (Estimated)
Objection Period Start
09/2018 (Estimated)
Decision
11/2018 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Natural Gas |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T28N, R115W, Sec. 14, 6th P.M. |
Environmental Assessment · Big Piney Ranger District · updated 6/5/2018
22 miles northwest of Big Piney, Wyoming , near South Cottonwood Creek · Sublette, Wyoming
True Oil has submitted the Lander Peak Exploration Proposal for two exploratory wells; one from an existing pad and one from a reclaimed pad. EA and draft decision were released in April 2017 and objections were received.
Minerals and geology
Comment Period
10/01/2015
Objection Period Start
04/08/2017
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Natural Gas |
| Final DN and FONSI for True Oil LLC - Lander Peak Area Exploratory Proposal | Decision Signed Date: 06/05/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Township 32 North, Range 115 West, Sections 15 and 27 |
Decision Memo · Jackson Ranger District · updated 5/31/2018
Snow King Resort; immediately adjacent to the Town of Jacksdon, Wyoming · Teton, Wyoming
Installation of a vault toilet within the existing permit boundary; no additional road construction or maintenance would be needed.
Special use management
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pinedale Ranger District · updated 3/23/2018
Green River corridor from Green River Lakes southwest to forest boundary at north end of State Hwy. 352, approximately 20 miles north of Cora, WY. · Sublette, Wyoming
Inventory, development and implementation of a management plan to address resource concerns regarding dispersed recreation use and roaded access within the Green River corridor; including camping restrictions and travel management updates.
Watershed managementRecreation managementRoad management
Scoping Start
08/2018 (Estimated)
Comment Period
08/2018 (Estimated)
Objection Period Start
09/2019 (Estimated)
Decision
11/2019 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Dispersed Recreation Mgmt.; Travel Management |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 3/23/2018
About 25 miles northwest of Big Piney, WY, in the Upper North Piney Creek watershed to the west of Apperson Creek and Forest Road 10370. · Sublette, Wyoming
Commercial thinning of 70 ac. of lodgepole pine and mixed conifers to the west of Apperson Creek. Project proposes to increase structural diversity, manage hazardous fuel loading, & salvage forest products. Construct a half mile of temporary roads.
Forest products
Decision
01/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage); Timber Sales (Green) |
| North Piney Post and Pole Commercial Thinning Project | Decision Signed Date: 01/29/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T31, R115, Sec. 10,11,14,15 |
Decision Memo · Pinedale Ranger District · updated 3/23/2018
Upper Green River area and Fremont or Willow Lake, in the vicinity of Pinedale, Wyoming. · Sublette, Wyoming
Issuance of 2 new recreation event permits: Winter Non-Motorized Race and Pinedale Sled Dog Classic (relocation).
Special use management
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Authorization of two Winter Recreation Events on Nat. Forest System Lands | Decision Signed Date: 02/05/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/5/2018
Near Esther Way in Teton Village, Wyoming · Teton, Wyoming
Replacement of the Teton Village Water and Sewer District's 50 year-old Esther Pump Station.
Special use management
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Pump House Replacement Project -- Teton Village Water and Sewer District | Decision Signed Date: 12/13/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Buffalo Ranger District · updated 2/14/2018
Various locations east of Moran, Wyoming · Teton, Wyoming
Providing special use permits for commercial, guided, day-use bank fishing on non-wilderness segments of the Buffalo Fork River, Blackrock Creek, Spread Creek and Pacific Creek on the Blackrock Ranger District.
Special use management
Comment Period
10/16/2017
Objection Period Start
12/23/2017
Decision
02/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Guided Bank Fishing Project | Decision Signed Date: 02/13/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 1/30/2018
Approximately 5 miles south of Moran, Wyoming. · Teton, Wyoming
Grooming of 3,700' of cross-country ski trail on FS System land adjacent to the Triangle X Ranch; grooming will be by snowmobile and drag groomer on an existing roadbed; open to the public at no charge, but not open for public snowmobile use.
Special use management
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Triangle X Ranch | Decision Signed Date: 01/30/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 1/9/2018
The Ditch Creek Road enters the National Forest approximately 4 miles northeast of Kelly, Wyoming. · Teton, Wyoming
Relocate the transfer corral/staging area of 4U Outfitters on the Ditch Creek Rd. approximately 2 miles closer to the Forest boundary (not as far up the road).
Special use management
Decision
01/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 1/7/2018
In the Upper Gros Ventre River corridor, approximately 20 mile east northeast of Jackson, Wyoming. · Teton, Wyoming
Trail Improvements for OHV use including construction of an OHV bridge and approximately half mile of new OHV trail, conversion of approximately two and half miles of road to OHV trail, and bringing an OHV trail up to standard.
Recreation management
Decision
01/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Dew Place/Bacon Creek Area OHV Trail Project | Decision Signed Date: 01/06/2018 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 12/15/2017
Various locations of Jackson Ranger District · Teton, Wyoming
Renewal of 5 expiring outfitter/guide permits.
Special use management
Decision
12/2017 (Estimated)
Implementation
12/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Recreation Special Use Permit Renewals | Decision Signed Date: 12/13/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 11/16/2017
Turpin Meadow Ranch recreation resort permit area · Teton, Wyoming
Construction of 1 pole barn, 3 yurts for employee housing, and 1 combined kitchen and bathroom building for employees.
Special use management
Decision
11/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 9/29/2017
Upper Green River Area approximately 30 miles north of Pinedale, Wyoming Legal Land Description: 38N 110W Sec 25/26; 39N 110W Sec13, 24; 39N 109W 6 · Sublette, Wyoming
Improve boat ramp condition and access at Lower Green River Lake, Dollar Lake, and sites at the Forest Boundary.
Wildlife, fish, rare plantsWatershed managementRecreation management
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Watershed Improvements |
| Green River Boat Access Improvement Project | Decision Signed Date: 08/07/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 9/21/2017
Approximately 12 miles east of Moran, Wyoming; just northwest of the intersection of the Togwotee Highway and Fourmile Rd. · Teton, Wyoming
Low impact public gathering of posts and poles in an approximately 10 acre area.
Forest products
Scoping Start
07/2017 (Estimated)
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Products Sales |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 9/18/2017
Approximately 30 miles east of Jackson Wyoming in the Upper Gros Ventre River drainage. · Teton, Wyoming
Complementing watershed restoration in the Upper Gros Ventre by the Trust for Public Land & Trout Unlimited, this project will plug existing ditches, remove 2 water diversion structures, replace culverts and restore 150' of stream channel morphology.
Watershed management
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Upper Gros Ventre River Ranch Restoration | Decision Signed Date: 09/15/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 8/30/2017
The northern portion of the Teton Wilderness, 79 miles north of Jackson, WY, near the popular Yellowstone Meadows/Thorofare River/Bridger Lake/Yellowstone Park boundary area. · Teton, Wyoming
Replacement of the badly deteriorating Hawks Rest bridge in the Teton Wilderness with a 172 foot long single-span steel bridge.
Recreation management
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Hawks Rest Bridge Project | Decision Signed Date: 08/01/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Jackson Ranger District · updated 8/1/2017
Portions of the Jackson, Buffalo and Big Piney Ranger Districts. · Sublette; Teton, Wyoming
To develop a designated motorized route for the northern districts of the Bridger-Teton National Forest. This updated travel plan will be in accordance with the National OHV rule published on 11/9/05.
