Uinta-Wasatch-Cache National Forest — Project Detail

733 projects with crawled detail · milestones · contacts · documents

Uinta-Wasatch-Cache National Forest

R04 Intermountain · 733 projects · crawled 2026-08-01
In Progress 23 Completed 653 Cancelled 57
Decision Memo 637 Environmental Assessment 81 Environmental Impact Statement 15
732 with documents 191 with comments page
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/2/2025
Neffs Canyon Trailhead area, 4326 White Way, Salt Lake City, UT 84124 · Salt Lake, Utah

Project would issue a special use permits to conduct a geotechnical exploration near the mouth of Neff's Canyon.

Special use management
Scoping Start
05/28/2025
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Adam Shaw · adam.shaw@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/25/2025
Bench east of Bountiful, approximate address is 799 Bountiful Blvd, Bountiful, UT · Davis, Utah

Bountiful City proposes to bury 850 feet of fiber line along north side of an existing access road to a buried reservoir to improve culinary water system operations.

Special use management
Scoping Start
03/25/2025
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/25/2025
State Route 110 east of Hyrum near Hardware Ranch WMA · Cache, Utah

Replace the existing aerial transmission line with a buried transmission line along State Route 101 to maintain power to Hardware Ranch and reduce risk to the line from wildfire.

Special use management
Scoping Start
03/25/2025
Decision
03/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/24/2025
A few miles South-East of Brighton%u2019s main parking lot. · Salt Lake, Utah

Brighton and USFS personnel will treat for beetle kill this will include, cut, pile, and burn up to 40 acres of trees at Brighton Ski Resort.

Recreation managementVegetation management (other than forest products)
Scoping Start
02/12/2024
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Scott Frost · scott.frost@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Forest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/14/2025
Road/dam cut on State Route (SR) 158, immediately north of Pineview Dam, between mileposts 0.1 and 0.5. · Weber, Utah

UDOT proposes to compete rockfall/hazard mitigation on 1-acre of federal land adjacent to SR158 in response to safety concerns.

Special use management
Scoping Start
03/03/2025
Decision
03/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/12/2025
Albion Basin area of the Alta Ski Resort adjacent to the Town of Alta and within upper Little Cottonwood Canyon. · Salt Lake, Utah

Replace the existing Supreme lift in a revised alignment in the same general area in order to eliminate an 8-degree bend in the existing lift.

Special use management
Scoping Start
07/24/2024
Decision
03/2025 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Larry Framme · lawrence.framme@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionTownship 3S, Range 3E, sections 9 & 10
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/12/2025
Lot 6 of the Tibble Fork Recreation Residence Tract, North Fork of American Fork Canyon Utah · Utah, Utah

Cabin in Tibble Fork Recreation Residence Tract would be demolished and rebuilt with similar size and specifications as existing

Special use management
Scoping Start
03/12/2025
Decision
03/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Russell Hanson Jr · russell.hansonjr@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/12/2025
Lot 34 of the Tibble Fork Recreation Residence Tract, North Fork of American Fork Canyon Utah · Utah, Utah

Cabin on lot 34 Tibble Fork Recreation Residence Tract built in 1952 will be demolished and a new cabin built without new disturbance to the lot.

Special use management
Scoping Start
01/02/2025
Decision
03/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Sarah Flinders · sarah.flinders@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/10/2025
Maple Canyon, above, below and through Whiting Campground · Utah, Utah

Mapleton Irrigation Company proposes to improve their existing irrigation canal in Maple Canyon to improve efficacy and reduce future maintenance and erosion risks.

Special use management
Scoping Start
02/03/2025
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/29/2025
South and west of Albion Basin. · Salt Lake, Utah

Project would remove a small portion of rocks to improve visibility and safety near area known as devils elbow.

Recreation managementSpecial area managementSpecial use management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Adam Shaw · adam.shaw@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/29/2025
North of Collins lift upper terminal. · Salt Lake, Utah

Create a bench access road from the Collins service road to the top of the Race Course ski run, terminating near the winch post. This bench will allow snowcats to access and groom the Race Course ski run when needed to disperse the density of skiers.

Recreation managementSpecial area managementSpecial use management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
06/2025 (Estimated)
Adam Shaw · adam.shaw@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/29/2025
Wildcat Base Area · Salt Lake, Utah

Project would expand wildcat base pumphouse, install 2 new pumps, and relocate existing snowmaking infrastructure affecting up to 0.30 acres

Recreation managementSpecial area managementSpecial use management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Adam Shaw · adam.shaw@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/29/2025
South and east of Albion Basin and at the bottom of Rock N Roll ski run. · Salt Lake, Utah

Remove large rocks and rock outcroppings at the entrance to the Devils Playground and reduce the grade of the terrain to improve intermediate skier access and safety, particularly during storm periods or periods of flat light.

Special use management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/29/2025
18 miles east of Logan along Saddle Creek · Cache, Utah

Improve stream and riparian habitat using low impact methods along Saddle Creek.

Wildlife, fish, rare plantsWatershed management
Scoping Start
01/20/2025
Decision
01/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Paul Chase · paul.chase@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/28/2025
Brighton Resort, approximately 16 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Brighton is proposing to shorten the existing Explorer Lift.

Recreation managementSpecial area management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Area Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/28/2025
Brighton Resort, approximately 16 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Brighton is proposing to expand an existing maintenance building.

Recreation managementSpecial area management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/28/2025
Brighton Resort, approximately 16 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Brighton is proposing to replace the existing Milly Express Lift.

Special area management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Area Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/28/2025
Solitude Resort, approximately 14 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Solitude is proposing to perform glading

Special area management
Scoping Start
04/15/2024
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Area Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/23/2025
Approximately 6 miles up Logan Canyon from the Logan office · Cache, Utah

The cabin on lot #8 of the Birch Glen tract was demolished in 2017 due to the extremely poor condition of the cabin. The owner of the demolished cabin has proposed to build a new cabin at the same site. Lot is located in an RHCA.

Special area managementSpecial use management
Scoping Start
09/03/2024
Decision
01/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Special Area Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land Description26 12N 2E 23
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/23/2025
Approximately 750 airline feet west of Tony Grove Guard Station · Cache, Utah

Place explosives storage magazines on Logan Ranger District in a manner that satisfies BATFE regulations and Forest Service requirements.

Recreation management
Scoping Start
06/06/2024
Decision
01/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Marshall Alford · marshall.alford@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/23/2025
Dewitt Springs: 5 miles north of Logan Ranger District Office. Right Hand Fork: 10 miles north of LRD. Blind Hollow: 15 miles north of LRD Office. Temple Fork: 24 miles north of LRD · Cache, Utah

USU has submitted a proposal on Logan Ranger District for a climate monitoring station at Dewitt Springs and the addition of telemetry stations at Blind Hollow,Temple,Right Hand Forks to increase efficiencies at existing climate monitoring stations

Special use management
Scoping Start
11/18/2024
Decision
01/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 12/23/2024
Competition and related activities are hosted at Brighton and Solitude Resorts. Participants ride Solitude and Brighton lifts to the top of the ski areas and hike down while shooting 3D targets. · Salt Lake, Utah

A recreation event permit for the 3D Archery Shoot held on the Salt Lake RD. Competition and related activities are hosted at Brighton and Solitude Resorts. Participants ride Solitude and Brighton lifts to the top of the ski areas and hike down&shoot

Recreation managementSpecial use management
Scoping Start
09/09/2024
Decision
11/2024 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT.2S., R.3E., S.34; T.2S., R.3E., S.27
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/26/2024
Forest Lake is located south of the American Fork River at the upper reaches of Shaffer Fork (FR194). Pittsburg Lake is located north of the American Fork River, just south of Alta Ski Area (FR007). · Utah, Utah

We are proposing to decommission two high elevation dams. The strategic decommissioning of these dams would promote a balanced ecological landscape, while allowing forest resources and conservation efforts to be focused on more important projects.

Watershed management
Scoping Start
06/05/2023
Decision
11/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
Chandler Cross · Chandler.Cross@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/6/2024
Approximately 22 miles west of Woodruff · Cache, Utah

Project would improve Boreal toad habitat in 2 locations on the Ogden Ranger District by improving pond and riparian habitat at Buck Spring and Davenport Spring

Wildlife, fish, rare plantsWatershed management
Scoping Start
11/06/2024
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Paul Chase · paul.chase@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT9N R4E Sec17 SE SW Davenport Spring: T9N R4E Sec21 SE SE
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/30/2024
Approximately 11.1 miles east of Kamas, Utah on Highway 150. 1.7 miles north of highway 150 along Boulder Creek upstream of the Confluence with North Fork Provo River. · Summit, Utah

Project would improve Columbia Spotted Frog Habitat on three ponds the Heber-Kamas Ranger District by improving pond and riparian habitat at Boulder Creek above Highway 150.

Wildlife, fish, rare plants
Scoping Start
10/18/2024
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Daniel Jauregui · daniel.jauregui@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/30/2024
Pleasant Grove Ranger District, 0.6 miles SSW from Tibble Fork Reservoir · Utah, Utah

UDOT proposes to install an automated weather station approx. 70' off of the roadway on SR-144 below Tibble Fork Reservoir. This station would be used for winter snowpack and weather record keeping to assist with avalanche forecasting for AF Canyon.

Special use management
Scoping Start
10/25/2024
Decision
10/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Russell Hanson Jr · russell.hansonjr@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/30/2024
Approximately 15 miles west of Woodruff, UT, near Dairy Ridge. · Rich, Utah

The project would restore stream and riparian areas by extending and constructing a pipeline to draw livestock away from sensitive areas. Project would not alter or cancel existing rights or authorizations.

Watershed management
Scoping Start
10/28/2024
Decision
10/2024 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Anthony Vonniederhausern · anthony.vonniederhausern@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionSec 11, 12, 14, T 8 N, R 4 E
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/19/2024
North Ogden Canyon, Weber County, Utah on the Ogden Ranger District of the Uinta-Wasatch-Cache National Forest · Weber, Utah

Proposal would replace wires and towers over 2.25 miles in North Ogden Canyon

Special use management
Scoping Start
09/18/2024
Decision
09/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/19/2024
South of Highway 189- Provo Canyon, between Vivian and Big Springs Parks · Utah, Utah

RMP alter 4 sections of powerlines, placing 3 underground and adding covered conductor to another. This will remove the powerline from USFS lands in one section. Project will reduce potential for wildfire ignition or to be affected by wildfires.

Special use management
Scoping Start
09/18/2024
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/12/2024
Entire forest, excluding all research natural areas and with restrictions in certain wilderness areas · Box Elder; Cache; Davis; Duchesne; Juab; Morgan; Rich; Salt Lake; Summit; Utah; Wasatch; Weber, Utah

Renew 6 expiring forest-wide priority use permits for ten years. The new permits will have their user days adjusted based on the use clause in the original permits. With reduction in days, 1 other district permittee was offered a forest wide permit.

Special use management
Scoping Start
08/16/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/9/2024
Salt lake ranger district · Davis; Morgan; Salt Lake; Tooele, Utah

These two universities have operated on the UWC in the past, without proper authorization. The special uses team has been working with all local universities to get the proper permits in place.

Special use management
Scoping Start
08/16/2024
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (4); 32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/31/2024
[Dry Mountain T.10S, R.2E, 26] [Loafer Mountain %u2013 T.10S, R.3E, 26] · Utah, Utah

Forest Service alongside Utah Division of Wildlife Resources propose to install four 1800-gallon guzzlers with associated aprons and fencing on Dry and Loafer Mountain to provide perennial, reliable water sources for wildlife.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
07/01/2024
Decision
07/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Drew Eline · Drew.Eline@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/31/2024
Little Valley Allotment, Tooele County, Utah · Tooele, Utah

Project would authorize the proposal to install an approximately 625-foot by 125-foot exclosure fence around a wet meadow area to protect sage-grouse habitat in the Little Valley Allotment, Vernon Management Area.

Wildlife, fish, rare plants
Scoping Start
06/07/2024
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Drew Eline · Drew.Eline@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/31/2024
Approximately 5 miles east of Ogden · Weber, Utah

Project would implement sanitation harvest on live and dead trees, improve stand and ecosystem health, and reduce fuel loading to reduce risk of Balsam Wooly Adelgid and improve stand conditions across 250-acres in Snowbasin Resort

Forest products
Scoping Start
04/04/2024
Decision
07/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Milena Rockwood · milena.rockwood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 7/31/2024
Mill Creek Canyon, Salt Lake County, Utah · Salt Lake, Utah

Road improvements for safety in Mill Creek Canyon. Cooperating Agency with Federal Highways Administration. Forest Service would make decision on new easement and proposed work outside of easement(trailhead work, temporary construction permit etc.)

Road management
Scoping Start
02/29/2024
Comment Period
03/06/2024
Objection Period Start
05/22/2024
Decision
07/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/10/2024
The project area starts approximately 33 miles south of Evanston Wyoming, along the Mirror Lake Highway (Hwy. 150) at the North Slope Road turn-off (Forest System Rd. 058) and extends to Trail Lake · Duchesne; Summit; Wasatch, Utah

Reinforce shaded fuel break along HWY150 by utilizing POD boundary to provide control feature to reduce the risk of uncharacteristic wildfires, remove public safety hazards, and protect travel corridors. Up to 327ac Roadless affected via cutpileburn

Fuels management
Scoping Start
09/20/2023
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Justin Robinson · justin.c.robinson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District; Evanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/10/2024
Northeast of Santaquin%u2019s Main Street, along the east bench hillsides · Utah, Utah

The Forest Service is responding to an application from Santaquin City to construct two debris basins on National Forest System Lands as part of a larger project to protect homes and development from flooding and/or debris flows.

Special use management
Scoping Start
04/04/2024
Comment Period
06/17/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 7/10/2024
The proposed project activities on the Streeper Creek South Allotment are located 32 miles south of Heber City, Utah and east of Strawberry Reservoir. Elevations range between 7,700 to 8,700 feet. · Duchesne; Summit; Wasatch, Utah

Project would reduce safety concerns by expanding water distribution off of FS Road 042 in the Streeper Creek South Alloemtn.

Grazing management
Scoping Start
05/06/2024
Comment Period
05/31/2024
Objection Period Start
07/2024 (Estimated)
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Amber Helmus · amber.helmus@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 7/8/2024
Project location is in the Moffit and Whitney Area of the Evanston-Mountain View Ranger District, the project area is in Summit County, Utah and is approximately 30 miles South of Evanston Wyoming · Summit, Utah

Proposed project would treat up to 36008 acres using hand and mechanical treatments and prescribed burning to reduce accumulated fuels, improve stand conditions, and improve wildlife habitat. Up to 201 acres of roadless would cut/pile/burned.

Vegetation management (other than forest products)Fuels management
Scoping Start
09/19/2023
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Bridget Baker · Bridget.Baker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Green)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/1/2024
Alta Ski Resort Base Area · Salt Lake, Utah

Alta has proposed to expand the Albion Day Lodge to the east of the existing building. Up to a three-story building is being contemplated. Alta and its architect will work with the USFS and Town of Alta in the design of the building.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/20/2024
Logan Canyon and Lefthand Fork · Cache, Utah

Remove junipers in Logan canyon and Lefthand fork by lop and scatter, lop and pile burn, and mastication over 2867ac to reduce the risk of wildfires on surrounding communities, while also restoring age class and structure of the vegetation.

Vegetation management (other than forest products)Fuels management
Scoping Start
02/20/2024
Decision
05/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Milena Rockwood · milena.rockwood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 5/20/2024
Project occurs along Strawberry Ridge, a 23 mile long north to south running ridgeline with Strawberry Reservoir to the east and Diamond Fork drainage to the west. · Utah; Wasatch, Utah

The UWC proposes to complete fuels reduction and vegetation treatments in the Strawberry Ridge project area to reduce fuel loading and better meet desired future conditions. Proposed work would occur both in and out of roadless areas.

Watershed managementVegetation management (other than forest products)Forest productsFuels management
Scoping Start
07/25/2023
Comment Period
09/01/2023
Objection Period Start
02/28/2024
Decision
05/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Anthony Gray · anthony.gray@usda.gov
NEPA / regulatory detail
Special AuthorityIra - Inventoried Roadless Area Activities Requiring Chief's Approval
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Timber Sales (Green); Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/13/2024
White Rock Spring, just north of Davenport Canyon, Grantsville Division · Tooele, Utah

Project would reconstruct an existing water transmission line and redevelop the associated spring collection infrastructure, at White Rock Spring.

Special use management
Scoping Start
07/25/2023
Decision
02/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/13/2024
Approximately 11 miles southeast of Spanish Fork. Off Highway 6, project is about 3-6 miles traveling north on Diamond Fork Road. · Utah, Utah

Forest Service alongside Utah Division of Wildlife Resources propose to restore shrublands burned by wildfire in crucial winter range in the Diamond Fork area via scalping, seeding, and shrub planting to promote healthy big game habitat.

Land management planningVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
05/13/2024
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Drew Eline · Drew.Eline@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Duchesne Ranger District · updated 5/6/2024
Headwaters of Iron Mine Creek, on the north side of the creek. · Duchesne, Utah

Proposal to construct approximately 1 mile of new access road, across the Ashley NF and UWC NF, and then begin small-scale hardrock mining operations for decorative calcite on the Ashley NF, near the headwaters of Iron Mine Creek.

Minerals and geology
Scoping Start
10/03/2023
Comment Period
10/11/2023
Objection Period Start
02/28/2024
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
David Herron · david.herron@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
ForestsAshley National Forest; Uinta-Wasatch-Cache National Forest
DistrictsDuchesne Ranger District; Heber-Kamas Ranger District
Legal Land DescriptionT2N R9W Sec 19 of Uintah Meridian, and T3N R9E Sec 18 of Salt Lake Meridian.
Decision Memo · Salt Lake Ranger District · updated 4/22/2024
Snowbird Ski Resort · Salt Lake, Utah

Snowbird proposes to install 1.4 miles of snowmaking pipe in Mineral Basin on existing, previously disturbed Lupine Loop and Bird Nest ski trails. The snowmaking pipe installation would result in approximately 7 acres of disturbance.

Special use management
Scoping Start
08/11/2022
Decision
04/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Rebecca Hotze · rebecca.hotze@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/19/2024
3 miles east of Ogden, near Mt. Ogden Peak · Weber, Utah

Snowbasin to reconfigure and expand Bear Hollow run by reshaping and recontouring to allow more natural movement. Project would affect up to 3 acres

Special use managementRecreation management
Scoping Start
01/05/2024
Decision
03/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Sean Harwood · sean.harwood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/19/2024
3 miles east of Ogden, near Mt. Ogden Peak · Weber, Utah

Replace the existing Becker Ski Lift in similar alignment to existing.

Recreation managementSpecial use management
Scoping Start
01/05/2024
Decision
03/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Sean Harwood · sean.harwood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/19/2024
3 miles east of Ogden, near Mt. Ogden Peak · Weber, Utah

Snowbasin to fill in the grotto which is at the bottom of the Bear Hollow run. This fill-in will alleviate congestion problems and help provide safer uses.

Recreation managementSpecial use management
Scoping Start
03/15/2024
Decision
03/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Sean Harwood · sean.harwood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/19/2024
3 miles east of Ogden, near Mt. Ogden Peak · Weber, Utah

Snowbasin to grade skiers left hillside with the cut material moved to the downhill side of the road to expand the overall width of the run to create safer runs and less congestion.

Recreation managementSpecial use management
Scoping Start
01/01/2024
Decision
03/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Sean Harwood · sean.harwood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/15/2024
South and west of the Albion parking area. · Salt Lake, Utah

Relocate the Ski School Conveyor and construct a new conveyor to provide access to better beginner/learning terrain at Albion Base and reduce snowmaking requirements. Reroute hiking trail, remove old conveyor base, and reclaim disturbed areas (.75ac)

Special use management
Scoping Start
11/03/2023
Decision
03/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/14/2024
Just east of Salt Lake City, about 9 miles up Big Cottonwood Canyon, on the Mill D South trail. About 3.5 miles up the Mill D north trail, near Lake Desolation. · Salt Lake, Utah

Project would construct a 0.23 mile reroute on the Lake Desolation Trail equaling to improve safety and reduce erosion.

Recreation management
Scoping Start
03/14/2024
Decision
03/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Hales · matthew.hales@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/14/2024
The proposed Pipeline Trail connection is accessed via Mill Creek Canyon Road at the Elbow Fork TH. Connection would be between the terminus of the Pipeline Trail and the Upper Pipeline Trail. · Salt Lake, Utah

Construction a new 0.15 mile trail to link the upper and lower sections of the Pipeline Trail to address safety concerns at the Elbow Fork Trailhead.

Recreation management
Scoping Start
03/14/2024
Decision
03/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Bethany Nickison · Bethany.Nickison@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
North side of Albion parking lot. · Salt Lake, Utah

The proposed action is to construct a 10,000-square-foot equipment storage building northwest of the existing vehicle maintenance building along the northern edge of the Albion parking lot to increase on-mountain storage.

Special use management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Alta ski resort · Salt Lake, Utah

Proposed Action is to create benched trails along Catherines Traverse, Thirds Traverse, and High Traverse for better snow retention, maintenance, terrain access, and snowcat access to So Long ski run affecting 1.6 acres

Special use management
Scoping Start
10/10/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3S R3E, Sections 5 and 8
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Brighton Resort, approximately 16 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Brighton is proposing to improve the existing Alpine Rose building affecting less than 0.5ac

Recreation management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Brighton Resort, approximately 16 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Install a new six-passenger chondola from the base area to the Snake Creek Lodge and develop an additional beginner area with two teaching carpets and re-grading a steep portion of the Scout trail.

Recreation management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Brighton Resort, approximately 16 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Brighton is proposing to install 138 light poles to light an additional 45 acres of existing terrain primarily served by Milly Express, allowing the resort to operate an additional lift during evening hours. Ground disturbance would be up to 1 acre

Recreation management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Brighton Resort, approximately 16 miles east of Cottonwood Heights, UT in Big Cottonwood Canyon · Salt Lake, Utah

Brighton is proposing to analyze approximately 7.5 miles of trails to augment the previously approved 4.5 miles of trails.

Recreation management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Snowbird Ski and Summer Resort; SR-210 at Meadows Drive, approximately 12 miles East of Sandy, UT · Salt Lake, Utah

Snowbird proposes to replace the Gadzoom chairlift with a detachable six-passenger chairlift in the same alignment as the existing and construct a chair storage facility at the top terminal, while removing hazard fuels.

Recreation management
Scoping Start
01/04/2024
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Snowbird Ski and Summer Resort; SR-210 at Meadows Drive, approximately 12 miles East of Sandy, UT · Salt Lake, Utah

Snowbird proposes to replace the Mineral Basin Express in the same alignment as existing, with a detachable six-passenger chairlift and raise the top terminal by approximately 6 feet to a similar elevation as the existing Summit Restaurant.

Recreation management
Scoping Start
01/04/2024
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Solitude Mountain Resort: SR-190, approximately 16 miles East of Cottonwood Heights, UT · Salt Lake, Utah

Beginner terrain improvement on three existing trails, including additional grading and widening. Two carpets would be installed along with a pre-approved sprung structure between Last Chance Lodge and the vehicle shop. Affecting up to 16ac

Recreation management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Solitude Mountain Resort: SR-190, approximately 16 miles East of Cottonwood Heights, UT · Salt Lake, Utah

Solitude proposes a combined sewer, power and water utility line, from the Last Chance Lodge to the On-Mountain Yurt. The sewer and water lines would be in separate trenches, follow NorthStar and cross Mill B South Fork Creek.

Recreation management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/4/2024
Solitude Mountain Resort: SR-190, approximately 16 miles East of Cottonwood Heights, UT · Salt Lake, Utah

Solitude proposes the construction of a small shed to house waste and an existing generator. The shed will have an approximately 2,000 square foot footprint and take place on entirely previously disturbed lands.

Recreation management
Scoping Start
11/03/2023
Decision
01/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Matthew Loscalzo · Matthew.Loscalzo@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/7/2023
Approximately 7.5 miles east of Belt Route 215 in Mill Creek Canyon. The site is located on the south side of Mill Creek, across from Clover Springs Picnic Area. · Salt Lake, Utah

The NRCS proposes to install a SNOTEL site at the existing Mill Creek snow course. The site would be 150sqft with a 20 ft meteorological tower, precipitation can, snow pillow, precipitation gage, and electronics shelter.

Special use management
Scoping Start
11/07/2023
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/7/2023
Four remote avalanche control system (RACS; Wyssen) towers located near the Mt Superior summit in Little Cottonwood Canyon · Salt Lake, Utah

UDOT proposes to install four Wyssen Towers and associated equipment on National Forest System lands near the summit of Mt Superior in Little Cottonwood Canyon for avalanche control necessary to protect traffic on State Route 210.

Special use management
Scoping Start
11/07/2023
Decision
11/2023 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/25/2023
Project location is approximately 35 miles East of Logan Utah of the Sink Road 20055 and Cheney Creek Road 20239 · Cache, Utah

Proposed project would thin up to 246 acres of overstocked mixed conifer in previously harvested stands located on the Logan District to increase stand health and vigor and reduce the risk of mountain pine beetle infestation.

Vegetation management (other than forest products)
Scoping Start
10/03/2023
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Bridget Baker · Bridget.Baker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/19/2023
East bench above Lindon City, an area known as the Canberra neighborhood. · Utah, Utah

Project would construct a new access road affecting up to 0.6 acres to two culinary water storage reservoirs and would restore the existing 1.6acre access road. Access to existing ROW will be blocked by future development.

Special use management
Scoping Start
10/02/2023
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/29/2023
T10S, R5W, Sections 7, 8, 18, 19 T10S, R7W Section 2 · Tooele, Utah

To maintain the waterline, project would replace 4.6 miles of the South Oak Brush water transmission pipeline and redevelop two existing spring collection areas on the Vernon unit of the Spanish Fork Ranger District

Facility management
Scoping Start
09/06/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Gloria Falls Trail Completed
Decision Memo · Salt Lake Ranger District · updated 9/20/2023
accessed via the White Pine Trailhead in Little Cottonwood Canyon. Hike 1 mile up the White Pine trail to take the Red Pine trail at the signed junction. Go 0.5 miles up canyon to falls · Salt Lake, Utah

: The proposed project would extend the existing Red Pine trail to follow a social trail up to Gloria Falls for up to approximately half a mile to reduce impacts to sensitive resources.

Recreation management
Scoping Start
09/14/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Zinnia Wilson · zinnia.wilson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/20/2023
Four locations within Logan Canyon, T14N, R3E Secs 10&14, T14N, R4E, Sec 34, T13N, R3E, Sec11 · Cache, Utah

Proposed scientific snow instrumentation and monitoring activities to be conducted under a special use permit at monitoring sites within in the Uinta-Wasatch-Cache National Forest in or near Logan Canyon, Utah.

Special use management
Scoping Start
09/20/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 8/31/2023
North Slope of the Uinta Mountains from East Fork Bear River on the west to the ridgeline east of West Fork Smiths Fork on the east, from the Forest Boundary on the North, Wilderness to South · Summit, Utah

The UWC proposes to complete fuels reduction and vegetation treatments in the Anadarko project area to reduce fuel loading and better meet desired future conditions. Riparian and stream channel restoration would also occur.

Fuels managementForest productsVegetation management (other than forest products)Watershed management
Scoping Start
03/14/2023
Comment Period
04/23/2023
07/09/2023
Objection Period Start
07/09/2023
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Peter Howard · peter.howard@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land Description1N 11E Sec 4&5; 2N 10E Sec 11-15 & 22-27; 2N 11E Sec 1-36; 2N 12E Sec 1-31; 2N 13E Sec 4-9, 17-19 & 30; 3N 11E Sec 13-14, 22-26 & 33-36; 3N 12E Sec 13-36; 3N 13E Sec 16-21 & 28-33 SLM
Environmental Assessment · Evanston-Mountain View RD · updated 8/31/2023
The Whitney Area is in Utah (about 12 miles from the border with Wyoming). Kamas, Utah, and Evanston, Wyoming, are the closest towns. · Summit, Utah

The Forest Service proposes to improve existing allotment infrastructure by constructing 17 new ponds (each up to 0.1 acre) on the 13,650 acre project area within the Whitney Area on the Evanston Mountain-View Ranger District.

Grazing management
Scoping Start
05/10/2023
Comment Period
07/12/2023
Decision
08/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Aimee Cameron · aimee.cameron@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
Whitney Area Stock Ponds DN and FONSIDecision Signed Date: 08/30/2023
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT1N R9E, Sections 4, 12, 14, 15 & 23
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/21/2023
Sections of US-89 in Logan Canyon (between MP 489.2 to 492.1) · Cache, Utah

Project would install 4025 linear feet of snow fencing to reduce wind-driven snow drifts along US-89 in Logan Canyon.

Road managementSpecial use management
Scoping Start
08/01/2023
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT. 14 N. R. 4 E. Sections 15, 16, & 27
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/1/2023
Approximately 3.62 miles south of Santaquin on the left side of Canyon Rd (FR014). · Utah, Utah

Project would construct 0.77 miles of connector trails allowing access between the lower and upper parcels of Santaquin City to connect the trails between the two parcels.

Recreation management
Scoping Start
07/27/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Luke Decker · luke.decker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/26/2023
The projects are located north and south of the Mirror Lake HWY, as far as 16 miles east and 5 miles north of Kamas Utah.? Areas know as Pitt and Page Hill, Soapstone, Provo Overlook, Broadhead Meadow · Summit, Utah

proposal to remove hazard trees, enhance Aspen stands, complete small wood thinning, adjust existing piles, and restore stream and riparian habitat on 1,744 acres to ensure continuity of treatments, improve habitat, and reduce fuels in Upper Provo.

Fuels managementVegetation management (other than forest products)
Scoping Start
01/02/2023
Decision
07/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Daniel Jauregui · daniel.jauregui@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/13/2023
Silver Lake Area of Big Cottonwood Canyon near Brighton, UT · Salt Lake, Utah

Project proposed to improve communication services in the Silver Lake Area of Big Cottonwood Canyon via buried fiber lines under Nordic Trail Lane and to the south of the Visitor Center parking lot for a total of 300 linear feet.

Special use management
Scoping Start
07/10/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Caitlin Campbell · caitlin.campbell@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/6/2023
Maple Canyon. Waterline runs from storage tank near the mouth of Maple canyon approx. 2 miles up canyon, with three forks in the system up sub canyons. · Utah, Utah

Project would replace the existing culinary water collection & transmission system in Maple Canyon to replace existing system. Project would temporarily affect Mapleton roadless area via overland equipment and truck access.

Special use managementFacility management
Scoping Start
07/06/2023
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Larry Framme · larry.framme@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Facility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/21/2023
Solitude Ski Resort · Salt Lake, Utah

Solitude proposes to construct an aerial adventure course and a tubing hill uphill from the Moonbeam Base Area, between Last Run and Hal's Hollow ski trails.

Special use management
Scoping Start
08/11/2022
Decision
02/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/21/2023
Brighton Ski Resort · Salt Lake, Utah

The trail would be 2.7 miles long, with an average tread width of 5 feet, Brighton has proposed a mountain biking trail starting at the top of Majestic lift and ending at the bottom of the Great Western lift.

Special use management
Scoping Start
08/11/2022
Decision
02/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/21/2023
Alta Ski Resort · Salt Lake, Utah

Alta has proposed to construct a buried 1-to-2-million-gallon tank to store water for snowmaking. This tank would be located adjacent to the existing 100,000-gallon Quincy Mine tank and tied into the existing snowmaking system.

Special use management
Scoping Start
08/11/2022
Decision
02/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/21/2023
ALta Ski Resort · Salt Lake, Utah

The old Snow Cup service road would be widened using cut and fill to allow snowcats to access and groom the Race Course run terrain with less required snow on the ground.

Special use management
Scoping Start
08/11/2022
Decision
02/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/21/2023
Solitude Ski Resort · Salt Lake, Utah

Solitude proposes to improve its existing snowmaking infrastructure system through the expansion and improvement of Stilling Pond, the construction of two new snowmaking valve houses, the implementation of new snowmaking pipelines and coverage.

Special use management
Scoping Start
08/11/2022
Decision
02/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/21/2023
Snowbird Ski Resort · Salt Lake, Utah

Snowbird proposes to replace and realign Wilbere lift. The proposed lift would be a fixed-grip, top drive quad approximately 2,500 feet in length with a vertical rise of approximately 750 feet.

Special use management
Scoping Start
08/11/2022
Decision
04/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/21/2023
Snowbird Ski Resort · Salt Lake, Utah

Snowbird is seeking Forest Service approval to install the RACS known as a Wyssen Tower. In total, Snowbird proposes to construct 23 Wyssen Towers (fifteen on NFS lands; eight on private lands).

Special use management
Scoping Start
08/11/2022
Decision
02/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 4/27/2023
Three allotments, Byrants Fork,Mud Crk. Cattle, and Current Crk., are located along Highway 40 and one allotment, West Fork, is located along Highway 35. · Duchesne; Wasatch, Utah

Improve range infrastructure on four allotments on the Heber-Kamas Ranger District. Improvements would consist of improving water systems and infrastructure, adjusting existing fencing, and expanding an existing corral.

Grazing management
Scoping Start
01/23/2023
Comment Period
03/10/2023
Objection Period Start
03/10/2023
Decision
04/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Daniel Jauregui · daniel.jauregui@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 4/26/2023
Near Lyman Lake, one mile North on FR 070 after turning off FR 058 (North Slope Rd) · Summit, Utah

Lyman Lake Recreation Camp proposes to install one six-vault and one two-vault, permanent, waterless restrooms (CXT) to manage sanitation needs. Lyman Lake Recreation Camp is proposing to install one six vault and one two vault, permanent,

Special use management
Scoping Start
06/06/2022
Decision
04/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Justin Robinson · justin.c.robinson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 4/26/2023
Approximately 2 miles northeast of Stateline Reservoir within Sage Creek Drainage. Wells would be in WY. Pipeline would start in WY and follow FS roads down to UT and back up to WY. · Summit; Uinta, Utah; Wyoming

Transworld Oil Company proposes to construct two new wells and construct and bury a steel flowline to transport natural gas, from an existing well site to an existing natural gas line. Wells in existing drillpad. Flowline in FS road ROW.

Minerals and geology
Scoping Start
03/20/2023
Decision
04/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Roger Kesterson · roger.kesterson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (17), 36 Cfr 220.6(E)(17)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 4/11/2023
From Evanston Ranger Station south along Highway 150 for 30 miles to Lily Lake Ski Area. Within Lily Lake, warming hut would be on Sage Draw Connector southwest of Beulah Yurt · Summit, Utah

Project would be to construct a warming hut on the eastern side of the Lily Lake Trail System.

Recreation management
Scoping Start
04/04/2022
Decision
03/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Bethany Nickison · Bethany.Nickison@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Lily Lake Ski System Warming Hut Decision MemoDecision Signed Date: 03/07/2023
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT. 2 N. R. 10 E. Section 21
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/11/2023
Project is located at/near Pineview Reservoir, Port Ramp, Pineview Trailhead, North Arm trailhead. · Weber, Utah

Proposed project is to repair and improve facilities at and adjacent to Pineview Trailhead and Port Ramp within existing recreation sites, make road improvements and connections, and to construct a new parking area.

Recreation managementFacility management
Scoping Start
02/01/2022
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
David Ashby · david.ashby@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22); 32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Trail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 6 North Range 1 East Sections 10 and 15
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/22/2023
Approximately  mile up Bear Trap Fork Trail in Big Cottonwood Canyon · Salt Lake, Utah

Replacement of an existing water transmission line serving private property in Bear Trap Fork of Big Cottonwood Canyon.

Special use management
Scoping Start
10/06/2022
Decision
10/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/22/2023
Outside of the Brighton Ski Resort boundary, below Mt. Wolverine. · Salt Lake, Utah

Ski Utah has proposed to increase the area where they can guide skiers. The addition will assist with the logistics of their "interconnect" and allow for operation when the Highway 2 Heaven is closed.

Special use management
Scoping Start
12/09/2022
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Mary Armbruster · mary.armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 12/20/2022
Located on the west side of the northern Stansbury Mountains, approximately 10 miles south of U.S. Highway 80 and off of Skull Valley Road. · Tooele, Utah

UDWR and FS propose to install two wildlife guzzlers in the northern Stansburys adjacent to existing guzzlers. Existing guzzlers are running dry early in the season due to drought and high usage.

Wildlife, fish, rare plants
Scoping Start
12/19/2022
Decision
12/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Drew Eline · Drew.Eline@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 12/7/2022
The proposed reroutes of the Great Western Trail are located in upper Mill Creek Canyon, east of Upper Big Water Trailhead, just over 3 miles from the road. · Salt Lake, Utah

Reroute approximately 0.30 miles of the Great Western Trail in Mill Creek Canyon to move it away from the riparian area and lower the overall trail grade.

Recreation management
Scoping Start
12/01/2022
Decision
12/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Garret Nuzzo-Jones · garret.nuzzo-jones@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 12/1/2022
Hillside above Dogwood Picnic Area, 1.2 Miles up from the mouth of Big Cottonwood Canyon, just outside Salt Lake City · Salt Lake, Utah

Project would extend Bonneville Shoreline Trail roughly one quarter of a mile east into Big Cottonwood Canyon, to use Dogwood Picnic Area as a trailhead. The Decision Notice from 2010 identified Oakridge as the trailhead.

Recreation management
Scoping Start
11/30/2022
Decision
12/2022 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Zinnia Wilson · zinnia.wilson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/11/2022
Approximately 16 miles up Logan Canyon in the Temple Fork Drainage · Cache, Utah

Remove encroaching conifer in aspen stands and riparian area of Spawn Creek. Subalpine fir/Douglas fir < 20" diameter at breast height (dbh) would be lopped and scattered, 21-35" dbh would be girdled and left standing, > 36" would be left in place.

Vegetation management (other than forest products)
Scoping Start
10/11/2022
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Paul Chase · paul.chase@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 10/6/2022
Snowbasin Resort Base Area · Weber, Utah

Most of the channel realignment project is on private land, but the upper approximate 100 feet lies on the USFS. Realignment of this upper section is necessary to achieve the alignment that will make the rest of the channel system properly function.

Special use management
Scoping Start
10/06/2022
Decision
11/2022 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
G Monument Rebuild Completed
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/3/2022
Approximately 3/4 of a mile NE of the Battle Creek Trailhead on the Wasatch Front adjacent to Pleasant Grove. · Utah, Utah

Pleasant Grove City proposes to rebuild their G monument, which is in disrepair and is contributing to an impaired viewshed, soil erosion and unauthorized social trails. It's on the hillside east of town between Battle Creek and Grove Creek trails.

Special use management
Scoping Start
09/27/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Larry Framme · larry.framme@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/26/2022
The same location as the existing Crest Express lift at Brighton resort. · Salt Lake, Utah

Brighton proposes to replace Crest Express with a new lift constructed in essentially the same alignment. The new lift would be an efficient Doppelmayr D-line six-passenger detachable chairlift.

