The City of Orem is proposing to reconstruct an existing water transmission line across National Forest System lands (NFS). The reconstruction line would be place in the same location and covered with existing native material.
Location
The project is located in the Pleasant Grove Ranger District.
Project timeline
1
Scoping Start
03/07/2013
2
Decision
05/2014 (Estimated)
3
Implementation
06/2014 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Orem City Alta Springs / Provo Canyon Water Line Replacement | Decision Signed Date: 05/12/2014 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Pleasant Grove Ranger District |
| Legal Land Description | Section 33, Township 5 South, Range 3 East, Salt Lake Base Meridian |