Road managementRecreation management
NOI in Federal Register
01/05/2007
DEIS NOA in Federal Register
06/20/2008
FEIS NOA in Federal Register
01/30/2009
Decision
01/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Travel Management |
| Off-Highway Vehicle Route Designation Project | Decision Signed Date: 01/26/2009 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District; Jackson Ranger District; Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/20/2017
Approximately 1 mile south the Red Top Meadows on the Fall Creek Rd. south of Wilson, Wyoming. · Teton, Wyoming
Restoration of Coburn Meadow by constructing a trailhead to direct parking, hardening the site, and reclaiming a short section of a non-Forest Service system road.
Recreation management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Coburn Meadow Recreation Improvement | Decision Signed Date: 07/07/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Jackson Ranger District · updated 7/20/2017
Immediately adjacent to Teton Village, Wyoming · Teton, Wyoming
Creation/improvement of mountain features/facilities including ski runs, lifts, snow making, and other infrastructure, all of which have received conceptual approval as part of the updated Master Development Plan.
Special use management
Comment Period
11/28/2016
Objection Period Start
05/12/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/19/2017
Approximately 5 miles south of Jackson, WY; near the intersection of Henry's Rd. and Highway 89. · Teton, Wyoming
Reauthorization with no change of a spring and 2" diameter water transmission line 250 ft. in length and collection box for domestic use.
Special use management
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Water Transmission Line Authorization -- Bauknight | Decision Signed Date: 07/18/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/19/2017
Approximately 9 miles southwest of Jackson, Wyoming. · Teton, Wyoming
Close the hunting outfitter base camp at the Cabin Creek Trailhead and re-establish a base camp near the end of the road on the North Fork Fall Creek.
Special use management
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| North Fork Fall Creek Base Camp | Decision Signed Date: 05/24/2017 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/19/2017
Between Horsethief canyon and Game Creek adjacent to Highway 26/89/191. · Teton, Wyoming
Installation of a 775 ft. long single phase electric underground primary distribution line within a conduit and transformer in order to service a permitted well on NFS lands. Due to a WYDOT project, the existing powerline and poles must be removed.
Special use management
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T. 40 N., R. 116 W. sec. 27, SW1/4 |
Decision Memo · Buffalo Ranger District · updated 7/19/2017
South of Spread Creek, just east of the Grand Teton National Park boundary. · Teton, Wyoming
Re-issuance of the permit for the existing aggregate pit to Grand Teton National Park; sand, rock, and gravel support federal road projects in the area.
Special use management
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Big Piney Ranger District · updated 5/30/2017
Approximatey 23 west of Big Piney, Wyoming · Sublette, Wyoming
Reconstruct the dam and road at Middle Piney Lake.
Facility management
Comment Period
11/17/2015
Objection Period Start
08/15/2016
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Big Piney Ranger District · updated 5/3/2017
Eastern slope of Wyoming Range · Sublette, Wyoming
A decision on whether or not to authorize the Bureau of Land Management to lease 39,490 acres in the Wyoming Range for Oil and Gas exploration and development. The FSEIS is available as of 12/16/2016.
Minerals and geology
NOI in Federal Register
03/21/2014
DEIS NOA in Federal Register
04/08/2016
FEIS NOA in Federal Register
12/16/2016
Decision
01/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Natural Gas |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 3/27/2017
East and northeast of Grover, Wyoming · Lincoln, Wyoming
Construction of up to three ponds to encourage greater livestock distribution in the grazing allotment.
Grazing management
Decision
11/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 2/1/2017
The upper Gros Ventre River drainage, approximately 25 miles east of Jackson, WY. · Teton, Wyoming
Establish an outfitter base camp at Breakneck Flat near Gunsight Pass in the upper Gros Ventre drainage and close the base camp at the base of the Red Hills.
Special use management
Decision
01/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bridger-Teton National Forest All Units · updated 1/5/2017
Forest Park is about 33 mi south on Greys River Road (FSR 10138) from Alpine and 14 miles northeast of Afton. Dell Creek is about 4 mi east on Dell Creek Road (FSR 30600) from Hwy 191/189, Bondurant · Lincoln; Sublette, Wyoming
Wyoming Game and Fish Commission purposes to operate and manage the Forest Park and Dell Creek feedgrounds to supplementally feed wintering elk under a one year special use permit.
Special use management
Decision
01/2017 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District; Greys River Ranger District |
| Legal Land Description | Forest Park feedground - NW 1/4 and SW 1/4 of Sec 21, NW 1/4 and NE 1/4 Sec 28, T33N, R116W. Dell Creek feedground - N 1/4 and SW 1/4 Sec 14, T33N, R113W, Sixth Principal Meridian |
Decision Memo · Buffalo Ranger District · updated 12/6/2016
T45N, R113W, Sections 15, 16, 20, 21, 22, and 29, Sixth Principal Meridian · Teton, Wyoming
Use of approximately 486 acres for a livestock area for 140 HMs for horses from June 10-October 10 of each year for 10 years. This use is associated with Heart 6 Ranch's resort operations.
Special use management
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | T45N, R113W, Sections 15, 16, 20, 21, 22, and 29, Sixth Principal Meridian |
Decision Memo · Buffalo Ranger District · updated 10/24/2016
Dime Lake is 3.25 miles south of Flagg Ranch and Mystery Lake is 3 miles NE of Brooks Lake, Wyoming. · Fremont; Teton, Wyoming
Authorize Wyoming Game and Fish Dept. to use rotenone to remove introduced trout species from Dime Lake and Mystery Lake in the Teton Wilderness.
Wildlife, fish, rare plants
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Dime and Mystery Lake Snake River Cutthroat Trout Restoration Project | Decision Signed Date: 07/07/2016 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 9/27/2016
Clark Draw approximately 2 miles south of Bondurant, Wyoming · Sublette, Wyoming
Construct approximately 400 feet of fence along Clark Draw to exclude cattle from the stream segment.
Grazing management
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T37N R113W Section 15 |
Decision Memo · Big Piney Ranger District · updated 9/27/2016
North Horse Creek area, west of Daniel Junction, Sublette County, Wyoming. · Sublette, Wyoming
Remove road fill and culverts from the end of FS Road 10112 to reduce negative impacts and improve stream function.
Watershed management
Decision
09/2016 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Road Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Township 34N, Range 115W, Section 12 |
Decision Memo · Kemmerer Ranger District · updated 9/27/2016
Approximately 25 miles west of Big Piney, Wyoming - Indian, Nameless, Coyote, Witherspoon, Spring, Crystal, and Little Clear creeks · Lincoln, Wyoming
Kemmerer Ranger District proposes to replace seven culverts and remove one constructed fish passage barrier in the LaBarge Creek Watershed for the purpose of improving fish passage, flood capacity, and road infrastructure improvement.
Road managementWildlife, fish, rare plantsWatershed management
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | T28N, R116W, Sec 24; T29N, R116W, Sec 36; T29N, R115W, Sec 31; T29N, R116W, Sec 26; T29N, R116W, Sec 16; T29N, R116W, Sec 21 |
Decision Memo · Big Piney Ranger District · updated 9/27/2016
Approximately 24 miles west/southwest of Daniel, Wyoming · Sublette, Wyoming
Realign the stream channel in order to reduce flooding of the road and trailhead at South Cottonwood Creek. Cancelled. This project may require EA and would be rescoped.