Special use management
Scoping Start
08/10/2022
Decision
09/2022 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/20/2022
Snowbird Ski Resort · Utah, Utah

Snowbird proposes to construct the Cirque Traverse Skiway which would extend off the existing mountain road that leads to the Cirque Traverse trail.

Special use management
Scoping Start
09/20/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/20/2022
Firs Tract · Salt Lake, Utah

The decommissioning and rebuilding of a storm damaged recreation residence in the Firs Tract.

Special use management
Scoping Start
09/20/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/14/2022
The project is located on the western side of Pine Valley 9 miles from Francis, Utah. · Wasatch, Utah

Stabilize the river bank and protect from further erosion by installing approximately 165 feet of rock rip-rap and willow pole plantings along the west bank of the Provo River in Pine Valley, located NE of Woodland, UT.

Watershed management
Scoping Start
08/29/2022
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Daniel Jauregui · daniel.jauregui@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 9/14/2022
Snowbasin Ski Resort · Weber, Utah

Snowbasin Resort has proposed to place two Gaz-ex exploders at the top of Mt. Allen for the purpose of avalanche mitigation and operation of the tram in years of heavy snowfall.

Special use management
Scoping Start
08/23/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Alta Ski Resort · Salt Lake, Utah

Modify the old Ballroom access road to a constant design grade of 7.7% to eliminate the need for skiers to check their speed and better manage snow cover on the traverse. Modification would be completed by cut and fill.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 8/31/2022
Snowbasin Ski Resort · Weber, Utah

Snowbasin Resort has proposed to install snowmaking equipment along the Boardwalk route between Bullwinkle run and the top of wildcat. The site will be accessed by existing roads and all materials will be transported via that road system.

Special use management
Scoping Start
08/23/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Solitude Ski Resort · Salt Lake, Utah

Solitude Ski Resort has proposed to remove the old Eagle Express chairlift and replace it with a new detachable quad lift. The new lift would be located in a similar alignment.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Alta Ski Resort · Salt Lake, Utah

Modify the High Mambo ski run to reduce the pitch and blind spots which have resulted in serious injury to skiers. The project would include filling a depression at the bottom of the run and removing a hump in the middle of the run.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Brighton Ski Resort · Salt Lake, Utah

The Brighton has proposed a mountain biking trail that would be 2.7 miles long, with an average tread width of 5 feet, starting at the top of Majestic lift and ending at the bottom of the Great Western lift.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Solitude Ski Resort · Salt Lake, Utah

Solitude proposes to construct approximately 11 miles of mountain biking and hiking trails located on NFS lands and adjacent private lands between the Roundhouse Restaurant and the Moonbeam Base Area.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Alta Ski Resort · Salt Lake, Utah

Alta proposes to construct a new ski patrol building approximately 90 feet North of the existing structure, and to use the existing structure for storage. The footprint of the new building would not exceed 750 square ft.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Alta Ski Resort · Salt Lake, Utah

Alta proposes to place fill on Sunnyside run between the summer road and Albion Meadows trail to reduce the grade of the Sunnyside run below the summer road.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/31/2022
Alta Ski Resort · Salt Lake, Utah

Alta proposes to develop the snowmaking corridors necessary to provide a base for groomed run skiing from the top to the bottom of the Supreme lift, extending from a vault south of Alf%u2019s Restaurant to Cat Track below Grand Junction.

Special use management
Scoping Start
08/11/2022
Decision
09/2022 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Christopher Sailor · christopher.sailor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/31/2022
6 miles south of Vernon City. 2.5 mile west of Benmore administrative site. · Tooele, Utah

Project adds 2,471 acres to the original 200 acres of shrub planting area south of Vernon near the Benmore lek to improve critical nesting habitat for sage-grouse. Habitat loss in the area has put the sage-grouse population at risk of extirpation.

Vegetation management (other than forest products)
Scoping Start
08/18/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Drew Eline · Drew.Eline@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/23/2022
Approximately 10 miles southwest of McKinnon, WY · Sweetwater, Wyoming

Interstate Irrigation and Reservoir Company has proposed reconstruction of a stream diversion on Burnt Fork of Henrys Fork River, which currently divers irrigation water into an unnamed ditch. The new diversion will include a fish screen.

Special use management
Scoping Start
07/21/2022
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/23/2022
Foothills adjacent to U of U hospital. Approximately  mile north of Red Butte Canyon · Salt Lake, Utah

The Forest Service is proposing to convey the encumbered land, approximately 0.05 acres to the University of Utah, for fair market value. Proceeds from the conveyance will be retained by the Forest and used for other acquisition.

Land ownership management
Scoping Start
02/24/2022
Decision
01/1970 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
Decision Decided Date07/01/2026
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/22/2022
Approximately 25 miles southeast of Spanish Fork, off Highway 6 and Sheepcreek Road · Utah, Utah

Restore 2,981 acres of native shrub species in the Sheepcreek area to address threats to crucial winter foraging area for deer, elk, and moose.

Vegetation management (other than forest products)
Scoping Start
08/18/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Drew Eline · Drew.Eline@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/22/2022
Approximately 500 feet South East of Snowbasin Skyline/Great Western TRHD parking lot and within existing buried utility corridor. Adjacent to Green Pond Trail. · Weber, Utah

AT&T proposes to construct a wireless communications facility (90 feet by 25 feet fenced enclosure, 80-foot Monopine antenna, equipment shelter, generator, and propane tank) at Snowbasin Ski Area, adjacent to the Skyline-Great Western Trailhead.

Special use management
Scoping Start
08/22/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Charles Rosier · charles.rosier@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/15/2022
Along State Rt. 158 from just below Pineview Reservoir Dam, along west side of the reservoir, to the intersection with 2200 N, Eden, UT., approx. 375 ft. · Weber, Utah

Rocky Mountain Power will convert overhead power lines to underground lines from the Forest boundary below Pineview Dam along Rt. 158 including lines to three recreation sites: Windsurfer Beach, Port Ramp Marina, and Ogden Pineview Yacht club.

Special use management
Scoping Start
07/06/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Larry Framme · larry.framme@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/9/2022
From Springville head east on Canyon Road for 9 miles staying right at the fork in the road until you reach the trailhead on the south side of the road. · Utah, Utah

The first 0.5-0.7 mile of the Kirkman Hollow trail will be reconstructed to restore better grades and trail stability.

Recreation management
Scoping Start
08/01/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Sarah Flinders · sarah.flinders@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/1/2022
The Currant Creek Developed Campground is located approximately 40 miles East of Heber, UT on Highway 40 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

The Heber-Kamas District is planning to construct a 1.0-mile fence on the south side of the Currant Creek Developed Campground to prevent permitted cattle on the Currant Creek livestock allotment from entering the developed campground.

Recreation managementGrazing managementSpecial use management
Scoping Start
07/27/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Amber Helmus · amber.helmus@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/1/2022
Ledgefork Developed Campground is located approximately 19 miles Northwest of Kamas, UT on FS road # 033 and 051 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Summit, Utah

The Heber-Kamas District is planning to construct a 0.5-mile fence on the south side of the Ledgefork Developed Campground to prevent permitted cattle on the Weber River livestock allotment from entering the campground.

Special use managementRecreation managementGrazing management
Scoping Start
07/27/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Amber Helmus · amber.helmus@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/10/2022
Alta Ski Area - south of Albion Basin Campground. · Salt Lake, Utah

Alta proposes adjusting an existing service road to create a more functional route that bypasses the concentration of cabins in the Albion Alps subdivision. The route adjustment would be made on NFS land and Alta's private property.

Special use management
Scoping Start
07/08/2022
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/8/2022
Albion Basin Campground at Alta Resort · Salt Lake, Utah

Alta Ski Area proposes to re-route the lower part of the Rock n Roll ski run to bypass campsite #9 in the Albion Basin Campground.

Special use management
Scoping Start
07/08/2022
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/8/2022
Solitude, in Big Cottonwood Canyon · Salt Lake, Utah

Solitude proposes to upgrade and realign the existing Down and Out mountain biking trail and build two new trails: an uphill mountain biking trail and a multi-use trail. A pump track between the Down and Out and the multi-use trail is also proposed.

Recreation management
Scoping Start
07/07/2022
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 7/5/2022
Wasatch County, Utah, on the Uinta-Wasatch-Cache National Forest east of Heber City along Highway 35. · Wasatch, Utah

Proposal to use commercial timber harvest (salvage sales) to remove the dead overstory, reforest with spruce seedlings where needed, and close the no longer needed roads. This DNA is tiered to the original North Heber Salvage Project EA.

Vegetation management (other than forest products)
Scoping Start
05/17/2022
Comment Period
05/17/2022
Objection Period Start
05/2022 (Estimated)
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Scott Frost · scott.frost@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Maintenance; Timber Sales (Salvage)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/24/2022
Payson, UT. Base of the east slope of Little Mountain parallel to the Forest boundary and Goosenest Dr. for approximately 2,500 feet in length. · Utah, Utah

Payson City will construct a new buried 12.4 kV electric transmission line. Proposed right-of-way is approximately 2500 feet in length and 20 feet in width, along the Forest Boundary in section 21.

Special use management
Scoping Start
04/29/2022
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Larry Framme · larry.framme@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT .9 S., R. 2 E., Sec 21
Decision Memo · Logan Ranger District · updated 5/19/2022
Approximately 3 miles north and east of Hardware Ranch. · Cache, Utah

Proposal to masticate approximately 2,747 acres of Juniper within a 3,780-acre project boundary to provide protection of habitat from high intensity wildfire near the Hardware Ranch Wildlife Management Area.

Wildlife, fish, rare plants
Scoping Start
02/22/2022
Decision
05/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Masako Wright · masakowright@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Mahogany Ridge Juniper Mastication Decision MemoDecision Signed Date: 05/17/2022
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Salt Lake Ranger District · updated 4/27/2022
Salt Lake County, Utah, Alta. · Salt Lake, Utah

Proposal to construct a utility right-of-way and widen the existing Albion Basin Road (National Forest System Route (NFSR) 028)to improve access to the proposed Patsey Marley Hill Property and Subdivision.

Special use management
Scoping Start
02/21/2017
Comment Period
02/21/2020
Objection Period Start
11/21/2021
Decision
04/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Patsey Marley Shrontz Roadway Improvements Decision NoticeDecision Signed Date: 04/26/2022
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/5/2022
Road and trails throughout the Logan Ranger District · Cache, Utah

This is a continuation of an existing special uses permit for a competitive race that has been in place for approximately 25 years. It takes place on designated trails and roads over the course of 2 days on the last Friday/Saturday of September.

Special use management
Scoping Start
02/01/2022
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Amy Forsgren · amy.forsgren@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/5/2022
Green Canyon Yurt Location near Wilderness Trailhead; Up Bunchgrass Trail; Up Steam Mill Trail. · Cache, Utah

The existing special uses permit allows for 3 yurts to be located and rented on National Forest Lands at Green Canyon. This is a modification in the permit to increase service days by 20 percent and add 600 days to allow for summer use of the yurts.

Special use management
Scoping Start
02/01/2022
Decision
04/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Amy Forsgren · amy.forsgren@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 3/8/2022
From Francis, UT, take SR 35 for 7.9 miles, Turn left onto Cedar Hollow Rd for .8 miles to trailhead. · Summit, Utah

Proposal to reroute a segment of trail to address resource damage including constructing 1.5 miles of new trail and removing 1 mile of old trail.

Recreation management
Scoping Start
02/22/2022
Decision
03/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Nicholas Brown · nicholas.r.brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Aspen Pass ATV Trail Reroute 3301 Decision MemoDecision Signed Date: 03/01/2022
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/8/2022
1.5 Miles East of Millcreek UT. in Millcreek canyon. · Salt Lake, Utah

Proposal to construct shaded fuel breaks to break up the continuity of unhealthy stands, connect natural barriers to provide protective buffers around infrastructure and assist with fire suppression efforts.

Fuels management
Scoping Start
02/03/2022
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
Guy Wilson · guy.wilson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Mill Creek Stewardship Fuels Treatments Decision MemoDecision Signed Date: 03/04/2022
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 3/8/2022
From Kamas, UT drive east on Hwy 150 for 11.8 miles, then turn left on North Fork road 496 for 1.8 miles. · Summit, Utah

Proposal to reconstruct 0.7 miles of the North Fork Loop Ski-SNO-3409 trail.

Recreation management
Scoping Start
02/22/2022
Decision
03/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Nicholas Brown · nicholas.r.brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 3/8/2022
The canyon north of Yellow Pine Trailhead which is 6.2 miles up Mirror Lake Hwy 150 from Kamas, UT. · Summit, Utah

Proposal to add 2 more directional loops to phase 1 in the Slate Creek drainage area. This will be a 9.2 mile, class 3 trail system with an 18 inch tread. A 0.4 mi access trail will also be constructed from Yellow Pine trail to Yellow Pine Campground

Recreation management
Scoping Start
11/23/2021
Decision
03/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Nicholas Brown · nicholas.r.brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/12/2022
The Albion lift is on the norther portion of Alta Ski Area within resort's special use permit boundary. Located up Little Cottonwood Canyon. · Salt Lake, Utah

Alta Ski Area proposes to remove the Albion Chairlift. The Albion lift is a fixed grip, center pole chairlift that was installed in 1976. It is rarely operated and maintained only to provide capacity if the Sunnyside lift breaks down.

Special use managementRecreation management
Scoping Start
09/01/2021
Decision
01/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Baldy RAC Sites Completed
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/12/2022
North face of Mount Baldy. Project is within Alta Ski Area's special use permit boundary. Located up Little Cottonwood Canyon. · Salt Lake, Utah

Alta Ski Area is proposing a phased installation of Remote Avalanche Control (RAC) devices on Mount Baldy for avalanche mitigation.

Recreation managementSpecial use management
Scoping Start
09/01/2021
Decision
01/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/7/2022
Project location is within the special use boundary of Solitude Mountain Resort up Big Cottonwood Canyon. Specifically, it is within the Apex Express terrain pod. · Salt Lake, Utah

Solitude Mountain Resort is proposing to improve the skiing experience and snow surface quality in the Apex Express terrain pod by widening Blue Spruce ski trail and adding snow making infrastructure along the north western edge of Blue Spruce.

Recreation managementSpecial use management
Scoping Start
09/01/2021
Decision
01/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/5/2022
Project is within the special use permit boundary of Brighton Resort up Big Cottonwood Canyon. · Salt Lake, Utah

Brighton Resort will reconfigure the teaching area around the Explorer Lift and Magic Carpet to accommodate the increased needs for beginner terrain.

Recreation managementSpecial use management
Scoping Start
01/04/2022
Decision
01/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 12/16/2021
Alta, Utah %u2013 Alta Ski Area: Approximately 28 miles southeast from Salt Lake City in Little Cottonwood Canyon. · Salt Lake, Utah

Proposal to connect the existing Snakepit Trail to the larger Albion Basin trail system.

Recreation management
Scoping Start
10/04/2021
Decision
12/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Zinnia Wilson · zinnia.wilson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Snakepit Trail Construction Decision MemoDecision Signed Date: 12/15/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 11/30/2021
At the base of Farmington Canyon, just east of Farmington City · Salt Lake, Utah

Proposal to construct 1.14 miles of trail on Forest Service Land between the Farmington City and the Forest Service parking area for the existing Upper Farmington Creek trail.

Recreation management
Scoping Start
10/04/2021
Decision
11/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Zinnia Wilson · zinnia.wilson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Lower Farmington Creek Trail Decision MemoDecision Signed Date: 11/29/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/23/2021
Bear River Ranger Station, Christmas Meadows · Summit, Utah

Proposal from Union Telephone Company to install buried conduit for telecommunication cables (fiber optic) connecting existing infrastructure in Summit County, Utah. Cables will be installed in the UDOT ROW and NFS lands.

Special use management
Scoping Start
10/18/2021
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Union Telephone Fiber Optic Decision MemoDecision Signed Date: 10/20/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 11/22/2021
Non-Motorized area south of the Bear Lake overlook shown as a non-motorized on the Logan winter travel plan, including Sunrise Campground and Limber pine trailhead. · Rich, Utah

Proposal to groom non-motorized snow trails with a snowmobile. Grooming will occur on designated winter trails during low use times. Parking will occur at the Bear Lake Overlook and Limber Pine Trailhead.

Special use management
Scoping Start
10/29/2021
Decision
11/2021 (Estimated)
Implementation
12/2021 (Estimated)
Project documents
David Ashby · david.ashby@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Bear Lake Overlook Snow Trail Grooming Decision MemoDecision Signed Date: 11/19/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 11/22/2021
Located on the east bench of Santaquin, Utah. Santaquin is approximately 20 miles south of Provo Utah. · Utah, Utah

Proposal to conduct geotechnical investigations using a large truck and drill rig on USFS property including three boreholes that will extend into the earth approximately 45-60 feet deep. The bore holes are between 4-6 inches in diameter.

Watershed management
Scoping Start
11/03/2021
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Luke Decker · luke.decker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Santaquin East Bench Debris Basin Geotech Decision MemoDecision Signed Date: 11/19/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/3/2021
Located just north of the Lost Creek Campground and on both sides of the Mirror Lake Highway · Summit, Utah

Proposal to commercially remove dead overstory trees greater than 8 inches within 241 acres of spruce-fir stands between Lost Lake and the Bald Mountain Overlook to improve soil, water, and vegetation conditions within Upper Provo Watershed.

Forest products
Scoping Start
10/08/2021
Decision
11/2021 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Scott Frost · scott.frost@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
Lost Creek Vegetation Treatment Decision MemoDecision Signed Date: 11/03/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/7/2021
Tibble Fork Reservoir to Silver Lake Flat Reservoir · Utah, Utah

Proposal to install approximately 2.3 miles of new conduit along the National Forest System Road (NFSR) 010 and FR 008 to Silver Lake Flat Reservoir and 2 cellular antenna nodes (35-foot tall poles).

Special use management
Scoping Start
09/24/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Russell Hanson Jr · russell.hansonjr@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Silver Lake Distributed Antenna System (DAS) Extension Decision MemoDecision Signed Date: 10/05/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/4/2021
Located on the South Westernmost portion of the Stansbury Mountains in Condie Meadows and Barlow Canyon. · Tooele, Utah

Proposal from Castle Rock Land and Livestock, to reconstruct a water transmission line in Barlow Canyon. Activities include trenching and installing two new HDPE water transmission lines, a 12 inch irrigation pipeline and a 3 inch stock water line.

Special use management
Scoping Start
06/29/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Barlow Creek Pipeline Reconstruction Decision MemoDecision Signed Date: 09/24/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/26/2021
Big Cottonwood Canyon · Salt Lake, Utah

Proposal from Rocky Mountain Power (RMP), to reconstruct and relocate portions of the main electric transmission line in Big Cottonwood Canyon. The project will mitigate wildfire hazards posed by the current transmission line.

Special use management
Scoping Start
07/06/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Big Cottonwood Canyon Powerline Reconstruction Decision MemoDecision Signed Date: 08/05/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 8/26/2021
Directly east of the bottom-most portion of the horse camp loop adjacent to Blackhawk Campground, but outside of the camp ground administrative boundary. · Utah, Utah

Harvest approx 53 acres of dead standing trees greater than 8 inches dbh. Cut trees would be skid to landing areas and hauled to a nearby mill. No temp road is expected, although some renovation of about 0.35 miles of an admin FS Rd would be required

Fuels managementForest products
Scoping Start
07/13/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
Blackhawk Fuelwood Reduction 2 Decision MemoDecision Signed Date: 08/11/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/26/2021
Mill Creek Canyon, between the Forest boundary and Firs Summer Home Tract, including Porter Fork. · Salt Lake, Utah

Proposal from Rocky Mountain Power to rebuild and relocate portions of the electric transmission lines in Mill Creek Canyon, in order to mitigate wildfire hazards posed by the aging line.

Special use management
Scoping Start
07/06/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Mill Creek Electric Transmission Line Location Decision MemoDecision Signed Date: 08/16/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 8/26/2021
Mount Timpanogos Trail on Pleasant Grove Ranger District. · Utah, Utah

Proposal to improve the trail alignment and increase safety for trail users. Last year multiple rockslides occurred on the old route and even as the Utah Conservation Crew was working this season, rockslides continued.

Recreation management
Scoping Start
08/04/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Jentry Cataluna · jentry.cataluna@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Mount Timpanogos Trail Reroute Decision MemoDecision Signed Date: 08/17/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
West Hodges Pond Completed
Decision Memo · Logan Ranger District · updated 8/6/2021
Approximately 20 miles northeast of Logan, UT, just south of West Hodges Creek. · Cache, Utah

Proposal to construct a pond (0.04 acres) up a tributary to West Hodges Creek to capture annual snowmelt and flows from a nearby spring.

Grazing management
Scoping Start
07/20/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
West Hodges Pond Decision MemoDecision Signed Date: 08/06/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/5/2021
Moonbeam base area at Solitude Mountain Resort. Located up Big Cottonwood Canyon in Salt Lake County, Utah. · Salt Lake, Utah

Solitude will realign the existing conveyor, maintenance road, and containing rock wall, as well as regrade the project area. The project will increase on-snow skier circulation and availability of terrain.

Recreation managementSpecial use management
Scoping Start
07/06/2021
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/21/2021
Project is located within the SUP boundary of Alta Ski Resort up Little Cottonwood Canyon. · Salt Lake, Utah

The proposed action is to restore wetland areas at 6 sites at Alta Ski Resort. This project is part of the wetland mitigation required by the Army Corps of Engineers for wetland impacts that resulted from the Albion Parking Lot expansion.

Watershed managementRecreation managementSpecial use management
Scoping Start
07/12/2021
Decision
07/2021 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 7/20/2021
Approximately 20 miles northeast of Logan, UT, just south of West Hodges Creek. · Cache, Utah

Proposal to construct a pond (0.04 acres) up a tributary to West Hodges Creek to capture annual snowmelt and flows from a nearby spring.

Grazing management
Scoping Start
07/20/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 7/17/2021
Snowbasin Mountain Resort · Weber, Utah

Replace Middle Bowl lift, currently a fixed-grip triple chairlift, with a detachable four- or six-person chairlift. The lift would be 4,767 feet long, with a top drive terminal, bottom terminal, and 16 intervening lift towers.

Special use managementRecreation management
Scoping Start
06/22/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 7/9/2021
Approximately 20 miles northeast of Logan, UT, near Twin Creek Corral. · Cache, Utah

Proposal to construct the Twin Creek pipeline (approx 0.81 miles) in its existing location with minor rerouting to avoid aspen groves. The pipeline will extend from the spring source to Twin Creek Corral with a spur to the rider camp.

Grazing management
Scoping Start
06/25/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Twin Creek Water System Decision MemoDecision Signed Date: 07/08/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Ogden Ranger District · updated 7/8/2021
By Pineview Reservoir and Huntsville City, near the intersection of SR39 and SR167 · Weber, Utah

Proposal to construct a helibase on National Forest System land near the town of Huntsville and Pineview Reservoir in Weber County, Utah. The helibase would be used to house the Wasatch Helitack crew and up to three helicopters.

Special use management
Scoping Start
04/29/2021
Comment Period
06/04/2021
Objection Period Start
07/2021 (Estimated)
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Sean Harwood · sean.harwood@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/6/2021
Approximately 21 miles East of Heber, UT. 1.5 miles going north on Little South Fork Trail · Wasatch, Utah

Proposal to reroute a trail to address resource damage. The reroute will include constructing 0.3 miles of new trail and removing 0.15 miles of old trail.

Recreation management
Scoping Start
06/25/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Nicholas Brown · nicholas.r.brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Little South Fork Reroutes Decision MemoDecision Signed Date: 07/01/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/6/2021
Approximately 32 miles East of Kamas, UT · Summit, Utah

Proposal to reroute a segment of trail to address resource damage by constructing 0.58 miles of new trail and removing 0.4 miles of old trail.

Recreation management
Scoping Start
06/25/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Nicholas Brown · nicholas.r.brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Lofty Lake Loop Reroutes Decision MemoDecision Signed Date: 07/02/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 6/28/2021
Cemetery Point at Pineview Reservoir · Weber, Utah

Proposal to place between 8 and 11 anchors along approximately 275 feet of a tire water break. Due to low water conditions at Pineview this year, the cove at Cemetery Point would not be accessible.

Special use management
Scoping Start
05/19/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Pineview Waterbreak at Cemetery Point Decision MemoDecision Signed Date: 06/25/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 6/25/2021
Approximately 20 miles northeast of Logan, UT, starting at Twin Creek Corral and extending north to Bunchgrass Creek. · Cache, Utah

Proposal to reconstruct the Twin Creek fence beginning at Twin Creek Corral and extending north approximately 2.1 miles to Bunchgrass Creek.

Grazing management
Scoping Start
06/23/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Twin Creek Allotment Fence Decision MemoDecision Signed Date: 06/25/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 6/21/2021
The project is located 5.17 miles east from the Forest boundary on the Millville Peak Road, FSR 20168. · Cache, Utah

Proposal to realign 700 linear feet of FSR 20168 at milepost 5.17 on a stable slope to circumvent the unstable slump on the existing road prism. Abandoned road alignment will be obliterated.

Road management
Scoping Start
06/08/2021
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ryan Stone · rlstone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Road Improvements/Construction
Millville Peak Road Realignment Decision MemoDecision Signed Date: 06/17/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 6/14/2021
Approximately 15 miles South East of Payson · Utah, Utah

Proposal to add an upper Grotto trail starting from the existing Ski Lift parking area. The new addition will be approximately 1 mile and will begin above the Grotto area and drop into the existing trail just below the Grotto falls.

Recreation management
Scoping Start
06/08/2021
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Jentry Cataluna · jentry.cataluna@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Grotto Trail Construction Decision MemoDecision Signed Date: 06/14/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/10/2021
Approx. 5 miles up Emigration Canyon, and another up Pinecrest Canyon turn off. · Salt Lake, Utah

Proposal to relocation powerline from aerial to underground burial whose primary purpose is to eliminate the risk of wildfire from downed powerline. Existing overhead lines and equipment will be removed and buried on approx. 0.5 miles of NFS lands.

Special use management
Scoping Start
05/26/2021
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Powerline Wildfire Rebuild, Pinecrest Canyon Decision MemoDecision Signed Date: 06/09/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 6/8/2021
The project is located in and adjacent to the City of Mapleton, West of the Fire Road, ~2 miles South of Maple canyon along the Forest boundary in little slide creek · Utah, Utah

Proposal to allow Mapleton City to cross a peninsula of NFS lands to move livestock from one parcel of property to another.

Grazing management
Scoping Start
06/07/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Luke Decker · luke.decker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (7)
Special AuthorityTrailing And Crossing Of Livestock, Sec. 402 Of Flpma
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Authorizations
Mapleton Grazing Crossing Permit Decision MemoDecision Signed Date: 06/08/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/8/2021
Ogden Ranger District - Public Grove Area · Weber, Utah

Proposal to remove the 1/3 mile of 015 road from the Ogden Travel Plan.

Recreation managementRoad management
Scoping Start
04/19/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
David Ashby · david.ashby@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning
Public Grove Road 015 Removal Decision MemoDecision Signed Date: 06/08/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 5/28/2021
Wyssen Towers will be located within Snowbird Resort's special use permit boundary up Little Cottonwood Canyon. · Salt Lake, Utah

The proposed project involves construction and installation of 16 Wyssen Towers (nine on NFS lands; seven on private lands). Total disturbance for all towers would be less than 0.1 acre within Snowbird SUP area.

Special use managementRecreation management
Scoping Start
05/25/2021
Decision
05/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 5/26/2021
Neff%u2019s Canyon Trailhead parking lot. Located directly east of the town of Olympus Cove. · Salt Lake, Utah

Proposal to improve trailhead

Recreation managementFuels managementWatershed management
Scoping Start
05/06/2021
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Nathan Siemers · nathan.siemers@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Watershed Improvements
Neff's Parking Area Trail and Fire Safety Improvements Decision MemoDecision Signed Date: 05/26/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 5/19/2021
The Stansbury Front Trail, between Martin Fork and South Willow Canyon · Tooele, Utah

Proposal to reroute a motorized single-track trail to increase safety, reduce erosion, and reduce the number of miles in wilderness.

Recreation management
Scoping Start
05/12/2021
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Matthew Hales · matthew.hales@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Stansbury Front Reroute in Martin Fork Decision MemoDecision Signed Date: 05/19/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 4/27/2021
Mouth of Rock Canyon, Provo, Utah · Utah, Utah

Proposal from Provo City to improve 0.58 miles of existing trails, create 0.35 miles of new connecting trails, and install two bridges across the ephemeral streambed in Rock Canyon.

Recreation management
Scoping Start
04/06/2021
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Sarah Flinders · sflinders@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
Rock Canyon Trailhead Improvements Decision MemoDecision Signed Date: 04/27/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/23/2021
Mill Creek Canyon, Salt Lake Ranger District · Salt Lake, Utah

Proposal to construct three miles of single-track hiker and biker trail to connect Big Water and Elbow Fork Trailheads.

Recreation management
Scoping Start
02/28/2019
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/20/2021
Project originates in Morgan County and follows SR 167 (Trappers Loop) to Pineview and Huntsville. · Weber, Utah

Proposal to install a fiber optic telecommunications cable and facilities to upgrade services to the Towns of Mountain Green, Huntsville, Eden and Liberty. Cable will be buried adjacent to existing roads and streets. Total NFS ROW is 5500 ft by 25 ft

Special use management
Scoping Start
03/10/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
All West Fiber Optic Huntsville Decision MemoDecision Signed Date: 04/20/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/12/2021
Davis County. Trailhead located in south Farmington on Wasatch Front. Approximately .3 mi (North Site) and .7 miles (South Site) from trailhead. · Salt Lake, Utah

Proposal to construct two new sections of trail to replace two problematic sections. New trail segments will be designed with grade reversals, drainage dips, and drains to shed water and prevent erosion.

Recreation management
Scoping Start
04/07/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Davis Creek Trail Construction Decision MemoDecision Signed Date: 04/12/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/12/2021
Several miles South and East of Draper City, UT · Salt Lake, Utah

Proposal to adopt the Lower Jacobs Ladder trail as it is currently used by most bikers including a small reroute.

Recreation management
Scoping Start
12/10/2020
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Lower Jacob's Ladder Trail Decision MemoDecision Signed Date: 04/12/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 4/7/2021
3 miles north east of Nephi UT. 1 mile north of SR. 132. · Juab, Utah

Proposal to masticate, lop and scatter a shaded fuel break, and cut and chip on public, private, and state lands in coordination with City and County. Juniper and Oak brush treatments to reduce fire hazard on 30-60% of NFS lands.

Fuels management
Scoping Start
03/18/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Reese Flat Fuels Mitigation Decision MemoDecision Signed Date: 04/07/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/7/2021
West of the Trial Lake Dam · Summit, Utah

New 20-year term permits will be issued for both Historic Cabins at Trial Lake, Maycock and Grix since both permits are set to expire in a few years.

Special use management
Scoping Start
03/10/2021
Decision
03/2021 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Trial Lake Historic Cabins Permit Reissuance Decision MemoDecision Signed Date: 03/11/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 4/7/2021
5 miles south of Vernon City. 1 mile west of Benmore admin site. · Tooele, Utah

Proposal blade soil to scalp 1-2 foot strips with a dozer to plow strips throughout thin shrub stands.

Wildlife, fish, rare plants
Scoping Start
03/11/2021
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Vernon Shrub Planting Decision MemoDecision Signed Date: 04/07/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/31/2021
The project area is approximately 10 miles east of Salt Lake City on Interstate-80, on the south side of the freeway in Parley%u2019s and Lamb's Canyons, with a small portion of the Project Area extending · Salt Lake, Utah

Proposal to treat approximately 2,000 acres using mechanical bull hog equipment and chainsaws to masticate, hand cut, lop and scatter, pile and burn or chip; or broadcast burn excess fuels in the area.

Fuels management
Scoping Start
03/16/2021
Decision
03/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (9)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/20/2021
Supreme lift side of Alta Ski Area within the Special Use Permit boundary. · Salt Lake, Utah

ASL proposes completing the Corkscrew project (original decision signed in 2014) and improving an additional intermediate exit by combining Nina's Curve and Schuss Gully into one run.

Special use managementRecreation management
Scoping Start
10/07/2020
Decision
03/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/16/2021
At the mouth of Rock Canyon east of Provo, Utah · Utah, Utah

Proposal from Provo City to install 1,200ft of 24in HDPE pipe, 5ft in the ground, construct a 500ft stream channel, install a 20ft X 20ft detention basin and energy dissipator, and construct 3 cascading pool structures in Rock Canyon Creek.

Special use management
Scoping Start
03/10/2021
Decision
03/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Charlie Condrat · ccondrat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rock Canyon Aquifer Storage and Recovery Decision MemoDecision Signed Date: 03/15/2021
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 2/11/2021
Project areas are located around Pine Valley where the Provo river leaves Hwy 150 and crosses Hwy 35. Approximately five miles East of Woodland. · Summit; Wasatch, Utah

Proposal to masticate 1,349 acres of Juniper to reduce wildfire risk and increase forage for wildlife.

Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
11/24/2020
Decision
12/2020 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Riley Bergseng · rbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 12/23/2020
Project is along the northern Forest Boundary adjacent to Hwy 150, north and south of the Bear River Guard Station. · Summit, Utah

Proposal to improve forest and watershed health, increase wildlife habitat diversity, and to reduce the risk of uncontrollable high intensity/severity wildfires by treating units within a 5,175 acre treatment area using a variety of methods.

Wildlife, fish, rare plantsFuels management
Scoping Start
11/12/2020
Decision
12/2020 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Christine Brown · christineabrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements
Whitney Bear River Project Decision MemoDecision Signed Date: 12/21/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 12/3/2020
400 feet north of the current parking lot at Tibble Reservoir. Parking lot would be within the northern-most part of the disturbed area known as Borrow Pit %u201CA%u201D during the Tibble Reservoir Dam project in 2017. · Utah, Utah

Proposal to convert the recently disturbed borrow area just north of the current Tibble parking lot to a separate OHV parking lot. The area would be graded and road base would be applied.

Recreation management
Scoping Start
11/04/2020
Decision
12/2020 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Russell Hanson Jr · rhansonjr@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management
Tibble OHV Parking Lot Decision MemoDecision Signed Date: 12/03/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 12/1/2020
Smithfield Canyon Snow Trail is located approximately 7 miles north of Logan Utah along Highway 91 and 3 miles north east of Smithfield City · Cache, Utah

Proposal for Nordic United to groom a snow ski trail along 2.5 miles of the Smithfield Canyon.

Recreation management
Scoping Start
11/30/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
David Ashby · david.ashby@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Smithfield Canyon Snow Trail Decision MemoDecision Signed Date: 12/01/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/24/2020
The project is located approximately 8 miles East of Francis, UT on Highway 35 and the junction of FS Road #202 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

Proposal to replace/relocate the existing Lower Muddy Spring Trough in Cedar Hollow. The primary purpose of this water development is to provide water to the allotment, which will improve livestock distribution.

Grazing management
Scoping Start
11/09/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Lower Muddy Spring Trough Relocation Decision MemoDecision Signed Date: 11/16/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 11/24/2020
The eastern boundary of Mapleton City at the base of Spanish Fork Peak. · Utah, Utah

Proposal to thin Oak and Juniper brush in order to create defensible space and shaded fuel breaks. A variety of treatment methods will be used to manipulate the stand structure and composition including mastication, lop and scatter, and cut and chip.

Fuels managementVegetation management (other than forest products)
Scoping Start
10/05/2020
Decision
11/2020 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
Mapleton City Fuel Break Decision MemoDecision Signed Date: 11/09/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 11/16/2020
Mutual Dell LDS Org Camp in American Fork Canyon · Utah, Utah

Proposal to tear down the older, existing pavilion canopy cover and replace the entire structure with a new one in the exact same footprint as the older one and one that matches the same dimensions. - PROPOSAL CHANGED IN NOV, WILL REVISIT WHEN READY.

Special use management
Scoping Start
10/01/2020
Decision
01/1970 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Billy Preston · bpreston@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date07/01/2026
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/12/2020
Davis and Weber Counties, also runs through the Weber Basin Job Corps Center · Davis; Weber, Utah

The Bureau of Reclamation has prepared an EA to analyze the impacts of the Davis Aqueduct Parallel Pipeline Project and requested easement. The USFS is a cooperating agency. The EA can be found at: https://www.usbr.gov/uc/DocLibrary/ea.html#EA2020

Special use management
Scoping Start
08/28/2020
Decision
11/2020 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Sean Harwood · sharwood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Davis Aqueduct Parallel Pipeline Decision MemoDecision Signed Date: 11/09/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 11/4/2020
Along the east side of the Monte Cristo Highway (Hwy 39) near Mt. McKinnon. Approximately 20 miles west of Woodruff, UT · Rich, Utah

Proposal to relocate a fence to a more suitable location.Approximately 0.4 miles of existing fence would be removed, and 0.3 miles of fence would be constructed.

Grazing management
Scoping Start
03/19/2020
Decision
11/2020 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Dairy Ridge Boundary Fence Decision MemoDecision Signed Date: 11/04/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/3/2020
The project is located approximately 36 miles East of Heber, UT on Highway 40 and on FS road #226 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

Proposal to construct 0.5 miles of fence off the Strawberry Knoll of the Bear Hole allotment to decrease the chance of livestock drifting off their permitted area.

Grazing management
Scoping Start
10/09/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Bear Hole Boundary Fence Decision MemoDecision Signed Date: 11/02/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/3/2020
The project is located approximately 15 miles East of Kamas, UT on Highway 150 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

Proposal to construct a new handling facility farther up the canyon to provide a safe place to put livestock when they are found.

Grazing management
Scoping Start
10/09/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Kamas Valley Corral Facility Decision MemoDecision Signed Date: 11/02/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/3/2020
The project is located approximately 26 miles East of Kamas, UT on Highway 150 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

Proposal to extend the existing Trial Lake Boundary Fence to prevent livestock from leaving and grazing off the allotment.

Grazing management
Scoping Start
10/09/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Trial Lake Boundary Fence Extension Decision MemoDecision Signed Date: 11/02/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/3/2020
The project is located approximately 7 miles East of Oakley, UT on Highway 183 to FS roads 038 to 031 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

Proposal to relocate the existing handling facility. The current corral is hard to access with trucks hauling trailers. Relocating the handling facility would allow permittees better access to the corral.

Grazing management
Scoping Start
10/09/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Weber River Corral Relocation Decision MemoDecision Signed Date: 11/02/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 10/27/2020
Lower Millcreek Canyon, 10 miles east of Salt Lake City, UT · Salt Lake, Utah

Proposal to construct a segment of BST in Rattlesnake Gulch to meet design parameters required by the BST master-document, and by the Forest Service Handbook design parameters for Class III mountain bike trail. Will also reroute the top 0.25 miles.

