Set six posts (three on each side of river) as anchors for high tension rope crossing. By installing the poles the trees will no longer be utilized. These poles will be buried 4'into and incased in concrete for stability and long term use.
Location
HIGHWAY 108, T6N R23E, SEC 17 NW NW SW
Project timeline
1
Scoping Start
01/08/2018
2
Decision
03/2018 (Estimated)
3
Implementation
03/2018 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Sonora Bridge River Crossing MCMWTC | Decision Signed Date: 03/12/2018 |
| Forests | Humboldt-Toiyabe National Forest |
| Districts | Bridgeport Ranger District |
| Legal Land Description | Not Applicable |