Recreation managementWatershed managementWildlife, fish, rare plants
Decision
11/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (19), 36 Cfr 220.6(E)(19) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T 33N. R 115 W. Section 18 |
Decision Memo · Jackson Ranger District · updated 9/21/2016
1/2 mile south of PowWow Point · Lincoln, Wyoming
Evaluation of a proposal for Communications Technologies, Inc. to continue to use and maintain the PowWow Communications Site as a facility manager for the maximum term of 30 years. No changes to currently permitted structures are proposed.
Special use management
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| PowWow Communications Site Reauthorization | Decision Signed Date: 09/20/2016 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Section 26, T38N, R116W, 6th Principal Meridian |
Decision Memo · Jackson Ranger District · updated 9/2/2016
Approximately 1 mile north of Hoback Junction. · Teton, Wyoming
Reauthorization of a road right-of-way to access a guest house. The current authorization is for a ROW that is 548 ft. x 16 ft. This was scoped during 4th quarter 2012 and a decision was delayed until now.
Special use management
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T. 39 N., R. 116 W., Section 23. |
Decision Memo · Jackson Ranger District · updated 6/28/2016
Dog Creek area · Teton, Wyoming
Use of approximately 71 acres of NFS land for 14 head of cattle in the Dog Creek area for use as a livestock area for 20 years. Use has occurred since 1961.
Special use management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T 39 N, R 116 W, Sections 31 and 32 |
Decision Memo · Greys River Ranger District · updated 6/10/2016
Adjacent to the town of Star Valley Ranch, Wyoming · Lincoln, Wyoming
Decrease fuel adjacent to private property by thinning timber stands and burning
Fuels management
Decision
03/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Star Valley Ranch Bark Beetle Mitigation and Wildland Urban Interface Maint | Decision Signed Date: 03/28/2016 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Big Piney Ranger District · updated 4/25/2016
Big Piney Ranger District various locations · Sublette, Wyoming
The 2011 decision on this project was withdrawn to allow for additional environmental analysis. To access and comment on the new DSEIS, please go to http://www.fs.usda.gov/project/?project=48737
Minerals and geology
NOI in Federal Register
02/04/2008
DEIS NOA in Federal Register
01/26/2010
FEIS NOA in Federal Register
01/25/2011
Objection Period Start
01/25/2011
Decision
01/2011 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Natural Gas |
| Oil & Gas Leasing U.S. Forest Service Wyoming Range | Decision Signed Date: 01/25/2011 (FS Withdrawn) Legal Notice Date: 02/05/2011 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pinedale Ranger District · updated 3/30/2016
Approximately 23 miles east of Pinedale Wyoming in the Bridger Wilderness · Sublette, Wyoming
Raid Lake,Cross Lake and East Fork allotments were closed to livestock grazing. This project has been cancelled.
Grazing management
Comment Period
09/04/2015
Objection Period Start
04/2017 (Estimated)
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Big Piney Ranger District · updated 3/28/2016
At the Forest boundary of Forest Service Road 10389 in the vicinity of Horse Creek, west of Merna, Wyoming · Sublette, Wyoming
Expand the west and north boundaries of the existing parking lot by cutting live and dead trees on less than one acre. Grade and improve the surface of the existing parking area. The purpose of the project is to increase user safety.
Recreation management
Comment Period
07/08/2015
Decision
11/2015 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management; Travel Management |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T34N R113W NE ¼ NW ¼ Section 6 |
Environmental Impact Statement · Bridger-Teton National Forest All Units · updated 12/2/2015
Approximately 13 miles east of Kelly, Wyoming; south of the Gros Ventre River · Teton, Wyoming
Long-term authorization for the Wyoming Game and Fish Commission to continue to use the facilities at the Alkali feedground on National Forest System land to conduct winter elk feeding and related management programs.
Special use management
NOI in Federal Register
04/23/2012
DEIS NOA in Federal Register
04/19/2013
FEIS NOA in Federal Register
01/23/2015
Objection Period Start
01/29/2015
Decision
12/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Long Term Special Use Authorization for the Wyoming Game & Fish Commission | Decision Signed Date: 12/01/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Kemmerer Ranger District · updated 9/28/2015
Approximately 20 miles northeast of Cokeville, Wyoming · Lincoln, Wyoming
Cancelation of previously proposed design. Will conduct maintenance.
Road managementWildlife, fish, rare plantsWatershed management
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance; Watershed Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Township 28 N, Range 117 1/2 W, Section 36 |
Decision Memo · Greys River Ranger District · updated 9/17/2015
5 miles east of Smoot, Wyoming · Lincoln, Wyoming
Lower the dam's spillway by 3 feet.
Special use management
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Cottonwood Dam Maintenance Project | Decision Signed Date: 08/25/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/15/2015
Hoback Campground, approximately 8 miles east of Hoback Junction · Teton, Wyoming
Burial of an electrical distribution cable in a 715" long x 42" deep x 24" wide trench and installation of a 25 kva transformer that will be 33" x 36" x 24" in order to provide power to the host site.
Special use management
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | SW 1/4 Section 1, T38N, R115W |
Decision Memo · Jackson Ranger District · updated 6/10/2015
Pow Wow Point · Teton, Wyoming
WYDOT upgrade and use of Pow Wow Communicatons Site in order to install a WyoLINK radio communication system to connect with other WyoLINK sites throughout the State of Wyoming.
Special use management
Decision
05/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Authorization to Upgrade of PowWow Communications Site | Decision Signed Date: 05/18/2011 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T38N, R116W, NW 1/4 Section 26 |
Decision Memo · Jackson Ranger District · updated 6/1/2015
Snow King ridge between Ferrins trail and Cache/Game trail; see Decision Memo for specifics. · Teton, Wyoming
Trail construction, reconstruction, and changes in use involving the Putt-putt trail, KC and Josie's Ridge trails, and Game Ck. trail; construction of Skyline trail; see Decision Memo for specifics of the final decision.
Recreation management
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Cache-Game Trail Projects | Decision Signed Date: 05/28/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T40N, R116W, Section 2,3,6,7,11,12 |
Decision Memo · Jackson Ranger District · updated 5/5/2015
Just north and east of Gunsight Ranch · Teton, Wyoming
Reissue authorizations for two water systems and one road right-of-way to Etca White. The property was recently deeded to Ms. White. Previously it was in the name of her and her former husband. There are no changes to the current permitted uses.
Special use management
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Authorization of 2 water systems and 1 road right-of-way to Etca White | Decision Signed Date: 05/04/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Section 34, T42N, R112W, Sixth Principal Meridian |
Decision Memo · Jackson Ranger District · updated 4/29/2015
Within the Snow King Resort permit boundary, Jackson, Wyoming · Teton, Wyoming
Ropes course and treetop challenges including swinging bridges, nets, and zip lines.
Special use management
Decision
04/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Snow King Mountain Resort Aerial Adventure Course | Decision Signed Date: 04/27/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 3/16/2015
Within the permit area boundary of Snow King Mountain Resort in Jackson, Wyoming · Teton, Wyoming
Replacement and realignment of the Rafferty lift and construction of two associated intermediate ski trails.