Recreation management
Scoping Start
08/25/2020
Decision
10/2020 (Estimated)
Implementation
03/2021 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Rattlesnake Gulch Reroute and Bonneville Shoreline Trail Construction DMDecision Signed Date: 10/27/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/9/2020
On Peruvian Ridge within the special use permit boundary of Alta Ski Area. · Salt Lake, Utah

The building is to be expanded 8ft to the North East along the 20ft length of the structure. The existing roof line will be maintained. The new expansion will be accessed via an interior man-door from the existing structure.

Recreation managementSpecial use management
Scoping Start
08/24/2020
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 9/29/2020
Sinks Road (Forest System Road 20055) and Cheney Creek Road (Forest System Road 20239), approximately 20 miles northeast of Logan, Utah. · Cache, Utah

The Forest Service is proposing to thin previously harvested stands that were clearcut as part of the Little Bear Timber Sale (1973). The entire project area is encompasses approximately 69 acres on National Forest System lands

Wildlife, fish, rare plants
Scoping Start
03/29/2017
Decision
10/2020 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Peter Howard · pahoward@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 13 North, Range 4 East, Section 10 Salt Lake Meridian
Decision Memo · Spanish Fork Ranger District · updated 9/24/2020
Spanish Fork Ranger District · Utah, Utah

Cabin owner proposal to re-design and re-construct a portion of the cabin's south roof to better support snow load and distribute snow load fall. Owner also proposes to re-shingle the entire roof with fire proof shingles.

Recreation managementSpecial use management
Scoping Start
12/17/2015
Decision
05/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 9/23/2020
Approximately 3.25 miles west of Highway 89 on the Nebo Creek Road · Utah, Utah

Proposal to put native fish (Bonneville Cutthroat trout) back into Nebo Creek before non-native fish swim upstream into this area. UDWR would install a fish barrier to prevent fish from swimming over or through it.

Wildlife, fish, rare plants
Scoping Start
09/15/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Nebo Creek Fish Barrier Decision MemoDecision Signed Date: 09/20/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 9/15/2020
Three miles east of Layton, UT. · Salt Lake, Utah

Proposal to reroute and construct approximately eighty feet of the Adams Canyon Trail in Layton, UT. Work will include clearing vegetation, removing rocks, digging tread, and restoring the short segment of old trail that will no longer be needed.

Recreation management
Scoping Start
09/14/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Adams Canyon Trail Reroute Decision MemoDecision Signed Date: 09/15/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 9/1/2020
Cascade Springs, Pleasant Grove Ranger District, Utah County, Utah. · Utah, Utah

Proposal to remove accumulated sediments from pool areas at Cascade Springs. Proposal is intended to increase available fish habitat complexity and boost carrying capacity of the springs. Sediment will be removed through use of a suction pump.

Wildlife, fish, rare plants
Scoping Start
04/06/2017
Decision
10/2018 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Russell Hanson Jr · rhansonjr@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 9/1/2020
Approximately 23 miles southwest of Mountain View, Wyoming · Summit, Utah

Project will treat approximately 1,872 acres impacted by the mountain pine beetle epidemic. The project will move this area towards the desired future condition of a more healthy and resilient forest.

Forest products
Scoping Start
10/06/2015
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Jeff Matthews · jmmatthews@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 9/1/2020
Approximately 30 miles south of Evanston, Wyoming. · Summit, Utah

Recent mortality of spruce trees due to the spruce bark beetle has appeared along the eastern slope adjacent to Whitney Reservoir. Proposed action is to harvest spruce trees (less than 250 acres) in order to control the spread of insects

Forest products
Scoping Start
10/06/2015
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Jeff Matthews · jmmatthews@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT. 1 N., R. 9 E., sections 3, 9, and 10
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/28/2020
Alta Ski Area · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorized Alta Ski Area to make improvements to the High Traverse at the ski area. Currently, the High Traverse quickly gets skied down to expose rocky areas which affects access and safety.

Special use managementRecreation management
Scoping Start
06/2016 (Estimated)
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/28/2020
Alta Ski Area · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize Alta Ski Area to use existing snowmaking infrastructure from Cecret Lake, and build a small building to generate power using water head-pressure as the lake overflows.

Recreation managementSpecial use management
Scoping Start
06/2016 (Estimated)
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/26/2020
T02S S15 R12W 30 · Wasatch, Utah

Conduct stream enhancement treatments to be implemented within the identified 2,600 LF of Strawberry River mitigation area.

Watershed management
Scoping Start
05/18/2020
Decision
06/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 8/25/2020
Alta, Utah %u2013 Alta Ski Area: Approximately 28 miles southeast from Salt Lake City up Little Cottonwood Canyon protected watershed and Highway 210. · Salt Lake, Utah

Proposal to build three trails totaling 0.74 miles and restore damaged areas at Alta Ski Area. Locations include Catherine's Pass, Sunnyside to Cecret Lake, and Home Run.

Recreation management
Scoping Start
08/24/2020
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Albion Trailhead and Bike Connections Decision MemoDecision Signed Date: 08/24/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 8/25/2020
Along the American Fork River. · Utah, Utah

The Pleasant Grove Ranger District proposes to armor the banks of the American Fork River to minimize the risks of erosion.

Watershed management
Scoping Start
04/05/2017
Decision
06/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Gary Gray · gcgray@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/25/2020
Parcels are located between Logan Dry Canyon and Providence Canyon, within the proclaimed forest boundary east of Logan, Utah. · Cache, Utah

The Uinta-Wasatch-Cache National Forest proposes to acquire two parcels of land totaling 320.00 acres.

Land acquisition
Scoping Start
12/03/2018
Decision
02/2020 (Estimated)
Implementation
02/2020 (Estimated)
Project documents
Sharon Andrews · sharonandrews2@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (6), 36 Cfr 220.6(D)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Purchases
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionSec 1, T. 11. N., R. 1. E., Sec 12, T. 11. N., R. 1. E.
Decision Memo · Heber-Kamas Ranger District · updated 8/25/2020
Soapstone Winter Trailhead up Hwy 150 · Summit, Utah

Proposal to expand parking at the Soapstone Trailhead to eliminate congestion and address safety issues.

Recreation management
Scoping Start
09/28/2017
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Logan Ranger District · updated 8/25/2020
Allotments are located southeast of Logan, Utah. · Cache, Utah

Proposal is to authorize the continuance of grazing on the White Rock, Millville, and Providence Allotments.

Grazing management
Scoping Start
03/14/2012
Comment Period
02/2013 (Estimated)
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Authorizations; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 8/6/2020
Approximately 14 miles southeast of Heber City, Utah, near Heber Mountain in the upper reaches of the West Fork of the Duchesne River. · Wasatch, Utah

Proposal to harvest the roots of approximately 120 acres of Veratrum californicum (Corn lily) from the Uinta NF. An external proponent would use a chemical in the plants to explore and establish medical options for the treatment of certain cancers.

ResearchForest products
Scoping Start
05/15/2020
Comment Period
05/15/2020
Decision
06/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Daniel Jauregui · djauregui@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Products Sales; Research And Development
Heber Veratrum Harvest Decision NoticeDecision Signed Date: 06/30/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 8/4/2020
Wind Caves Trailhead approximately 8 miles East of Logan Utah · Cache, Utah

Proposal to increase parking to accommodate more visitors while working with UDOT to prohibit parking along the highway and install a double restroom for use at the trailhead.

Recreation management
Scoping Start
01/30/2020
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
David Ashby · david.ashby@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Wind Caves Trailhead Expansion Decision MemoDecision Signed Date: 08/04/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 8/3/2020
The project is located approximately 8 miles East of Francis, UT on Highway 35 and the junction of FS Road #202 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

The Big Springs Phase 2 Waterline range improvement will connect to Phase 1 (decision memo signed in June 2020) and continue poly pipe for approximately 2.5 miles. Four troughs will be installed along with two, 5,000 gallon water storage tanks.

Grazing management
Scoping Start
07/29/2020
Decision
08/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
Cedar Hollow Big Spring Waterline Phase 2 Decision MemoDecision Signed Date: 08/03/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/30/2020
Numerous locations on the Logan and Ogden ranger districts. · Box Elder; Cache; Davis; Weber, Utah

The State of Utah's Division of Oil, Gas, and Mining proposes to reclaim/close entrances to abandoned mines which pose safety hazards to the public.

Heritage resource managementMinerals and geologyWatershed managementSpecial area management
Scoping Start
03/05/2020
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Pete Gomben · pgomben@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHeritage Resource Management; Abandoned Mine Land Clean-Up
Willard Peak Abandoned Mine Reclamation Project CompletedDecision Signed Date: 07/29/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District; Logan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/29/2020
All projects are located in various locations off Highway 40 in Heber City, Utah and off of Highway 35 in Kamas, Utah. · Summit; Wasatch, Utah

Proposed improvements include; South Low Pass Fence for the Currant Creek Allotment, Sheep Corrals for the Nobletts and Wolf Creek Allotments, Hoy Hollow Waterline for the West Fork Allotment, and the Three Forks Spring for the East Daniels Allotment

Grazing management
Scoping Start
11/13/2019
Decision
11/2019 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 7/27/2020
Carter Creek Campground is located approximately 4 miles east of Highway 150 along the North Slope Road on the Evanston side of the Evanston-Mountain View Ranger District · Summit, Utah

Proposal from American Water Operations & Maintenance, LLC to drill a replacement groundwater well to replace the existing well at the Carter Creek Campground.

Special use managementRecreation management
Scoping Start
07/02/2020
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Juan Barrientez · jbarrientez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations; Travel Management
Carter Creek Campground Well Replacement Decision MemoDecision Signed Date: 07/27/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Rock Dipper Merge Completed
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/23/2020
The project is located at Alta Ski Resort where the Big Dipper and Rock N' Roll ski runs merge. · Salt Lake, Utah

The purpose of this proposal is to improve skier flow in the Rock Dipper area where the Big Dipper and Rock N' Roll ski runs merge. The Big Dipper ski run would be modified by filling a depression between the two ski runs.

Special use managementRecreation management
Scoping Start
10/04/2019
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/17/2020
Approximately 17 miles East of Heber City, UT on Highway 40 located on the Heber-Kamas District of the Uinta-Wasatch-Cache National Forest. · Wasatch, Utah

Proposal to construct a construct one livestock water system which would consist of a 40ft by 40ft by 5ft pond.

Grazing management
Scoping Start
07/13/2020
Decision
07/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Box Spring Livestock Water System Decision MemoDecision Signed Date: 07/14/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 6/30/2020
6.4 Miles south on FSR 015 (Nebo Loop Road, milepost 4.5) from intersection with UT198. · Utah, Utah

This project was entered as a duplicate and is being cancelled.

Road management
Scoping Start
06/30/2020
Decision
01/1970 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Ryan Stone · rlstone@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Road Maintenance; Road Improvements/Construction; Travel Management
Decision Decided Date07/01/2026
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/29/2020
Northeast end of the Stansbury Mountain Range approximately 5 miles west of Grantsville. · Tooele, Utah

Proposal to masticate 60-80 percent (6,911 acres) of the juniper within the treatment units on the east facing slope of the Stansbury mountain range in order to improve wildlife habitat, reduce hazardous fuel buildup, and improve livestock forage.

Fuels managementWildlife, fish, rare plants
Scoping Start
03/26/2020
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
North and South (NorSo) Willow Mastication Project Decision MemoDecision Signed Date: 06/27/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/23/2020
Mouth of Red Butte Canyon, east of University of Utah · Salt Lake, Utah

Proposal from Salt Lake City Public Utilities to construct an additional storage reservoir at the existing Fort Douglas site.

Special use management
Scoping Start
06/04/2020
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Fort Douglas Storage Reservoir #2 Decision MemoDecision Signed Date: 06/22/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/11/2020
Wasatch Front from west side Wellsville Mountains to Centerville, Utah · Box Elder; Cache; Davis; Weber, Utah

This project was accidentally entered as a duplicate and has been cancelled. Please see project number 49798 for project documents.

Facility management
Scoping Start
06/10/2020
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Charlie Condrat · ccondrat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District; Ogden Ranger District; Logan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/2/2020
NFS lands immediately north of SR-210 at the mount of Little Cottonwood Canyon, approximately between mileposts 3.83 and 4.25. · Salt Lake, Utah

Proposal from UDOT to perform grading and revegetation on National Forest System lands immediately adjacent to SR-210 to reduce erosion and the potential need for soil retaining walls associated with improvements to SR-210 outside of NFS lands.

Road management
Scoping Start
05/28/2020
Decision
06/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
UDOT SR-210 Merge Lane Decision MemoDecision Signed Date: 06/01/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 5/18/2020
Wasatch Front Foothills from the Point of the Mountain south to Provo Canyon. · Utah, Utah

Proposal to complete missing sections of the BST, provide access from neighborhoods to NFS lands, provide for a variety of easy, moderate, and loop trails, and disperse users out of American Fork Canyon.

Watershed managementRecreation management
Scoping Start
12/02/2019
Decision
12/2019 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Jentry Cataluna · jentry.cataluna@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
Front Country Trails Phase 1 Signed DMDecision Signed Date: 12/16/2019
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 5/18/2020
Utah County, Multiple Locations Across Spanish Fork District and Parts of Manti-La Sal · Utah, Utah

Proposal to repair the flood damaged areas within the ephemeral drainages on affected areas in Utah County resulting from previous fires.

Watershed management
Scoping Start
04/29/2020
Decision
05/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Luke Decker · luke.decker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11); 32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other; National Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Utah County Emergency Watershed Protection (EWP)Decision MemoDecision Signed Date: 05/07/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/15/2020
Project is located approximately 8 miles up Big Cottonwood Canyon from the junction of SR-190 and SR-210. It is located near the intersection of SR-190 and Donut Falls Road, in the Cardiff Fork parking area. · Salt Lake, Utah

Proposal to install pedestrian upgrades at the existing the existing intersection of SR-190 (Big Cottonwood Canyon) and Donut Falls Road in Salt Lake County.

Road management
Scoping Start
04/29/2020
Decision
05/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Lance Kovel · lance.kovel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Travel Management
UDOT Cardiff Fork SR-190 Crosswalk Decision MemoDecision Signed Date: 05/13/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/8/2020
Approximately 500%u2019 uphill (southeast) of Weber Basin Job Corps Campus, along dirt access road · Weber, Utah

Proposal to replace and realign water infrastructure at the Weber Basin Job Corps Center by order of the State of Utah Division of Drinking Water, within its campus by Dec. 31, 2020. South Weber City will be implementing the project.

Special use management
Scoping Start
03/02/2020
Decision
05/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Sean Harwood · sharwood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
South Weber Water Transmission Line Replacement DMDecision Signed Date: 05/07/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/29/2020
Spruces Campground, about 9 miles up Big Cottonwood Canyon. · Salt Lake, Utah

Proposal to develop a cross-country ski and snowshoe trail network at Spruces Campground in Big Cottonwood Canyon, and to plow an existing paved parking lot in Spruces Campground.

Recreation management
Scoping Start
04/21/2020
Decision
04/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Matthew Hales · matthew.hales@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Spruces/Cardiff Winter Trails DMDecision Signed Date: 04/28/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 4/23/2020
Approximately 33 miles southeast of Evanston, Wyoming. On the north slope of the Uinta Mountain Range. · Summit, Utah

Treat the streams in the West Fork Smiths Fork drainage including some waters within the High Uintas Wilderness with piscicide (rotenone) to remove nonnative fish species and enhance habitat for native Colorado River cutthroat trout.

Wildlife, fish, rare plants
Scoping Start
08/25/2017
Decision
04/2020 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
West Fork Smiths Fork Colorado River Cutthroat Trout Enhancement DMDecision Signed Date: 04/22/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/2/2020
Wellsville Division, Baker Canyon north of Brigham City · Box Elder, Utah

Proposal from the West Corrine Water Company to replace the existing deteriorating pipeline and prevent pollution from entering the system at the springs by providing collection boxes in Baker Canyon.

Special use management
Scoping Start
04/01/2020
Decision
04/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Baker Springs and water transmission line redevelopment decision memoDecision Signed Date: 04/01/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/2/2020
Davis County, Utah · Salt Lake, Utah

Davis County, in coordination with the U.S. Forest Service, is proposing to construct and reconstruct the Bonneville Shoreline Trail. The complete trail would be approximately 39 miles long and would include trailheads.

Recreation management
Scoping Start
10/01/2019
Decision
04/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Bonneville Shoreline Trail - Davis County Decision MemoDecision Signed Date: 04/02/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 3/31/2020
Located in Dry Creek Canyon near the Horsetail Falls trailhead (northeast of Alpine, UT). · Utah, Utah

Exchange of land between private land owner and Uinta-Wasatch-Cache National Forest. Parcels of equal size will be exchanged to consolidate land ownership which will benefit both the Forest Service and the private land owner.

Land ownership management
Scoping Start
10/15/2013
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Russell Hanson Jr · rhansonjr@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
Welch Land Exchange Decision MemoDecision Signed Date: 03/30/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionTownship 4 South; Range 2 East; Section 8
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/27/2020
Trail location is on the border of the Salt Lake and Pleasant Grove Ranger Districts. · Salt Lake, Utah

Proposal from the Salt Lake Climbers Alliance to reroute a steep section of trail on the route to Lone Peak. Trail reroute will be approximately three miles and reduce the 32 percent grade to a 12 percent grade.

Recreation management
Scoping Start
03/20/2020
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District; Pleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/26/2020
The Sunnyside Pitch 1 project is located within the Alta Ski Area special use permit. It is towards the bottom of the Home Run ski trail near the Albion Base Area. · Salt Lake, Utah

To add fill and recontour a short lower section of the Home Run ski run so that the grade is more consistent; providing safe egress for beginner skiers.

Recreation management
Scoping Start
09/26/2019
Decision
03/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Sunnyside Pitch 1 Adjustment Decision MemoDecision Signed Date: 03/24/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 3/19/2020
Adjacent to building at Cemetery Point · Weber, Utah

Proposal by Club Rec to install a walking path at Pineview Reservoir from the gravel parking area to entrance of building for public use. Path will be dug out and cement will be poured.

Recreation management
Scoping Start
03/19/2020
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Cemetery Point Walkway DecisionDecision Signed Date: 03/19/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 3/13/2020
The canyon north of Yellow Pine Trailhead which is 6.2 miles up Mirror Lake Hwy 150 from Kamas, UT. · Summit, Utah

Proposal to construct approximately 4.8 miles of mountain bike trail in partnership with South Summit Trails Foundation to create loop systems that flow and drain properly.

Recreation management
Scoping Start
03/11/2020
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Nicholas Brown · nicholas.r.brown@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Slate Creek Trails Phase 1 Signed DecisionDecision Signed Date: 03/11/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/11/2020
Located within the Theater In the Pines Group Campground on the Pleasant Grove Ranger District · Utah, Utah

Proposal to construct a well and related appurtenances (water well, submerged pump, meter, control box, buried power lines, and subsurface piping on NFS lands adjacent to the Theater in the Pines Group Campground and Mt. Timpanogos Trailhead.

Special use management
Scoping Start
02/25/2020
Decision
03/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/25/2020
Approximately 2.5 Miles NW of Mendon, UT along the Three Mile Creek Road, FSR 20219. Northwest Cache County adjacent to the Wellsville Wilderness Boundary. · Cache, Utah

Proposal by the University of Utah Seismology department to install a seismograph station to gather information about local earthquakes and earthquake hazards.

Special use management
Scoping Start
01/30/2020
Decision
02/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Larry Framme · larry.framme@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Three Mile Seismograph Station Signed Decision MemoDecision Signed Date: 02/06/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/30/2020
Grove Creek Canyon approximately 1/4 mile from trailhead and Battle Creek Canyon approx. 1/2 mile from trailhead. · Utah, Utah

Proposal to reconstruct a portion of the Grove Creek Canyon intake and screen structure on the in-stream diversion, and to replace the existing Battle Creek Canyon screened intake and concrete weir with a new style in stream Coranda type screen.

Special use management
Scoping Start
01/14/2020
Decision
01/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pleasant Grove City Irrigation Improvements Decision MemoDecision Signed Date: 01/14/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/7/2020
The Farmington City Mountain Bike Park Connector Trail would be just south of the mouth of Farmington Canyon, East of Farmington City. · Salt Lake, Utah

Proposal to construct a 0.75 mile segment of trail to connect the Bonneville Shoreline Trail to the Farmington City Mountain Bike Park.

Recreation management
Scoping Start
12/18/2019
Decision
01/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Farmington City Mountain Bike Park Connector Trail Decision MemoDecision Signed Date: 01/07/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/7/2020
The Jacob%u2019s Ladder trail is on the border between Salt Lake RD and Pleasant Grove RD, south and east of Salt Lake City. · Salt Lake, Utah

Proposal to reroute a steep section of the Jacob's Ladder trail on the route to Lone Peak.

Recreation management
Scoping Start
12/18/2019
Decision
01/2020 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Jacob's Ladder Trail Reroute Decision MemoDecision Signed Date: 01/07/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/7/2020
Trail maintenance and construction will occur from top of Guardsman Pass in Big Cottonwood Canyon to the Saddle above Millcreek Canyon. This is to the south and east of Salt Lake City, UT. · Salt Lake, Utah

Proposal to reroute 1/4 mile of Wasatch Crest Trail to improve biker safety and resource conditions.

Recreation management
Scoping Start
12/18/2019
Decision
01/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Wasatch Crest Trail Reroute Decision MemoDecision Signed Date: 01/07/2020
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/6/2020
The East Zone of the UWC includes the Heber-Kamas and Evanston-Mountain View Ranger Districts (approximately 900,000 acres) · Duchesne; Summit; Wasatch, Utah

Proposal to implement vegetation treatments across the East Zone of the Uinta-Wasatch-Cache National Forest.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Scoping Start
08/30/2019
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Daniel Jauregui · dano.jauregui@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Rangeland Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District; Evanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 12/17/2019
East Castle within Alta Ski Area. East Castle is located off of the Supreme Chairlift. · Salt Lake, Utah

The proposed project is to install an avalanche control device in the East Castle Area of Alta Ski Resort. The area includes several significant avalanche paths that must be controlled for skiers to ski the area.

Special use managementRecreation management
Scoping Start
10/04/2019
Decision
12/2019 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
East Castle Remote Avalanche Device Install Decision MemoDecision Signed Date: 12/16/2019
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 12/17/2019
Access road will be located near the Eagle Express lift near Solitude's private property. The temporary admin facilities will be between Last Chance Lodge and Solitude's vehicle shop. · Salt Lake, Utah

Solitude Mountain Resort proposes to construct an access road on NFS land to connect to a parking lot on their private property. Additionally, Solitude proposes to construct temporary administration facilities on private and NFS lands.

Special use managementRecreation management
Scoping Start
10/07/2019
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Solitude Loop Parking and Administrative Facility Decision MemoDecision Signed Date: 10/16/2019
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 12/17/2019
Upper Solitude condominiums, following Pacificorp dba Rocky Mountain Power permitted power line linear right of way, terminating at Brighton Resort. · Salt Lake, Utah

Proposal to install fiber optic line within the existing RMP powerline and replace two power poles within the current linear right of way in Solitude Area.

Special use management
Scoping Start
12/02/2019
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Larry Framme · larry.framme@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
BCC Fiber DMDecision Signed Date: 12/16/2019
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 12/10/2019
Gilbert Creek 10 miles south of Robertson, WY on the Mountain View RD, Uinta County Wyoming · Uinta, Wyoming

This project has two objectives: (1) install Beaver Dam Analogues (BDAs) and (2) trap and translocate nuisance beavers to Gilbert Creek of the Mountain View Ranger District.

Wildlife, fish, rare plants
Scoping Start
10/29/2019
Decision
12/2019 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Christina Hacker · christina.hacker@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT12N, R115W, Sections 5, 8, 17, 18, 19, 20, 29, and 30
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 12/4/2019
Hobble Creek, which begins near Daniels Summit in Wasatch County and flows nearly 21 miles where it terminates into Utah Lake. · Utah, Utah

Proposal from the Bureau of Reclamation to replace 2.6 miles of the open Hobble Creek Ditch with a new 24-inch high-density polyethylene (HDPE) pipeline. The proposed action would impact 8.78 acres of National Forest System lands.

Special use management
Scoping Start
06/25/2019
Decision
12/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Elisha Hornung · elisha.hornung@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Logan Ranger District · updated 12/4/2019
The project area is located on the southwest edge of Wellsville City, approximately 1 mile north of Wellsville (Sardine) Canyon. · Cache, Utah

Logan Ranger District of the Uinta-Wasatch-Cache National Forest is proposing to construct a trailhead and trails on National Forest System lands, with some sections of trail located within the Wellsville Mountains Wilderness.

Recreation management
Scoping Start
08/29/2019
Comment Period
08/29/2019
Objection Period Start
10/10/2019
Decision
12/2019 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Zachary Maughan · zmaughan@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.; Trail Management; Road Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 12/2/2019
Approximately 10 miles east of Huntsville, Utah. · Weber, Utah

Proposal to provide a boat ramp, additional parking, repair and improve access to the overlook.

Recreation management
Scoping Start
06/03/2019
Decision
07/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 12/2/2019
Parking area is on FR008 at north end of Silver Lake Flat Reservoir, in American Fork Canyon. · Utah, Utah

Extend dirt parking area North into pre-disturbed meadow area.

Facility management
Scoping Start
05/07/2018
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionSec.6, T.004.0S., R.003.0E., 26
Environmental Assessment · Pleasant Grove Ranger District · updated 11/20/2019
Slate Canyon - Pleasant Grove Ranger District · Utah, Utah

Proposal from the Utah State Hospital to develop Knight Springs located up Slate Canyon by installing new water pipeline. The project would provide sufficient, high quality drinking water to the patients and residents of the hospital.

Special use management
Scoping Start
04/26/2016
Comment Period
06/29/2019
Objection Period Start
08/12/2019
Decision
11/2019 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other; Ira - Inventoried Roadless Area Activities Requiring Chief's Approval
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 11/18/2019
Weber Basin Job Corp Center, Ogden, Utah · Davis, Utah

Proposal from BOR to conduct geotechnical testing in advance of a supplemental pipeline for the Davis Aqueduct.

Special use management
Scoping Start
11/15/2019
Decision
11/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Sean Harwood · sharwood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/1/2019
Approximately 25 miles east of Heber City, Utah, on the south southwest side of Strawberry Reservoir. · Wasatch, Utah

Proposal to increase the quality of nesting and brood-rearing habitat for sage grouse by creating a mosaic pattern in the sagebrush community through the use of mechanical treatments including dixie harrowing and mowing.

Wildlife, fish, rare plants
Scoping Start
10/30/2019
Decision
10/2019 (Estimated)
Implementation
04/2020 (Estimated)
Project documents
Anthony Gray · aagray@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 10/22/2019
Salt Lake Ranger District · Salt Lake, Utah

In partnership with Salt Lake County and Salt Lake City Department of Public Utilities, the following improvements to toilet and water systems are proposed on the Salt Lake Ranger District.

Recreation management
Scoping Start
07/17/2017
Decision
12/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 10/5/2019
Wasatch Front Foothills East of Layton, Fruit Heights and Centerville · Davis, Utah

Proposal from Division of Wildlife Resources to revegetate burn areas from the Francis, Snoqualmie, and Gun Range Fires in 2019. DWR will work with dedicated hunters and sportsman group volunteers to plant native plant seeds.

Wildlife, fish, rare plants
Scoping Start
10/04/2019
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Masako Wright · masakowright@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNot Applicable / Other; National Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 10/1/2019
Uinta-Wasatch-Cache National Forest · Box Elder; Cache; Davis; Duchesne; Juab; Morgan; Rich; Salt Lake; Sanpete; Summit; Tooele; Utah; Wasatch, Utah

removing obsolete standards, guidelines, and definitions from the Uinta and Wasatch-Cache forest plans so that future management for Canada lynx habitat and its prey can be managed consistently with the best available scientific information.

Land management planning
Scoping Start
07/22/2019
Comment Period
08/16/2019
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Pamela Manders · pamela.manders@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Salt Lake Ranger District · updated 9/10/2019
Lower Little Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

The Salt Lake Ranger district is proposing, as part of the Wasatch Water Legacy Partneship, to develop a climbing access manangement plan, including a trailhead, at the site of the Grit Mill in lower Little Cottonwood Canyon.

Watershed managementRecreation managementHeritage resource management
Scoping Start
08/14/2013
Comment Period
08/14/2013
Objection Period Start
04/09/2014
Decision
09/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.; Heritage Resource Management; Trail Management; Scenery Management; Watershed Improvements; Wilderness Management
Decision Notice-FONSI for the Grit Mill and Climbing Master Plan ProjectDecision Signed Date: 09/15/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3S, R2 E, Sec. PB43
Environmental Impact Statement · Ogden Ranger District · updated 9/10/2019
Ogden Ranger District · Box Elder; Cache; Morgan; Rich; Weber, Utah

The Ogden Ranger District is preparing a supplemental EIS in response to a March 7, 2012 court order instructing the Forest Service to address deficiencies in the previous EIS and record of decision for the Ogden Travel Plan.

Road management
NOI in Federal Register
01/14/2013
DEIS NOA in Federal Register
03/30/2015
FEIS NOA in Federal Register
03/30/2015
Objection Period Start
03/30/2015
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Sendi Kalcic · sendikalcic@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
Record of Decision Ogden Ranger District Travel Plan Revision November 2015Decision Signed Date: 11/06/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 9/10/2019
The Upper Provo Watershed Restoration Project is located in Summit and Wasatch Counties, Utah · Summit; Wasatch, Utah

The project proposes primarily non-commercial thinning, prescribed burning, mechanical vegetation treatments (mowing, mastication), and planting over a period of up to 10 years.

Vegetation management (other than forest products)Watershed managementForest productsFuels management
Scoping Start
03/06/2013
Comment Period
09/30/2014
Objection Period Start
02/06/2015
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Jim Gibson · jgibson@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Salvage); Watershed Improvements
Upper Provo Watershed Restoration Project Decision Notice and FONSIDecision Signed Date: 05/29/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionThe legal description includes all or some of the following: Township 2 North, Range 7, 8; Township 3 North Range 7, 8, 9 SLBM.
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/6/2019
Located in Utah and Wasatch Counties approximately 30 miles south/southeast of Spanish Fork, UT; and northwest of Soldier Summit off Highway 6 toward Price, UT. · Utah; Wasatch, Utah

Proposal to increase the size of the Sheep Creek project area prescribed burn and allow for the construction of a section of control line that would increase safety of fire personnel implementing the project.

Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Scoping Start
09/04/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Sandi Imlay · simlay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 9/5/2019
American Fork Canyon, Utah County, Utah · Utah, Utah

Proposal to improve fiber optic and cellular network in AF Canyon by installing approximately 6.4 miles of new conduit along SR-92 and SR-144, approximately 28 (35-foot tall) cellular antenna nodes, and a structure to house wireless comm equipment.

Special use management
Scoping Start
06/12/2019
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Russell Hanson Jr · rhansonjr@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/22/2019
Bald Mountain on the HKRD, Summit County · Summit, Utah

Proposal to upgrade an existing forest service communications site to include T-Mobile equipment and antennas to provide wireless communications and data service to the area.

Special use management
Scoping Start
08/19/2019
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Daniel Jauregui · djauregui@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/5/2019
Albion Basin: The Devil's Castle road/cat track within the Alta Ski Resort Special Use Permit boundary. · Salt Lake, Utah

Alta Ski Lifts proposed to install a series of avalanche snow fences above the Devil's Castle Road within the ski area permit boundary. The two fences would be installed in avalanche start zones providing safety to the public and ski area employees.

Road managementFacility managementRecreation managementSpecial use management
Scoping Start
08/01/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Arben Kraja · arben.kraja@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 8/1/2019
Twin Peaks, Lone Peak, and Mount Timpanogos wilderness areas · Salt Lake; Utah, Utah

Proposal by the Utah Division of Wildlife Resources to land helicopters in the Twin Peaks, Lone Peak, and Mount Timpanogos wilderness areas to capture and collar mountain goats.

Wildlife, fish, rare plants
Scoping Start
02/09/2017
Comment Period
07/12/2017
Objection Period Start
12/07/2017
Decision
03/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Pamela Manders · pmanders@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District; Pleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/30/2019
Spanish Fork Canyon · Utah, Utah

Proposal to construct new buried fiber optic within the ROW of U.S. 6. The new fiber will parallel an existing fiber optic conduit.

Special use management
Scoping Start
07/29/2019
Decision
07/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/30/2019
East of Kamas along Hwy 150 · Wasatch, Utah

Define "mechanical treatment" and add 4,942 additional acres of treatment to the project area.

Fuels management
Scoping Start
06/12/2019
Decision
07/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Riley Bergseng · rbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/15/2019
Just east of Neff's Canyon trailhead · Salt Lake, Utah

Proposal from SLDPU to modify authorized water storage and transmission infrastructure on NFS lands in Neff%u2019s Canyon. Portions of the infrastructure have aged and are in need of repair or replacement.

Special use management
Scoping Start
06/24/2019
Decision
07/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/1/2019
Heber-Kamas Ranger District, Wasatch and Summit Counties · Summit; Wasatch, Utah

Range improvement projects have been proposed on multiple allotments for the HKRD, specifically Bear Hole, Currant Creek, Mud Creek Sheep, North Streeper, Water Hollow, West Fork. Types of projects include water systems, fence, corral,

Grazing management
Scoping Start
06/25/2019
Decision
07/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Amber Helmus · ahelmus@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/26/2019
Salt Lake Ranger District, Big Cottonwood Canyon, Cardiff Trail · Salt Lake, Utah

Proposal to amend a previous decision regarding the Cardiff trail to include a pedestrian bridge to allow users to cross Big Cottonwood Creek. Proposed pedestrian bridge would be installed parallel to and upstream from the vehicle bridge.

Recreation management
Scoping Start
07/17/2017
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 6/26/2019
South arm of Causey Reservoir, approximately 25 miles east of Ogden, Utah. · Weber, Utah

Construction of a boat ramp in the south arm of Causey Reservoir for emergency use. The county search and rescue perform several operations a year and a boat ramp would improve access to the reservoir and facilitate search and rescue operations.

Recreation management
Scoping Start
04/12/2016
Decision
10/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 7 North, Range 3 East, sections 26,27,34,35, Salt Lake Meridian
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/25/2019
Big Cottonwood Canyon, Salt Lake County, Utah · Salt Lake, Utah

Proposal to remove BWA infested subalpine fir trees within special use permit area boundaries.

Special use managementRecreation managementVegetation management (other than forest products)
Scoping Start
06/14/2019
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Arben Kraja · akraja@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/25/2019
Rattlesnake trailhead is located in Millcreek Canyon approximately  of a mile on the north side of the road. · Salt Lake, Utah

Proposal to grade and pave a parking lot, install vault toilets, realign trail access, install information kiosk, address roadside parking issues.

Recreation management
Scoping Start
06/24/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Colton Rogers · coltongrogers@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 6/24/2019
North side of Highway 89, Logan Canyon. Approximately 1.5 miles from the mouth of the canyon and east of Logan, Utah. · Cache, Utah

Proposal to establish a class 2 trail (foot traffic only) to a popular climbing area (First Practice Wall), decommission existing social trails, and install an information sign.

Recreation management
Scoping Start
04/01/2019
Decision
06/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Zachary Maughan · zmaughan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 12 North, Range 2 East, Section 30 Salt Lake Meridian
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/18/2019
Cardiff Fork Road (019) and SR-190 Big Cottonwood Canyon · Salt Lake, Utah

Proposal from CenturyLink to amend their existing special use authorization in order to install new fiber optic conduit from a junction box along Big Cottonwood Canyon Road up the Cardiff Fork Road (019) to service residences within Cardiff Fork.

Special use management
Scoping Start
04/01/2019
Decision
05/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 6/12/2019
Davis County, within the special use permit area of the Bountiful Lions Gun Club. · Davis, Utah

Proposal by Davis county amateur radio emergency services to install a self-supporting antenna radio tower that will be 30 feet in height and will support three antennas.

Special use management
Scoping Start
04/26/2019
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 5/29/2019
The project is located approximately 7 miles northeast of Ogden, UT near Pineview Dam. · Weber, Utah

The Forest Service proposes to permit Ogden City to replace a diversion structure located on Wheeler Creek which provides municipal water to the city of Ogden.

Special use management
Scoping Start
12/03/2018
Decision
05/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 5/14/2019
West Fork of the Duchesne, Currant Creek, and East Strawberry Ridge · Wasatch, Utah

Proposal to improve and maintain wildlife habitat by regenerating aspen through prescribed burning. Also proposing to reduce fuel loads which have been increasing due to bark beetle mortality.

Wildlife, fish, rare plantsFuels management
Scoping Start
12/23/2015
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Anthony Gray · aagray@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 5/13/2019
The Crystal Lake Trailhead off of SR150 · Summit, Utah

Proposal to build and increase the size of the Crystal Lake TH from 54 spots to 123.

Recreation management
Scoping Start
04/26/2019
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 4/30/2019
Approximately 11 miles east of Spanish Fork, Utah. · Utah, Utah

Proposal from Utah Division of Wildlife Resources to plant cottonwood trees and install post assisted log structures on lower Diamond Fork Creek.

Watershed managementVegetation management (other than forest products)
Scoping Start
04/09/2019
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 4/30/2019
Approximately 17 miles south-south-east of Spanish Fork, Utah. · Utah, Utah

Proposal from Utah Division of Wildlife Resources to protect and improve riparian resources in the Nebo Creek drainage post the Bald Mountain Fire.

Watershed management
Scoping Start
04/09/2019
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (11), 36 Cfr 220.6(E)(11)
Special AuthorityNot Applicable / Other; National Fire Plan - Healthy Forests Initiative Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/9/2019
Little Cottonwood Canyon - Upper Albion Basin · Salt Lake, Utah

Proposal to realign the Albion Meadow Trail and the Alf's Connector Trail; to create the Top Sunnyside connector trail; and to fully restore the existing trails that will be closed when these trails are opened.

Recreation management
Scoping Start
04/05/2019
Decision
04/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Zinnia Wilson · zpwilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/31/2019
Big Cottonwood Canyon Climbing Areas · Salt Lake, Utah

Proposal in coordination with SLCA to provide sustainable access to popular climbing areas, and to stabilize staging areas in Big Cottonwood Canyon.

Recreation management
Scoping Start
02/28/2019
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 3/28/2019
Burnt Fork and Beaver Creek watersheds of the Evanston-Mountain View Ranger District. The project area is approximately 7 miles south of Lone Tree, Wyoming. · Summit, Utah

Landscape scale (70,772 acres) proposal for reducing hazardous fuel loads and regenerating aspen in conifer-encroached stands through prescribed burn, lop and scatter, and cut and pile.

Vegetation management (other than forest products)Wildlife, fish, rare plantsFuels management
Scoping Start
08/10/2018
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Christina Hacker · chacker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT1N, R16 and 17E, (multi sections); T2N, R15, 16,and 17E, (multi sections); and T3 1/2 N, R16 and 17E, (multi sections)
Decision Memo · Spanish Fork Ranger District · updated 3/4/2019
Spanish Fork Ranger District, Vernon, Utah in Tooele County. · Tooele, Utah

Proposal to extend the existing Little Valley Pipeline, install enclosures to capture trough overflow at four locations within the Vernon Unit, replace an existing abandoned pipeline, and install two troughs.

