Decision Memo Completed

Orem City Alta Springs / Provo Canyon Water Line Replacement

Uinta-Wasatch-Cache National Forest Utah, Utah Pleasant Grove Ranger District

The City of Orem is proposing to reconstruct an existing water transmission line across National Forest System lands (NFS). The reconstruction line would be place in the same location and covered with existing native material.

Location

The project is located in the Pleasant Grove Ranger District.

Project timeline

1
Scoping Start
03/07/2013
2
Decision
05/2014 (Estimated)
3
Implementation
06/2014 (Estimated)

NEPA / regulatory detail

Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Orem City Alta Springs / Provo Canyon Water Line ReplacementDecision Signed Date: 05/12/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionSection 33, Township 5 South, Range 3 East, Salt Lake Base Meridian
Special use management