Special use management
Decision
03/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Snow King Mountain Resort Rafferty Lift Replacement and Ski Trail Construct | Decision Signed Date: 03/13/2015 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 2/18/2015
Approximately 9 miles south of Jackson, WY, just north of Ross Plateau. · Teton, Wyoming
Reauthorization of a 2" water transmission pipeline and headbox to convey irrigation and stock water from Barrell Spring to private property.
Special use management
Decision
02/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | NW 1/4 Section 11, T39N, R116W |
Decision Memo · Big Piney Ranger District · updated 12/30/2014
Approximately 22 miles west/ southwest of Daniel, Wyoming · Sublette, Wyoming
The Forest Service proposes to authorized Black Diamond Energy, LLC access via a special use permit to the Maki Creek 1 and Beamers Bluff 24-19 wells to initiate reclamation activities by removing existing facilities.
Minerals and geology
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Natural Gas |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T 33N, R 115W, section 19 |
Decision Memo · Greys River Ranger District · updated 12/30/2014
Western slopes of the Salt River Range from one mile south of Turnerville to one mile north of Smoot · Lincoln, Wyoming
Prescribed burning of vegetation to restore a balance of age classes in the mountain shrub, big sagebrush, aspen, and conifer woodlands.
Vegetation management (other than forest products)
Decision
12/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 12/30/2014
Prater, Green and Cedar Creek Canyons to the east of the Town of Star Valley Ranch, Wyoming. · Lincoln, Wyoming
Construct or reconstruct about 6.5 miles of non-motorized trails in Prater Canyon, Green Canyon and Cedar Creek Canyon area and enhance two trailhead parking areas.
Recreation management
Decision
12/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Portions of Township 35N. Range 118W, Sections 20, 21, 28, 29, 32, and 34 |
Decision Memo · Greys River Ranger District · updated 12/29/2014
just east of Alpine WY; at the Forest boundary. · Lincoln, Wyoming
Extend the existing winter parking lot at the Greys River Road at the Forest Boundary in Alpine; Town of Alpine and Lincoln County will provide gravel; Town of Alpine will plow.
Recreation management
Decision
12/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt. |
| Alpine Parking Area Expansion | Decision Signed Date: 12/19/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 12/9/2014
Southeast of Hoback Junction · Teton, Wyoming
Reauthorization of a right-of-way across NFS lands by the Harmening family in order to reach private property . This ROW encompasses approximately 300 ft. x 20 ft. This use has been authorized since 1970.
Special use management
Decision
12/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Harmening Road Right-of-Way Reauthorization | Decision Signed Date: 12/05/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | SE ¼ NW ¼ Section 26, T39N, R116W |
Decision Memo · Jackson Ranger District · updated 11/26/2014
Within the permit area of the Jackson Hole Mountain Resort at the bottom of the ski hill adjacent to the Four Seasons property · Teton, Wyoming
Reauthorization of a sewer transmission line across NFS lands for Teton Village Water and Sewer District. This ROW encompasses approximately 340 ft. x 25 ft. This use has been authorized since 1994.
Special use management
Decision
11/2014 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| ton Village Water & Sewer District Sewage Transmission Line Reauthorization | Decision Signed Date: 11/25/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | SW ¼ NE ¼ Section 24, T42N, R117W |
Decision Memo · Bridger-Teton National Forest All Units · updated 10/1/2014
Gunsight, Buffalo District, 7 miles n. of Goosewing; Hardscrabble, Jackson District, sw of Moccasin Basin; Salt Lick, Pinedale District, 25 miles n. of Pinedale, west of Bridger Wilderness. · Sublette; Teton, Wyoming
Planting three areas totaling 205 acres with 49,500 whitebark pine seedlings: Gunsight Fire area, Hardscrabble Fire area and Salt Lick Fire area.
Vegetation management (other than forest products)
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Planting whitebark pine at three locations on the Bridger-Teton National Fo | Decision Signed Date: 09/17/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District; Buffalo Ranger District; Pinedale Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 9/30/2014
Deer Creek Drive, approximately 1 1/2 miles south of Hoback Junction. · Teton, Wyoming
In order to replace an aging and failing electrical underground cable, Lower Valley Energy has requested to dig a trench on NFS lands to bury the cable. The ROW for this cable will be 1,007' long x 24" wide x 42" deep.
Special use management
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| LVE burial of an electrical underground cable along Deer Creek Drive | Decision Signed Date: 09/29/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Section 34, T39N, R116W |
Decision Memo · Jackson Ranger District · updated 9/9/2014
Jackson Hole Mountain Resort, Teton Village, Wyoming · Teton, Wyoming
Installation and use of a third Gazex exploder for avalanche control in the Headwall area.
Special use management
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Avalanche Hazard Reduction System Expansion at the Jackson Hole Mountain Re | Decision Signed Date: 09/04/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 9/8/2014
Approximately 20 miles west of Dubois, Wyoming, northern boundary of the Pinedale Ranger District, along the Contintental Divide from Sheridan Pass to the Forest Road No. 534. · Fremont; Teton, Wyoming
The Forest Service proposes to reconstruct as well as relocate short sections within a 13-mile segment of the Continental Divide National Scenic Trail.
Recreation management
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Continental Divide National Scenic Trail Reconstruction Project | Decision Signed Date: 07/22/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | T42N, R110W, and T41N, R109W & 110W |
Decision Memo · Buffalo Ranger District · updated 7/24/2014
Approximately 13 miles northeast of the Blackrock Ranger Station. · Teton, Wyoming
Amendment of Special Use Permit (BUF770301) to authorize relocation of burned over Hunting Camp #1 on the North Fork of the Buffalo River in the Teton Wilderness to a location east of the burned camp.
Special use management
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Dave Hettinger Assigned Site Relocation | Decision Signed Date: 07/23/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 7/3/2014
Mosquito Creek and Swinging Bridge areas near Jackson, Wyoming · Teton, Wyoming
Trail reconstruction and road obliteration in the Mosquito Creek and Swinging Bridge areas.
Recreation management
Decision
03/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| 2013 Mosquito Cr/Swinging Bridge Dirt Bike Trails | Decision Signed Date: 03/31/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Pinedale Ranger District · updated 6/30/2014
Approximately 50 miles NW of Pinedale, WY and 4 miles NW of Lower Green River Lake. · Sublette, Wyoming
Road easement authorization for Desert Homestead Road & Ditch Association (4 private inholdings) located 4 mi. northwest of Lower Green River Lake.Special use permit authorization for existing headgate, ditch, & above-ground pipe within Osborn Ditch1
Special use managementLand ownership management
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Use Adjustments |
| Desert Homestead Road Easement and Water Development Authorization | Decision Signed Date: 05/05/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | T39N, R109W, Section 13 and 14 |
Decision Memo · Kemmerer Ranger District · updated 6/30/2014
Southern boundary of the Kemmerer Ranger District. · Lincoln, Wyoming
Construct 18 mi. of fence to restrict unauthorized livestock from entering the Forest. This project was originally combined with the Thompson Fence as project #43340. SEND Comments to comments-intermtn-bridger-teton-kemmerer@fs.fed.us by 4/2/14.
Grazing management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Decision Memo: South Boundary Fence Project | Decision Signed Date: 06/30/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Township 26N, Range 118W, Section 23 south and then westerly to Township 25N, Range 118W, Section 23. |
Decision Memo · Kemmerer Ranger District · updated 6/30/2014
The fences would be located along Packsaddle Ridge, and at the head of McKay Creek, Spring Creek and Packsaddle Creek, in the northern portion of the District. · Sublette, Wyoming
Construct approximately 7 miles of drift fences in the area of Thompson Pass. (The Kemmerer South Boundary Fence was originally a part of this project; the boundary fence is now its own project.)