Grazing management
Scoping Start
02/01/2019
Decision
02/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Logan Peak Trail Completed
Decision Memo · Logan Ranger District · updated 2/21/2019
East of Logan, Utah within the Bear River Range. Proposed trail would extend west from Logan Peak. · Cache, Utah

A proponent has requested adding approx. 1.6mi of system trail from Logan Dry Canyon Trail to Logan Peak. Trail was likely constructed by CCC and previously a system trail that was removed. Approximately 50% of the trail would need repairs.

Recreation management
Scoping Start
10/07/2014
Decision
02/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT11N, R2E, S1/2 Section 4 and T11N, R2E, NW1/4 Section 9 Salt Lake Base and Meridian
Decision Memo · Logan Ranger District · updated 2/14/2019
In Logan Canyon, approximately 7 miles east of Logan, Utah. · Cache, Utah

Forest Service proposes to realign multiple sections of the Jardine Juniper Trail to make it sustainable and provide a safe trail for non-motorized recreation use. Sections are very eroded, unsustainable, and difficult for users to ascend/descend.

Recreation management
Scoping Start
09/27/2017
Decision
02/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Zachary Maughan · zmaughan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 12 North, Range 3 East, Section 26, Salt Lake Meridian
Decision Memo · Logan Ranger District · updated 12/6/2018
In Logan Canyon, approximately 7 miles east of Logan, Utah. · Cache, Utah

Restoring and rehabilitating campground facilities; naturalizing previously disturbed areas (e.g., trails and sites too close to water).

Recreation management
Scoping Start
10/02/2018
Decision
12/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 12 North, Range 2 East, sections 22, 23
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 12/4/2018
Alta Ski Area · Salt Lake, Utah

Implementation of projects from Alta's Master Development Plan.

Special use managementRecreation management
Scoping Start
04/20/2016
Comment Period
10/20/2017
Objection Period Start
04/11/2018
Decision
12/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 11/30/2018
Alta Ski Resort in Little Cottonwood Canyon on the Salt Lake Ranger District · Salt Lake, Utah

Additional Cecret Lake Trailhead parking is being proposed in the previous bottom terminal location of the Supreme lift.

Recreation management
Scoping Start
07/12/2018
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 11/29/2018
Alta Ski Resort, Little Cottonwood Canyon, Utah · Salt Lake, Utah

Relocation of an Avalauncher tower to better meet the needs of the ski resort avalanche mitigation program.

Special use management
Scoping Start
05/02/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3S R3E Section: 4
Decision Memo · Salt Lake Ranger District · updated 11/29/2018
The proposed projects are located approximately 12 miles east from the mouth of Big Cottonwood Canyon, partially within Solitude%u2019s Special Use Permit boundary · Salt Lake, Utah

To grade sections of the existing Summit Access East ski trail and install new snowmaking infrastructure to the south side of the Main Street trail.

Land management planning
Scoping Start
05/09/2018
Decision
05/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E T3S Section 27
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/1/2018
Alta Ski Area · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize Alta Ski Area to construct a seasonal food and beverage yurt adjacent to challenger ski run.

Recreation managementSpecial use management
Scoping Start
06/2016 (Estimated)
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 10/26/2018
Approximately 27 miles northeast of Ogden, Utah. Off of the Monte Cristo Road. · Rich, Utah

Reduce undesirable impacts to vegetation by: installing a horse corral near Bluff Spring; add a trail connecting Bluff Springs Road to Bluff Spring system trail; add trail connecting Bluff Springs Road (#20738) from the Bluff Springs Trail dead end.

Recreation management
Scoping Start
10/13/2016
Comment Period
04/04/2017
Decision
10/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Zachary Maughan · zmaughan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 8 North, Range 4 East, Section 21
Decision Memo · Salt Lake Ranger District · updated 10/22/2018
South side of Little Cottonwood Canyon, accessed from the White Pine Trailhead. · Salt Lake, Utah

Proposal to realign the trail to meet the ten percent grade that travels cross-slope. Project will improve drainage and to keep tread at the desired 2-3 foot width. Proposed structure improvements near the Maybird Junction to keep people on trail.

Recreation management
Scoping Start
08/14/2018
Decision
10/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 9/27/2018
Cardiff Fork/Big Cottonwood Canyon · Salt Lake, Utah

Proposal to construct an extension of the Donut Falls Trail from the Donut Falls Trailhead to just before the bridge at the Cardiff Fork Trailhead.

Recreation management
Scoping Start
12/21/2015
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 9/26/2018
East of Logan, Utah. At Dewitt Springs located in Logan Canyon. · Cache, Utah

Logan City has proposed maintenance projects at their culinary water source, Dewitt Springs: 1)Replace an existing water drain line which has collapsed; 2) Repair bank erosion around Dewitt Springs security fence to allow for fence maintenance.

Special use management
Scoping Start
06/16/2015
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 9/26/2018
West Fork Smiths Fork watershed · Summit, Utah

The Forest Service proposes to develop four ponds that would benefit both wildlife and livestock. Two new ponds would be created, and a ditch and water bars along a closed logging road would be modified o catch water.

Wildlife, fish, rare plantsGrazing management
Scoping Start
12/07/2012
Decision
04/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Aimee Cameron · aimeecameron@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Decision Memo · Spanish Fork Ranger District · updated 9/25/2018
T12 S, R3E, NE  section 17, Salt Lake Meridian, at 11136'36.28"W, 3947'0.57"N ( NAD 83) · Utah, Utah

Develop a spring for stock water use on the Nephi-Salt Creek Allotment. The water will be collected in a head box and delivered to two 1,200 gallon troughs via 100 feet of buried 1.5 inch diameter pipeline.

Grazing management
Scoping Start
09/24/2018
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 9/18/2018
Tibble Fork recreation residence tract is located up American Fork Canyon on the Pleasant Grove Ranger District. It is approximately 7.0 up the canyon and 0.5 miles off of Road 085. · Utah, Utah

Proposal from the HOA of the Tibble Fork Recreation Residence Tract of the Pleasant Grove Ranger District to demolish and replace an existing 6,000 gallon water tank and replace it with a newer, larger water tank capable of holding 15,900 gallons of

Recreation managementSpecial use management
Scoping Start
09/04/2018
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Billy Preston · bpreston@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 9/10/2018
Strawberry Reservoir, south of Highway 40. · Wasatch, Utah

Proposal to build a new parking lot with a boat ramp near Chicken Creek East. A restroom will be constructed and the two East/West Chicken Creek Day Use areas will be removed and revegetated.

Recreation management
Scoping Start
08/23/2018
Decision
09/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Anthony Gray · aagray@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 9/10/2018
Spanish Fork Ranger District, Diamond Fork Canyon · Utah, Utah

Proposal to conduct phosphate mining activities on a lease area regulated by the BLM with concurrence from the USFS as the surface landowner.

Minerals and geology
Scoping Start
01/26/2017
Comment Period
01/26/2017
Objection Period Start
03/02/2018
Decision
09/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency; Ira - Inventoried Roadless Area Activities Requiring Chief's Approval
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/10/2018
Wasatch-Cache National Forest · Box Elder; Cache; Davis; Morgan; Rich; Salt Lake; Summit; Tooele; Weber; Uinta, Utah; Wyoming

The UWC National Forest has begun the process of an administrative change to the Wasatch-Cache Forest Plan to correct the Wilderness Management Prescriptions in the Henrys Fork and Beaver Creek watersheds to reflect the historic and current uses.

Land management planningSpecial area management
Scoping Start
06/26/2018
Comment Period
06/26/2018
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Charlie Condrat · ccondrat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 8/29/2018
Uust inside the Forest Boundary on the east side of Mapleton City, Utah. · Utah, Utah

Proposal from Mapleton City to install a municipal waterline from their existing infrastructure in Maple Canyon across 1,950 linear feet of Forest System Lands. The 50-foot construction width will impact 2.23 acres.

Special use management
Scoping Start
08/27/2018
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 8/16/2018
In the Bear River Range, east of Logan, Utah. · Cache, Utah

Proposal to remove juniper in Green Canyon, Logan Dry Canyon and Providence Canyon. Juniper would be removed by hand cutting and the area seeded with browse species to improve the quality and quantity of forage for wildlife.

Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
10/26/2015
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Masako Wright · masakowright@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionPortions of: (Green Cyn) T 12 N, R 2 E; (Logan Dry Cyn) T 11 N, R 1 E, Sec 1 and 6, and T 12 N, R 1 E, Sec 31 and 36; and, (Providence Cyn) T 11 N, R 2 E, Sec 18.
Decision Memo · Salt Lake Ranger District · updated 8/9/2018
Proposed lacation in Lower Davis Creek area, Farmington City, Davis County, UT · Davis, Utah

Farmington City is proposing to construct a water storage tank to include within their current special use permit

Special use management
Scoping Start
05/06/2011
Decision
04/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3N, R1E, Sec 29,
Decision Memo · Spanish Fork Ranger District · updated 8/9/2018
Red Hollow, Wignal Flat · Utah, Utah

USFS proposal to provide water for existing livestock grazing areas in the Red Hollow and upper Wignal areas. A water powered generator and solar powered generator will be installed to pump water.

Grazing management
Scoping Start
12/02/2015
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 8/9/2018
Tibble Fork Reservoir Parking Lot and Timpooneke Road. · Utah, Utah

Installing an emergency phone at the Tibble Fork Parking Lot for public safety.

Recreation management
Scoping Start
02/17/2015
Decision
04/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 8/9/2018
The project is located west of Whitney Reservoir on land administered by the Uinta-Wasatch-Cache National Forest approximately 30 miles south of Evanston, Wyoming. · Summit, Utah

Two exclosures will be constructed to compare current livestock grazing and no livestock grazing on tall forb communities to better understand these communities and their true potentials. Vegetation monitoring will occur every 5-10 yrs or as needed.

Grazing management
Scoping Start
04/16/2015
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Aimee Cameron · aimeecameron@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT. 1 N., R. 9 E., Section 4, NE1/4 and T. 1 N., R. 9 E., Section 8, SE1/4, Salt Lake Base & Meridian.
Malan Basin Cancelled
Decision Memo · Ogden Ranger District · updated 8/7/2018
East of Ogden, Utah. · Weber, Utah

The United States of America, Forest Service proposes to acquire approximately 1,482.38 acres. TR Guest Ranch LLC and Saving Our Foothill Property LLC are working with The Trust for Public Lands(third party facilitator) to sell land in Malan Basin.

Land acquisition
Scoping Start
09/28/2017
Decision
04/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Sharon Andrews · sharonandrews2@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (6), 36 Cfr 220.6(D)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Purchases
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 5 North, Range 1 West, Sections 2 and 3; Township 6 North, Range 1 West, Sections 34 and 35, Salt Lake Meridian
Decision Memo · Pleasant Grove Ranger District · updated 7/30/2018
Tibble Fork Recreation Residence Tract, American Fork Canyon · Utah, Utah

Proposal to demolish and rebuild a cabin in the Tibble Fork Recreation Residence Tract that was damaged by fire.

Recreation managementSpecial use management
Scoping Start
07/23/2018
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Billy Preston · bpreston@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/27/2018
Southwest side of Sheeprock Mountains, Vernon Unit, Tooele County, Utah. · Utah, Utah

Proposal to improve rangeland distribution of livestock by installing two troughs and enhance Sage Grouse habitat by creating up to four wet areas fenced from livestock use.

Grazing managementWildlife, fish, rare plants
Scoping Start
07/26/2018
Decision
07/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Species Habitat Improvements; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 7/16/2018
South shore of Pineview Reservoir, approximately 8 miles east of Ogden, Utah. · Weber, Utah

The Forest Service proposed to decommissioning the campground and remove improvements to restore the wetland areas to a more natural state thereby allowing waters to flow into natural channels and floodplains.

Recreation management
Scoping Start
05/01/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 6 North, Range 1 East, Section 18 Salt Lake Meridian
Decision Memo · Logan Ranger District · updated 7/12/2018
Between Logan Canyon summit on Highway 89, east of Logan, Utah, and Hardware Ranch · Cache; Rich, Utah

The Forest Service proposes to issue a 5-year permit to the Arctic Breed Rescue to host the K9 Challenge sled dog race.

Special use management
Scoping Start
04/02/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
5-Year Special Use PermitsDecision Signed Date: 07/12/2018
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 7/12/2018
East of Logan, Utah, in Logan Canyon. · Cache, Utah

The Forest Service proposes to issue a 5-year permit to Nordic United to hold the Crowbar, which is an annual backcountry ski event.

Special use management
Scoping Start
04/02/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
5-Year Special Use PermitsDecision Signed Date: 07/12/2018
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/12/2018
Next to Oakley City, UT water tank north of Kamas, UT. · Summit, Utah

In partnership with Oakley City, UT and South Summit Trails Foundation, the USFS proposes to construct two sections of trail to create loop system trails that intersect with Oakley City trails. Trail length will be 0.1 miles for each trail.

Recreation management
Scoping Start
07/05/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 7/12/2018
Box Elder Campground, approximately 5 miles east of Brigham City, Utah. · Box Elder, Utah

Forest Service proposes to issue a 5-year special use permit to the Society for Creative Anachronism for the Harvest Festival, which incorporates activities related to pre-17th century Europe.

Special use management
Scoping Start
04/02/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
5-Year Special Use PermitsDecision Signed Date: 07/12/2018
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 7/6/2018
Pineview Reservoir on the Ogden Ranger District. · Weber, Utah

Reissuance of a permit to the yacht club for a ten year term.

Special use management
Scoping Start
04/12/2016
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 7/3/2018
Approximately 9 miles east of Hyrum, Utah. · Cache, Utah

Reconstruct and/or realign the Herd Hollow-Seep Hollow pasture fence on the South Cache allotment as follows: 2 miles reconstructed in existing locations,  mile removed from unsuitable locations,  mile realigned to a more suitable location.

Grazing management
Scoping Start
04/12/2016
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT. 11 N., R. 3 E., sections 5,8, 17
Environmental Assessment · Logan Ranger District · updated 6/25/2018
Approx. 45 miles east of Logan. The 24,031 acre analysis area includes a combination of National Forest System, Utah School and Institutional Trust Lands Administration, and private lands. · Cache; Rich, Utah

Proposal includes a combination of commercial timber harvesting, pre-commercial thinning, and prescribed fire to treat approx. 13,263 acres. Access to the project area would involve use of temporary and existing roads.

Fuels managementVegetation management (other than forest products)Forest products
Scoping Start
01/12/2017
Comment Period
02/06/2017
Objection Period Start
05/16/2018
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Sendi Kalcic · sendikalcic@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics); Hfra Title Vi: Insect And Disease Projects
Notice and Comment Regulation218 (2013) HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District; Logan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 6/25/2018
Forest wide where present. · Box Elder; Cache; Davis; Rich; Salt Lake; Tooele; Utah; Wasatch; Weber, Utah

Mechanically treat, by lop and scatter, juniper and pinyon pine whips on approximately 71,868 acres of National Forest System lands on the Uinta-Wasatch-Cache National Forest.

Wildlife, fish, rare plantsVegetation management (other than forest products)Fuels management
Scoping Start
03/19/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 6/13/2018
American Fork Canyon, Pleasant Grove Ranger District. Utah, County. · Utah, Utah

Proposal from American Fork City to authorize the rehabilitation of a spring collection system and the replacement of certain City-owned culinary water pipelines on Forest Service management lands in American Fork Canyon.

Special use management
Scoping Start
08/12/2017
Comment Period
04/24/2018
Decision
06/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 5/21/2018
Sunset campground is located approximately 3.3 miles up Farmington Canyon Road (FR007). · Davis, Utah

Salt Lake Ranger District proposes to take a phased approach to decommission Sunset Campground. This decision is to implement phase one which is to remove all existing infrastructure including signs, restrooms, tables, site markers, fire rings, roads

Recreation managementFacility management
Scoping Start
03/08/2018
Decision
05/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3N R1E S9
Decision Memo · Heber-Kamas Ranger District · updated 5/21/2018
Highway 150 Yellowpine CG, Pine Valley CG · Wasatch, Utah

Proposal is an addition to the approved and partially implemented Upper Provo Watershed EA signed in 2014. Of the 1316 acres, 500 acres are polygons within the 91,000 acre boundary.

Fuels management
Scoping Start
10/18/2017
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Riley Bergseng · rbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 5/18/2018
The project area is located approximately 17 miles northeast of Logan, Utah, in Logan Canyon. A portion of the new section of trail is located in the Mount Naomi Inventoried Roadless Area. · Cache, Utah

Proposal to expand the Tony Grove Winter Trailhead parking lot and construct an additional 0.7 mile section of non-motorized trail from the parking lot to the existing White Pine %u2013 Bunchgrass Canyon Trail (#7051).

Recreation management
Scoping Start
10/05/2016
Decision
05/2018 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Zachary Maughan · zmaughan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Trail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 13 North, Range 3 East, SE Section 2, NE Section 11, and SW Section 12.
Decision Memo · Logan Ranger District · updated 5/18/2018
The project area is located approximately 18 miles northeast of Logan, Utah, in the Mount Naomi Inventoried Roadless Area. Off of the Tony Grove Road. · Cache, Utah

The proposal is to realign a section of the White Pine - Bunchgrass Canyon Trail (#7051). A new section of trail, approximately 1 mile, would be constructed and the old section of trail would be restored and reseeded.

Recreation management
Scoping Start
10/05/2016
Comment Period
04/06/2017
Decision
05/2018 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Zachary Maughan · zmaughan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 14 North, Range 3 East, W1/2 Section 34.
Decision Memo · Ogden Ranger District · updated 5/14/2018
Pineview Reservoir, east of Ogden, Utah. · Weber, Utah

Forest Service in cooperation with UDWR, proposes to place artificial structures via boat in the deep water portions of Pineview Reservoir to allow young panfish (yellow perch, black crappie) an enhanced opportunity for survival from predation.

Wildlife, fish, rare plants
Scoping Start
04/02/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT6N, R1E, Sections 11, 12, 14, 15
Decision Memo · Ogden Ranger District · updated 5/3/2018
West shore of Pineview Reservoir, approximately 6 miles east of Ogden, Utah. · Weber, Utah

Yacht Club at Pineview Reservoir has submitted a request to the Forest Service regarding replacing the existing breakwater line with a new breakwater system. The purpose of the project is to reduce the impact of waves in marina generated by boats.

Recreation management
Scoping Start
09/28/2017
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 6 North, Range 1 E, Section 10, Salt Lake Meridian
Environmental Assessment · Ogden Ranger District · updated 4/24/2018
Approximately 10 miles west of Randolph, Utah · Rich, Utah

The proposal is to consolidate 10 grazing allotments (5 BLM and 5 FS) into 1 management unit with 20 pastures on BLM and 8 pastures on FS lands.Management would focus on time, timing, frequency, and intensity of livestock grazing on about 143,000 ac.

Grazing management
Scoping Start
08/15/2011
Comment Period
04/15/2016
Objection Period Start
12/15/2017
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/18/2018
Big Cottonwood Canyon, Utah. Pinetree Community · Salt Lake, Utah

Proposal to issue a special use permit to the Pinetree community for additional development of a spring to provide an adequate water source to the community.

Special use management
Scoping Start
10/07/2016
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 4/18/2018
Approximately 21 miles south of Mountain View, Wyoming, west of Stateline Reservoir. · Summit, Utah

Proposal for new spring development (i.e., headbox and fencing), water pipeline (approx. 600 feet), and trough. Proposal would help improve livestock distribution resulting in lighter use across the Gilbert Creek allotment.

Grazing management
Scoping Start
10/05/2017
Decision
04/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Aimee Cameron · aimeecameron@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSalt Lake Meridian, Township 3 North, Range 13 East, SW1/4
Decision Memo · Salt Lake Ranger District · updated 4/13/2018
Big Cottonwood Canyon, Mill D, Salt Lake Ranger District · Salt Lake, Utah

Proposal to reroute a steep section of trail within the segment from the Dog Lake/Desolation Lake Junction in Mill D to Dog Lake. Purpose is to create a sustainable trail at a lower grade.

Recreation management
Scoping Start
05/03/2017
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Salt Lake Ranger District · updated 4/13/2018
Farmington Canyon and Lamb's Canyon, Salt Lake Ranger District, Salt Lake and Davis County, Utah · Davis; Salt Lake, Utah

Proposal to amend the Travel Management Plan for roads in Farmington Cnyn and Lamb's Cnyn. Requires changes to the current MVUM by establishing summer use dates and winter seasonal closure dates for the two roads and adds Lamb's Cnyn road into NFS.

Road management
Scoping Start
02/16/2017
Comment Period
11/30/2017
Objection Period Start
02/16/2018
Decision
04/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/20/2018
Stansbury Mountains, Tooele County · Tooele, Utah

Proposal to lop and scatter treatments on the Stansbury Mountains. This first phase will retreat old chaining treatments that were completed in the 1980%u2019s.

Wildlife, fish, rare plants
Scoping Start
07/14/2017
Decision
12/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/20/2018
Snowbird Ski and Summer Resort · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize the construction and operation of a zip line at Snowbird Ski and Summer Resort.

Recreation managementSpecial use management
Scoping Start
03/15/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/20/2018
Alta, Utah · Salt Lake, Utah

Proposal to construct a fiber optic cable near the end of SR 210 within the Albion Basin Road (NFSR 028) to the Patsey Marley private property. The fiber optics line would be collocated with the proposed Patsey Marley utility ROW.

Special use management
Scoping Start
05/03/2017
Decision
03/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 3/20/2018
Tibble Fork Estates. American Fork Canyon. · Utah, Utah

Proposal to masticate a shaded fuel break between the main ingress egress road to the south of the Tibble Fork Estates community.

Fuels managementRecreation management
Scoping Start
10/11/2017
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · R4 - Intermountain Region All Units · updated 3/20/2018
This project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, Utah, and Nevada. · Beaver; Duchesne; Emery; Garfield; Iron; Juab; Millard; Piute; Sevier; Uintah; Wasatch; Weber, Utah

This proposed 600 kV direct current transmission line is designed to carry renewable energy (primarily wind power) from generation sources in central Wyoming to markets in in the pacific southwest

Special use management
NOI in Federal Register
01/04/2011
DEIS NOA in Federal Register
02/18/2011
FEIS NOA in Federal Register
01/13/2017
Objection Period Start
01/21/2017
Decision
05/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Charles Call · ckcall@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Transwest Express Transmission ProjectDecision Signed Date: 05/31/2017
ForestsAshley National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Uinta-Wasatch-Cache National Forest
DistrictsRoosevelt Ranger District; Pine Valley Ranger District; Fillmore Ranger District; Richfield Ranger District; Ferron Ranger District; Heber-Kamas Ranger District; Spanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 3/20/2018
Uinta-Wasatch-Cache National Forest. · Box Elder; Cache; Davis; Morgan; Rich; Salt Lake; Summit; Tooele; Utah; Wasatch; Weber; Uinta, Utah; Wyoming

The UWCNF has begun a process to realign its forest plans with the 2012 Final Planning Rule (see: 36 Code of Federal Regulations 219). In particular, the UWCNF will address the purpose of the monitoring plan program set forth in 36 CFR 219.12(a)(1).

Land management planningRegulations, directives, orders
Scoping Start
02/2015 (Estimated)
Comment Period
07/2015 (Estimated)
Objection Period Start
08/2015 (Estimated)
Decision
10/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Charlie Condrat · ccondrat@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 3/9/2018
East of Logan, Utah. In logan Canyon, just upstream from Bridger Campground. · Cache, Utah

Logan City proposes to repair the stream bank just above Bridger Campground in order to protect the pipeline. The bank has eroded and has nearly exposed the city culinary water line and created a hazard on the Forest Service River Trail.

Special use management
Scoping Start
06/16/2015
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/9/2018
East Layton on the bench between Shoreline Circle and Fernwood Drive along fire break road. · Davis, Utah

Re-treat shaded fuel break along Fire Break Road, on the east Layton bench.

Road managementFuels management
Scoping Start
03/08/2018
Decision
03/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Travel Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT4N, R1W, Sec. 1,12
Decision Memo · Spanish Fork Ranger District · updated 3/9/2018
Hobble Creek, Spanish Fork Ranger District · Utah, Utah

Proposal to relocate the Packhard trailhead 0.3 miles up the road to where the current dispersed site is located, re-route the trail to the trailhead, rehabilitate the current trail section and close the trailhead to overnight camping.

Recreation management
Scoping Start
07/20/2016
Decision
03/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Sarah Flinders · sflinders@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 3/8/2018
Off the Sinks Road (Forest System Road #20055), approximately 20 miles east of Logan, Utah. · Cache, Utah

Construct a 4-wire let down fence approximately 1 mile long.

Grazing management
Scoping Start
04/12/2016
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 1/29/2018
In Logan Canyon, four miles east of Logan, UT. · Cache, Utah

The proposal involves constructing a new 0.3 mile section (re-route) of non-motorized trail from the Bridger Look-Off area to the upper group site area of the Spring Hollow Campground. Sections of two other trails will be decommissioned.

Recreation management
Scoping Start
06/16/2015
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT. 12 N., R. 2 E., sections 27, 28
Decision Memo · Uinta-Wasatch-Cache All Units · updated 1/16/2018
Alta Ski Area, East Baldy · Salt Lake, Utah

Installation of pedestals to place Obell'X Avalanche Control Devices.

Recreation managementSpecial use management
Scoping Start
05/02/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Salt Lake Ranger District · updated 12/26/2017
Red Butte Canyon, Salt Lake County · Salt Lake, Utah

The NEON research sites include the construction, maintenance, and operation of ecological observation and experiment stations within w/in Red Butte RNA to study land use, invasive species, and urban effects for 10-15 years.

Special use managementResearch
Scoping Start
11/23/2014
Comment Period
11/24/2014
Objection Period Start
07/13/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Elisha Hornung · ehornung@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Research And Development
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 12/26/2017
Snowbird, Utah · Salt Lake, Utah

Proposal to reissue Wasatch Powderbird Guides a new 10-year outfitter and guide permit which will include the same terms and conditions as the current permit.

Special use management
Scoping Start
05/03/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Monte Cristo WUI Completed
Decision Memo · Ogden Ranger District · updated 12/8/2017
Aproximately 43 miles east of Ogden, Utah along the Monte Cristo Highway (Utah SR-39) · Cache; Rich, Utah

Forest Service is proposing a two-phase vegetation treatment (i.e., ladder fuel, dead or dying, small tree, encroaching conifer removal; limbing mature trees)on lands around Monte Cristo Guard Station (historic) and several out-buildings.

Fuels management
Scoping Start
07/12/2017
Decision
12/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Jeff Sanocki · jsanocki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 8 North, Range 4 East, Section 4, Salt Lake Meridian
South Fork WUI Completed
Decision Memo · Ogden Ranger District · updated 12/8/2017
Six miles East of Huntsville, Utah along the South Fork of the Ogden River. · Weber, Utah

Proposal to lop and scatter juniper on approximately 1,221 acres along the Wildland Urban Interface.

Fuels management
Scoping Start
07/12/2017
Decision
12/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Jeff Sanocki · jsanocki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 6 North, Range 8 East, Sections 5, 6, 7, 12
Decision Memo · Evanston-Mountain View RD · updated 11/7/2017
Three sites on the Evanston-Mountain View Ranger District · Summit; Uinta, Utah; Wyoming

The Forest Service proposes to treat 238 acres of dead lodgepole pine around goshawk nests to hasten regrowth of trees. Dead pine would be lopped and scattered by hand with chainsaws. No live trees would be cut. No soil disturbance would occur.

Wildlife, fish, rare plants
Scoping Start
10/03/2016
Decision
11/2016 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Christina Hacker · chacker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 10/25/2017
The project area is located in the Ogden Valley at Pineview Reservoir approximately 10 miles east of Ogden, Utah, along Utah State Route #158. · Weber, Utah

The Forest Service proposes to mark and designate and area for open swimming at Pineview Reservoir, making it easily accessible for swimmers and giving them a location that is safe to swim in limits the potential for accidents with boats.

Recreation management
Scoping Start
04/12/2016
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 6 North, Range 1 East, Section 10, Salt Lake Meridian
Decision Memo · Ogden Ranger District · updated 10/25/2017
Spring Creek Trailhead on the east side of Pineview Reservoir, near Huntsville, Utah. · Weber, Utah

Expand the parking at Spring Creek to accommodate approximately twice the number of vehicle parking spots (50 total) currently available now and install a double CXT style restroom.

Recreation management
Scoping Start
07/06/2016
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Sendi Kalcic · sendikalcic@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 6 North, Range 2 East, Section 7
Decision Memo · Uinta-Wasatch-Cache All Units · updated 10/23/2017
Farmington Reservoir, Davis County, Utah. · Davis, Utah

Proposal by the Bureau of Reclamation to remove 1,200 feet of existing chain link fence and replace with 1,500 feet to encase the reservoir and toe of the dam.

Special use management
Scoping Start
10/18/2017
Decision
10/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Elisha Hornung · ehornung@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Environmental Assessment · Logan Ranger District · updated 10/20/2017
Section 20, Township 9 North, Range 1 West, east of Brigham City, Utah. · Box Elder, Utah

The Forest Service proposes to authorize Pacificorp to relocate a 0.5-mile segment of an existing transmission line onto National Forest System lands to avoid excavation activites on private land.

Special use management
Scoping Start
01/23/2013
Comment Period
08/07/2014
Decision
08/2016 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Sendi Kalcic · sendikalcic@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Staker-Parsons Powerline Relocation & Non-Significant Forest Plan AmendmentDecision Signed Date: 08/12/2016
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 10/19/2017
Just off the Nebo Loop Road near the Holman Exclosure. · Utah, Utah

The existing trough would be moved from the dispersed camping site which has grown bigger over the years. The new trough location is approximately 260 feet from the current location.

Grazing management
Scoping Start
10/02/2014
Decision
03/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT10S R2E Sections 35 & 36 SLM.
Decision Memo · Ogden Ranger District · updated 10/3/2017
Approximately 7 miles northeast of Ogden, Utah. · Weber, Utah

In order to provide public access that avoids private land, there is a need to construct 0.25 mile of new system trail connecting the Bicentennial Trail to National Forest System land.

Recreation management
Scoping Start
10/13/2016
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Zachary Maughan · zmaughan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionTownship 8 North, Range 1 West, Section 34 Salt Lake Meridian
Decision Memo · Logan Ranger District · updated 9/27/2017
Within Providence Canyon and Logan Dry Canyon, east of Logan, Utah. · Cache, Utah

Forest Service proposal to treat juniper in Providence Cyn and Logan Dry Cyn (approx. 36 acres and 34 acres, respectively)in order to improve watershed condition and wildlife habitat. Juniper would be cut, then either removed or lopped and scattered.

Watershed managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
09/2017 (Estimated)
Decision
01/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Masako Wright · masakowright@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionProvidence Canyon: Township 11 North, Range 2 East Section 18; Logan Dry Canyon: Township 11 North, Range 1 East, Sections 1 and 6, and Township 12 North, Range 1 East, Sections 31 and 36
Decision Memo · Salt Lake Ranger District · updated 9/22/2017
Solitude, Utah · Salt Lake, Utah

Proposal to realign approximately 0.6 miles of the Solbright trail with less than 0.2 miles of trail on USFS lands.

Special use management
Scoping Start
07/14/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Bear 100 Completed
Decision Memo · Logan Ranger District · updated 9/19/2017
Race takes place throughout 100 miles of the Bear River Range, beginning in Logan and ending in Bear Lake. · Cache, Utah

Proposal to issue a 5-year special use permit, authorizing the Bear 100 race and associated race support. Racers would use Forest Service designated roads and trails. The permit would include an alternate race course route for bad weather.

Special use management
Scoping Start
03/29/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Eli Ridge Pipeline Completed
Decision Memo · Ogden Ranger District · updated 9/15/2017
Eli Ridge of the Monte Cristo Range; approximately 20 miles northeast of Ogden, Utah. · Rich, Utah

Proposal to install approximately 2 miles of 2-inch high-density pipe, one water storage tank (20,000 gallon capacity) and six tire troughs (12,000 gallon capacity each) on the Woodruff-Dairy Ridge Allotment.

Grazing management
Scoping Start
07/12/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land Descriptionsections 9 & 10, Township 8 North, Range 4 E
Decision Memo · Ogden Ranger District · updated 9/14/2017
The project site is located in the vicinity of Cave Ridge in the Monte Cristo Range. · Rich, Utah

Installation of the Sprout Spring Storage Tank on the Woodruff-Dairy Ridge grazing allotment.

Grazing management
Scoping Start
10/13/2016
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Anthony Vonniederhausern · avonniederhausern@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 9/11/2017
Near Hardware Ranch Wildlife Management Area and Pleasant Valley, approximately 15 miles southeast of Logan, Utah. · Cache, Utah

Utah Division of Wildlife Resources desires to conduct a habitat restoration project to prevent loss of understory and Phase II juniper expansion. Juniper trees encroaching into sagebrush and meadow areas would be lopped and scattered.

Wildlife, fish, rare plants
Scoping Start
03/29/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Masako Wright · masakowright@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 11 North, Range 3 East, sections 23, 24, 25, 26
Decision Memo · Heber-Kamas Ranger District · updated 9/11/2017
Soapstone Basin. · Wasatch, Utah

Install a septic system and add an addition to the cabin.

Recreation managementLand ownership management
Scoping Start
10/24/2014
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Evan Glenn · evanrglenn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 9/6/2017
Mary Ellen Gulch, Utah County · Utah, Utah

Proposal for a 5-year Research Permit Authorization for an avalanche management study area in Mary Ellen Gulch for the winters of 2017-2022 to improve the understanding of avalanche dynamics and develop effective means of snow safety.

Special use management
Scoping Start
07/14/2017
Decision
09/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 9/2/2017
Approximately 30 miles east of Ogden, Utah. · Weber, Utah

Proposal to issue a 5 year special use permit to TEAM Unlimited LLC to operate the XTERRA race. Activities include a swim in Pineview Reservoir and running/biking races, and event filming through use of crew, special equipment, and vehicles.

Special use management
Scoping Start
10/13/2016
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 9/1/2017
Little Cottonwood Canyon, Utah · Salt Lake, Utah

Proposal by UDOT to install a 10 by 10, Type 2 High Explosive Magazine Cache on Forest Service land near the Alta Guard Station in Little Cottonwood Canyon.

Special use management
Scoping Start
07/14/2017
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 8/28/2017
American Fork Canyon, Echo picnic site below Tibble Fork Dam. · Utah, Utah

Proposal to pave the two parking areas at the Echo picnic site and build a trail to the restroom. Proposal is intended to provide safer access between the two sites.

Recreation management
Scoping Start
10/14/2016
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Endurance Utah Completed
Decision Memo · Ogden Ranger District · updated 8/18/2017
East of Ogden, Utah · Cache; Weber, Utah

Proposal to issue a 5 year special use permit to Endurance Utah to operate two recreation events: Skyline Trail Run (marathon and half marathon) and Eden Epic mountain bike race.

Special use management
Scoping Start
10/13/2016
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Amy Forsgren · aforsgren@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 8/10/2017
Tibble Fork Recreation Residence, Pleasant Grove Ranger District · Utah, Utah

Proposal to tear down the existing cabin and build a new structure on the same 1,500 foot footprint.

Recreation managementSpecial use management
Scoping Start
02/06/2017
Decision
07/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Billy Preston · bpreston@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 8/10/2017
Pleasant Grove Ranger District, Provo City · Utah, Utah

Proposal by Provo City Public Utility for a 30 foot by 30 foot easement to install and bury electrical power/conduit, sewer piping, storm water piping, and culinary water piping.

Special use management
Scoping Start
06/29/2017
Decision
08/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Russell Hanson Jr · rhansonjr@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 8/9/2017
On the east side of Pineview Reservoir. · Weber, Utah

The Ogden Ranger District proposes to expand the parking area at Pelican Beach on the east side of Pineview Reservoir. The proposed expansion is in response to an increase in recreation demand for the Pelican Beach area.

Recreation management
Scoping Start
07/01/2014
Decision
06/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Sendi Kalcic · sendikalcic@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 8/7/2017
On the southeast end of Pineview Reservoir; east of Ogden, Utah. · Weber, Utah

Town of Huntsville has submitted an application to reconstruct a culinary water transmission pipeline across National Forest System land. The replacement pipeline would be constructed within an abandoned road through Jefferson Hunt Campground.

Special use management
Scoping Start
03/30/2017
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land Descriptionsections 18 and 19, Township 6 North, Range 2 East
Decision Memo · Logan Ranger District · updated 8/7/2017
Wellsville Mountains · Box Elder; Cache, Utah

The purpose of this project is to understand the stratigraphic distribution, paleocommunity structure, taphonomy, and geochemistry of Burgess Shale-type fossils within the Spence Shale (Wellsville Mountains). Specimens will be collected for analysis.

Research
Scoping Start
06/28/2017
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Roger Kesterson · rkesterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 8/3/2017
To Be Determined · Box Elder; Cache; Rich, Utah

Utah State University is requesting to conduct research aimed at better understanding the vegetative response to climate change. The proposal involves installation of twelve (12m x12m) "precipitation manipulation shelters" at forest edge sites.

Special use management
Scoping Start
10/2014 (Estimated)
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/27/2017
Bottom of Ward Canyon, Davis County, Utah · Davis, Utah

The Bountiful Lions Gun Range is operated by the Bountiful Lions Club of Bountiful, and operates under a special use permit, originally issued in 1959, that will expire at the end of 2013. The Gun Club has submitted an application to renew the permit

Special use management
Scoping Start
07/09/2013
Decision
01/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2N, R1w, Sec. 17
Decision Memo · Heber-Kamas Ranger District · updated 7/20/2017
Heber Kamas Ranger District, located near mile post 14 on SR-150, at the end of FSR 142. · Summit, Utah

Proposal by Utah State Parks and Recreation to construct and maintain a storage shed for a snow cat groomer located north of the Soapstone Trailhead.

Facility managementRecreation management
Scoping Start
06/07/2017
Decision
07/2017 (Estimated)
Implementation
08/2017 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction; Facility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 7/20/2017
Strawberry Bay Marina, located at Strawberry Reservoir in Wasatch County. · Wasatch, Utah

Proposal to upgrade existing facilities and construct new facilities at Strawberry Bay Marina, located at Strawberry Reservoir.

Recreation management
Scoping Start
06/11/2016
Comment Period
04/05/2017
Objection Period Start
05/15/2017
Decision
07/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 7/19/2017
The project initiates in central Wyoming and crosses public, private, and state lands in Wyoming, Colorado, and Utah. Project terminates at the Mona substation in central Utah. · Beaver; Duchesne; Emery; Garfield; Iron; Juab; Millard; Piute; Sevier; Uintah; Wasatch; Weber, Utah

This proposed 500 kV transmission line is designed to deliver power to Rocky Mountain Power utility costumers in Utah and the intermountain west. Generation sources are located in central Wyoming.