Grazing management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Decision Memo: Thompson Pass Drift Fence Project | Decision Signed Date: 06/30/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | Beginning at Township 29N, Range 116W Section 13 southeast to Township 28N Range 115W Section 6 |
Decision Memo · Buffalo Ranger District · updated 6/27/2014
Spread Creek · Teton, Wyoming
Bank stabilization and relocation of a portion of a ditch near Spread Creek due to the breaching of an existing ditch.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | NE 1/4 SW 1/4 Section 14, T44N, R114W |
Decision Memo · Jackson Ranger District · updated 6/27/2014
Gros Ventre River Corridor and Shadow Mountain area, northeast of Jackson, Wyoming · Teton, Wyoming
Authorization of guided ATV service on existing motorized trails in the Gros Ventre corridor and Shadow Mountain areas
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Issuance of Special Use Permits for Guided OHV Service | Decision Signed Date: 06/03/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 6/27/2014
Snow King Mountain at the southern end of the town of Jackson, Wyoming · Teton, Wyoming
Authorization to install and operate infrastructure primaily to support snow making, including burying water lines and electrical cable, and installation of electric tranformers, hydrants, and snow guns.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Snowmaking Development at Snow King Mountain Resort | Decision Signed Date: 06/12/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 6/5/2014
Turpin Summer Home Tract, lot 3B · Teton, Wyoming
To retire an existing overhead line & replace it with a buried powerline within a conduit. Trench to be dug for the conduit would be 150 ft. long x 36 in. deep x 24 in. wide. Also, a secondary riser would be installed on the exising pole.
Special use management
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Lower Valley Energy Powerline Burial, Lot 3B, Turpin Summer Home Tract | Decision Signed Date: 05/02/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Section 14, T45N, R112W |
Decision Memo · Pinedale Ranger District · updated 3/19/2014
White Pine Communication Site, Fortification Mountain, east side of Forest Road 740 (Skyline Drive). · Sublette, Wyoming
Construction of communication site building and tower, in addition to existing tower at White Pine Communication Site.
Special use management
Comment Period
03/15/2013
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| White Pine Communication Site Building and Tower Construction Project | Decision Signed Date: 03/13/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
| Legal Land Description | T35N R108W Section 28 SE 1/4 |
Decision Memo · Jackson Ranger District · updated 3/10/2014
Bryan Flat Rd./McKoy Rd. in the Bryan Flat area · Teton, Wyoming
Construction, operation & maintenance of a water transmission pipeline to supply water to 2 residences which. The ROW would be 3661' x 10'. It would be located 10' to the west of the road and be buried 7' below the existing grade of the road.
Special use management
Comment Period
01/06/2014
Decision
02/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization of a water transmission line - Bryan Flat Rd./McKoy Rd. area | Decision Signed Date: 02/14/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T38N, R115W, section 9 |
Decision Memo · Jackson Ranger District · updated 3/7/2014
Dry Cottonwood Communications Site and Bacon Ridge Communications Site · Teton, Wyoming
Reauthorization of the use of the Dry Cottonwood Communications Site (encompassing 0.13 acres) and the Bacon Ridge Communications Site (encompassing 0.25 acres) for 20 years for solar-powered radio telephone communication systems.
Special use management
Comment Period
01/27/2014
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Darwin Ranch Communications Sites | Decision Signed Date: 03/06/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Dry Cottonwood located at T42N, R112W, Section 27 and Bacon Ridge located at T40N, R111W, Section 26 |
Decision Memo · Jackson Ranger District · updated 3/4/2014
Lower Slide Lake · Teton, Wyoming
Rendezvous River Sports has proposed to hold 2 Stand-Up Paddleboard races on Lower Slide Lake during their annual Intermountain Touring Symposium held the 3rd or 4th Sat. in June for up to 60 people. The Symposium has been held for 13 years.
Special use management
Comment Period
01/27/2014
Decision
02/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Rendezvous River Sports' Intermountain Touring Symposium SUP Races | Decision Signed Date: 02/28/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Sections 3 and 4, T42N, R114W |
Decision Memo · Jackson Ranger District · updated 2/18/2014
Phillips Pass area · Teton, Wyoming
On the 4th weekend of Aug., a 25 mile mountain bike race on Sat. & a half marathon on Sun. are proposed. They are to be held in the Phillips Pass area with up to 75 participants for each race. These races have been held the last 2 years.
Special use management
Comment Period
01/14/2014
Decision
02/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization of TPK Racing Recreation Event for 5 years | Decision Signed Date: 02/18/2014 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 1/3/2014
Cache Creek Drive · Teton, Wyoming
Proposal to reissue a permit authorizing the Town of Jackson to operate and maintain a water transmission pipeline for the maximum term of 20 years. The water from this pipeline is needed to provide potable water to residents in the area.
Special use management
Comment Period
11/26/2013
Decision
12/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization to continue to operate and maintain a water line - TOJ | Decision Signed Date: 12/31/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | NE ½ SW ¼ Section 35, T41N, R116W |
Environmental Assessment · Jackson Ranger District · updated 12/17/2013
Horsethief Canyon · Teton, Wyoming
Closure of landfill on 18 acres of NFS land through re-shaping and re-capping of the landfill and construction of groundwater and landfill gas monitoring wells.
Special use managementWatershed management
Comment Period
05/18/2013
Objection Period Start
05/19/2013
Decision
12/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Harzardous Waste Compliance Actions; Special Use Authorizations; Watershed Improvements |
| Horsethief Canyon Landfill Closure | Decision Signed Date: 12/16/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T40N, R116W, SW ¼ Section 22, Sixth Principal Meridian |
Environmental Assessment · Kemmerer Ranger District · updated 12/3/2013
Hams Fork area, north of Kemmerer, Wyoming · Lincoln, Wyoming
Proposed project addresses hazardous fuels; safety hazards associated with standing dead trees; the vitality of aspen, whitebark pine and lodgepole pine; and recovery of merchantable value of beetle-killed timber.
Fuels managementVegetation management (other than forest products)
Objection Period Start
06/08/2013
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 |
| Project Activity | Species Habitat Improvements; Timber Sales (Salvage) |
| Hams Fork Vegetation Project | Decision Signed Date: 09/11/2013 |
| DN / FONSI Hams Fork Vegetation Project | Decision Signed Date: 09/11/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
| Legal Land Description | T25N, R 116W, R117W, R118W; T26N, R 116W, R117W, R118W; T27N, R 116W, R117W, R118W; T28N, R116W |
Environmental Assessment · Bridger-Teton National Forest All Units · updated 12/3/2013
Tributaries of the Snake River in the northern portion of the Bridger-Teton National Forest; mostly in Teton County, Wyoming with portions in Lincoln and Freemont Counties · Fremont; Lincoln; Teton, Wyoming
Forest Plan Amendment creating goals, desired future conditions and standards for management of recently designated Wild and Scenic Rivers. Amendment will be incorporated into a Comprehensive River Management Plan (CRMP).
Wildlife, fish, rare plantsRecreation managementSpecial area managementLand management planning
Comment Period
05/11/2013
Objection Period Start
09/30/2013
Decision
12/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District; Greys River Ranger District; Jackson Ranger District; Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Big Piney Ranger District · updated 10/21/2013
The project area is located south of Middle Piney Creek, east of Fish Creek Mtn and Mount Darby, extending through Snider Basin and ends on Packsaddle Ridge. · Sublette, Wyoming
Harvesting fire killed trees on approximately 1,200 acres from the Fontenelle fire of 2012 and opening one gravel pit for road surfacing material.
Forest products
Comment Period
02/02/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Noxious Weed Treatments; Road Maintenance; Timber Sales (Salvage) |
| Fontenelle Fire Salvage Project DN/FONSI | Decision Signed Date: 09/26/2013 Legal Notice Date: 09/30/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | portions of T28N R116W sec 1, T28N R115W secs 5 & 6, T29N R115W secs 3,4,9,10,15,16,19-22, 27-30, 32 -35 & T30N in R115W secs 9,10, 15,16,21,22,27,28, 32-34 |
Decision Memo · Jackson Ranger District · updated 10/21/2013
Jackson Hole Mountain Resort, Teton Village, Wyoming · Teton, Wyoming
Authorization of JHMR to contruct and operate an Aerial Adventure Course within their permit area consisting of a "ropes course" at the base area, a zip line beginnig at the top of the Teewinot Lift, and a "drop tower" at the top of the same lift.
Special use management
Comment Period
06/25/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Development and Operation of Aerial Adventure Course at Jackson Hole... | Decision Signed Date: 08/18/2013 Legal Notice Date: 08/25/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Big Piney Ranger District · updated 10/21/2013
In the vicinity of Horse Creek, just west of Merna, Wyoming · Sublette, Wyoming
Reauthorization of livestock grazing on approximately 17,370 ac. Project will be analyzed in an EIS. The draft EIS is available and comments are due by July 15,2013. Please submit comments to: comments-intermtn-bridger-teton-big-piney@fs.fed.us
Grazing management
NOI in Federal Register
10/31/2011
DEIS NOA in Federal Register
05/31/2013
FEIS NOA in Federal Register
09/26/2013
Decision
09/2013 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Authorizations |
| Sherman Cattle and Horse Allotment Grazing and Management Project | Decision Signed Date: 09/26/2013 Legal Notice Date: 10/01/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Buffalo Ranger District · updated 9/30/2013
Approximately 15 miles northeast of Moran, Wyoming and approximately 6 miles north northwest of Moran, Wyoming · Teton, Wyoming
Realignment and reconstruction on Divide Lake Trail; puncheon and bridge replacement on the North Buffalo Trail; relocation on the Pilgrim Creek Trail.
Recreation management
Comment Period
01/02/2013
Decision
01/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| 2013 Trail Projects | Decision Signed Date: 01/14/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Greys River Ranger District · updated 9/16/2013
Approximately 11 miles up the Smith's Fork Road, southeast of Smoot, Wyoming. · Lincoln, Wyoming
Issuance of a Special Use Permit to Star Valley Search and Rescue for a warming hut/safety shelter and vaulted toilet; not for routine camping, but for emergency overnight stays; day use would occur winter and summer.
Special use management
Comment Period
08/12/2013
Decision
09/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Poker Flat Warming Hut and Safety Shelter | Decision Signed Date: 09/16/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 9/9/2013
Approximately 4 miles southwest of Hoback Junction. · Teton, Wyoming
Proposal from Snake River Sporting Club Owners Association and SRS Club, LLC to utilize wheeled motorized vehicles year-round to reach private property across NFS lnd and to plow and maintain the road.
Special use management
Comment Period
07/16/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Snake River Sporting Club Owners Association, Inc. and SRS Club, LLC | Decision Signed Date: 08/30/2013 Legal Notice Date: 09/08/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T38N, R116W, Section 8 & T39N, R116W, Section 32 |
Decision Memo · Jackson Ranger District · updated 6/26/2013
Jackson Hole Mountain Resort, Teton Village, Wyoming · Teton, Wyoming
Redevelopment of the portion of the South Pass Traverse from the base of the Casper lift to the Werner trail and upgrade of the Teewinot switchback; installation of a snowmaking water-booster pump building adjacent to the traverse.
Special use management
Comment Period
03/28/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management |
| Redevelopment of the South Pass Traverse at Jackson Hole Mountain Resort | Decision Signed Date: 05/03/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Jackson Ranger District · updated 5/22/2013
Cow and Calf of the Woods avalanche paths in Hoback Canyon · Teton, Wyoming
AuthorizeWYDOT to install (3) Obellx remote gas-operated avalanche release systems at the Cow & Calf of the Woods avalanche paths in Hoback Canyon. This would involve the excavation & construction of (3) 5’ x 5’ x 5' concrete foundations.
Special use management
Comment Period
03/18/2013
Decision
05/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization for WYDOT to install 3 Obellx avalanche release systems | Decision Signed Date: 05/21/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T38N, R115W, NE ¼ Section 10, Sixth Principal Meridian |
Decision Memo · Big Piney Ranger District · updated 4/8/2013
18 miles west of Big Piney, WY · Sublette, Wyoming
Reconstruction of about 15 miles of the boundary and pasture fence that were damaged in the 2012 Fontenelle Fire. Trees that pose a safety threat or are susceptible to falling on the fence would be cut.
Grazing management
Comment Period
10/09/2012
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (11), 36 Cfr 220.6(E)(11) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | 215 |
| Project Activity | Roadless Area Management; Grazing Structural Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | Section 36, Township 29N, Range 115W to Section 25, Township 31N, Range 115W |
Decision Memo · Jackson Ranger District · updated 4/8/2013
Snow King Mountain Recreation Permit Area · Teton, Wyoming
Installation of fiber optic cable along the Snow King Summit chairlift to the top of the chairlift, then buried in the ground in a 70' x 10" x 10" ditch from the top of the chairlift to the Panorama house to provide 4G communication services.
Special use management
Comment Period
03/02/2013
Decision
04/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization for Snow King to install & operate a fiber optic cable | Decision Signed Date: 04/03/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T40N, R116W, Section 4 and T41N, R116W, Sections 33 and 34 |
Decision Memo · Jackson Ranger District · updated 4/8/2013
South of Horsethief Canyon · Teton, Wyoming
Construct & pump test a water well that will be 600' deep x 6.25" in diameter to provide potable water to 72 homes within the Squaw Creek District .
Special use management
Comment Period
02/19/2013
Decision
04/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization for Squaw Crk Water District to drill exploratory water well | Decision Signed Date: 04/04/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | NE ¼ SW ¼ Section 27, T40N, R116W |
Environmental Assessment · Buffalo Ranger District · updated 3/28/2013
In the vicinity of Grouse Mountain in the upper Spread Creek Drainage. Access is on Forest road 30100. · Teton, Wyoming
Thinning competing trees and/or prescribed fire to investigate enhancement of whitebark pine survival and regeneration on 400 acres within the upper Spread Creek drainage
Wildlife, fish, rare plantsForest products
Comment Period
03/21/2012
Decision
05/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Green) |
| Grouse Mountain Whitebark Pine Restoration Project | Decision Signed Date: 05/14/2012 Legal Notice Date: 05/22/2012 |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
| Legal Land Description | T43N, R112W, sec 2,3,4,10,11,13, 14,15 |
Decision Memo · Jackson Ranger District · updated 3/18/2013
Highway 89 along the Snake River Canyon from Alpine to Fall Creek Road and Fall Creek Road for 9 miles · Teton, Wyoming
Epic Relays would like to hold a running relay race for up to 100 teams on the 2nd Saturday in August along the Snake River Canyon from Alpine, WY to Fall Creek Rd and then along Fall Creek Rd for approximately 9 miles.