Special use management
NOI in Federal Register
04/01/2011
DEIS NOA in Federal Register
04/01/2011
FEIS NOA in Federal Register
01/13/2017
Objection Period Start
01/21/2017
Decision
05/2017 (Estimated)
Implementation
01/2020 (Estimated)
Project documents
Charles Call · ckcall@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Energy Gateway South Transmission ProjectDecision Signed Date: 05/31/2017
ForestsAshley National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Uinta-Wasatch-Cache National Forest
DistrictsDuchesne Ranger District; Pine Valley Ranger District; Fillmore Ranger District; Richfield Ranger District; Price Ranger District; Heber-Kamas Ranger District; Spanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/18/2017
Approximately 0.5 mile northwest of Samak along Highway 150. · Summit, Utah

The Forest Service proposes to authorize Allwest Communications to upgrade an existing 525-foot section of copper line with 96-strand fiber optic line. The upgraded line would be installed along the existing copper line, which runs along Highway 150.

Special use management
Scoping Start
04/03/2017
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Virginia Daniel · vdaniel@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionTownship 2 South, Range 6 East, Section 25.
Decision Memo · Logan Ranger District · updated 7/18/2017
Specific locations within Evanston-Mountain View, Heber-Kamas, and Logan ranger districts. · Cache; Summit; Wasatch, Utah

Proposal by Evanston-Mountain View, Heber-Kamas, and Logan ranger districts to: (1) install beaver deceivers and pond levelers; (2) install Beaver Dam Analogues; (3) trap and translocate nuisance beavers from human conflict areas.

Watershed managementWildlife, fish, rare plants
Scoping Start
03/31/2016
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Christina Hacker · chacker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District; Evanston-Mountain View RD; Logan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/18/2017
Bountiful, UT upper end of Muller Park Day Use · Salt Lake, Utah

Proposal to upgrade the deteriorating Bountiful City water treatment plant and associated infrastructure and connect it to the existing sewer located at the top of Muller Park day use site area.

Special use management
Scoping Start
05/03/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/18/2017
Layton City, Utah · Davis, Utah

Proposal to improve firefighter and public safety by performing maintenance on the Snoqualmie Fire Break road. Activities would include hand crews using chainsaws and brush cutters.

Vegetation management (other than forest products)Fuels management
Scoping Start
05/03/2017
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Guy Wilson · gswilson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/18/2017
Farmington, Utah, Davis County · Utah, Utah

Proposal for the Forest Service to exchange road easements with the Margetts.

Land ownership managementLand acquisition
Scoping Start
05/02/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/18/2017
The project is located in the southwest quarter of the Vernon Unit in T9S, R6W, Section 31 in the West Sheeprock Management Area · Utah, Utah

Proposal to treat 526 acres of pinyon-juniper woodland through lop and scatter mechanical thinning methods.

Fuels managementWildlife, fish, rare plants
Scoping Start
05/16/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 7/18/2017
Along SR-150 at the location of the current temporary booth. Heber-Kamas Ranger District, Summit County, Utah. · Summit, Utah

Proposal to replace the existing temporary Mirror Lake Fee Booth structure with a permanent foundation structure.

Facility management
Scoping Start
05/02/2017
Decision
05/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/18/2017
Pole Canyon, just off Forest Road #016, in T12S, R2E, Section 22 · Utah, Utah

Proposal to re-install a culvert (9 foot diameter by 40 foot long) on Pole Canyon Creek to reduce sediment from existing traffic and provide a safer access route for recreationists using dispersed camping sites in the Canyon.

Recreation management
Scoping Start
05/16/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/18/2017
Porter Fork Tract, Salt Lake Ranger District, Millcreek Canyon · Salt Lake, Utah

Modification of two existing decks on the lot number 7 cabin have been proposed due to natural wood deterioration.

Special use managementRecreation management
Scoping Start
05/02/2017
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 7/18/2017
Heber-Kamas Ranger District · Wasatch, Utah

Proposal to relocate two roads to improve watershed and riparian health while maintaining motorized vehicle access to Squaw Creek area. Proposal is to move Squaw Creek road out of the RHCA and move Streeper Creek road to a new location.

Recreation managementWildlife, fish, rare plantsRoad management
Scoping Start
03/14/2016
Comment Period
12/21/2016
Objection Period Start
02/03/2017
Decision
04/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Species Habitat Improvements; Road Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/18/2017
Tie Fork, Spanish Fork Ranger District. Sec.11, T.010.0S., R.006.0E., 26 · Utah, Utah

Proposal to install 20 Beaver Dam Analogs (BDA) on Tie Fork.

Wildlife, fish, rare plants
Scoping Start
05/16/2017
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 7/18/2017
Activities are proposed for two sites along the Wasatch Front. The first site is approximately 0.2 miles south of Squaw Mountain. The second site is 0.4 miles east of Bicentennial Park in Provo. · Utah, Utah

The Uinta-Wasatch-Cache National Forest proposes to authorize the Abandoned Mine Reclamation Program of the State of Utah Division of Oil, Gas, and Mining to perform mine closure activities on two sites, each under a separate decision memo.

Wildlife, fish, rare plantsMinerals and geology
Scoping Start
10/10/2016
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Pete Gomben · pgomben@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Timpanogos Mine Closure Decision MemoDecision Signed Date: 12/27/2016 (FS Withdrawn)
Timpanogos Mine Closure Site 4070317HO001Decision Signed Date: 05/09/2017
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/18/2017
Vernon and Little Valley Creeks (T5S, R5W, sections 14, 15 and 26 · Utah, Utah

Proposal to install 25 Beaver Dam Analogs (BDA%u2019s) in 5 locations along Vernon and Little Valley Creeks.

Wildlife, fish, rare plants
Scoping Start
05/16/2017
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Justin Robinson · jcrobinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 6/15/2017
The proposed pipeline would cross the UWCNF in the Wolf Creek/Upper South Fork Provo River area of the Heber-Kamas Ranger District, and in the Bountiful Peak area of the Salt Lake Ranger District. · Davis; Duchesne; Morgan; Salt Lake; Summit, Utah

The proposed action includes a 12-inch buried carbon steel pipeline approximately 135 miles long and ancillary facilities. Approximately 14 miles of the pipeline would be on the Uinta-Wasatch-Cache National Forest.

Minerals and geologySpecial use management
NOI in Federal Register
01/22/2014
DEIS NOA in Federal Register
01/31/2014
FEIS NOA in Federal Register
06/2015 (Estimated)
Objection Period Start
08/2015 (Estimated)
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Special AuthorityIra - Inventoried Roadless Area Activities Requiring Chief's Approval
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District; Heber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 3/21/2017
American Fork Canyon, above Tibble Fork Dam. · Utah, Utah

Proposal to reroute the existing Tibble Fork 041 single track trail from the top of the Tibble Fork dam to the upper slope above the reservoir and connect it to the Mill Canyon Trail #040. Reroute would eliminate switchbacks and increase safety.

Recreation management
Scoping Start
10/14/2016
Decision
03/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 3/20/2017
Cascade Springs picnic area, Pleasant Grove Ranger District · Utah, Utah

Proposal to add an additional picnic tables at Cascade Springs picnic area. Tables will be placed along the first section of trail at the lower parking area, and at the upper parking lot to provide closer access to amenities.

Recreation management
Scoping Start
10/14/2016
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 3/18/2017
T10S, R5W, Sections 1,11, 12 T9S, R5W, Sections 35, 36 · Utah, Utah

Proposal to route pipelines through a portion of the Little Valley and Sharpes Allotments to deliver water to three troughs on the Bennion Allotment and Vernon Campground. A solar pump will be required.

Grazing management
Scoping Start
12/01/2015
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Nebo Creek Corral Completed
Decision Memo · Spanish Fork Ranger District · updated 3/18/2017
Up the Nebo Creek road at the junction with and old closed road. · Utah, Utah

Construct cattle corrals that are approximately 30 by 30 feet of steel panels. The purpose of the corral is to hold cattle at the site until they can be trailered off the Forest.

Grazing management
Scoping Start
10/02/2014
Decision
03/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT11S R3E Section 16 SLM.
Decision Memo · Spanish Fork Ranger District · updated 3/17/2017
Pipeline & Troughs: T9S, R5W, Sections 2, 3, 4 Fence: T9S, R5W, Section 8 · Utah, Utah

Proposal to pipe stock water to the Ault BLM pasture. The proposed pipeline will be approximately 1.75 miles long and will be attached to an existing stock water pipeline from the Vernon Reservoir.

Vegetation management (other than forest products)Grazing management
Scoping Start
12/01/2015
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 3/17/2017
Monks Hollow/Diamond Fork Group Sites · Utah, Utah

USFS proposal to relocate the current fence across the river into Hollows Pasture to eliminate damage by cattle to fences at group sites. Fence on the south side of the creek will be removed. Cattle in Diamond Fork Pasture will have access to water.

Grazing managementRecreation management
Scoping Start
12/02/2015
Decision
03/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 3/17/2017
Approximately 11 east of Logan, Utah within the Bear River Range · Cache, Utah

Project would extend a pipeline across mud flat to an existing trough in Willow Creek and add a hydrant to the cow camp.

Grazing management
Scoping Start
06/19/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Kyler McCarrel · kmccarrel02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Mud Flat Pipeline Extension (Reroute)Decision Signed Date: 11/06/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N R3E Section 11 Salt Lake Base and Meridian
Dock Flat Pipeline Completed
Decision Memo · Heber-Kamas Ranger District · updated 3/9/2017
Section 4, 9, 16, 21 Township 2 South, Range 12 West, USM · Wasatch, Utah

Proposal to construct a 2.25 mile pipeline connecting the Strawberry Extension Pipeline to a trough at Telephone Hollow. The pipe will be laid in a trench approximately 5 inches by 5 inches.

Grazing management
Scoping Start
09/30/2016
Decision
02/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 3/9/2017
On the slope to the north of the West Fork of the Duchesne near the eastern Forest Boundary · Wasatch, Utah

Proposal to replace the existing headbox and connect it to a 1.5 inch polypipe. The pipe will be laid on the ground and will carry water to two troughs just outside of the Chevron pipeline corridor.

Grazing management
Scoping Start
09/30/2016
Decision
02/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 2/10/2017
Big Cottonwood Canyon, Mill D SHA · Salt Lake, Utah

Owner proposal to build an addition to accommodate new indoor bathroom. Cabin sewer line will be connected to the new Mill D sewer line to comply with Salt Lake Valley Health Department requirements.

Recreation managementSpecial use management
Scoping Start
12/21/2015
Decision
02/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Carol Majeske · cmajeske@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/7/2017
T3 S, R2 E, S5 · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize Alta Ski Area to modify the existing garbage collection area and install a modern garbage collection system.

Special use managementRecreation management
Scoping Start
06/29/2016
Decision
08/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/7/2017
Alta Ski Area · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize snowmaking improvements on Little Dipper and Rollercoaster ski runs. The improvements are anticipated to increase efficiency and decrease maintenance of the system.

Special use managementRecreation management
Scoping Start
06/29/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/7/2017
Alta Ski Area T3 S, R2 E, S5 · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize Alta Ski Area to replace an aging water storage tank and collection system with a modern collection system and underground tank.

Special use managementRecreation management
Scoping Start
06/29/2016
Decision
09/2016 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/7/2017
Alta Ski Area · Salt Lake, Utah

This project involves the removal of two antiquated chair lifts at Alta Ski Area: Cecret and Supreme. The resort is requesting authorization to remove the previously mentioned lift and replace them with one new lift.

Recreation managementSpecial use management
Scoping Start
01/09/2017
Decision
02/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 2/7/2017
Snowbasin Ski Area · Weber, Utah

Implementation of projects from the Master Development Plan of Snowbasin Ski Area.

Special use managementRecreation management
Scoping Start
03/30/2016
Comment Period
09/24/2016
Objection Period Start
12/06/2016
Decision
01/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/7/2017
Snowbird Ski and Summer Resort · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize Snowbird Ski Area to enhance beginner terrain in the Baby Thunder Area by adding two conveyors, and completing minor grading to the areas around those conveyors.

Recreation managementSpecial use management
Scoping Start
06/29/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/7/2017
SR210 Mile Marker 13.1-13.3. · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing to authorize Utah Department of Transportation to install five remote Gazex avalanche control systems and one gas control house above SR210 from Mile Post 13.1-13.3.

Road managementSpecial use managementRecreation management
Scoping Start
06/29/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Shawnee Hinman · sfhinman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 2/6/2017
Millcreek Canyon Recreation Sites · Salt Lake, Utah

Proposal to modify multiple developed recreation sites in Millcreek Canyon that are currently contributing to erosion and sediment in the stream.

Vegetation management (other than forest products)Recreation management
Scoping Start
10/07/2016
Decision
02/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Leah Norsworthy · lnorsworthy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Forest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Spanish Fork Ranger District · updated 2/6/2017
Vernon, Utah · Utah, Utah

Proposal to improve greater sage-grouse habitat, improve spring/fall mule deer habitat and watershed conditions, close non-system roads and trails, remove redundant system roads, and reduce hazardous fuels.

Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Scoping Start
09/30/2015
Comment Period
11/02/2016
Objection Period Start
12/14/2016
Decision
02/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Rangeland Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 1/31/2017
Upper Falls picnic area on Pleasant Grove Ranger District · Utah, Utah

Proposal to install a pedestrian bridge that would connect the Upper Falls Picnic Site to the Provo River Parkway.

Recreation management
Scoping Start
03/30/2016
Decision
01/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
James Hinricks · jhinricks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 1/20/2017
Devils Kitchen Overlook Nebo Loop Road · Utah, Utah

Proposal to replace and relocate the double vault wood toilet located at the trail head to the Devils Kitchen Overlook. Replacement toilet will be located to the west of current toilet.

Recreation management
Scoping Start
10/07/2016
Decision
01/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
James Hinricks · jhinricks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/9/2017
Albion Meadows, Little Cottonwood Canyon, Salt Lake County, Utah · Salt Lake, Utah

Proposal to reroute the Albion Meadows trail from private property onto Forest Service lands. The rerouted section would be approximately 0.33 miles long and three feet wide. The old trail would be scarified and revegetated using native plants.

Recreation management
Scoping Start
07/05/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/9/2017
Albion Meadows, Little Cottonwood Canyon, Salt Lake County, Utah · Salt Lake, Utah

Proposal to reroute the Albion Meadows trail from private property onto Forest Service lands. The rerouted section would be approximately 0.33 miles long and three feet wide. The old trail would be scarified and revegetated using native plants.

Recreation management
Scoping Start
07/11/2016
Decision
08/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/9/2017
Brighton- Big Cottonwood Canyon · Salt Lake, Utah

Big Cottonwood Improvement District proposes an addition to the existing Brighton area sewer system. The addition is needed for compliance with Salt Lake Valley Health Department watershed requirements.

Special use management
Scoping Start
12/21/2015
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 1/6/2017
Cottonwood Campground, South Willow Canyon, Tooele County · Utah, Utah

Proposal to demolish and remove an existing single unit vault toilet and replace it with a single unit CXT concrete toilet.

Recreation management
Scoping Start
10/04/2016
Decision
01/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
George King · gmking@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 1/4/2017
Approximately 24 miles southeast of Mountain View, Wyoming, north of Hoop Lake. · Summit, Utah

Proposal to improve greater sage-grouse habitat by removing trees, which are currently encroaching the sage brush flats and discourage greater sage-grouse from using the area. Project would also improve habitat for deer, elk, moose, and bighorn sheep

Wildlife, fish, rare plants
Scoping Start
03/31/2016
Decision
01/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Christina Hacker · chacker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Decision Memo Telephone Hollow and Willow Park Lop and ScatterDecision Signed Date: 01/03/2017
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 12/9/2016
Approximately 15 miles southeast of Logan, UT. Project area is adjacent to the northwest boundary of Hardware Ranch Wildlife Management Area. · Cache, Utah

Utah Division of Wildlife Resources desires to conduct a habitat restoration project to prevent loss of understory and Phase II juniper expansion. Juniper trees encroaching into sagebrush and meadow areas would be lopped and scattered.

Wildlife, fish, rare plants
Scoping Start
06/16/2015
Comment Period
05/03/2016
Decision
06/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Kevin Labrum · kclabrum@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT. 11 N., R. 3 E., within portions of sections 26, 34, 35 Salt Lake Meridian
Decision Memo · Spanish Fork Ranger District · updated 12/2/2016
Vernon Management Unit · Tooele, Utah

Project consists of 1,640 acres of one way chain treatment and seeding. Seeding will occur first and the one way chaining will help bury the seed and provide a better seed to soil contact.

Wildlife, fish, rare plants
Scoping Start
10/07/2016
Decision
12/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 11/18/2016
Approximately 3 miles east of Hyrum, Utah, located along the south side of the Blacksmith Fork River. · Cache, Utah

Cache County and the City of Hyrum have proposed the creation of a trail which follows the corridor of a buried waterline. Approximately 1.2 miles of this proposed trail runs across National Forest System lands.

Recreation management
Scoping Start
04/12/2016
Comment Period
08/25/2016
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 11/3/2016
Millcreek Canyon, Salt Lake County, Utah · Salt Lake, Utah

Proposal to construct a connector trail from the Lower Big Water lot in Millcreek Canyon to the overflow parking lot. The proposal is intended to improve public safety by removing the need for users to walk the road.

Recreation management
Scoping Start
07/05/2016
Decision
11/2016 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 11/1/2016
Major Evans Gulch, American Fork Canyon Management Area · Utah, Utah

Exchange of National Forest System lands (19.62) for Private Lands (25.11)to consolidate the ownership.

Land ownership management
Scoping Start
10/11/2013
Decision
10/2015 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Jon Stansfield · jstansfield@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT3S R3E Sections 29 & 30 SLBM.
Decision Memo · Salt Lake Ranger District · updated 10/25/2016
Junction of I-80 and Lambs Canyon Road · Salt Lake, Utah

Proposal to install a gate at the junction of I-80 and the Lambs Canyon Road. Closures would be implemented for emergency safety.

Special use managementRecreation management
Scoping Start
10/14/2016
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Marshall Alford · malford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTravel Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 10/24/2016
On the hills above Centerville, Bountiful, North Salt lake · Davis, Utah

Proposal to allow dedicated hunters and sportsman group volunteers to plant Bitterbrush seed (Pursha tridentate) with hand planters along the Wasatch Front.

Wildlife, fish, rare plants
Scoping Start
10/05/2016
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Michael Duncan · mduncan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Wasatch Front Winter Range Bitterbrush AugmentationDecision Signed Date: 10/24/2016
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 9/20/2016
Cascade Springs parking lot on Pleasant Grove Ranger District · Utah, Utah

Proposal to remove the old toilet at Cascade Springs and replace with a new CXT double vault toilet. Project is intended to upgrade and improve facilities at the Cascade Springs parking area to better support increased use.

Recreation management
Scoping Start
03/30/2016
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
James Hinricks · jhinricks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 9/12/2016
Big Cottonwood Canyon and Little Cottonwood Canyon · Salt Lake, Utah

Ski Utah proposal to renew their special use permit to continue operating a daylong, guided ski tour called The Ski Utah Interconnect Adventure Tour, for the next 10 operating seasons. No changes are proposed to the conditions of the permit.

Special use management
Scoping Start
12/21/2015
Decision
02/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 9/12/2016
It crosses both the Wasatch-Cache (Salt Lake Ranger District) and the Uinta National Forest (Pleasant Grove Ranger District) and occurs primarily on the existing system Great Western trail. · Salt Lake, Utah

Proposal to reissue a 5-year operating permit for the Wasatch Front 100 mile endurance run which expired on 12/31/15.

Special use management
Scoping Start
03/30/2016
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 9/9/2016
South West 1/4, Section 5, Township 2 South, Range 10West USM · Wasatch, Utah

Proposal to construct approximately 500 feet of lay-down fence that can be stood up during the separation process to help hold the cattle and reduce the need for running horses across the hillside.

Grazing management
Scoping Start
04/26/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 9/9/2016
Low Pass on Heber-Kamas Ranger District · Wasatch, Utah

Proposal to relocate cattle guard uphill to minimize sediment accrual at bottom of hill.

Wildlife, fish, rare plantsRoad managementWatershed managementGrazing management
Scoping Start
12/17/2015
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Maintenance; Grazing Structural Improvements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 9/9/2016
North end of the Nebo Loop, near Maple Dell, Maple Bench/Maple Lake · Utah, Utah

Proposal to reduce fuels through mastication, thin-chip and pile burns of oak/maple/conifer stands.

Fuels management
Scoping Start
12/17/2015
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 9/9/2016
Heber Ranger District · Wasatch, Utah

Proposal to provide water for livestock away from riparian areas and improve overall distribution of livestock.

Grazing managementVegetation management (other than forest products)
Scoping Start
12/17/2015
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 8/30/2016
Located in the vicinity of Dairy Ridge in the Monte Cristo Range. · Rich, Utah

Proposal for an extension of the Woodruff-Dairy Ridge Pipeline and installation of troughs on the grazing allotment. Water developments assist in the sustainable use of vegetative resources and proper livestock distribution.

Grazing management
Scoping Start
04/08/2015
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Ann Robins · arobins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT. 8 N., R. 42 E., sections 13,14, and 15
Decision Memo · Logan Ranger District · updated 8/30/2016
Approximately 11 miles northeast of Logan, Utah in the Bear River Range · Cache, Utah

Project would reroute the Worm Trail out of Spawn Creek exclosure and up the hill to the west.

Recreation management
Scoping Start
06/19/2014
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
David Ashby · dashby@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT13N, R3E, Section 26 Salt Lake Base and Meridian
Decision Memo · Logan Ranger District · updated 8/25/2016
Approximately 12 miles east of Logan, Utah · Cache, Utah

Wire fencing separating Chicken Creek and Mud Flat pasture on the Logan Canyon Grazing Allotment is located in a wet area. 3/4 mile of fence would be removed. A new fence would be constructed approx. 1/4 mile uphill in relatively dry, flat terrain.

Grazing management
Scoping Start
03/11/2015
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Ann Robins · arobins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT. 12 N., R. 3 E., Section 2, Salt Lake Base and Meridian
Environmental Assessment · Evanston-Mountain View RD · updated 8/18/2016
The proposed action is located within northern Utah near the Wyoming border. The nearest town is Mountain View, Wyoming which is approximately 24 air miles northeast of the project area. · Summit, Utah

Burnett Oil Company has submitted an application for permit to drill a test well. The Forest Service will analyze impacts on surface resources. The Bureau of Land Management will be a cooperating agency and will analyze subsurface impacts

Minerals and geologyRoad management
Scoping Start
09/26/2014
Comment Period
12/22/2015
Objection Period Start
04/01/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Roger Kesterson · rkesterson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityNatural Gas; Oil; Road Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSoutheast quarter of the southwest quarter of Section 3, Township 2 North, Range 13 East, Salt Lake Meridian
Decision Memo · Ogden Ranger District · updated 8/9/2016
East of Ogden, Utah · Morgan, Utah

Snowbasin is proposing to install 2 GAZEX exploders and accompanying shelter in the Strawberry area that will assist in safer avalanche mitigation. This site is within the current ski resort permit boundary. Work would be done by hand and helicopter.

Special use management
Scoping Start
04/08/2015
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/27/2016
Adjacent to and NW of Nebo Loop road, south of Beaver Dam Overlook. NFSR 70015. · Utah, Utah

Private special use permit holder requests renewal of an expired permit to use existing road and gate to access a private inholding.

Special use management
Scoping Start
12/17/2015
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Larry Framme · lframme@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 7/27/2016
Township 4 North, Range 1 West, Section 12, northwest quarter. Salt Lake Meridian. · Davis, Utah

Permit Holders Ron and Carol Rankin are applying to have their current permit for spring development, water storage tank and transmission line reissued for an additional 20 year term.

Special use management
Scoping Start
03/27/2015
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/27/2016
Vernon Management Unit in Sections 1, 12, 13 Township10 South, Range 6 West and in Sections 17 and 32 Township 10 South, Range 5 West · Utah, Utah

Proposal to eliminate the effects of unauthorized motorized travel on soils, vegetation, and wildlife habitat by scarifying and seeding approximately one mile of roads at four different access points. Proposal includes blocking and signing closures.

Vegetation management (other than forest products)Road managementWildlife, fish, rare plantsRecreation management
Scoping Start
12/01/2015
Decision
05/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Species Habitat Improvements; Travel Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pleasant Grove Ranger District · updated 7/26/2016
Pleasant Grove and Spanish Fork Ranger Districts along Wasatch Front · Utah, Utah

Proposal to replace 4 of the 5 guzzlers along the Wasatch Front with an improved design that will store more water and allow big game and smaller upland game species to access the water. All locations will stay the same except for Lindon.

Wildlife, fish, rare plants
Scoping Start
03/30/2016
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
James Hinricks · jhinricks@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/18/2016
T8S R4E Sec. 36 T8S R5E Sec. 31 T9S R5E Sec. 1 · Utah, Utah

USFS proposal to use prescribed fire to remove dead vegetation, reduce fuel loading, promote vegetation growth (both upland and riparian), and improve the Ute Ladies Tresses population by reducing competition for resources with other plants.

Fuels managementVegetation management (other than forest products)
Scoping Start
12/02/2015
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Riley Bergseng · rbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/18/2016
McCune Canyon, off Salt Creek Canyon, West of Ponderosa Campground · Utah, Utah

Proposal to reduce fuels in and near Ponderosa Campground to enhance wildland urban interface.

Fuels management
Scoping Start
02/11/2016
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/15/2016
T7S, R5E, Section 35 · Utah, Utah

USFS proposal to replace existing wooden vault toilet at the guard station with a new single seat toilet. This project is a pre-requisite to putting the Diamond Fork guard station into the rental system.

Facility management
Scoping Start
12/02/2015
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/14/2016
Big Cottonwood Canyon, Lake Solitude trail. · Salt Lake, Utah

Proposal to reroute a steep and eroded section of the trail along an elevation contour line to the east. The reroute would be approximately 1/3 of a mile, and would place the trail to a greater extent on Forest Service lands.

Recreation management
Scoping Start
12/21/2015
Decision
07/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/14/2016
Little Cottonwood Canyon, Salt Lake Ranger District · Salt Lake, Utah

Proposal to demolish the pavilion and restore the site to native wetland. This would address public safety and environmental concerns associated with the site and remove it as an attractant for deviant behavior, thus improving watershed conditions.

Recreation managementWatershed management
Scoping Start
03/30/2016
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Matthew Lane · malane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Watershed Improvements
Whitmore Pavilion removalDecision Signed Date: 07/13/2016
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 7/7/2016
At the Snowbasin Ski Resort permit area. · Weber, Utah

Snowbasin Ski Resort proposes to install two GAZEX exploders and an accompanying shelter in the Strawberry area that would improve avalanche control. The proposed site is within the current permit boundary. Work would be done by hand and helicopter.

Special use management
Scoping Start
04/08/2015
Decision
11/2015 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Pleasant Grove Ranger District · updated 5/24/2016
Battle Creek Canyon, approximately 2.5 miles east of the city of Pleasant Grove, Utah. · Utah, Utah

Replacing and realigning portions of the Battle Creek Canyon culinary water pipeline to decrease the risk of contamination. Approximately 12.0 acres of the Mt. Timpanogos inventoried roadless area would be affected.

Special use management
Scoping Start
08/06/2015
Comment Period
02/08/2016
Objection Period Start
03/18/2016
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Jon Stansfield · jstansfield@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionTownship 5 South, Range 2 East, sections 13, 14, 23, and 24.
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/7/2016
Davis County, Salt Lake Ranger District · Davis, Utah

Proposal to issue Kays Creek Irrigation an authorization for the maximum term of 20-years. Kays Creek Irrigation Company was first issued a special use permit in 1966 for reconstruction of a water diversions and related water transmission pipeline.

Special use management
Scoping Start
03/31/2016
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 4/7/2016
Red Pine Fork of Little Cottonwood Creek, Salt Lake Ranger District · Salt Lake, Utah

Proposal to reissue a 30-year term special use permit to Salt Lake City Corporation, Public Utilities Division, authorizing the historic Red Pine Dam and reservoir located in the Red Pine Fork of Little Cottonwood Creek.

Special use management
Scoping Start
03/31/2016
Decision
03/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 4/7/2016
Spanish Fork Ranger District · Utah, Utah

Proposal to have travel dates that open prior to Memorial Day, align more with gate intervals, align with county road agreements, align with concessionaires operating plan and allow access to private inholdings and access to FS lands by forest users.

Road management
Scoping Start
02/23/2016
Decision
04/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
George Garcia · gcgarcia@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (2), 36 Cfr 220.6(D)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTravel Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Tibble Fork Dam Completed
Environmental Assessment · Pleasant Grove Ranger District · updated 4/7/2016
Tibble Fork Dam is in the American Fork Canyon of northern Utah County, Utah. It is located 10 miles north east of the city of Alpine, UT. · Utah, Utah

The Natural Resources Conservation Service (NRCS) is proposing to fund rehabilitation of the Tibble Fork Dam in the American Fork Canyon of northern Utah County, Utah. It is located 10 miles north east of the city of Alpine, UT.

Special use management
Scoping Start
12/31/2012
Comment Period
12/31/2012
Objection Period Start
12/31/2012
Decision
03/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Evanston-Mountain View RD · updated 3/25/2016
The proposed project is located approximately 15 miles south of Mountain View, Wyoming. The project area lies within Uinta County, Wyoming, and Summit County, Utah. · Summit; Uinta, Utah; Wyoming

The UWCNF proposes: 3,369 acres of stand clearcut with leave trees; 2,770 acres of two-aged stand clearcut with reserves; 0.75 miles of new specified road construction; 46.7 miles of temporary road construction; and 15.2 miles of temporary road use.

Forest productsFuels management
Scoping Start
01/29/2014
Comment Period
07/21/2015
Objection Period Start
12/29/2015
Decision
03/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Pete Gomben · pgomben@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
Roughneck Vegetation Restoration Project Decision Notice and FONSIDecision Signed Date: 03/18/2016
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Bear Lake WUI Completed
Decision Memo · Logan Ranger District · updated 2/19/2016
Approximately 3 miles southwest of Garden City, Utah · Rich, Utah

Fuels treatment and wildlife habitat improvement.

Fuels management
Scoping Start
02/24/2015
Decision
02/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Christina Anabel · ckanabel@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Bear Lake WUI Hazardous Fuels Reduction & Wildlife Habitat ImprovementDecision Signed Date: 02/19/2016
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT. 13 N., R. 4 E., sections 1, 12-14, 22-24; T. 14 N., R. 4 E., sections 25, 36
Decision Memo · Logan Ranger District · updated 1/4/2016
Coldwater Canyon, Wellsville Range · Box Elder, Utah

The town of Deweyville is proposing heaving maintenance and rehabilitation of the Coldwater Canyon Spring No. 1 complex which is a culinary water source. The proposal will address: collection pipes, a central collection manhole, liner construction

Special use management
Scoping Start
03/11/2015
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionDisturbance is less than 0.05 acres within T. 11 N., R. 2 W., West 1/2 of Section 26, Salt Lake Base and Meridian.
Decision Memo · Ogden Ranger District · updated 12/15/2015
East bench of the Uinta Highlands southeast of Ogden, Utah. · Weber, Utah

The Uinta Highlands Improvement District proposes to rebuild its culinary water reservoir #3. The reservoir is located on private land owned by the improvement district. Portions of the pipeline and access road are on NFS land.

Special use management
Scoping Start
05/07/2015
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 12/4/2015
Southwest side of Stansbury Mountains in Tooele County · Tooele, Utah

In August 2013 the Patch Springs wildfire burned 31,010 acres on the Southwest Side of the Stansbury Mountain Range in Tooele County Utah.The State DWR proposes to treat approx. 2,100 acres of NFS land by aerially seeding and chaining.

Wildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)
Scoping Start
12/12/2013
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Michael Duncan · mduncan@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Rangeland Vegetation Improvements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 12/1/2015
Dogwood Picnic Area &amp; "S" Curve area in Big Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

the SLRD is proposing to construct belay platforms that are anchored by barrier rock and/or gabion baskets and to improve the access trails that lead to two climbing areas in Big Cottonwood Canyon - Dogwood and the Pile.

Recreation managementWatershed management
Scoping Start
12/12/2013
Decision
12/2014 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 11/30/2015
Mineral Basin area. · Utah, Utah

Snowbird Ski Resort proposes installation of a Howitzer in Mineral Basin for avalanche control on both Forest Service and private lands. Snowbird currently conducts avalanche reduction in Mineral Basin using hand charges and Avalaunchers.

Special use management
Scoping Start
04/01/2015
Decision
09/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionTownship 3 South, Range 3 East, Section 17.
Decision Memo · Heber-Kamas Ranger District · updated 11/25/2015
Upper Strawberry River · Wasatch, Utah

Installing a new pipeline and trough to improve livestock distribution.

Grazing management
Scoping Start
10/14/2014
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Lagoon Pipeline Completed
Decision Memo · Heber-Kamas Ranger District · updated 11/25/2015
Upper Strawberry River · Wasatch, Utah

Add a trough outside of an exclosure.

Grazing management
Scoping Start
10/15/2014
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Mud Creek Pipeline Completed
Decision Memo · Heber-Kamas Ranger District · updated 11/25/2015
Mud Creek Drainage · Wasatch, Utah

A headbox, pipeline and 3 troughs would be installed to lessen the impact on boreal toads.

Grazing management
Scoping Start
10/15/2014
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 11/25/2015
Indian Creek Road. · Wasatch, Utah

Install a pipeline and trough.

Grazing management
Scoping Start
10/15/2014
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 11/16/2015
Off the Nebo Loop Road. · Utah, Utah

Reconstruct approximately ¼ mile of fence between the Nephi and Payson Allotments. A portion of the fence will be relocated out of trees and snow areas to better maintain after reconstruction.

Grazing management
Scoping Start
10/02/2014
Decision
12/2014 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT11S R2E Section 15 SLM.
Decision Memo · Salt Lake Ranger District · updated 10/2/2015
Brighton Circle, Big Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

This proposal calls for a 15 year re-issuance of the recreation special use permit for the Wasatch Mountain Club on the Salt Lake Ranger District. The permit would be re-issued for the continued purpose of operating and maintaining a clubhouse.

Special use management
Scoping Start
05/04/2009
Decision
08/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
15 Year Permit, Recreation Special Use Permit, for Wasatch Mountain ClubDecision Signed Date: 08/13/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R3E, SLM; SW ? section 35
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/16/2015
On the Pleasant Grove Ranger District. · Utah, Utah

Snowbird Ski Resort proposes an extension of the Path to Paradise ski run. Approximately 480 feet of Forest Service land through the Twin Peaks inventoried roadless area would be graded, resulting in a continuous 12-foot-wide track.

Recreation managementSpecial use management
Scoping Start
04/17/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Pollyanna Bergseng · pbergseng@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
Path to Paradise Ski Trail Modification and Mineral Basin Howitzer MountDecision Signed Date: 09/09/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionTownship 3 South, Range 3 East, Section 18.
Environmental Assessment · Salt Lake Ranger District · updated 8/20/2015
The dam is located just upstream of Porter Fork in the Mill Creek Drainage. · Salt Lake, Utah

The purpose of this project is to restore watershed function and aquatic ecosystem to more closely match historic conditions in Mill Creek Canyon.

Watershed managementRecreation managementWildlife, fish, rare plants
Scoping Start
08/12/2013
Comment Period
08/12/2013
Objection Period Start
06/18/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Paul Cowley · pcowley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Population Enhancements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionThe project is located in the southwest corner of Township 2 South, Range 2 East Section 27.
Decision Memo · Heber-Kamas Ranger District · updated 8/18/2015
In the Lakes Country area of the Heber-Kamas Ranger District. · Summit, Utah

The Heber-Kamas Ranger District proposes to create a Class 4 trail around Butterfly Lake. A portion of the proposed trail would be built on existing user-created trails, while a portion would involve new trail construction.

Watershed managementRecreation management
Scoping Start
02/17/2015
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Evan Glenn · evanrglenn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Butterfly Lake Trail Decision MemoDecision Signed Date: 08/13/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionTownship 4 North, Range 9 West, Section 23, Uintah meridian.
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 8/14/2015
The project is located in the High Uintas Wilderness in both Duchesne and Summit counties. The project is located northeast of Duchesne, UT and southwest of Manila, UT. · Duchesne; Summit; Uinta, Utah; Wyoming

This is a duplicate entry. For information on the project, follow the link "High Uintas Wilderness Domestic Sheep Analysis Project (Ashley and UWC National Forests)" below.

Grazing management
NOI in Federal Register
08/2015 (Estimated)
DEIS NOA in Federal Register
10/2016 (Estimated)
FEIS NOA in Federal Register
03/2017 (Estimated)
Objection Period Start
03/2017 (Estimated)
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Paul Cowley · pcowley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsAshley National Forest; Uinta-Wasatch-Cache National Forest
DistrictsRoosevelt Ranger District; Duchesne Ranger District; Evanston-Mountain View RD
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 6/5/2015
Heber-Kamas Ranger District · Wasatch, Utah

The proposal would remove bark beetle killed timber, supplement existing regeneration of spruce-fir to meet forest plan stocking rates, and obliterate the old road prisms, temporary roads, and skid trails. No new system roads are propoposed.

Forest productsRoad management
Scoping Start
09/03/2014
Comment Period
09/03/2014
Objection Period Start
04/15/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Jim Gibson · jgibson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage)
North Heber Salvage Project Decision NoticeDecision Signed Date: 06/05/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 5/15/2015
Approximately 20 miles east of Logan, UT · Cache, Utah

State of Utah, Division of Water Resources proposes to drill 2 exploratory test holes with piezometer on Temple Fork Road to gather geotechnical information related to a potential dam site. Holes will be sealed after 1 year of data collection.

Special use management
Scoping Start
10/10/2014
Decision
05/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Bear River Project GeoExploration Decision MemoDecision Signed Date: 05/01/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT13N, R3E, Section 26 SW1/4, Salt Lake Base and Meridian
Santaquin WUI Completed
Decision Memo · Spanish Fork Ranger District · updated 5/1/2015
The project is located in the Spanish Fork Ranger District within the Santaquin canyon area. · Utah, Utah

The USFS and the UDWR are proposing to improve undesirable fuel conditions within the Santaquin canyon area.

Fuels management
Scoping Start
04/30/2014
Decision
05/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Santaquin Wildland Urban Interface ProjectDecision Signed Date: 05/01/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT10S R1E sections 12, 13, &amp; 24 (USFS) 12, 13, 14, 15, &amp; 23 (UDWR); T10S R2E sections 7, 18, &amp;19 (USFS).
Decision Memo · Salt Lake Ranger District · updated 4/14/2015
Silver Lake, Big Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

Proposal to replace the boardwalk, located in BCC. All existing boardwalk, bridges, and fishing piers will be replaced in current location and the boardwalk will be widened from 6 to 8%u2019 to better accommodate visitors with disabilities

Recreation management
Scoping Start
07/09/2013
Decision
04/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Watershed Improvements
Decision Memo Silver Lake Boardwalk ReplacementDecision Signed Date: 04/13/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 3/25/2015
Snowbasin Ski Resort. · Weber, Utah

The Ogden Ranger District proposes to authorize improvements to a natural sink pond to hold an additional 20 acre-feet of water for snowmaking capability at Snowbasin Ski Resort.