Special use management
Comment Period
01/27/2013
Decision
03/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization of a Relay Race for Epic Relays on NFS Lands for 5 yrs | Decision Signed Date: 03/18/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
Decision Memo · Jackson Ranger District · updated 3/7/2013
Southeast Boundary of Jackson Hole Mountain Resort · Teton, Wyoming
Burial of 68' of powerline to bring power from NFS land to private property; a trench that is 68' long, 24" wide and 42" deep will be dug to bury the line; a vault will be installed on NFS land to carry the power from an existing primary conductor.
Special use management
Comment Period
01/18/2013
Decision
03/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization to bury a powerline-LVE-Lot 86, JH Ski Corp. | Decision Signed Date: 03/04/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
Decision Memo · Jackson Ranger District · updated 2/5/2013
Fall Creek Road between Red Top Meadows and Triple R Ranch · Teton, Wyoming
Triple R Ranch, LLC is proposing to drive wheeled, motorized vehicles year-round on Fall Creek Road from Red Top Meadows (FS#31000) to their ranch to reach private property. They are also requesting to plow the road and do routine maintenance.
Special use management
Comment Period
11/20/2012
Decision
01/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization to use vehicles year-round of Fall Crk Rd.-Triple R Ranch | Decision Signed Date: 01/24/2013 Legal Notice Date: 02/03/2013 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39N, R117W, sections 13 & 24 and T39N, R116W, sections 18 & 19 |
Environmental Impact Statement · Bridger-Teton National Forest All Units · updated 1/4/2013
Noble Basin, 7 miles southeast of Bondurant, WY · Sublette, Wyoming
Project cancelled due to buyout of leases.
Minerals and geology
NOI in Federal Register
12/10/2007
DEIS NOA in Federal Register
'/ (Estimated)
FEIS NOA in Federal Register
'/ (Estimated)
Implementation
'/ (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Forest Service Energy Implementation Plan |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations; Natural Gas |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
Decision Memo · Jackson Ranger District · updated 12/17/2012
Various locations throughout the Buffalo and Jackson Ranger Districts · Teton, Wyoming
These permits include: 5 road right-of-ways, 4 water transmission lines, 1 natrual gas pipeline, and 1 pasture permit. No changes are proposed for any of these permits.
Special use management
Comment Period
07/02/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Reissuance of 11 Special Use Permits on the Buffalo and Jackson RDs | Decision Signed Date: 12/17/2012 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District; Buffalo Ranger District |
Decision Memo · Jackson Ranger District · updated 12/4/2012
South of Hoback Junction and South of the Snake River Sporting Club · Teton, Wyoming
Lyle and Sharon Waggoner are requesting use of wheeled motorized vehicles on a closed Forest Service road that is not open to motorized travel to reach their private property. FS land must be crossed to reach their private property.
Special use management
Comment Period
10/09/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization to use motorized vehicles to reach private property - Waggone | Decision Signed Date: 11/14/2012 Legal Notice Date: 11/20/2012 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Section 32, T39N, R116W and Sections 8, 16, and 21, T38N, R116W |
Decision Memo · Pinedale Ranger District · updated 9/26/2012
Approximately 40 miles north of Pinedale, Wyoming · Fremont, Wyoming
Relocation of 1.5 miles of the trail, south and west of Lake of the Woods, to remove trail from motorized Forest Road 698 and 534; the roads will remain open to motorized use.
Recreation management
Comment Period
06/04/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Continental Divide National Scenic Trail Re-route: Lake of the Woods Segme | Decision Signed Date: 08/13/2012 |
| Forests | Bridger-Teton National Forest |
| Districts | Pinedale Ranger District |
Environmental Impact Statement · Big Piney Ranger District · updated 9/26/2012
Piney Creeks watershed approximately 25 miles west of Big Piney, Wyoming · Sublette, Wyoming
A variety of vegetation management treatments in the Piney Creek drainages over the next five to seven years. Currently collecting data in preparation for analysis.
Fuels managementWildlife, fish, rare plantsForest products
NOI in Federal Register
02/04/2010
DEIS NOA in Federal Register
'/ (Estimated)
FEIS NOA in Federal Register
'/ (Estimated)
Implementation
'/ (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
Decision Memo · Jackson Ranger District · updated 9/24/2012
Approximately 3 miles southeast of Hoback Junction · Teton, Wyoming
Conversion of a term grazing permit to a special use permit for pasturing 2 horses for one month each year on 3.5 acres.
Special use management
Comment Period
08/20/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management; Special Use Authorizations |
| Authorization for use of a Livestock Area for Pfaff | Decision Signed Date: 09/24/2012 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39N, R115W, NE ¼ section 31 |
Decision Memo · Buffalo Ranger District · updated 8/16/2012
Buffalo Valley; approximately 7 miles east of Moran, Wyoming · Teton, Wyoming
Restoration of a headgate and associated oxbow for a long-standing, permitted irrigation ditch with associated water right.
Special use management
Comment Period
04/10/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming
The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.
Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Regulation Creation/Modification |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
Decision Memo · Jackson Ranger District · updated 6/26/2012
Vicnity of Fall Creek Road and Red Top Meadows · Teton, Wyoming
Proposal to authorize Fall Creeks Ranch, LLC to use wheeled motorized vehicles year-round on 2.5 miles of National Forest System land to access their private property, road maintenance and plowing.
Special use management
Comment Period
04/26/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Authorization for wheeled motorized travel, road maintenance, snow removal | Decision Signed Date: 06/22/2012 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | Sections 2, 3, 10, 11, and 15, T39N, R117W, 6th Principal Meridian |
Decision Memo · Bridger-Teton National Forest All Units · updated 5/17/2011
Various locations forest-wide except the Greys River Ranger District · Lincoln; Sublette; Teton, Wyoming
Treat the trunks of approximately 250 whitebark pine trees in various locations across the forest with the insecticide carbaryl to protect them from mountain pine beetles.
Vegetation management (other than forest products)
Decision
05/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Application of Carbaryl Insecticide to Protect Whitebark PineTrees from Mou | Decision Signed Date: 05/13/2011 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District; Big Piney Ranger District; Jackson Ranger District; Buffalo Ranger District; Pinedale Ranger District |
Decision Memo · Greys River Ranger District · updated 4/11/2011
Six miles east of Smoot, Wyoming · Lincoln, Wyoming
Geotechnical investiagation of an existing dam involving core drilling to determine the structural integrity of the dam.
Special use management
Decision
03/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Cottonwood Lake Dam Geotechnical Drilling | Decision Signed Date: 03/30/2011 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
Environmental Assessment · Bridger-Teton National Forest All Units · updated 3/23/2011
Teton Pass via Old Pass Road, BPA ROW roads, & within Highway 22 ROW; Within Highway 26/287 ROW from Moran to Wind River Lake, FS Roads 30060 & 30040. · Fremont; Teton, Wyoming
Burial of approximately 35 miles of two 1.25inch conduits containing fiber optic broadband cable via plowing technique. Route will primarily be within existing road right-of-ways and utility right-of-ways.