Recreation managementSpecial use management
Scoping Start
07/03/2014
Decision
03/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Decision Memo Snowbasin Resort Water ImpoundmentDecision Signed Date: 03/19/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/25/2015
Mill F S. fork within Solitude Ski Mountain Resort permit boundary in Big Cottonwood Canyon, Salt Lake County, UT. · Salt Lake, Utah

Solitude Mountain Resort is proposing to amend its special use permit to realign and upgrade the Summit lift within their existing permitted boundary. The existing lift is a 32-year-old fixed-grip double chair that accesses Honeycomb Canyon

Recreation managementSpecial use management
Scoping Start
06/23/2014
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Solitude Summit Lift Upgrade/RelocationDecision Signed Date: 03/25/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R3E Sect. 27
Decision Memo · Salt Lake Ranger District · updated 3/17/2015
Brighton Circle in upper Big Cottonwood Canyon, Salt Lake County, UT. · Salt Lake, Utah

The Brighton LDS Girls Camp proposes to amend its permit for building upgrades to meet ABA Accessibility Standards. All construction work is within previously disturbed areas and/or on existing structures.

Recreation managementSpecial use management
Scoping Start
06/23/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM for LDS Recreation Properties, LLC, (Brighton Girls Camp)Decision Signed Date: 10/14/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3S, R3E Sect. 35
Decision Memo · Salt Lake Ranger District · updated 3/17/2015
Mill D Recreation Residence Track in Big Cottonwood Canyon, Salt lake County, UT. · Salt Lake, Utah

SLRD is proposing to continue a shaded fuelbreak along a section of road in the Mill D Recreation Residence community in Big Cottonwood Canyon. We propose to extend the project to complete the Mill D loop, treating an additional 5,000 feet

Fuels managementRoad managementSpecial area managementVegetation management (other than forest products)
Scoping Start
06/23/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Jeff Sanocki · jsanocki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance
DM for Mill D Residence Shaded Fuel Break Phase IIDecision Signed Date: 09/11/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT 2 S, R 3 E, Section 17
Decision Memo · Salt Lake Ranger District · updated 3/16/2015
Patsey Marley Ridge to Grizley Gulch in upper Little Cottonwwod Canyon outside of Alta Ski Area's permit boundary in Salt Lake County, UT. · Salt Lake, Utah

Alta Ski Area has requested to amend its special use permit to mitigate the avalanche potential and include the area on NFS lands outside of its permitted ski area boundary that affect the Ski Resort.

Recreation managementSpecial use management
Scoping Start
06/23/2014
Decision
12/2014 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Decision Memo for Alta Avalanche Protection Zone Permit AmendmentDecision Signed Date: 12/12/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT 3S, R 3E
Decision Memo · Salt Lake Ranger District · updated 3/16/2015
All infrastructure would be located within Alta Ski Area's Special use permit boundary in upper Little Cottonwood Canyon, Salt lake County, UT. · Salt Lake, Utah

Alta is proposing to install and operate (under a communications use lease) a Distributed Antenna System (DAS) comprised of seven cellular nodes and accompanying fiber optic cable within its permitted boundary.

Special use management
Scoping Start
03/25/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo for Alta Ski Area DAS/Fiber Optic ProjectDecision Signed Date: 07/16/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/16/2015
Gad Valley &amp; base area at Snowbird Resort in Little Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

Snowbird is proposing to construct downhill mountain bike trail segments accessible in Gad Valley

Special use managementRecreation management
Scoping Start
12/12/2013
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/16/2015
All Infrastructure would be located within Snowbird's Special use permit boundary in Little Cottonwood Canyon, Salt lake County, UT. · Salt Lake, Utah

Snowbird is proposing to install and operate (under a communications use lease) a DAS comprised of eight cellular nodes and accompanying fiber optic cable within its permitted boundary

Special use management
Scoping Start
03/25/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo for Snowbird Ski and Summer Resort Fiber Optic/DAS ProjectDecision Signed Date: 07/16/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 3/16/2015
Located in Mineral Basin, within Snowbird's Special Use permit boundary, in Utah County, UT · Utah, Utah

Snowbird is proposing to install a new snowmaking line within their existing permit boundary in Mineral Basin. The line would be installed to the East of Baldy Express lift along the Birds Nest and Lupine Loop trails on private and NFS land

Special use managementRecreation management
Scoping Start
03/25/2014
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
DM for Snowbird 2014 Summer Projects: Snowmaking & Facility ModificationsDecision Signed Date: 08/13/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District; Pleasant Grove Ranger District
Legal Land DescriptionT2S, R2E, Sec. 17
Decision Memo · Evanston-Mountain View RD · updated 2/19/2015
Approximately 25 miles southeast of Mountain View, Wyoming. · Summit, Utah

The project proposes a controlled burn to remove dead standing conifers, restore soil nutrients, and stimulate aspen regeneration. Fire would also aid in restoration of the forest understory component and increase habitat for bighorn sheep.

Fuels managementWildlife, fish, rare plants
Scoping Start
05/20/2014
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Jeff Sanocki · jsanocki@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Species Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionTownship 2 North, Range 15 East, Sections 1, 2, 11, and 12; Township 2 North, Range 16 East, Section 6.
Decision Memo · Pleasant Grove Ranger District · updated 1/30/2015
Approximately 162 South 100 West, Provo, UT. · Salt Lake, Utah

The Uinta-Wasatch-Cache National Forest is proposing the sale of a 3,100 square foot, Forest Service-owned warehouse located in Provo, UT.

Facility management
Scoping Start
03/10/2013
Decision
12/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Jon Stansfield · jstansfield@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Purchases
Provo Warehouse Conveyance Decision MemoDecision Signed Date: 12/16/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 1/27/2015
1500 East Highway 89, Logan, UT 84321 · Cache, Utah

The Forest Service is proposing to acquire a building and 1.269 acres of land within which it is situated. The building is currently leased by the Forest Service and the land is owned by the Utah Department of Transportation.

Land acquisition
Scoping Start
10/07/2014
Decision
01/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Christina Price · christinajprice@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (6), 36 Cfr 220.6(D)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Purchases
Logan Ranger District Office Acquisition Letter to FileDecision Signed Date: 01/07/2015
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT.12N., R.1E., Section 35, NE1/4NE1/4 Salt Lake Base and Meridian
Decision Memo · Logan Ranger District · updated 1/14/2015
Temple Fork Canyon (including Spawn Creek, Mud Flat, Chicken Creek, and Cottonwood Canyon). · Cache, Utah

The project targets crucial elk winter range within 2,500 acres of Temple Fork Canyon. The proposal involves removing (hand cutting and scattering) invading juniper trees to maintain and enhance sagebrush, meadow, and aspen habitats.

Wildlife, fish, rare plants
Scoping Start
12/05/2014
Decision
01/2015 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT 12 N., R 3 E., Sections 1, 2, 3, 4, 9, 10, 11 and T 13 N., R 3 E., Sections 25, 26, 36
Decision Memo · Salt Lake Ranger District · updated 10/30/2014
The project is located near the Cecret Lake Trailhead (Little Cottonwood Canyon) · Salt Lake, Utah

The Salt Lake Ranger District is proposing to construct a short road spur in upper Little Cottonwood Canyon between Albion Basin Road campground entrance and Cecret Lake Trailhead parking lot to serve as a traffic turnaround.

Special use management
Scoping Start
03/18/2013
Decision
03/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Carol Majeske · cmajeske@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 10/20/2014
Two sites approximately 8 miles and 25 miles northeast of Ogden, UT. · Weber, Utah

Proponent proposes to do maintenance and install 3 new structures along the existing Naughton to Ben Lomond Power Line within their current right of way. The purpose of the project is to reduce slack in the line.

Special use management
Scoping Start
10/07/2014
Decision
10/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rocky Mountain Power Structure and Phase Raiser Maintenance PALS#45659Decision Signed Date: 10/17/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT7N,R1W Sec 25, 26 and T8N,R4E Sec 13,14,15,22,21,30 Salt Lake Base and Meridian
Decision Memo · Heber-Kamas Ranger District · updated 10/3/2014
Strawberry Reservoir on the Heber-Kamas Ranger District · Wasatch, Utah

The Heber-Kamas RD proposes to reauthorize a 20-year permit for operation of the public service marinas at Strawberry Bay, Soldier Creek, Renegade Point, and Aspen Grove. Operations include marina services and fishing outfitter and guide services.

Special use management
Scoping Start
08/27/2014
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Evan Glenn · evanrglenn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Strawberry Marina Outfitter and Guide Permit Reissue (Operations)Decision Signed Date: 10/02/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Heber-Kamas Ranger District · updated 10/3/2014
Strawberry Reservoir on the Heber-Kamas Ranger District · Wasatch, Utah

The Heber-Kamas RD proposes to reauthorize a 20-year permit for operation of the public service marinas at Strawberry Bay, Soldier Creek, Renegade Point, and Aspen Grove. Operations include winter dock storage, winter restrooms, and parking spaces.

Special use management
Scoping Start
08/27/2014
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Evan Glenn · evanrglenn@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Strawberry Marina Outfitter and Guide Permit Reissue (Property)Decision Signed Date: 10/02/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Jones Ranch Trough Cancelled
Decision Memo · Spanish Fork Ranger District · updated 10/1/2014
This project is located off of the NEBO Loop Road near Jones Ranch. · Utah, Utah

A new trough is proposed to pull cattle off the private land (Jones Ranch) on to Forest Service System Lands. Approximately 700 feet of pipe would be buried with a mini excavator. The trench would be about eight inches deep and 12 inches wide.

Grazing management
Scoping Start
10/2014 (Estimated)
Decision
12/2014 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT10S R2E Sec 25, 36
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/30/2014
Box Elder Canyon along Highway 89/91. · Cache, Utah

Syringa Networks has applied for a permit for a fiber optic cable on approx. one mile of FS land along Highway 89/91 through Box Elder Canyon. Cable would be installed underground along the shoulder of the road on the north side of the highway.

Special use management
Scoping Start
06/07/2013
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Syringa Networks Fiber Optic Line Permit, Box Elder CountyDecision Signed Date: 07/15/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Ogden Ranger District · updated 9/29/2014
Ogden Ranger District · Weber, Utah

The Ogden Ranger District proposes to construct approximately five miles of non-motorized trail along the bench above North Ogden City as a continuation of the Bonneville Shoreline Trail.

Recreation management
Scoping Start
07/08/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Juan Barrientez · jbarrientez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Bonneville Shoreline Trail North Decision MemoDecision Signed Date: 09/16/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Uinta-Wasatch-Cache All Units · updated 9/29/2014
Various locations on the Logan and Ogden ranger districts. · Cache; Morgan; Weber, Utah

The Forest Service proposes to reissue a special use permit to allow apiaries at various locations on the Logan and Ogden ranger districts.

Special use management
Scoping Start
06/07/2013
Decision
04/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Letter to file for Cox Honey of Utah permit reissuanceDecision Signed Date: 04/07/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District; Logan Ranger District
Legal Land DescriptionNot Applicable
Balsam Spring Completed
Decision Memo · Spanish Fork Ranger District · updated 9/25/2014
Balsam Spring, Right Fork of Hobble Creek. · Utah, Utah

The pipeline originally fed the campground and a livestock watering trough. The trough was cutoff from the pipeline a few year back. A new pipeline will be installed to the trough from the spring with a separate intake than the recreation line.

Grazing managementRecreation management
Scoping Start
01/06/2014
Decision
06/2014 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Grazing Allotment Management; Grazing Structural Improvements
Miscellaneous Small Projects -- District WideDecision Signed Date: 06/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT7S R5E Sec 20 NW1/4 SLM.
Decision Memo · Spanish Fork Ranger District · updated 9/25/2014
Nebo Loop at the Salt Creek Overlook · Juab, Utah

Redesign of Overlook, resurfacing of area.

Recreation managementRoad management
Scoping Start
02/06/2014
Decision
06/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Duane Resare · dresare@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Road Maintenance
Miscellaneous Small Projects -- District WideDecision Signed Date: 06/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT12S R2E Section 10 NE 1/4 SLM.
Decision Memo · Spanish Fork Ranger District · updated 9/25/2014
Salt Creek Canyon · Juab, Utah

Small food plots will be established in up to 10 locations. The project will enhance winter forage sources for wild turkeys in the lower reaches of Salt Creek Canyon and eliminate the need for supplemental feeding.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
11/12/2013
Decision
06/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
Miscellaneous Small Projects-- District WideDecision Signed Date: 06/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT12S R2E Sections 8, 16, 17, 21, 22, 28, 31, 32 and 33 SLM.
Decision Memo · Spanish Fork Ranger District · updated 9/25/2014
Sams Canyon up Diamond Fork Canyon · Utah, Utah

This project allows for overflow water from the Diamond Fork Campground can be used to water cattle.

Grazing managementRecreation management
Scoping Start
01/13/2014
Decision
06/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Grazing Allotment Management; Grazing Structural Improvements
Miscellaneous Small Projects -- District WideDecision Signed Date: 06/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S R5E Section 31 SE 1/4 SLM.
Trumbolt Bridge Completed
Decision Memo · Spanish Fork Ranger District · updated 9/25/2014
Trumbolt Picknic Area, Santaquin Canyon · Utah, Utah

Replacement of the upper foot bridge which was found to be deficient by Forest Engineers.

Recreation management
Scoping Start
02/08/2014
Decision
06/2014 (Estimated)
Implementation
11/2014 (Estimated)
Project documents
Duane Resare · dresare@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Improvements/Construction
Micellaneous Small Project -- District WideDecision Signed Date: 06/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT10S R2E Section 30 NE 1/4 SLM.
Decision Memo · Spanish Fork Ranger District · updated 9/25/2014
Vernon Campground near Vernon Reservoir. · Tooele, Utah

Barrier rock will be installed at the campground to delineate boundaries and deter unauthorized route creation by ATVs.

Recreation management
Scoping Start
02/08/2014
Decision
06/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Duane Resare · dresare@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Facility Maintenance
Miscellaneous Small Projects -- District WideDecision Signed Date: 06/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S R5W Sections 34 and 35 SLM.
Decision Memo · Logan Ranger District · updated 9/22/2014
Near Third Dam along the Logan River. · Cache, Utah

The Logan Ranger District proposes to authorize two new utility poles to allow the City of Logan to install a fiber optic line that would run from Third Dam along the Logan River to its facility at Dewitt Springs.

Special use management
Scoping Start
07/10/2013
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Logan City Dewitt Springs Fiber Optic Line Project Decision MemoDecision Signed Date: 03/17/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 9/22/2014
From Third Dam to Dewitt Springs. · Cache, Utah

The Logan Ranger District proposes to authorize Logan City to install a fiber optic line from its existing line at Third Dam on the Logan River to its facility at Dewitt Springs. The project would require the installation of two new utility poles.

Special use management
Scoping Start
07/19/2013
Decision
09/2013 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Logan Ranger District · updated 9/22/2014
On the Right Hand Fork of the Logan River. · Cache, Utah

The proposal involves installation of a fish barrier in the Right Hand Fork of the Logan River to prevent the reinvasion of brown trout, which is a non-native species, following a treatment to remove them.

Wildlife, fish, rare plants
Scoping Start
06/06/2013
Decision
07/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionTownship 12 North, Range 3 East, Section 18
Decision Memo · Evanston-Mountain View RD · updated 9/22/2014
South of the Bear River snowpark on Highway 150 · Summit, Utah

The Forest Service proposes to issue a permit for access on and maintenance of a road approx. 14 feet wide and 250 feet long. Ownership of the property to which the road provides access has changed.

Special use management
Scoping Start
12/07/2012
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Private Road Special Use Permit Re-issuanceDecision Signed Date: 09/02/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT2N, R10E, Section 16
Decision Memo · Spanish Fork Ranger District · updated 9/4/2014
The new proposed location is known locally as Lavanger Hollow Flat. · Utah, Utah

This is a joint proposal between the Spanish Fork Grazing Association and the Forest Service to re-locate their corral facilities along the Highway 6 Corridor to a new location in lower Diamond Fork Canyon.

Grazing management
Scoping Start
02/07/2014
Decision
06/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Miscellaneous Small Projects -- District WideDecision Signed Date: 06/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S, R4E, Section 9, NE 1/4 of SE 1/4; T9S, R4E, Section 10, NW 1/4 of SW 1/4
Decision Memo · Spanish Fork Ranger District · updated 8/18/2014
The project is located in the Spanish Fork Ranger District. · Tooele, Utah

The proposed action is to build a 0.75 mile of new fence along the Forest Service and BLM boundary. The fence will be a 4-strand barbed wire fence.

Grazing management
Scoping Start
06/03/2013
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S R5W Section 2
Decision Memo · Pleasant Grove Ranger District · updated 8/18/2014
The project is located in American Fork Canyon (Pleasant Grove Ranger District) · Utah, Utah

This proposed extension would provide a safer route to connect trail users to the new lower alignment and bridge of the Mill Canyon Trail #040.

Recreation management
Scoping Start
03/03/2014
Decision
07/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Granite Flat Connector Trail ExtensionDecision Signed Date: 07/09/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionThe legal description of this project is Sections 7 and 8, T. 4 S., R. 3 E., Salt Lake Base Meridian.
Decision Memo · Pleasant Grove Ranger District · updated 8/18/2014
The project is located in the Pleasant Grove Ranger District. · Utah, Utah

The City of Orem is proposing to reconstruct an existing water transmission line across National Forest System lands (NFS). The reconstruction line would be place in the same location and covered with existing native material.

Special use management
Scoping Start
03/07/2013
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionSection 33, Township 5 South, Range 3 East, Salt Lake Base Meridian
Environmental Assessment · Pleasant Grove Ranger District · updated 8/18/2014
The project is located in the UWCNF in northern Utah County, within the American Fork-Dry Creek Watershed. · Utah, Utah

Silver Lake Flat Dam and Reservoir are located in the UWCNF (Pleasant Grove Ranger District) in northern Utah County, within the American Fork-Dry Creek Watershed.

Special use management
Scoping Start
04/11/2012
Comment Period
04/11/2012
Objection Period Start
04/11/2012
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Jon Stansfield · jstansfield@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations; Special Area Management
Silver Lake Flat DamDecision Signed Date: 07/28/2014 Legal Notice Date: 07/28/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Pleasant Grove Ranger District · updated 8/4/2014
The project crosses land managed by U.S. Forest Service, Uinta-Wasatch-Cache National Forest, Pleasant Grove Ranger District near Highland, Utah (Utah County). · Utah, Utah

Questar is proposing to replace a section of its Feeder Line (FL) 24 natural gas pipeline near Highland, Utah.

Special use management
Scoping Start
06/27/2013
Comment Period
06/27/2013
Decision
08/2013 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecial Use Authorizations
Questar Feeder Line 24 Highland, Utah Replacement ProjectDecision Signed Date: 08/15/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Evanston-Mountain View RD · updated 8/4/2014
Smiths Fork watershed approximately 25 miles southwest of Mountain View, Wyoming. · Summit, Utah

The Forest Service proposes treatments to reduce both the amount and continuity of woody fuels, to remove hazard trees associated with travel ways, to harvest beetle-killed or infested trees, and to create a mix of tree ages and species.

Vegetation management (other than forest products)Forest productsFuels management
NOI in Federal Register
06/11/2012
DEIS NOA in Federal Register
08/30/2013
FEIS NOA in Federal Register
03/06/2014
Objection Period Start
03/06/2014
Decision
08/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Timothy Gill · tgill@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityTimber Sales (Salvage)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Decision Memo · Evanston-Mountain View RD · updated 7/10/2014
T 1 N, R 119 W, sections 2 and 3. T 2 N, R 119 W, sections 34 and 35. · Summit, Utah

The Forest Service proposes to reroute a portion of the Upper Wolverine Trail to reduce the erosive impacts that have occurred via the existing trail in the years following the East Fork fire.

Watershed managementRecreation management
Scoping Start
11/26/2013
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Joseph McFarlane · jmcfarlane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
Upper Wolverine Trail Re-RouteDecision Signed Date: 06/25/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 7/3/2014
Trail reroutes are proposed for Albion Basin in upper Little Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

The SLRD, with Alta Ski Area and the CCF, is proposing to reroute 2 trails in Albion Basin. The 2 reroutes seek to improve legal access, sustainability, &amp; safety for FS Trails: the Albion Meadows &amp; Devils Castle Loop Trail

Watershed managementRecreation management
Scoping Start
03/25/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Watershed Improvements
Decision Memo for Alta Trail ReroutesDecision Signed Date: 07/03/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT 3S, R 3E, Sec. 9
Decision Memo · Salt Lake Ranger District · updated 7/3/2014
Collins Gulch area at alta Ski Area, Little Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

Alta is proposing to widen the Corkscrew and address erosion issues in Nina%u2019s Curve ski runs, consistent with their goal of maintaining two summer groomed runs top to bottom off each detachable lift to provide reasonable low snow skiing.

Special use managementRecreation management
Scoping Start
12/12/2013
Decision
05/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
DECISION MEMO for Alta Corkscrew ProjectDecision Signed Date: 05/01/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR2E, T2S, Sec. PB44
Decision Memo · Salt Lake Ranger District · updated 7/3/2014
Desolation and GWT trails below Dog Lake in Big Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

The SLRD is proposing to reroute a short section of the Desolation trail (#019) in Big Cottonwood Canyon. The proposed reroute is just east of the junction of the Mill D to Dog Lake and Mill D to Desolation trails on the Mill D - Deso Lake Trail.

Watershed managementRecreation management
Scoping Start
12/12/2013
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Watershed Improvements
DM for Desolation Trail: Mill D to Desolation Trail RelocationDecision Signed Date: 06/23/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR2E, T1S, Sec. 6
Decision Memo · Salt Lake Ranger District · updated 7/3/2014
Trail #s 1158 &amp; 1159, Big Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

The SLRD is proposing to reroute a steep and eroded section (approx. 2,500 %u2018) of trail in Big Cottonwood Canyon from the Mill D trail (#1158), below Dog Lake, to the Desolation trail (#1159).

Recreation management
Scoping Start
07/09/2013
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Watershed Improvements
DM for Desolation Trail Relocation between Dog Lake and Desolation LakeDecision Signed Date: 06/23/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT1S, R2E, Sec. 5
Decision Memo · Salt Lake Ranger District · updated 7/3/2014
Great Western Trail in Upper Millcreek Canyon, Salt lake County · Salt Lake, Utah

The SLRD is proposing to reroute a short section of the GWT (approx. 700 ft.) just west of the junction of the Old Red Pine Trail (# 1315) and Old Red Pine Road in upper Mill Creek Canyon.

Recreation management
Scoping Start
12/12/2013
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management; Watershed Improvements
DM for Great Western Trail Relocation and Old Red Pine Restoration ProjectDecision Signed Date: 06/23/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E, T1S, Sec. 33
Decision Memo · Salt Lake Ranger District · updated 7/3/2014
Lambs Canyon in Salt Lake County · Salt Lake, Utah

The SLRD is proposing to reroute three short sections (approx. 0.5 miles combined) of the Great Western Trail (# 1900G5) in Lambs Canyon to move the old trail out of the riparian area and to improve the grades and drainage.

Recreation managementWatershed management
Scoping Start
12/12/2013
Decision
06/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
DM for Great Western Trail Relocation in Lambs CanyonDecision Signed Date: 06/13/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR2E, T1S, Sec. 19, 24, 25
Decision Memo · Salt Lake Ranger District · updated 7/3/2014
Guiding activities would take place in numerous locations on the Salt Lake &amp; Heber/Kamas RD's in Salt Lake, Wasatch &amp; Summit Counties, UT · Salt Lake; Summit; Wasatch, Utah

SPLORE is requesting the re-issuance of their O &amp; G permit for a 10- year term. Their current permit is set to expire in May 2014. SPLORE serves children and adults with disabilities and special health care needs.

Recreation managementSpecial use management
Scoping Start
03/25/2014
Decision
05/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Special Use Authorizations
Decision Memo for SPLORE outfitter and Guide ServiceDecision Signed Date: 05/05/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District; Heber-Kamas Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 4/9/2014
Town of Alta, Little Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

Alta Ski Area, in Little Cottonwood Canyon, is proposing to implement the Big Grizzly lift upgrade to a handle tow lift within their existing permit boundary.

Recreation managementSpecial use management
Scoping Start
07/09/2013
Decision
02/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
DM for Alta Ski Area Big Grizley Ski Tow ReplacementDecision Signed Date: 02/20/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2s, R2E, Sec. PB44
Decision Memo · Salt Lake Ranger District · updated 4/9/2014
Big Cottonwood Canyon, Salt lake County, UT · Salt Lake, Utah

UDOT is requesting to construct a new weather station south of Reynolds Peak that would provide weather observations and would enhance avalanche forecasting above the BCC highway (SR 190)

Special use management
Scoping Start
07/09/2013
Decision
03/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM for UDOT BCC Reynolds Peak Weather StationDecision Signed Date: 03/10/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT1S, R2E, sec. 7
Decision Memo · Spanish Fork Ranger District · updated 2/18/2014
The project is located in Spanish Fork Ranger District. · Utah, Utah

To issue a 50 year term permit to South Utah Valley Electric Service District (SESD) for a buried power line along the shoulder of the Nebo Loop road beginning at the mouth of Payson Canyon and ending at the White Pine Communications site.

Special use management
Scoping Start
05/16/2013
Comment Period
05/16/2013
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
South Valley Electric Service District Permit IssuanceDecision Signed Date: 02/07/2014 Legal Notice Date: 02/07/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Salt Lake Ranger District · updated 2/12/2014
The project is located in east Hickman Canyon of the Stansbury Mountain in Tooele County. · Tooele, Utah

The Salt Lake Ranger District and Tooele County are proposing to construct a new trailhead on East Hickman Canyon of the Stansbury Mountains in Tooele County.

Special use management
Scoping Start
03/18/2013
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Categorical Exclusion For East Hickman TrailheadDecision Signed Date: 05/09/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Evanston-Mountain View RD · updated 2/12/2014
Along the Highway 150 corridor. · Summit, Utah

The Forest Service proposes to add three non-motorized trails to the designated trail system to allow for trail maintenance. The proposed Ruth Lake Climbing Wall, Stone Garden, and Lilly Lake trails are along the Highway 150 corridor.

Recreation management
Scoping Start
12/07/2012
Comment Period
12/07/2012
Decision
02/2014 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
Joseph McFarlane · jmcfarlane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Non-motorized Trail Additions Decision MemoDecision Signed Date: 02/07/2014 Legal Notice Date: 02/07/2014
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Decision Memo · Salt Lake Ranger District · updated 1/23/2014
Big Cottonwood Canyon, Salt Lake Couty, UT · Salt Lake, Utah

The Salt Lake Ranger District is proposing to implement a fuel-break demonstration project in the Mill D North Fork cabin area in Big Cottonwood Canyon.

Fuels management
Scoping Start
07/19/2013
Decision
11/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
Christine Brown · christineabrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
Mill D Fuel Break Demonstration ProjectDecision Signed Date: 11/12/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R3E, Sec. 17
Environmental Assessment · Salt Lake Ranger District · updated 9/25/2013
Within an existing utility corridor along the foothills on the south side of Interstate Highway 84. · Davis, Utah

The Salt Lake Ranger District proposes to authorize Questar to replace 3.26 miles of existing 16-inch natural gas pipeline, known as the Questar Main Line 3.

Special use management
Scoping Start
03/29/2013
Comment Period
03/29/2013
Decision
09/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Decision Notice and FONSI Questar Mainline 3 Weber Cny Replacement ProjectDecision Signed Date: 09/25/2013 Legal Notice Date: 09/25/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT 5 N, R 1 E, Sections 28 and 30.
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 8/20/2013
In the Smiths Fork watershed approximately 25 miles southwest of Mountain View, Wyoming. · Summit; Uinta, Utah; Wyoming

The Uinta-Wasatch-Cache NF proposes treatments to reduce both the amount and continuity of woody fuels, to remove hazard trees associated with travel ways, to harvest beetle-killed or infested trees, and to create a mix of tree ages and species.

Forest productsFuels managementVegetation management (other than forest products)Watershed management
NOI in Federal Register
06/11/2012
DEIS NOA in Federal Register
10/2012 (Estimated)
FEIS NOA in Federal Register
01/2013 (Estimated)
Objection Period Start
01/2013 (Estimated)
Decision
03/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Pete Gomben · pgomben@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics)
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Alta MDP Phase 1 Completed
Decision Memo · Salt Lake Ranger District · updated 8/12/2013
The projects are located in Alta Ski Area, in Little Cottonwood Canyon. · Salt Lake, Utah

Alta Ski Area, in Little Cottonwood Canyon, submitted an updated Master Development Plan (MDP), and is proposing to implement specific projects from the MDP within their existing permit boundary.

Recreation management
Scoping Start
03/18/2013
Comment Period
04/07/2013
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
DM for Alta Ski Area 2013 Summer ProjectsDecision Signed Date: 07/29/2013 Legal Notice Date: 08/02/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Evanston-Mountain View RD · updated 7/31/2013
. · Summit, Utah

Bridger Valley Electrical Company plans to replace a buried electrical line through the Christmas Meadows summer home tract. The new line would be buried 30 to 36 inches deep in an existing roadbed. Equipment would be confined to an existing road.

Special use management
Scoping Start
06/12/2013
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Bernard Asay · basay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Facility Maintenance
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Decision Memo · Spanish Fork Ranger District · updated 7/30/2013
The project is located east of the city of Mapleton in Maple Canyon. · Utah, Utah

This project will help to reduce hazardous fuels around USFS &amp; private land boundaries as well as travel corridors in the Whiting Canyon area. It will also help to improve mule deer winter range and reduce tree canopy crown fire potential.

Fuels management
Scoping Start
06/02/2013
Comment Period
06/02/2013
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
Whiting Canyon Fuel ReductionDecision Signed Date: 07/25/2013 Legal Notice Date: 07/27/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT8S R4E Sections 7, 8, and T8S R3E 12, and 13
Decision Memo · Evanston-Mountain View RD · updated 7/18/2013
Sections 25, 26, 35, and 36 of Township 3 North, Range 16 East · Summit, Utah

The Forest Service proposes to eliminate all conifer encroachment via lop-and-scatter, which would improve habitat for greater sage-grouse, spring/fall habitat for Rocky Mountain bighorn sheep, summer habitat for mule deer, as well as winter habitat.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
06/11/2013
Comment Period
06/11/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Ashly Herrera · anherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Population Enhancements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNot Applicable
Environmental Assessment · Heber-Kamas Ranger District · updated 7/12/2013
The Cold Springs Timber Sale project area is located approximately 23 air miles east of Heber City, Utah · Wasatch, Utah

This project would use a commercial timber sale to harvest and regenerate forest stands using a group selection prescription.

Forest products
Scoping Start
03/23/2012
Comment Period
03/27/2012
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Jim Gibson · jgibson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Cold Springs Salvage Timber SaleDecision Signed Date: 07/09/2013 Legal Notice Date: 07/12/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionTownship 3S, Range 9E, Sections 28-33, SBM and Township 1N, Range 9W, Sections 5-7; Township 1N, Range 10W, Sections 1, 12, USM.
Decision Memo · Salt Lake Ranger District · updated 7/11/2013
The project is located in Little Cottonwood Canyon. · Salt Lake, Utah

Crown Castle and UDOT are requesting special use permits to construct and operate a fiber optic system that includes traffic cameras and other information systems to enable UDOT to remotely monitor traffic and weather conditions in the area.

Special use management
Scoping Start
03/18/2013
Comment Period
04/07/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DM for SR-210: Little Cottonwood Canyon DAS Fiber Optic ProjectDecision Signed Date: 07/02/2013 Legal Notice Date: 07/11/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Evanston-Mountain View RD · updated 6/26/2013
North of Stateline Reservoir and west of Road 072 · Uinta, Wyoming

The Forest Service proposes to relocate a current motorized route from a riparian area to an upland location to reduce impacts to the riparian area.

Watershed managementWildlife, fish, rare plantsRecreation management
Scoping Start
12/07/2012
Comment Period
12/07/2012
Decision
04/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Joseph McFarlane · jmcfarlane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Trail Management; Watershed Improvements
Riparian Route Relocation Decision MemoDecision Signed Date: 04/08/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT2N R115W, Section 21
Decision Memo · Salt Lake Ranger District · updated 6/24/2013
The location is approximately 1.0 mile above the gate to the Mueller Park Picnic Area. · Salt Lake, Utah

Mill Creek Water Division Facility Reconstruction - Bountiful City is proposing to reconstruct their existing water diversion facility with a similar but slightly smaller structure.

Special use management
Scoping Start
03/18/2013
Comment Period
04/07/2013
Decision
06/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Jack Vanderberg · jvanderberg@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DM Bountiful City:Mueller Water System Special Use Permit Authorization SpDecision Signed Date: 06/18/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Salt Lake Ranger District · updated 6/24/2013
The project is located in the Salt Lake Ranger District · Salt Lake, Utah

NEON is requesting a short-term permit (1-year) for access and to conduct preliminary geotechnical analysis in Red Butte Canyon, a Forest Service Research Natural Area (RNA).

Research
Scoping Start
03/18/2013
Comment Period
04/07/2013
Decision
05/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityResearch And Development
DM for NEON Observatory Red Butte Canyon Tower Site: Preliminary GeotechnicDecision Signed Date: 05/09/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Heber-Kamas Ranger District · updated 6/24/2013
The project is located in the Heber-Kamas Ranger District.. · Summit, Utah

Two cabins are located on the SW corner of Trial Lake. We are proposing to re-issue both permits to make them consistent with the same schedule as the cabins in the Soapstone Recreation Residence tract.

Special use management
Scoping Start
11/20/2012
Comment Period
12/07/2012
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Jeffrey Ward · jpward02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Trial Lake Isolated CabinsDecision Signed Date: 06/13/2013 Legal Notice Date: 06/17/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT2S, R9E, Sec. 6
Decision Memo · Salt Lake Ranger District · updated 6/24/2013
Of the 21 mine openings, 8 are located on National Forest System (NFS) lands. · Salt Lake, Utah

The Foothills Abandoned Mine Reclamation project plans to close hazardous abandoned mine openings in Weber, Morgan, Davis, and Salt Lake Counties. A total of 21 mine openings were identified as open and needing closure to protect public safety.

Minerals and geology
Scoping Start
03/18/2013
Comment Period
04/07/2013
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityAbandoned Mine Land Clean-Up
DECISION MEMO for Foothills Abandoned Mines Reclamation ProjectDecision Signed Date: 06/24/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Heber-Kamas Ranger District · updated 6/24/2013
The project is located in the Heber-Kamas Ranger District. · Wasatch, Utah

UDWR currently holds a Special Use Permit from the USFS to operate and maintain two residential facilities. USFS is proposing to re-issue a permit for a term of 20 years, with an new expiration date of 12/31/2033.

Special use management
Scoping Start
11/20/2012
Comment Period
12/07/2012
Decision
06/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Jeffrey Ward · jpward02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
UDWR Strawberry Fish Trap and Associated FacilitiesDecision Signed Date: 06/13/2013 Legal Notice Date: 06/17/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Decision Memo · Spanish Fork Ranger District · updated 5/15/2013
The project crossed for 19.21 miles in the Spanish Fork and Heber-Kamas Ranger District and 0.6 miles in the Manti-LaSal National Forest · Utah, Utah

The SFRD is proposing to re-issue a special use authorization for a 354 kV power transmission line, known as the Upalco to Mona Transmission line. Permit would be re-issued for 40-years.

Special use management
Scoping Start
04/06/2013
Comment Period
04/06/2013
Decision
05/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Deseret Power and Transmition Special Use PermitDecision Signed Date: 05/07/2013 Legal Notice Date: 05/09/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Decision Memo · Pleasant Grove Ranger District · updated 5/15/2013
The project is located in Pleasant Grove Ranger District in Utah County. · Utah, Utah

To re-issue a special use permit to Alpine City for operating and maintaining water diversion structures and water transmission line from Alpine Grove and Box Elder Springs.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Alpine City Corporation, Special Use AuthorizationDecision Signed Date: 04/11/2013 Legal Notice Date: 05/09/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 4 N., R. 2 E., Sec. 17, E ½ NW ¼.
Decision Memo · Pleasant Grove Ranger District · updated 5/15/2013
The project is located in Pleasant Grove Ranger District in Utah County. · Utah, Utah

To re-issue a special use permit to Alpine Irrigation District for operating and maintaining an irrigation ditch to transport water from Grove Spring.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Alpine Irrigation Company, Special Use PermitDecision Signed Date: 04/11/2013 Legal Notice Date: 05/09/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 4 S, R. 2 E., Sec. 29, W 1/2 SW 1/4
Decision Memo · Pleasant Grove Ranger District · updated 5/15/2013
The project is located in Pleasant Grove in Utah County. · Utah, Utah

To re-issue a special use permit to Lehi City for operating and maintaining water collection and transmission facilities, all within an area known as School House Spring.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Lehi City Corporation, Special Use AuthorizationDecision Signed Date: 04/11/2013 Legal Notice Date: 05/09/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 4 N., R. 2 E., Sec. 5 and 6
Decision Memo · Pleasant Grove Ranger District · updated 5/15/2013
The project is located in the Pleasant Grove Ranger District in Utah County. · Utah, Utah

To re-issue a special use permit to North Fork Special Services District for operating and maintaining a water transmission line, diverting overflow water from the Theatre-in-the-Pines water system to a storage tank owed by permittee.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
North Fork Special Services District Special Use PermitDecision Signed Date: 04/11/2013 Legal Notice Date: 05/09/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 5 S., R. 3 E., Sec. 9 NW ¼.
Decision Memo · Heber-Kamas Ranger District · updated 5/6/2013
The project is located in the Heber-Kamas Ranger District. · Wasatch, Utah

The new owners are proposing an addition to the existing cabin structure. The proposed construction will occur within an area that has been previously disturbed with an existing 1,000 square foot concrete patio and retaining wall.

Special use management
Scoping Start
11/20/2012
Comment Period
12/01/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Jeffrey Ward · jpward02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Recreation Residence Addition, Bryant's Fork Track, Lot #24Decision Signed Date: 05/02/2013 Legal Notice Date: 05/06/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Decision Memo · Heber-Kamas Ranger District · updated 5/6/2013
The project is located near Bald Mountain Pass on Highway SR-150 · Wasatch, Utah

The proposal includes closing SR 150 to all public travel at intermittent periods over two days and involves crashing a vehicle off the road east of Bald Mountain Pass.