Special use management
Comment Period
11/26/2010
Decision
02/2011 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Shoshone National Forest; Bridger-Teton National Forest; Caribou-Targhee National Forest |
| Districts | Wind River Ranger District; Jackson Ranger District; Buffalo Ranger District; Teton Basin Ranger District |
Decision Memo · Greys River Ranger District · updated 3/14/2011
1/2 mile east of Grover, WY in Phillips Canyon · Lincoln, Wyoming
Issuance of a special use permit for a long-running snowmobile hill climb event.
Special use management
Decision
02/2011 (Estimated)
Implementation
02/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Phillips Canyon Snowmobile Hill Climb | Decision Signed Date: 02/07/2011 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
| Legal Land Description | T33N, R118W, Sec 5 |
Decision Memo · Big Piney Ranger District · updated 9/28/2010
Last mile of Middle Piney lake Road, · Sublette, Wyoming
Relocation of approximately the last mile of FS Road 10024 (Middle Piney Lake Rd.) out of the riparian area to a location just east of Middle Piney Ck. Plan to relocate the road has been dropped; the current plan is to repair the existing road.
Road managementWildlife, fish, rare plants
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Improvements/Construction |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
| Legal Land Description | T30N R114W, Sec 4, 5, and 8 |
Decision Memo · Jackson Ranger District · updated 6/30/2010
Various locations District-wide · Lincoln; Teton, Wyoming
Reconstruction work on 19 trails in the following areas: Snake River Range, Gros Ventre Wilderness, Greater Snow King Area, Teton Pass, Munger Mountain, Slate Creek, and Shadow Mountain.
Recreation management
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| 2010 Jackson Area Trails Projects | Decision Signed Date: 06/04/2010 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
Environmental Assessment · Greys River Ranger District · updated 6/28/2010
East of the Town of Afton · Lincoln, Wyoming
Authorize the Town of Afton to use 8 acres of NF System Land to construct, operate and maintain a 225 kilowatt culinary water system hydroelectric project linked to the pre-existing town culinary system. Decision based on FERC's EA.
Special use management
Comment Period
05/01/2010
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Town of Afton Culinary Water System Hydroelectric | Decision Signed Date: 06/21/2010 |
| Forests | Bridger-Teton National Forest |
| Districts | Greys River Ranger District |
Decision Memo · Jackson Ranger District · updated 6/24/2010
Slate Creek in the Gros Ventre drainage · Teton, Wyoming
Improving livestock corrals & loading facility near Slate Creek. Previously proposed fences will be considered under Allotment Management Plan NEPA.
Grazing management
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T41N-R112W-Sections 1, 2, 11, 12 and 13, T42N-R113W-Section 23, & T42N-R113W-Section 9. |
Environmental Assessment · Buffalo Ranger District · updated 4/22/2010
Buffalo Fork drainage, adjacent to various developed areas. · Teton, Wyoming
Combination of mechanical fuel reduction and prescribed fire around 3 major development clusters in the Buffalo Valley
Fuels management
Comment Period
10/12/2009
Decision
04/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Bridger-Teton National Forest |
| Districts | Buffalo Ranger District |
Decision Memo · Kemmerer Ranger District · updated 4/22/2010
The Pole Creek fork of the Hams Fork drainage · Lincoln, Wyoming
Prescribed fire on 3,500 acres for aspen stand restoration. This project was combined in the database with the East Fork Salvage project in 12/2007; the projects have since been separated.
Vegetation management (other than forest products)
Comment Period
11/28/2008
Decision
04/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Pole Creek Prescribed Burn Vegetation Treatment | Decision Signed Date: 04/02/2010 Legal Notice Date: 04/06/2010 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
Environmental Assessment · Jackson Ranger District · updated 3/12/2010
Hoback Junction · Teton, Wyoming
Fuel reduction and aspen enhancement by way of mechanical thinning and prescribed burning in the Hoback Junction area.
Fuels management
Comment Period
07/01/2009
Decision
03/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Hoback Junction Fuels Reduction Project | Decision Signed Date: 03/04/2010 |
| Forests | Bridger-Teton National Forest |
| Districts | Jackson Ranger District |
| Legal Land Description | T39N R116W, T39N R115W |
Decision Memo · Kemmerer Ranger District · updated 8/17/2009
The East Fork of the Hams Fork drainage · Lincoln, Wyoming
Salvage of less than 250 acres of bug killed trees. This project was originally listed together with the Pole Creek Prescribed Burn.
Vegetation management (other than forest products)Forest products
Comment Period
11/26/2008
Decision
08/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Salvage) |
| East Fork Salvage and Sanitation Vegetation Treatment | Decision Signed Date: 08/03/2009 Legal Notice Date: 08/07/2009 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
Decision Memo · Kemmerer Ranger District · updated 6/30/2009
LaBarge Creek, i mile upstreamn from the Forest boiundary. · Lincoln, Wyoming
Construction of a permanent barrier to keep exotic fish species from entering native cutthroat trout habitat. Based on public comment, may possibly be categorically excluded from and EA/EIS.
Wildlife, fish, rare plants
Decision
04/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| LaBarge Creek Cutthroat Habitat Improvement | Decision Signed Date: 04/30/2009 |
| Forests | Bridger-Teton National Forest |
| Districts | Kemmerer Ranger District |
Decision Memo · Big Piney Ranger District · updated 6/22/2009
Bondurant Basin · Sublette, Wyoming
Reauthorization of en expired special use permit for cultivation of small isolated parcels in Bondurant Basin
Special use management
Decision
06/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Re-issuance of a cultivation permiton the Big Piney Ranger District | Decision Signed Date: 06/08/2009 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
Decision Memo · Big Piney Ranger District · updated 3/2/2009
Bondurant, Wyoming · Sublette, Wyoming
Transfer of a special use authorization for a private road across NFS land; the right-of-way is .02 miles in length.
Special use management
Decision
02/2009 (Estimated)
Implementation
02/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Transfer of Private Road Authorization to Paul M. Elwood of Bondurant, WY | Decision Signed Date: 02/02/2009 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
Decision Memo · Big Piney Ranger District · updated 9/30/2008
Hoback Basin · Sublette, Wyoming
Reauthorization of five special uses, three for cultivation on small isolated parcels and two for water transmission pipelines. This resulted in two decision documents.
Special use management
Decision
06/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Re-Issuance of Two Water Transmission Special Use Permits on the Big Piney | Decision Signed Date: 05/28/2008 |
| Re-Issuance of Three Cultivation Special Use Permits on the Big Piney RD | Decision Signed Date: 06/01/2008 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District |
Environmental Impact Statement · Big Piney Ranger District · updated 2/22/2008
Hoback Canyon · Sublette, Wyoming
Authorize the construction of a natural gas pipeline in the Hoback Canyon to service the Jackson area.
Special use management
NOI in Federal Register
07/16/2004
DEIS NOA in Federal Register
07/03/2006
FEIS NOA in Federal Register
01/18/2008
Decision
01/2008 (Estimated)
Implementation
07/2008 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Lower Valley Energy Natural Gas Pipeline Project | Decision Signed Date: 01/04/2008 Legal Notice Date: 01/18/2008 |
| Forests | Bridger-Teton National Forest |
| Districts | Big Piney Ranger District; Jackson Ranger District |