Road managementSpecial use management
Scoping Start
12/01/2012
Comment Period
12/01/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Jeffrey Ward · jpward02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionThe legal description for this project is: Section 26, Township 1 South, Range 9 East, Salt Lake Meridian.
Decision Memo · Heber-Kamas Ranger District · updated 5/6/2013
This project is located approximately 14 air miles east of Francis, Utah. · Summit, Utah

It is proposed to harvest dead and infested Engelmann spruce within the 27 acres area of the Piuta Organizational Camp. No temporary roads are proposed.

Fuels managementVegetation management (other than forest products)
Scoping Start
11/20/2012
Comment Period
12/01/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Jim Gibson · jgibson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Piuta Hazard Tree RemovalDecision Signed Date: 05/02/2013 Legal Notice Date: 05/06/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionTownship 2N, Range 8E, Section 21, SLBM
Environmental Assessment · Spanish Fork Ranger District · updated 5/6/2013
The project is located in the Spanish Fork Ranger District (Utah County) · Utah, Utah

Questar Pipeline Company is proposing to modify an existing natural gas facilities on its southern pipeline transmission system, known as the Questar ML 41 Project.

Special use management
Scoping Start
10/09/2012
Comment Period
10/09/2012
Decision
04/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Main Line (ML 41) Pipeline Compression ProjectDecision Signed Date: 04/04/2013 Legal Notice Date: 04/06/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Decision Memo · Heber-Kamas Ranger District · updated 5/6/2013
The project is located in the Heber-Kamas RD (Ponderosa Group Camp site near Samak in Summit County) · Summit, Utah

The purpose of this project is to improve timber stand conditions by reintroducing low to mixed severity fire within the Ponderosa pine and brush cover types promoting a more natural fire regime and creating the environment for regeneration to occur.

Vegetation management (other than forest products)Fuels management
Scoping Start
06/29/2012
Comment Period
06/29/2012
Decision
05/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Robert Lamping · rlamping@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
Ponderosa Group Samak Prescribed BurnDecision Signed Date: 05/02/2013 Legal Notice Date: 05/06/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionThe project is located entirely at T2S R7E Section 19.
Decision Memo · Spanish Fork Ranger District · updated 3/27/2013
The project is located in the Spanish Fork Ranger District. · Utah, Utah

To issue a special use permit for a site lease to Sanpete County Broadcasting Corporation for the White Pine Ridge Communication Site, located on the Nebo Division.

Special use management
Scoping Start
12/15/2012
Comment Period
12/15/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Environmental Assessment · Salt Lake Ranger District · updated 3/21/2013
Snowbird Ski Resort · Salt Lake, Utah

Eleven proposed projects to be completed over the next five years within Snowbird's permitted boundary.

Recreation management
Scoping Start
06/27/2011
Comment Period
05/10/2012
Decision
03/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
Decision Notice & Finding of No Significant Impacts for Snowbird Gad ValleyDecision Signed Date: 03/20/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Pleasant Grove Ranger District · updated 3/18/2013
The project is located in Pleasant Grove Ranger District in Utah County. · Utah, Utah

To re-issue a special use permit to Utah State Hospital for operating and maintain water collection and transmission facilities all within the area known as Slate Canyon.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
02/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Utah State Hospital Special Use Permit Water Collection and TransmissionDecision Signed Date: 02/13/2013 Legal Notice Date: 03/16/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 7 S., R. 3 E., Sect 3, 8, 9, 10, and 11
Decision Memo · Uinta-Wasatch-Cache All Units · updated 2/28/2013
Summit and Duchesne counties, Utah · Duchesne; Summit, Utah

The UWCNF proposes to authorize a 2-dimensional seismic acquisition project consisting of 103.9 linear miles of source/receiving lines and 53 helicopter landing zone areas. Data gathered by the project would refine knowledge of subsurface geology.

Minerals and geology
Scoping Start
08/26/2012
Comment Period
08/26/2012
Decision
02/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Roger Kesterson · rkesterson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNatural Gas; Oil
Stellar 2D Seismic Acquisition ProjectDecision Signed Date: 02/25/2013 Legal Notice Date: 02/28/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Legal Land DescriptionT 1 N, R 9, 10, and 11 E; T 2 N, R 10, 11, and 12 E; T 1 S, R 9, 10, and 11 E; and T 4 N, R 9 W.
Decision Memo · Logan Ranger District · updated 2/26/2013
Logan Canyon and near Mantua, Utah · Box Elder; Cache, Utah

The U-W-C NF is working to consolidate all permits previously issued to Century Link (Qwest) into one permit per Ranger District. There are three such lines on the Logan RD; one in Logan Canyon and two in Mantua. All lines are existing.

Special use management
Scoping Start
05/15/2012
Comment Period
05/15/2012
Decision
01/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Qwest dba Century Link, LLC Permit Re-issue and ConsolidationDecision Signed Date: 01/08/2013 Legal Notice Date: 02/22/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Ogden Ranger District · updated 2/26/2013
Ogden Ranger District · Box Elder; Cache; Weber, Utah

The U-W-C NF is working to consolidate all of the permits previously issued to Century Link (Qwest) into one permit per Ranger District. There are eleven lines located within the Ogden District. All are existing lines.

Special use management
Scoping Start
05/14/2012
Comment Period
05/14/2012
Decision
01/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Qwest dba Century Link, LLC Permit Re-issue and ConsolidationDecision Signed Date: 01/08/2013 Legal Notice Date: 02/22/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Pleasant Grove Ranger District · updated 2/26/2013
Lines are located along previously disturbed roadways and/or trails in Provo Canyon, South Fork Canyon, American Fork Canyon and the mouth of Rock Canyon. · Utah, Utah

The Qwest Communications dba Century Link provided GIS data sets and excel spreadsheets to the Uinta-Wasatch-Cache N.F. displaying the location of all telecommunication lines they believe located on NFS lands.

Special use management
Scoping Start
05/11/2012
Comment Period
05/11/2012
Decision
01/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Qwest dba Century Link, LLC Permit Re-issue and ConsolidationDecision Signed Date: 01/08/2013 Legal Notice Date: 02/26/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionUtah County.
Decision Memo · Salt Lake Ranger District · updated 2/26/2013
The lines are located at various locations across the SLRD including the Cottonwood Canyons, Mill Creek, Weber Canyon, Emigration Canyon, Guardsman Pass, etc. · Davis; Salt Lake; Weber, Utah

The SLRD is proposing to consolidate all of the permits previously issued to Qwest (13) into one consolidated 30-year master permit

Special use management
Scoping Start
05/14/2012
Comment Period
05/14/2012
Decision
01/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Qwest dba Century Link, LLC Permit Re-issue and ConsolidationDecision Signed Date: 01/08/2013 Legal Notice Date: 02/22/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Spanish Fork Ranger District · updated 2/26/2013
The lines are located at various locations along the Nebo Loop Road and in Hobble Creek Canyon. · Juab; Utah, Utah

The Qwest Communications dba Century Link provided GIS data sets and excel spreadsheets to the Uinta-Wasatch-Cache N.F. displaying the location of all telecommunication lines they believe located on NFS lands.

Special use management
Scoping Start
05/11/2012
Comment Period
05/11/2012
Decision
01/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Qwest dba Century Link, LLC Permit Re-issue and ConsolidationDecision Signed Date: 01/08/2013 Legal Notice Date: 02/26/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionUtah and Juab Counties
Decision Memo · Evanston-Mountain View RD · updated 2/22/2013
In the Hoop Lake and Poison Mountain areas of the ranger district in the Beaver Creek watershed. · Summit, Utah

The Forest Service proposes a lop-and-scatter treatment using chainsaws to restore aspen, shrubs, forbs, and grasses. All live conifers would be removed. Treatments would begin in August to avoid disturbance to nesting migratory birds.

Wildlife, fish, rare plants
Scoping Start
12/07/2012
Comment Period
12/07/2012
Decision
02/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Ashly Herrera · anherrera@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Hoop Lake and Poison Mountain Winter Range Vegetation Improvement ProjectDecision Signed Date: 02/19/2013 Legal Notice Date: 02/22/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionHoop Lake: T2N, R16E, sections 3 and 4. Poison Mountain: T2N, R15E, sections 1 and 2.
Bear Hole Fence Completed
Decision Memo · Heber-Kamas Ranger District · updated 2/12/2013
The project is located in Heber-Kamas RD in Wasatch County. · Wasatch, Utah

Construct approximately 1 mile of 4 strand barbed wire fence on the Bear Hole Allotment.

Grazing management
Scoping Start
06/29/2012
Comment Period
06/29/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT1S,R10W, Sec.33, 34
Decision Memo · Heber-Kamas Ranger District · updated 2/12/2013
The project os located in the Heber-Kamas Ranger District. · Summit, Utah

This proposal is to excavate a portal of a cave in order to restore natural ventilation to another nearby cave. Once access to the cave is restored, exploration will take place to determine if Columbian Grade Emeralds exist.

Minerals and geology
Scoping Start
11/20/2012
Comment Period
12/01/2012
Decision
02/2013 (Estimated)
Implementation
04/2013 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Josephine Mining ClaimDecision Signed Date: 02/04/2013 Legal Notice Date: 02/08/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Decision Memo · Heber-Kamas Ranger District · updated 2/12/2013
The project is located in the Heber-Kamas Ranger District. · Summit, Utah

The goal of this project is to reroute parts of the Clyde Lake Trail and connect the Clyde Lake Trail to the Notch Trail.

Recreation management
Scoping Start
11/20/2012
Comment Period
12/01/2012
Decision
02/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Josh Jurgensen · jjurgensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Clyde Lake and Notch Connect TrailDecision Signed Date: 02/04/2013 Legal Notice Date: 02/08/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT1E, R9W, Sec. 30, 31 UM
Decision Memo · Heber-Kamas Ranger District · updated 2/12/2013
The project is located in the Heber-Kamas Ranger District. · Summit, Utah

The goal of this project is to connect ATV trail 820 to FS Road 262. Currently, both of these routes are old logging roads that according to the 2007 Uinta Travel Plan dead end after a short road spur.

Recreation management
Scoping Start
11/20/2012
Comment Period
12/01/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Josh Jurgensen · jjurgensen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT3S, R8E, Sec. 26, 35 SLM
Decision Memo · Heber-Kamas Ranger District · updated 2/12/2013
The project is located in the Heber-Kamas RD. · Wasatch, Utah

The project will encompass 4.7 miles of river, and a variety of fixes will be done like: removal of old non-functioning structures, addition of more suitable bank stabilization structures, sloping and stabilization of banks and re-vegetation.

Watershed managementWildlife, fish, rare plants
Scoping Start
11/20/2012
Comment Period
12/01/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Kellie Whitton · kswhitton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Species Population Enhancements; Watershed Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Environmental Assessment · Spanish Fork Ranger District · updated 1/14/2013
Spanish Fork Ranger District · Utah, Utah

Reduce Juniper density to improve mule deer habitat and modify fuel loading by treating Juniper using a Bullhog/masticator. Create 6.6 miles of a new ATV trail. Change the maintenance designation of Old Sheep Creek Rd from level 2 to level 1.

Wildlife, fish, rare plantsRoad managementRecreation managementFuels management
Scoping Start
05/15/2012
Comment Period
05/15/2012
Decision
12/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Road Maintenance
Sheep Creek Project - Travel managementDecision Signed Date: 12/17/2012 Legal Notice Date: 01/13/2013
Sheep Creek Vegetation ProjectDecision Signed Date: 12/17/2012 Legal Notice Date: 01/13/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S R5E sections 24-26,35, and 36; T9S R6E sections 13-36; T9S R7E sections 19, 30 and 31; T10S R5E sections 1, 2 and 12; T10S R6E sections 1-15,17, and 18; T10S R7E sections 3-10, and 15-20.
Environmental Assessment · Ogden Ranger District · updated 1/3/2013
Approximately 40 miles east of Ogden, Utah · Cache; Rich, Utah

Proposal is to authorize grazing on 3 sheep allotments (Buck Springs, Pete's Hollow, and North Monte) using Forest Plan standards and guidelines to manage use.

Grazing management
Scoping Start
05/11/2011
Comment Period
05/11/2011
Decision
12/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Decision Notice/FONSI for the Buck Springs Area Sheep AllotmentsDecision Signed Date: 09/30/2011 (FS Withdrawn) Legal Notice Date: 10/06/2011
Buck Springs Area Sheep Allotment Decision Notice and FONSIDecision Signed Date: 12/27/2012 Legal Notice Date: 01/03/2013
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT8N, R3E, Section 3; T9N, R3E, Sections 23, 24, 26, 27, 33, 34; T9N, R4E, Sections 3-10, 13-22, 31-34; T10N, R4E, Sections 31, 32 SLM
Decision Memo · Pleasant Grove Ranger District · updated 12/31/2012
Wadsworth Canyon · Utah, Utah

To sleeve an existing clay pipeline with new PVC smaller diameter pipe located in Wadsworth Canyon. There will be no change to the diversion structure. It is required for continued operation of the pipeline. Permit would be re-issued for 20 years.

Special use management
Scoping Start
10/13/2012
Comment Period
10/13/2012
Decision
12/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Wadsworth Canyon Water Line SUP PL521602Decision Signed Date: 12/07/2012 Legal Notice Date: 12/12/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT4S, R2E, Sec. 17
Decision Memo · Salt Lake Ranger District · updated 12/26/2012
Big Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

Utah Department of Transportation is requesting a special use permit to construct and operate a fiber optic system that includes traffic cameras, cell phone service, and other information systems to enable UDOT to remotely monitor traffic and weather

Special use management
Scoping Start
05/14/2012
Comment Period
05/16/2012
Decision
10/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DECISION MEMO UDOT Camera/Data/Cell System ProjectDecision Signed Date: 10/05/2012 Legal Notice Date: 10/06/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR 2 & 3E, T 2S
Decision Memo · Logan Ranger District · updated 12/17/2012
West of Mantua, Utah · Box Elder, Utah

Proposal is to authorize a special use permit for installation of a water system (pump station and waterline) for the privately-owned Bel Mia Girl's Camp.

Special use management
Scoping Start
11/08/2012
Comment Period
11/08/2012
Decision
12/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Bel Mia GirlDecision Signed Date: 12/17/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT9N, R1W, Sections 27, 28, 33
Decision Memo · Logan Ranger District · updated 12/17/2012
Just south of the Elk Valley Guard Station · Cache, Utah

Proposal is to fence the riparian area just to the south of the Elk Valley Guard Station to protect it from livestock and vehicular traffic.

Grazing management
Scoping Start
11/08/2012
Comment Period
11/08/2012
Decision
12/2012 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Structural Improvements
Elk Valley Guard Station Riparian Fence Decision MemoDecision Signed Date: 12/17/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N, R4E, Section 33
Decision Memo · Logan Ranger District · updated 12/17/2012
Just north of the Elk Valley Guard Station · Cache, Utah

Proposal is to re-route about 1,000 feet of ATV trail to relocate it outside the fenced compund of the Elk Valley Guard Station. The guard station was fenced to keep livestock and traffic out of the compound.

Recreation management
Scoping Start
11/08/2012
Comment Period
11/08/2012
Decision
12/2012 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Kelli Taylor · ktaylor02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Elk Valley Trail Reroute Decision MemoDecision Signed Date: 12/17/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N, R4E, Sections 33 and 34
Decision Memo · Heber-Kamas Ranger District · updated 12/17/2012
The project is located in Heber-Kamas RD in Wasatch County. · Wasatch, Utah

Establish a watering site to improve distribution of livestock and improve range health.

Grazing management
Scoping Start
06/29/2012
Comment Period
06/29/2012
Decision
09/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
Nobletts Livestock Water LineDecision Signed Date: 09/26/2012 Legal Notice Date: 12/15/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT3S,R8E,Section 17.
Decision Memo · Spanish Fork Ranger District · updated 12/5/2012
The project is located in the Spanish Fork Ranger District. · Tooele, Utah

This project is proposing pipelines and a trough.

Special use managementGrazing management
Scoping Start
08/04/2012
Comment Period
08/04/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Grazing Structural Improvements
Vernon Division Stock Waterline and Trough InstallationDecision Signed Date: 11/30/2012 Legal Notice Date: 12/05/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionSec 4 & 5, T10S, R5W
Decision Memo · Pleasant Grove Ranger District · updated 11/30/2012
The project is located in Pleasant Grove Ranger District in Utah County. · Utah, Utah

To re-issue a special use permit for the Smith Ditch for operating and maintaining a irrigation pipeline-ditch, with flume, to transport water. The permit area covers 2.25 acres and/or 2 miles.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Smith Ditch SUP DMDecision Signed Date: 11/07/2012 Legal Notice Date: 11/20/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 6 S., R. 3 E., Sec. 4 and 5, Salt Lake Base Meridian.
Decision Memo · Pleasant Grove Ranger District · updated 11/30/2012
The project is located in Pleasant Grove Ranger District in Utah County. · Utah, Utah

To re-issue a special use permit to Provo City Park and Recreation for operating and maintaining a water transmission line for irrigation at White Pine Spring.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Provo City Parks and Recreation - White Springs SUP PLG 102007 CEDecision Signed Date: 07/26/2012 Legal Notice Date: 08/14/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT6S, R4E, Sec 7 E1/2 E 1/2
Decision Memo · Pleasant Grove Ranger District · updated 11/29/2012
Grove Creek Canyon · Utah, Utah

This proposal is to replace an existing irrigation water transmission line located in Grove Creek Canyon and to combine several existing uses into a single special use authorization. Permit would be issued for 20 years.

Special use management
Scoping Start
10/13/2012
Comment Period
10/13/2012
Decision
11/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Grove Creek Water Line Replacement SUPDecision Signed Date: 11/19/2012 Legal Notice Date: 11/28/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT5S, R2E, Sec. 22 Salt Lake Base Meridian
Decision Memo · Pleasant Grove Ranger District · updated 11/26/2012
The project is located in Pleasant Grove Ranger District in Utah County. · Utah, Utah

To re-issues a special use permit for operating and maintaining water collection headbox, water transmission line, 100,000 gallon steel storage tank, and chlorinator house.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Anne Hansen · annehansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
USDI-NPS Timpanogos Cave National Monument DMDecision Signed Date: 11/07/2012 Legal Notice Date: 11/20/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 4 S., R. 2 E., Sec 27 E 1/2 NW 1/4 Salt Lake Base Meridian
Decision Memo · Pleasant Grove Ranger District · updated 11/7/2012
Pleasant Grove Ranger District. · Utah, Utah

These six special use permits (maintain 4 water transmition lines, maintain 1 irrigation ditch and 1 monument and access trail) are located in the Pleasant Grove Ranger District in Utah County. 5 of these SUP have been re-scope in 2012.

Special use management
Scoping Start
11/15/2011
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Jon Stansfield · jstansfield@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionThese six special use permit are located in the Pleasant Grove Ranger District.
Decision Memo · Pleasant Grove Ranger District · updated 11/7/2012
Plesant Grove Ranger District. · Utah, Utah

These ten permits (maintain a stream gage, grant an easement, 5 water transmition lines, maintain a water tank and 2 irrigation line) are located in the Pleasant Grove Ranger District in Utah County.

Special use management
Scoping Start
07/06/2011
Decision
07/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Jon Stansfield · jstansfield@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionThese ten permits are located in the Pleasant Grove Ranger District.
Decision Memo · Logan Ranger District · updated 10/23/2012
Left Hand Fork of Blacksmith Fork, southeast of Logan, Utah · Cache, Utah

Proposal is to rehabilitate and protect riparian and stream habitats by delineating dispersed campsites along the river and closing unauthorized "hill climb" trails; the gate would be moved further up the road to get parking away from the river.

Wildlife, fish, rare plants
Scoping Start
07/20/2012
Comment Period
07/20/2012
Decision
10/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Left Hand Fork Riparian Restoration Phase IIDecision Signed Date: 10/22/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Logan Ranger District · updated 10/23/2012
Saddle Creek area east of Elk Vally Guard Station · Cache, Utah

1100 ac of sagebrush will be treated mechanically (600ac) and with prescribed fire (500ac); to create patchy and diverse habitats, only 20 to 30% of the mechanical areas will be treated and low intensity fire will be used in the burn areas.

Vegetation management (other than forest products)
Scoping Start
07/20/2012
Comment Period
07/20/2012
Decision
10/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
Kevin Labrum · kclabrum@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Saddle Creek Sagebrush Treatment Phase IIDecision Signed Date: 10/22/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Logan Ranger District · updated 9/28/2012
Blacksmith Fork Canyon on the Logan Ranger District · Cache, Utah

Proposal is to plant sagebrush and bitterbrush seedlings on south and west-facing slopes in the Blacksmith Fork area on the Logan Ranger District to improve winter wildlife habitats. The area to be treated includes about 1,800 acres.

Wildlife, fish, rare plants
Scoping Start
05/15/2012
Comment Period
05/15/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Kevin Labrum · kclabrum@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Logan Ranger District · updated 9/28/2012
South side of Highway 89 in lower Logan Canyon on the Logan Ranger District · Cache, Utah

Proposal is to construct about 200 feet of non-motorized trail and a foot bridge on the south side of the highway in lower Logan Canyon to connect Logan City's Gateway Trail to the Riverside Trail (#603) located on the National Forest.

Recreation management
Scoping Start
05/15/2012
Comment Period
05/15/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Kelli Taylor · ktaylor02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Spanish Fork Ranger District · updated 9/25/2012
Spanish Fork Ranger District. · Utah, Utah

Project will improve seven (7) stream crossings by either installing culverts or rock armoring the approaches and stream crossing in an effort to reduce sediment and erosion.

Road managementWildlife, fish, rare plants
Scoping Start
04/18/2012
Comment Period
04/18/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Kellie Whitton · kswhitton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Maintenance
Tie Fork Road Maintenance projectDecision Signed Date: 09/25/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT6S, R6E, Sec 2, 11, 14, T5S, R6E, Sec 35 SLM
Environmental Assessment · Heber-Kamas Ranger District · updated 9/23/2012
14 miles east of Kamas, Utah along the Mirror Lake Highway. · Summit, Utah

To authorize continued livestock grazing on the Kamas Valley Allotment on the Heber-Kamas Ranger District.

Grazing management
Scoping Start
05/17/2011
Comment Period
11/17/2011
Decision
09/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Kamas Valley Cattle Allotment EADecision Signed Date: 09/20/2012 Legal Notice Date: 09/23/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT1S, R7E, S31 - 33, T2S, R6E S1, 2,10-15, 22-25,35, 36, T2S, R7E, S1-36; T2S, R8E, S5-9, 13-14, 16-36; T2S, R9E, S17-20, 29-32; T3S, R7E, S1-12, 15-17, 21; T3S, R8E, S1-11, 16-17, T3S, R9E, S6, SLM
Decision Memo · Salt Lake Ranger District · updated 9/21/2012
Alta Ski Area, Little Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

Alta is proposing three small projects for completion during the summer of 2012: 1) Request for a snowmaking strainer system building; 2) Request for Little Griz Conveyor upgrade; & 3) Watson Sewer Line Repair

Special use managementRecreation management
Scoping Start
05/14/2012
Comment Period
05/16/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DM for Snowmaking Strainer, Little Griz Conveyor, Watson Sewer Repair AltaDecision Signed Date: 08/24/2012 Legal Notice Date: 08/27/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR 2E T 2S
Decision Memo · Salt Lake Ranger District · updated 9/21/2012
Top of Emmigration Canyon (SR · Salt Lake, Utah

Questar is proposing amend their permit to expand their permitted natural gas transfer facility to facilitate required inspection equipment

Special use management
Scoping Start
05/14/2012
Comment Period
05/16/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DM for Questar Pipeline Company Expansion of Little Mountain FacilityDecision Signed Date: 08/24/2012 Legal Notice Date: 08/27/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT 1N, R 2E, Sec. 34
Decision Memo · Salt Lake Ranger District · updated 9/21/2012
Solitude Mountain Resort, Big Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

Solitude Mountain Resort is proposing to re-design and construct an expansion to the Last Chance Mining camp day lodge that was initially approved in the Jan. 15, 2002 Record of Decision

Recreation managementSpecial use management
Scoping Start
05/14/2012
Comment Period
05/16/2012
Decision
08/2012 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Use Authorizations
DM for Solitude Mountain Resort Expansion Last Chance Mining Camp LodgeDecision Signed Date: 08/24/2012 Legal Notice Date: 08/27/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR 3E, T 2S, Sec. 22
Decision Memo · Salt Lake Ranger District · updated 9/21/2012
White Pine Trailhead, Little Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

The SLRD is proposing to remove and revegetate the existing paved access trail (approx. 200 ft.) from the White Pine Parking lot to the Little Cottonwood Creek Bridge and construct a new access trail at a sustainable grade.

Recreation management
Scoping Start
05/14/2012
Comment Period
05/16/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDispersed Recreation Mgmt.; Trail Management; Watershed Improvements
Decision Memo for White Pine Trail RelocationDecision Signed Date: 08/23/2012 Legal Notice Date: 08/27/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR 2E, T 2S, Sec. PB 53
Decision Memo · Pleasant Grove Ranger District · updated 8/9/2012
The project is located in Pleasant Grove Ranger District in Utah County. · Utah, Utah

The proposal is to authorize improvements into the cabin. Improvements include construction of a deck that will be approximately 340 sq. ft. and placement of a 500 gal. propane tank. Proposal follows the U-W-C NF Recreation Residence guidelines.

Special use management
Scoping Start
05/02/2012
Comment Period
05/02/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Use Adjustments
Chatfield Recreation ResidenceDecision Signed Date: 08/06/2012 Legal Notice Date: 08/09/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming

The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.

Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Tracy Parker · tparker03@fs.fed.us
NEPA / regulatory detail
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRegulation Creation/Modification
ForestsBeaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
DistrictsBeaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters
Environmental Assessment · Logan Ranger District · updated 6/19/2012
Approximately 18 miles east of Logan, Utah · Cache, Utah

The Logan Ranger District proposes to relocate a 1.2 mile stretch of Saddle Creek Road, located within the riparian area and stream channel of Saddle Creek, onto a bench 0.1 miles to the west of its current location.

Watershed management
Scoping Start
05/18/2011
Comment Period
05/18/2011
Decision
06/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
Saddle Creek Road Relocation ProjectDecision Signed Date: 06/15/2012 Legal Notice Date: 06/19/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N, R4E, Sections 22-27 and 34-35
Decision Memo · Pleasant Grove Ranger District · updated 3/30/2012
South Fork of the Provo River. · Utah, Utah

Request for special use authorization to build a waterline across National Forest system lands from a water source on private land.

Special use management
Scoping Start
10/27/2011
Decision
02/2012 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
Sylvia Clark · sgclark@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Big Spring Development Special Use Authorization PermitDecision Signed Date: 02/03/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT6S, R4E, Section 6.
Environmental Assessment · Heber-Kamas Ranger District · updated 3/26/2012
Clyde Creek drainage, Strawberry Reservoir Uint · Tooele, Utah

Salvage dead and bark beetle infested trees in the Clyde Creek drainage, Strawberry Reservoir Management Area.

Forest products
Scoping Start
08/01/2008
Comment Period
02/18/2011
Decision
05/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Jim Gibson · jgibson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Clyde Creek Timber Salvage Project DNDecision Signed Date: 05/04/2011 Legal Notice Date: 05/07/2011
Clyde Creek Salvage Timber SaleDecision Signed Date: 05/04/2011 (FS Withdrawn) Legal Notice Date: 05/07/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT3S, R12W, S4, 8-12,14-17, 20, 21 USM
Decision Memo · Spanish Fork Ranger District · updated 3/1/2012
Vernon Area. · Tooele, Utah

Proposal is to improve sage grouse winter and brooding habitat and deer winter range by treating juniper on about 1200 acres. The proposal also includes closing 2 miles of user-created roads.

Wildlife, fish, rare plants
Scoping Start
08/12/2011
Decision
01/2012 (Estimated)
Implementation
02/2012 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
East Vernon Habitat Improvement ProjectDecision Signed Date: 01/05/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT10S, R5W, Section 1,2, 11, 12, 13, 14 T9S, R5W section 22, 23, 24, 25, 26
Environmental Assessment · Logan Ranger District · updated 2/8/2012
Approximately 10 miles west of Logan, Utah · Cache, Utah

Project is to authorize grazing on 2 cattle allotments (Three Mile and Maple Bench) using Forest Plan standards and guidelines to manage use.

Grazing management
Scoping Start
05/04/2011
Comment Period
05/04/2011
Decision
02/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements
Three Mile and Maple Bench Allotments DN/FONSIDecision Signed Date: 02/06/2012 Legal Notice Date: 02/08/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Ogden Ranger District · updated 2/7/2012
East of Ogden Canyon, on the south side of Highway 39, south of Pineview Reservoir · Weber, Utah

Project involves treatment of maple and oak communities to enhance wildlife habitat and reduce fuels in the wildland urban interface on approximately 270 acres near the old Snow Basin road.

Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
12/16/2011
Decision
02/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Scott Robison · skrobison@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
Pineview Vegetation Treatment Decision MemoDecision Signed Date: 02/07/2012
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Heber-Kamas Ranger District · updated 1/13/2012
The project is located in Heber-Kamas Ranger District. · Wasatch, Utah

The project is located in Heber-Kamas Ranger District (T6S R6E Section 10/15).

Facility management
Scoping Start
10/25/2011
Decision
11/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Jeffrey Ward · jpward02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
UDOT Right of Way, DanielDecision Signed Date: 11/17/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT6S R6E Section 10/15
Environmental Assessment · Spanish Fork Ranger District · updated 11/21/2011
Vernon Area · Tooele, Utah

The Spanish Fork RD proposal is to authorize continued livestock grazing on the Vernon allotment. This includes water developments to improve livestock distribution.

Grazing management
Scoping Start
02/15/2011
Comment Period
02/15/2011
Decision
09/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations
Vernon allotment Grazing Authorization DNDecision Signed Date: 09/30/2011 Legal Notice Date: 11/19/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S, R6W, Sect. 12, 25, 36; T9S, R5W, Sec 4-10, 17-20, 28-33; T10S, R6W, Sec. 3-29, 32-36, T10S, R6W, Sec. 1-4, 9-12, 14-15, T9S, R7W, Sec. 1, 12-13.
Environmental Impact Statement · Evanston-Mountain View RD · updated 11/18/2011
Located approximately 25 miles southeast of Mountain View, Wyoming. · Summit, Utah

The Evanston/Mountain View Ranger District proposes to treat about 3,000 acres of a variety of vegetation types within the 39,760 acre Blacks Fork project area. Proposed treatments include timber harvest, prescribed fire, and mechanical thinning.

Fuels managementVegetation management (other than forest products)
NOI in Federal Register
05/28/2009
DEIS NOA in Federal Register
05/29/2011
FEIS NOA in Federal Register
11/18/2011
Decision
11/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Timothy Gill · tgill@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Salvage)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT2N, R12E, T3N, Salt Lake Meridian.
Decision Memo · Salt Lake Ranger District · updated 9/29/2011
Salt Lake County, Ut; Collins Gulch at Alta Ski Area, Little Cottonwood Canyon · Salt Lake, Utah

Alta Ski area is proposing to redevelop a spring collect system to meet state standards and modify approx. 100 feet of trail at Windy point to improve skier circulation

Recreation management
Scoping Start
05/06/2011
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
DM-Alta Bank Stabilization, Road Widening, Sewer Re-Route, & Spring SystemDecision Signed Date: 08/18/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R2E, Sec. 5 & 8
Decision Memo · Salt Lake Ranger District · updated 9/29/2011
Baer to Farmington Canyons, Davis County, Utah · Davis, Utah

The Baer Gutsman mountain running race permitee is requesting the re-issuance of their 5-year recreation event special use permit for the annual race in Baer Canyon in Davis County, Ut.

Recreation managementSpecial use management
Scoping Start
05/06/2011
Decision
07/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Matthew Zumstein · mzumstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Area Management
DM Recreation Events Bair Gutsman Runn Special Use PermitDecision Signed Date: 07/25/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3N, R1W-1E, Sec.s 36, 31-33, 3, 4
Doyle Spring SUP Completed
Decision Memo · Salt Lake Ranger District · updated 9/29/2011
Salt Lake County, Ut, Within the Brighton Ski Area in Big Cottonwood Canyon · Salt Lake, Utah

The Doyle's are proposing to renew their existing permit to continue the operation and maintenance of a head box and underground water transmission line that is used to convey water from the existing spring on National Forest to private land.

Special use management
Scoping Start
05/06/2011
Decision
09/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Doyle Spring/Transmission Line Permit Re-IssuanceDecision Signed Date: 09/12/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3S, R3E, Sec. 2
Decision Memo · Salt Lake Ranger District · updated 9/29/2011
Salt Lake County, UT; Brington Loop, Bigh Cottonwood Canyon · Salt Lake, Utah

The Brighton LDS Girls Camp is proposing to remove the underground tank and replace it with a larger, 8,000 gal. above ground tank on a new concrete pad to meet the State of Utah Division of Drinking Water standards.

Recreation managementSpecial use management
Scoping Start
07/06/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Brighton LDS Organizational Camp Water Tank ReplacementDecision Signed Date: 08/18/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R3E, Sec. 35
Decision Memo · Salt Lake Ranger District · updated 9/29/2011
Tooele County, Ut, So. Willow Guard Station, South Willow Canyon · Tooele, Utah

Issue a 20-year special use permit for the Tooele County emergency sirens located at the South Willow Administrative Site

Special use management
Scoping Start
07/06/2011
Decision
07/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Charles Rosier · crosier@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM Tooele Administrative Site & Vernon Reservoir Emergency SirensDecision Signed Date: 07/07/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionSection 6, T.4 S. R.6 W
Decision Memo · Salt Lake Ranger District · updated 9/29/2011
Salt lake County, Ut, within the permit boundary for Alta Ski Area in the Town of Alta · Salt Lake, Utah

The Town of Alta is requesting to amend Its SUP to make improvements to Sewer and waterlines within the Alta Ski Area

Special use management
Scoping Start
05/06/2011
Decision
08/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Pollyanna Popola · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM Town of Alta Sewer Line Realignment & Westward Ho Waterline ExtensionDecision Signed Date: 08/18/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR2E, T2S, Sec. PB44
Decision Memo · Pleasant Grove Ranger District · updated 8/30/2011
Tibble Fork Recreation Residence Tract, American Fork Canyon · Summit, Utah

The project area is located on the Pleasant Grove Ranger District in Utah County, Utah.

Special use managementRecreation management
Scoping Start
05/12/2011
Decision
07/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Holbrook Recreation Residence DMDecision Signed Date: 07/07/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionTownship 4 South, Range 2 East, sections 7, 17, 18, Salt Lake Base Meridian.
Decision Memo · Pleasant Grove Ranger District · updated 8/25/2011
South Fk of Deer Crk Trail, Near FR 114. · Utah, Utah

Re-route small section of highly used multiple use trail away from fall line through meadow. New route would traverse meadow on contour.

Recreation management
Scoping Start
02/08/2010
Decision
07/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
South Fork Little Deer Creek Decision MemoDecision Signed Date: 07/18/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT6S R3E Section 32
Decision Memo · Heber-Kamas Ranger District · updated 8/19/2011
Trial Lake/Washington Lake complex on Highway 150 · Summit, Utah

Use a commercial timber sale to remove dead and infested trees adjacent to roads, trailheads, parking and camping sites in the Trial Lake and Wolf Creek recreation siites

Forest products
Scoping Start
05/02/2011
Decision
08/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Jim Gibson · jgibson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
Trial Lake & Wolf Creek Tree RemovalDecision Signed Date: 08/17/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT1S, R9W, sections 5,6
Decision Memo · Salt Lake Ranger District · updated 8/12/2011
Brighton ski resort in Upper Big Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

Brighton Ski Resort is proposing to extend its snowmaking system above Twin Lakes to the top of the Millicent lift and realign its approved alignment from the parking lot to its pumphouse in the Majestic area, all within its permitted area boundary

Recreation managementSpecial use management
Scoping Start
05/06/2011
Decision
08/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Decision Memo For Brighton Ski Area Majestic And Millicent Area SnowmakingDecision Signed Date: 08/12/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R3E , sec. 2, 3
Decision Memo · Salt Lake Ranger District · updated 6/29/2011
Upper Albion Basin in Little Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

Upper Albion Baasin homeowners have submitted a request for a special use permit to allow motorized access (over the snow) to their homes during the mid day. This activity is proposed within a pemitted ski area (Alta)

Recreation managementSpecial use management
Scoping Start
08/31/2010
Decision
05/2011 (Estimated)
Implementation
11/2011 (Estimated)
Project documents
Catherine Kahlow · ckahlow@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Travel Management
Decision Memo for Albion Basin Homeowners Over the Snow Vehicle SUPDecision Signed Date: 05/04/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT3S, R2E, Sec. PB 43, 9
Decision Memo · Pleasant Grove Ranger District · updated 6/29/2011
Cascade Springs · Utah, Utah

Develop picnic tables and shade shelters adjacent to the parking area and toilet.

Recreation management
Scoping Start
04/24/2010
Decision
04/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Larry Velarde · lvelarde@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Cascade Springs Picnic Site CEDecision Signed Date: 04/01/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT4S, R3E, Section 24, SLM, Utah County, Utah
Decision Memo · Pleasant Grove Ranger District · updated 6/29/2011
Southeast Mill Canyon Peak Area · Wasatch, Utah

Reroute an existing trail.

Recreation management
Scoping Start
12/14/2009
Decision
01/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Larry Velarde · lvelarde@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Eastridge Trail No. 38 Reroute CEDecision Signed Date: 01/19/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT4S, R3E, Section 4, SLM, Wasatch County, Utah
Decision Memo · Spanish Fork Ranger District · updated 6/25/2011
Old Ray's Valley Road · Utah, Utah

Install 3 water troughs to mitigate for loss of cattle watering areas due to stream fencing.

Grazing management
Scoping Start
10/19/2005
Decision
01/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
Old RayDecision Signed Date: 01/10/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT8S, R6E, Section 6; T8S, R5E, Section 1
Decision Memo · Pleasant Grove Ranger District · updated 6/8/2011
Pleasant Grove Ranger District · Utah, Utah

Reissue special use permit to Utah County for management of Upper Falls Park.

Special use management
Scoping Start
01/11/2010
Decision
04/2011 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Sylvia Clark · sgclark@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionUpper Falls Park, T5S, R3E, Sec 34
Decision Memo · Logan Ranger District · updated 5/3/2011
Millville Canyon, south of Logan Utah · Cache, Utah

The Utah Division of Wildlife Resources proposes a wildlife habitat restoration project including the planting of bitterbrush and sagebrush on 51 acres of National Forest System land in Millville Canyon.

Wildlife, fish, rare plants
Scoping Start
05/05/2010
Decision
09/2011 (Estimated)
Implementation
10/2011 (Estimated)
Project documents
Kevin Labrum · kclabrum@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT11N, R2E, Section 30
Environmental Assessment · Spanish Fork Ranger District · updated 4/6/2011
UNIT - Spanish Fork Ranger District. STATE - Utah. COUNTY - Utah. · Utah, Utah

Use prescribed fire and mechanical treatment (Bullhog/masticator) to treat 30-60 percent of the oak/maple community to restore age class diversity, structural diversity and understory diversity. Close and reseed roads.

Wildlife, fish, rare plantsFuels management
Scoping Start
05/08/2008
Comment Period
05/08/2008
Decision
02/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionSLM T6S, R3E, Section 36; T7S, R4E, Sections 4-10 and 16-18, T6S, R4E, Section 31; T7S, R3E, Section 1 and 2. In the Left Fork of Hobble Creek Canyon.
Decision Memo · Ogden Ranger District · updated 4/6/2011
Bug Lake/Red Wells-Rock Creek · Weber, Utah

Reauthorize livestock grazing on the Bug Lake and the Red Wells-Rock Creek Sheep Allotments using Forest Plan Standards and Guidelines.

Grazing management
Scoping Start
03/20/2008
Decision
09/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Ann Robins · arobins@fs.fed.us
NEPA / regulatory detail
Categorical ExclusionSec 339
Special AuthorityGrazing, Sec 339, 2005 Consolidated Appropriations Bill (Grazing Authorizations On An Allotment)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Authorizations
Bug Lake/Red Wells-Rock Creek AllotmentsDecision Signed Date: 09/30/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Spanish Fork Ranger District · updated 4/6/2011
Approximately 3 miles southwest of Vernon, Utah · Tooele, Utah

Create openings in the sagebrush canopy with a Dixie Harrow. Reseed the area with grasses and forbes. Intent is to create age and structural class diversity in the sagebrush, increase understory diversity. Reduce fuel loading.

Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Scoping Start
11/01/2007
Comment Period
11/01/2007
Decision
08/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
Diagonal Electric Sagebrush Improvement ProjectDecision Signed Date: 08/14/2008 Legal Notice Date: 08/17/2008
Diagnal/Electric Sagebrush ImprovementDecision Signed Date: 08/14/2008 Legal Notice Date: 08/17/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S, R6W, Sections 10, 11, 12, 13 and 14, SLM, Tooele County, Utah
Decision Memo · Evanston-Mountain View RD · updated 4/6/2011
Evanston Ranger District. · Summit, Utah

Reauthorize grazing on two allotments (Luke Lym and Mill Creek).

Grazing management
Scoping Start
04/17/2008
Decision
09/2008 (Estimated)
Implementation
04/2009 (Estimated)
Project documents
Stephen Ryberg · sryberg@fs.fed.us
NEPA / regulatory detail
Categorical ExclusionSec 339
Special AuthorityGrazing, Sec 339, 2005 Consolidated Appropriations Bill (Grazing Authorizations On An Allotment)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Decision Memo · Pleasant Grove Ranger District · updated 4/6/2011
North of Grove Creek Trailhead · Utah, Utah

Pleasant Grove City has requested that a drainage outlet be constructed to control and mange water being held in a small pond (about 0.10 acre).

Special use management
Scoping Start
05/08/2007
Decision
10/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Larry Velarde · lvelarde@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT 5 S, R 2 E, Sec. 22, SLM
Environmental Impact Statement · Heber-Kamas Ranger District · updated 4/6/2011
Indian Springs Road off of the Strawberry Ridge · Wasatch, Utah

Proposal to relocate the existing Indian Springs road. Work would include construction of 1.9 miles of road at an upland, drier location and obliteration/restoration of 1.6 miles of existing road in the riparian area.

Watershed managementRoad management
NOI in Federal Register
05/22/2007
DEIS NOA in Federal Register
10/25/2007
FEIS NOA in Federal Register
07/03/2008
Decision
06/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
Indian Springs Road Realignment DecisionDecision Signed Date: 06/18/2008 Legal Notice Date: 07/02/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Environmental Impact Statement · Uinta-Wasatch-Cache All Units · updated 4/6/2011
Uinta National Forest · Juab; Sanpete; Tooele; Utah; Wasatch, Utah

Determine appropriate leasing terms and stipulations for the leasable land base within the entire Uinta National Forest.

Minerals and geology
NOI in Federal Register
02/02/2006
DEIS NOA in Federal Register
06/25/2010
FEIS NOA in Federal Register
03/04/2011
Decision
02/2010 (Estimated)
Implementation
04/2011 (Estimated)
Project documents
Kim Martin · kjmartin@fs.fed.us
NEPA / regulatory detail
Special AuthorityForest Service Energy Implementation Plan
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
Uinta National Forest Oiland Gas LeasingDecision Signed Date: 02/18/2010 Legal Notice Date: 03/04/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Decision Memo · Spanish Fork Ranger District · updated 4/6/2011
Sabie Mountain area on the Vernon Unit located about 10 miles southeast of Vernon, Utah. · Tooele, Utah

Thin encroaching pinyon-juniper in a previously chained area to improve mule deer habitat. Brush hog mature pinyon-juniper stands to create openings to enhance vegeative diversity. Close and reseed user-created roads and trails.

Vegetation management (other than forest products)Fuels managementWatershed managementWildlife, fish, rare plants
Scoping Start
02/07/2008
Comment Period
02/15/2008
Decision
07/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Rangeland Vegetation Improvements; Travel Management
Sabie Habitat Improvement ProjectDecision Signed Date: 07/21/2008 Legal Notice Date: 07/26/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S, R4W, Sections 27-34, and T10S, R4W, Sections 5-8, SLM, Tooele County, Utah
Decision Memo · Pleasant Grove Ranger District · updated 4/6/2011
Silver Lake Tract, American Fork Canyon · Utah, Utah

Conduct a Forest Plan consistency and permit compliance review and issue 13 recreation residence permits in Silver Lake Tract.

Recreation managementSpecial use management
Scoping Start
03/27/2008
Decision
10/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Joseph McFarlane · jmcfarlane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Tibble Fork and Silver Lake Recreation Residence TractsDecision Signed Date: 10/05/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Environmental Assessment · Pleasant Grove Ranger District · updated 4/6/2011
Lower Provo Canyon area, above Springdell, UT · Utah, Utah

Use prescribed fire and mechanical treatment (bullhog/masticator) to treat 30-60 percent of the oak/maple.

Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
10/16/2008
Comment Period
10/16/2008
Decision
01/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels)
Springdell South Fuels TreatmentDecision Signed Date: 01/07/2010 Legal Notice Date: 01/11/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT6S, R3E, Sections 4, 5, 7-10, 16-18, 21-23, 26 and 27
Decision Memo · Pleasant Grove Ranger District · updated 4/6/2011
Tibble Fork Recreation Residence Tract, American Fork Canyon · Utah, Utah

Conduct a Forest Plan consistency and permit compliance review and issue 38 recration residence permits in the Tibble Fork Tract.

Special use managementRecreation management
Scoping Start
03/27/2008
Decision
10/2008 (Estimated)
Implementation
12/2008 (Estimated)
Project documents
Joseph McFarlane · jmcfarlane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Tibble Fork and Silver Lake Recreation Residence TractsDecision Signed Date: 10/05/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Environmental Assessment · Spanish Fork Ranger District · updated 4/6/2011
Spanish Fork Ranger District - Vernon and Sheep Rock Management Units · Tooele, Utah

Improve sage grouse & deer habitat.Mechanically treat juniper with bullhog/masticator (approx. 2,500 acres), lop & scatter (approx. 5700 acres). Use prescribed fire following mechanical treatment. Close & rehab up to 24 miles user-created roads/trail

Wildlife, fish, rare plantsFuels management
Scoping Start
04/05/2010
Comment Period
04/05/2010
Decision
09/2010 (Estimated)
Implementation
03/2011 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S R7W sections 10, 11, 14, 15, 22, 23, 25-27 and 36; T9S R6W sections 4 - 9, 16, 22, 23, 25-27, 31, 35, and 36; T9S R5W sections 28 and 33; T10S R7W 1, 12, 13 and 24; T10S R6W sections 6, 7 and 18;
Decision Memo · Ogden Ranger District · updated 3/21/2011
Woodruff-Dairy Ridge Cattle Allotment · Rich, Utah

Proposal is to install a head box and water pipeline at Dip Hollow spring and replace the exisitng head box and pipeline at Sprout Spring. Project will aid in water and cattle distribution across the Woodruff-Dairy Ridge Allotment.

Grazing management
Scoping Start
10/26/2010
Decision
03/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Dip Hollow - Sprout Spring Decision MemoDecision Signed Date: 03/21/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT8N R4E Sections 2-3, 11-12
Decision Memo · Logan Ranger District · updated 3/21/2011
Logan River at the Pine Bluff Bridge · Cache, Utah

Proposal would place large rocks along the existing rock reinforcement structure to further stabilize the deteriorating streambank. Rocks will be placed during low water among existing rock and vegetation.

Wildlife, fish, rare plants
Scoping Start
10/20/2010
Decision
03/2011 (Estimated)
Implementation
08/2011 (Estimated)
Project documents
Kelli Taylor · ktaylor02@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Pine Bluff Bank StabilizationDecision Signed Date: 03/21/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionSection 24, T12N, R2E, SL B&M
Environmental Assessment · Pleasant Grove Ranger District · updated 2/15/2011
Lone Peak Wilderness Area · Utah, Utah

Stabilize the Silver Lake dam to reduce environmental and public safety hazards in the event of a dam failure. The proposed action includes drilling and blasting to lower the lake's spillway by 5-8 feet and plugging the outlet.

Facility management
Scoping Start
01/19/2010
Comment Period
01/19/2010
Decision
02/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Sylvia Clark · sgclark@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
DN and FONSI Silver Lake Dam StabilizationDecision Signed Date: 07/21/2010 (Reversed in Appeal (215)) Legal Notice Date: 07/31/2010
Silver Lake Stabilization Decision NoticeDecision Signed Date: 02/07/2011 Legal Notice Date: 02/11/2011
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT. 3 S., R. 2 E., Sec. 36
Decision Memo · Ogden Ranger District · updated 12/17/2010
Hdden Spring on the Woodruff-Dairy Ridge Cattle Allotment, east of Ogden, Utah · Rich, Utah

Project includes construction of a riparian protection fence, replacement of the existing headbox, and placement of a pipeline and trough away from the spring source, at Hidden Spring on the Woodruff-Dairy Ridge Cattle Allotment.

Grazing management
Scoping Start
07/12/2010
Decision
10/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Hidden Spring Range Improvement DMDecision Signed Date: 10/15/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT8N, R4E, Section 11
Environmental Assessment · Salt Lake Ranger District · updated 12/17/2010
Holladay (3000 East 6200 South) and Cottonwood Heights (3000 East 6801 South) · Salt Lake, Utah

A land exchange involving 4.17 acres of National Forest system land in Holladay for about 2 acres of non-federal land in Cottonwood Heights. Both properties are urban land. An office building, work center & warehouse would be located on the site,

Facility management
Scoping Start
06/21/2008
Comment Period
06/21/2008
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionSection 23, T.2 S., T. 1S.
Decision Memo · Salt Lake Ranger District · updated 12/17/2010
Moonbeam Base Area at Solitude Mountain Resort, Big Cottonwood Canyon · Salt Lake, Utah

Solitude Mountain Resort is proposing to place a “magic carpet” style conveyor lift adjacent to (north of) the Link lift and the Moonbeam base lodge.

Recreation managementSpecial use management
Scoping Start
05/17/2010
Decision
08/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Pollyanna Popola · ppopola@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Wilderness Management
DM fo Magic Carpet Conveyor Lift at Solitude Mountain ResortDecision Signed Date: 08/30/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R2E, Sec. 27
Decision Memo · Salt Lake Ranger District · updated 12/16/2010
near Bountiful, Utah. Areas include Mueller Park, Holbrook Canyon, and Ward Canyon Road. · Salt Lake, Utah

Treat vegetation using hand tools along ~ 12 miles of system trail and ~ 6.6 miles of system roads.

Recreation managementFuels management
Scoping Start
08/26/2010
Decision
10/2010 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Eric LaMalfa · elamalfa@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Trail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Pleasant Grove Ranger District · updated 12/16/2010
Pleasant Grove Ranger District, Forest Roads 085, 007, 008, 114, 198, and State Rte 92 · Utah, Utah

Homestead Snowmobiling, now DBA Lofty Peaks, has a 5-year permit to guide snowmobile users on the Pleasant Grove Ranger District. No changes to permit area.

Special use management
Scoping Start
06/18/2010
Decision
12/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
Cheryl Butler · cgbutler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Homestead Snowmobile PermitDecision Signed Date: 12/08/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Decision Memo · Ogden Ranger District · updated 12/16/2010
Generally northeast of Bug Lake in Rich County, Utah · Rich, Utah

Proposal consists of authorizing a special use permit to refurbish and use an existing unauthorized 1900-foot segment of road across National Forest to access a private parcel of land.Road will be gated and motorized use restricted to the landowner.

Special use management
Scoping Start
08/05/2009
Decision
11/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
R Kent Call Private Road Permit DMDecision Signed Date: 11/18/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionSection 8, T11N, R5E, SLBM
Decision Memo · Pleasant Grove Ranger District · updated 12/16/2010
Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah · Utah, Utah

Reissue special use permit to UDOT for management of weather stations.

Special use management
Scoping Start
06/18/2010
Comment Period
06/18/2010
Decision
07/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Sylvia Clark · sgclark@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionCascade Peak T 6 S,R 3 E Section 10; Bunnells T 6 S, R 3 E Section 11; Deer Creek Dam T 5 S R 4 E, Section 10; Aspen Grove T 5 S R
Decision Memo · Ogden Ranger District · updated 12/16/2010
Wheeler Creek Drainage east of Ogden, Utah · Weber, Utah

Project includes trail maintenance and reconstruction, foot bridge replacement(s), and a shaded fuel break along trails in the Wheeler Creek drainage for fire protection and to reduce erosion and improve watershed conditions.

Recreation management
Scoping Start
07/01/2010
Decision
10/2010 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
Wheeler Creek Watershed Improvements to Trails and RoadsDecision Signed Date: 10/14/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Logan Ranger District · updated 10/15/2010
Three Mile Cattle Allotment, northeast of Wellsville Mountains · Cache, Utah

Project includes construction of a riparian protection fence, spring headbox, pipeline, and trough(s) at two springs located on the Three Mile Cattle Allotment.

Grazing management
Scoping Start
07/12/2010
Decision
10/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Three Mile Range Improvement DMDecision Signed Date: 10/13/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT11 N, R2W, Section 1 and T12N, R2W, Sections 35,26
Environmental Assessment · Salt Lake Ranger District · updated 10/5/2010
Sounthern End of Mile High Dr., Olympus Covew, Salt Lake County · Salt Lake, Utah

The Forest proposes to sell approximately 5.75 acres of federal land managed by the Uinta-Wasatch-Cache National Forest to fund construction of a new office building for the Salt Lake Ranger District.

Land ownership management
Scoping Start
08/13/2009
Comment Period
08/13/2009
Decision
09/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
Catherine Kahlow · ckahlow@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Use Adjustments
Mt Olympus Administrative Site ConveyanceDecision Signed Date: 09/24/2010 Legal Notice Date: 10/01/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R1E, Sec. 11
Environmental Assessment · Spanish Fork Ranger District · updated 9/30/2010
Benmore Grazing Allotment · Tooele, Utah

Reauthorize grazing on the Benmore Allotment

Grazing management
Scoping Start
04/23/2010
Comment Period
04/23/2010
Decision
09/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Authorizations
Benmore Allotment GrazingDecision Signed Date: 09/28/2010 Legal Notice Date: 09/30/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT 9 S, R 6 W, Sections 12, 25, 36; T 9 S, R 5 W, Sections 4 - 10, 17 - 20, 28 - 33; T 10 S, R 6 W, Sections 1, 12, 13, 24; T 10 S, R 5 W, Sections 5 -9, 16, 20
Decision Memo · Salt Lake Ranger District · updated 9/30/2010
Gad Valley at Snowbird Ski and Summer Resort, Little Cottonwood Canyon · Salt Lake, Utah

Snowbird is proposing to construct phase 2 of its mountain bike trail system.The proposed trail would be roughly 1.5 miles long, up to 6 feet wide, with a grade and level of difficulty appropriate for beginner/intermediate riders.

Special use managementRecreation management
Scoping Start
05/17/2010
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DM for Single-Track Mountain Bike Trail Phase 2 Snowbird Ski and Summer ResDecision Signed Date: 07/30/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R2E
Environmental Assessment · Heber-Kamas Ranger District · updated 9/30/2010
Heber-Kamas Ranger District · Wasatch, Utah

Authorize grazing on the Little West Fork Duchesne, Little Sand Creek, Red Creek Mountain, and Pass Creek Sheep Allotments.

Grazing management
Scoping Start
12/03/2009
Comment Period
12/03/2009
Decision
09/2010 (Estimated)
Implementation
01/2011 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT1 N, R 11 W, S34-36; T 1 N, R 10 W, S 25-36; T1 S, R 12 W, S 12, 13; T1S, R11W, S1-22; T1S, R10W, S 1-12, 16 USM
Decision Memo · Ogden Ranger District · updated 9/29/2010
Near Forest boundary at 46th Street in Ogden, Utah · Weber, Utah

Project includes replacement of an existing Ogden City waterline from the water tank to the Forest boundary. Waterline will follow the roadway. Area affected is about 1 acre.

Special use management
Scoping Start
07/01/2010
Decision
09/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT5N, R1W, Section 11
Decision Memo · Pleasant Grove Ranger District · updated 9/29/2010
Grove Creek Trailhead, Pleasant Grove, UT · Utah, Utah

The City of Pleasant Grove proposes to divert water from the Pleasant Grove Irrigation Company's existing pipeline, located at the Grove Creek Trailhead, into their existing irrigation system.

Special use management
Scoping Start
05/07/2010
Decision
05/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Sylvia Clark · sgclark@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT5S R2E, SW 1/4 Sec. 15, NW 1/4 Sec. 22 SLBM
Decision Memo · Ogden Ranger District · updated 9/29/2010
Snowbasin Ski Area · Weber, Utah

Proposal includes two projects at Snowbasin Ski Area: 1) installation of an additional tower between two existing towers on the Needles Gondola; and 2) clearing of trees and slope grading on a short connector trail between School Hill and Becker Face

Special use management
Scoping Start
07/01/2010
Decision
08/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Snowbasin Gondola tower and School Hill Connector RunDecision Signed Date: 08/02/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT6N, R1E, Section 32
Decision Memo · Spanish Fork Ranger District · updated 9/27/2010
Nebo Unit · Utah, Utah

Close approximately 25 miles of user-created roads and trails in the Nebo Unit to protect deer and elk winter range;will use barricades, scarify to break up compaction, place water bars to minimize erosion, and post signs.

Wildlife, fish, rare plants
Scoping Start
04/08/2008
Decision
07/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Foothill Restoration ProjectDecision Signed Date: 07/26/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT 9 S, R 2 E, Sections 21, 28, 32, 33; T 10 S, R 2 E, Sections 4, 5, 6, 7, 8, 17, 18, 19, 20; T 10 S, R 1 E, Sections 12, 13, 24
Environmental Assessment · Evanston-Mountain View RD · updated 9/23/2010
Located on the north slope of the Uinta Mtns from just below Widdop Mountain on the north end to Bull Park on the south end · Summit, Utah

The Evanston-Mountain View and Flaming Gorge Ranger Districts are proposing to authorize continued grazing on the Burnt Fork Cattle and Horse (C&H), Beaver Creek C&H, and Hickerson Park Allotments.

Grazing management
Scoping Start
03/17/2010
Comment Period
03/17/2010
Decision
09/2010 (Estimated)
Implementation
05/2011 (Estimated)
Project documents
Justin McConkey · jmcconkey@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Burnt Fork, Beaver Creek, Hickerson Park Allotments DN/FONSIDecision Signed Date: 09/14/2010 Legal Notice Date: 09/22/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSections in R15E, R16E, R17E, T3N, T2N Salt Lake Meridian
Decision Memo · Evanston-Mountain View RD · updated 9/22/2010
Blacks Fork watershed · Summit, Utah

Proposal to use a combination of mechanical treatments on approximately 75 acres of mountain big sagebrush. Note: Name changed from East Fork Blacks Fork Sagebrush Treatment to more accurately reflect location.

Wildlife, fish, rare plants
Scoping Start
01/15/2010
Decision
09/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Dan Garcia de la Cadena · dgarciadelacadena@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
Blacks Fork Sagebrush Treatment DMDecision Signed Date: 09/17/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionT 3 N, R 12 E, sec. 4 & 21
Decision Memo · Evanston-Mountain View RD · updated 8/12/2010
Lower Mill Creek, near the junction of the Mill Creek Rd. and the North Slope Rd. and the area around Mill Creek Guard Station · Summit, Utah

A small commercial timber sale will be used to remove merchantable dead trees that have been infested and killed by the mountain pine beetle. ~200 acres will be treated to reduce hazard trees in a highly recreated area.

Vegetation management (other than forest products)
Scoping Start
01/12/2010
Decision
08/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Kelly Mumm · krmumm@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
Guard Station Salvage DMDecision Signed Date: 08/10/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSections 7 and 8, T2N, R11E SLM
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 7/29/2010
Albion Basin · Salt Lake, Utah

Previous decision; inadvertently posted to Planning Page instead of Project Page

Recreation management
Scoping Start
12/05/2005
Comment Period
07/19/2006
Decision
03/2007 (Estimated)
Implementation
04/2007 (Estimated)
Project documents
Dan Garcia de la Cadena · sscheid@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Environmental Assessment · Logan Ranger District · updated 7/21/2010
Franklin Basin, northeast of Logan, Utah · Cache, Utah

Proposal is to authorize grazing on the Franklin Allotment at a level and in a manner consistent with direction in the WCNF Revised Forest Plan, including adaptive management to improve unacceptable conditions where they exist.

Grazing management
Scoping Start
06/04/2008
Comment Period
03/26/2010
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Franklin Basin Cattle AllotmentDecision Signed Date: 07/21/2010 Legal Notice Date: 07/21/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Logan Ranger District · updated 7/12/2010
Elk Valley Sheep Allotment, southeast of Logan, Utah · Cache, Utah

Proposal would install a solar pump, collection box, and new water pipeline to provide water to adjacent areas on the Elk Valley Allotment.

Grazing management
Scoping Start
08/06/2008
Decision
07/2010 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Ann Robins · arobins@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
Elk Valley Sheep Allotment Range ImprovementsDecision Signed Date: 07/12/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N, R3E, Section 28
Environmental Assessment · Salt Lake Ranger District · updated 6/29/2010
City of Holladay · Salt Lake, Utah

The Forest Service is proposing to sell about 4.26 acres of vacant land southeast of the intersection of 6200 South and 3000 East in Holladay. The Forest decided that the 6200 South Administrative Site was excess to its needs and could be sold.

Land ownership management
Scoping Start
03/20/2010
Comment Period
03/20/2010
Decision
06/2010 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Catherine Kahlow · ckahlow@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityLand Use Adjustments
6200 South Administrative Site Property SaleDecision Signed Date: 06/17/2010 Legal Notice Date: 06/22/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT. 2 S., R. 1 E.,Section 23
Decision Memo · Pleasant Grove Ranger District · updated 6/29/2010
Pleasant Grove Ranger District. STATE - Utah. COUNTY - Utah LEGAL - T 4 S, R 3 E, Section 31 · Utah, Utah

Add a water tank, buried propane tank, shower facility, and pavilion to the existing infrastructure.

Recreation management
Scoping Start
02/26/2010
Decision
04/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Joseph McFarlane · jmcfarlane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Mutual Dell Organizational Camp Decision MemoDecision Signed Date: 04/26/2010 Legal Notice Date: 04/26/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT 4 S, R 3 E, Section 31
Environmental Assessment · Heber-Kamas Ranger District · updated 6/29/2010
Mirror Lake Highway from Coop Creek to east of Soapstone Campground · Summit, Utah

Restore ponderosa pine stand and reduce fuel loading on 3,900 acre. Fall dead hazard trees within 150' of Mirror Lake Highway on both sides of road adjacent to prescribed fire area.

Vegetation management (other than forest products)Fuels management
Scoping Start
07/31/2009
Comment Period
07/31/2009
Decision
04/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT2S, R7E, Sections 22,23,25,26,27,35,36; T2S, R8E, Section 29, 30, 31, 32; T3S, R7E, Section 1; T3S, R8E, Section 3, 4, 5, 6, 9, 10
Decision Memo · Ogden Ranger District · updated 6/29/2010
Red Spur Mountain · Cache, Utah

Proposal would issue a special use permit for installation of a non-commercial communication site cooperatively used by federal, state, county, and city governments. Facility would include a small building, tower, and solar panel.

Special use management
Scoping Start
05/05/2010
Decision
06/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
Evelyn Sibbernsen · esibbernsen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
UCAN Red Spur Communication Site DMDecision Signed Date: 06/28/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT10N, R5E, Section 5
Decision Memo · Logan Ranger District · updated 6/21/2010
Right Hand Fork Logan River · Cache, Utah

Proposal is to reinforce natural fish barrier in the Right Hand Fork of the Logan River with native materials (rock) to prevent reinvasion of non-native brown trout following DWR's introduction of native Bonneville cutthroat trout in this area.

Wildlife, fish, rare plants
Scoping Start
05/05/2010
Decision
06/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N R3E, Section 18
Environmental Assessment · Salt Lake Ranger District · updated 4/2/2010
Salt Lake County · Salt Lake, Utah

To construct and use approximately 24 miles of trail along the Lake Bonneville shoreline in Salt Lake County, approximately 8 miles of trail on National Forest System lands

Recreation management
Scoping Start
03/17/2006
Comment Period
07/14/2007
Decision
03/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management
Bonneville Shoreline Trail Salt Lake County Alignment DNDecision Signed Date: 03/29/2010 Legal Notice Date: 04/02/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Decision Memo · Ogden Ranger District · updated 3/24/2010
Wheeler Creek drainage · Weber, Utah

Proposal is to construct a 2.5 mile hiking trail (non-motorized) in the Wheeler Creek area.

Recreation management
Scoping Start
02/16/2007
Decision
03/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionSections 20 and 21, T6N, R1E Salt Lake BM
Decision Memo · Ogden Ranger District · updated 3/23/2010
Dairy Ridge area east of Ogden, Utah · Rich, Utah

Proposal would treat approximately 600 acres of sagebrush in the Dairy Ridge area to restore and sustain the structural mosaic of age class diversity in sagebrush communities

Vegetation management (other than forest products)
Scoping Start
04/24/2009
Comment Period
04/24/2009
Decision
03/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Paul Flood · pflood@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Evanston-Mountain View RD · updated 3/12/2010
Either adjacent to current RAWS station east of the crew's quarters or within the north horse pasture just north of the corrals at the Bear River Ranger Station · Summit, Utah

The National Oceanic and Atmospheric Administration (NOAA) is proposing to install long-term weather monitoring equipment near the Bear River Ranger Station.

Research
Scoping Start
01/11/2010
Decision
03/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Bernard Asay · basay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
NOAA Weather Equipment Installation DMDecision Signed Date: 03/09/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNE1/4, NE1/4, Sec. 29, T2N R10E SLM
Decision Memo · Evanston-Mountain View RD · updated 3/10/2010
Christmas Meadows Summer Home Area · Summit, Utah

Proposal to construct a 16 x 26 foot addition to an existing recreational residence in the Christmas Meadows Summer Home Area and move an existing storage shed to the southeast of an existing outhouse.

Special use management
Scoping Start
01/11/2010
Decision
03/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Bernard Asay · basay@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Arbuckle Recreational Residence Addition and Storage Shed Move DMDecision Signed Date: 03/09/2010
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSec. 10 and 15 T1N R10E SLM
Decision Memo · Evanston-Mountain View RD · updated 12/22/2009
This project is located on the Mountain View Ranger District approximately 26 miles southeast of Mountain View, Wyoming. · Summit, Utah

Proposal to burn aspen and sagebrush dominated plant communities to maintain age class/habitat diversity & forage productivity for big game and sagebrush-obligate species and reduce fuel loads in areas adjacent to infrastructure and forest resources.

Wildlife, fish, rare plantsFuels management
Scoping Start
06/09/2009
Comment Period
06/09/2009
Decision
12/2009 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Dan Garcia de la Cadena · dgarciadelacadena@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
Hoop Lake Sage Wildlife Habitat Improvement ProjectDecision Signed Date: 12/17/2009 Legal Notice Date: 12/22/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSLC meridian, Township 2N, Range 16E, within portions of sections 3, 4, 5, 9, 10 and 11
Decision Memo · Logan Ranger District · updated 12/17/2009
Card Canyon east of Logan, Utah · Cache, Utah

Proposal is to renew the expired special use permit for the Cache Valley Archery Club Target Range. The archery/target range consists of 20 acres and includes an archery course, parking, a small building, a picnic area, and bulletin board.

Special use management
Scoping Start
08/05/2009
Decision
09/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Connie McCaughey · cmccaughey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N, R3E, Section 30
Decision Memo · Logan Ranger District · updated 12/17/2009
Peter Sinks, 30 miles east of Logan, Utah · Cache, Utah

Utah Climate Center operates a weather sensor tower in Peter Sinks. The proposal is to install an additional tower nearby to facilitate transmitting signals to Logan Peak for real time monitoring of winter conditions.

Special use management
Scoping Start
08/05/2009
Decision
09/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Ronald Vance · rvance@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT14N, R4E, Section 32
Decision Memo · Ogden Ranger District · updated 12/17/2009
Powder Mountain Ski Resort area · Weber, Utah

Proposal is to issue a new SUP to replace expired permit. SUP is for operation and maintenance of an 8-inch sanitary sewer outfall line (.6 miles located on NFS land) to serve the Powder Mountain Ski Resort area.

Special use management
Scoping Start
01/23/2009
Decision
08/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionSection 12, T7N, R1E, Salt Lake BM
Decision Memo · Ogden Ranger District · updated 12/17/2009
Summit of North Ogden Divide adjacent to County Highway 162 · Weber, Utah

Project would authorize a new SUP to the Sons of Utah Pioneers for operation and maintenance of the existing memorial monument on North Ogden Pass adjacent to County Highway 162. The current permit has expired.

Special use management
Scoping Start
01/23/2009
Decision
08/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionSection 25, T7N, R1W, Salt Lake BM
Decision Memo · Evanston-Mountain View RD · updated 12/15/2009
Hovarka and Hilliard Canals · Summit, Utah

Proposal to install head gates and fish screens at the Hilliard and Hovarka irrigation diversions on the East Fork of the Bear River to eliminate fish entrainment, reducing mortality rates for the conservation Bonneville cutthroat trout population.

Wildlife, fish, rare plants
Scoping Start
05/18/2009
Decision
12/2009 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
Paul Chase · pchase@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSections 16 & 22 R8W, T2N Uinta
Decision Memo · Evanston-Mountain View RD · updated 12/15/2009
Stateline, East and West Marsh Lake, and Bridger Lake Campgrounds and Bridger Lake Administrative Site and within 100 feet of Forest Road 072 · Summit, Utah

Proposal to remove the dying and dead hazard trees, as well as beetle-infested logs, from the Stateline (13 acres), Marsh Lake (30 acres) and Bridger Lake (18 acres) Campgrounds and Bridger Lake Administrative Site (30 acres).

Facility management
Scoping Start
09/03/2009
Decision
10/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Amy Barker · abarker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Timber Sales (Salvage)
Tree RemovalDecision Signed Date: 10/20/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSections 17, 20, 29, 30, 31, 32 in R14E, T3N
Environmental Assessment · Heber-Kamas Ranger District · updated 12/11/2009
Kamas Ranger District south of Alpine Acres, Utah near the confluence of the Middle and Main Forks of the Weber River · Summit, Utah

Create a shaded fuel break; thinning trees and pile burning.

Fuels management
Scoping Start
09/02/2008
Objection Period Start
03/26/2009
Decision
05/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT1S, R8E, S 1 & ; T1N, R8E, 35 & 36. SLM
Environmental Assessment · Heber-Kamas Ranger District · updated 12/11/2009
Strawberry River segment from Doe Knoll to Willow Creek · Wasatch, Utah

In coordination with UDWR, restore natural channel, improve fish migration, stabilize banks, and re-establish riparian vegetation. Rock and log vanes, root wads, and other structures will be used to create a properly functioning river system.

Wildlife, fish, rare plantsWatershed management
Scoping Start
10/25/2007
Comment Period
10/25/2007
Decision
03/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
Nathan Berg · nathanberg@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
Strawberry River Fish Habitat Phase IIIDecision Signed Date: 03/06/2008 Legal Notice Date: 03/09/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Environmental Assessment · Evanston-Mountain View RD · updated 10/6/2009
The allotment is located near the western end of the north slope of the Uinta Mountains and covers approximately 26,000 acres. · Summit, Utah

The Evanston-Mountain View Ranger District is proposing to authorize continued sheep grazing on the Stillwater Allotment following current Forest Plan Standards and Guidelines.

Grazing management
Scoping Start
12/05/2008
Comment Period
08/25/2009
Decision
09/2009 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
Amy Barker · abarker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations
Stillwater Sheep and Goat (S&G) AllotmentDecision Signed Date: 09/30/2009 Legal Notice Date: 10/02/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Environmental Assessment · Ogden Ranger District · updated 10/5/2009
Monte Cristo area about 30 miles northeast of Ogden · Cache; Rich; Weber, Utah

Proposal is to reauthorize grazing on 4 sheep allotments (Blake Hollow, Bountiful, Dry Bread, and Little Monte) using Forest Plan standards and guidelines to manage use.

Grazing management
Scoping Start
03/05/2009
Comment Period
07/03/2009
Decision
09/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Monte Cristo Area Sheep Allotments Decision NoticeDecision Signed Date: 09/30/2009 Legal Notice Date: 10/03/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Environmental Assessment · Ogden Ranger District · updated 10/5/2009
Approximately 30 miles northeast of Ogden, Utah · Rich, Utah

Proposal is to authorize continued grazing of cattle on the Woodruff and Dairy Ridge allotments at a level consistent with direction in the Forest Plan and other applicable laws and regulations.

Grazing management
Scoping Start
05/13/2009
Comment Period
05/13/2009
Decision
09/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Chandler Mundy · cmundy@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management
Woodruff and Dairy Ridge Cattle Allotments Decision NoticeDecision Signed Date: 09/30/2009 Legal Notice Date: 10/03/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Spanish Fork Ranger District · updated 10/2/2009
Vernon Management Area · Tooele, Utah

Treat approximately 345 acres of sagebrush with a Bullhog/masticator, lop and scatter approximately 630 acres of pinyon/juniper, obliterate 2 miles of nonsystem roads and trails. Seed with native grasses and forbs.

Wildlife, fish, rare plantsFuels management
Scoping Start
07/09/2009
Comment Period
07/09/2009
Decision
09/2009 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionTownship 9 South, Range 4 West, Sections 30 and 31, and Township 9 South, Range 5 West, Sections 25 and 36.
Environmental Impact Statement · Evanston-Mountain View RD · updated 10/2/2009
North slope of the Uinta Mountains in northeast Utah · Summit, Utah

Develop an allotment management plan and authorize grazing

Grazing management
NOI in Federal Register
03/26/2003
DEIS NOA in Federal Register
08/19/2005
FEIS NOA in Federal Register
09/29/2006
Decision
09/2009 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Justin McConkey · jmcconkey@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Allotment Management; Grazing Authorizations
West Fork Blacks Fork Allotment Management PlanDecision Signed Date: 09/30/2009 Legal Notice Date: 10/02/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Environmental Assessment · Evanston-Mountain View RD · updated 9/29/2009
Where the outlet to Fish Lake crosses the West Fork Blacks Fork Road. · Summit, Utah

Proposal to relocate approximately 300 feet of the West Fork Blacks Fork Road to allow the installation of a culvert where the outlet to Fish Lake crosses the road in the northwest 1/4 of Section 7 T2N R12E. To eliminate a ford and reduce sediment.

Road management
Scoping Start
06/09/2009
Comment Period
06/09/2009
Decision
09/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
Amy Barker · abarker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNorthwest quarter of Section 7 T2N R12E.
Environmental Assessment · Evanston-Mountain View RD · updated 9/29/2009
Lower Mill City Creek Area, north of the Whitney Road (032) near the junction with the Mill City Creek Road (109) · Summit, Utah

Proposal to develop a trailhead that would have a vault toilet, bulletin boards, and a system of designed dispersed camping locations including graveled roads and parking spurs. Located in an area that has been used many years for dispersed camping.

Recreation management
Scoping Start
06/09/2009
Comment Period
06/09/2009
Decision
09/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
Amy Barker · abarker@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Dispersed Recreation Mgmt.
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionNE  Section 1 R9E T1N SLM
Decision Memo · Salt Lake Ranger District · updated 9/28/2009
Upper Big Cottonwood Canyon near the Brighton Circle · Salt Lake, Utah

Brighton Properties needs to amend their permit to replace an existing 2 inch diameter steel water transmission line with 3 inch diameter HDPE pipe, from the spring box to their water storage tank.Total length is about 2400 feet.

Special use management
Scoping Start
10/24/2008
Decision
08/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Brighton Properties Water Transmission Line Uprade & Permit RenewalDecision Signed Date: 08/13/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E, T2S, Sec 35
Environmental Assessment · Heber-Kamas Ranger District · updated 9/28/2009
Heber-Kamas Ranger District, Duchesne River Area · Duchesne, Utah

Authorize grazing on the Curry cattle allotment.

Grazing management
Scoping Start
12/19/2008
Comment Period
12/19/2008
Decision
09/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Special AuthorityGrazing, Rescissions Act Of 1995
Notice and Comment Regulation215
Project ActivityGrazing Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT3N, R9W, S12, 13, 14, 22, 27, 34
Decision Memo · Salt Lake Ranger District · updated 9/28/2009
Big Cottonwood Canyon, Salt Lake County · Salt Lake, Utah

The U of U proposes to conduct a 3-year study, using a combination of observational and manipulative field experiments combined with modeling and synthesis three conifer forests spanning an elevation gradient in Big Cottonwood Canyon.

ResearchSpecial use management
Scoping Start
05/04/2009
Decision
09/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Research And Development
University of Utah Research ProposalDecision Signed Date: 09/03/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R2E, Sec.s 13 & 14
Decision Memo · Ogden Ranger District · updated 9/10/2009
Pineview Reservoir, east of Ogden, Utah · Weber, Utah

Proposal would remove sand from a seasonally inundated area of Pineview Reservoir to be used to line a pipeline supplying water to a campground.Gravel would be removed from an old abandoned road to improve area roads. No vegetation will be removed.

Road management
Scoping Start
08/05/2009
Decision
09/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Rick Vallejos · rvallejos@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Sand and Gravel removal at Pineview ReservoirDecision Signed Date: 09/09/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Logan Ranger District · updated 8/6/2009
Bunchgrass drainage in Logan Canyon, east of Logan, Utah · Cache, Utah

Proposal is to re-issue a special use permit to the Nordic United Ski Club for a 10-mile cross-country ski race in the vicinity of the Bunchgrass yurt. Due to the steepness of the terrain, approximately 20 participants are expected.

Special use management
Scoping Start
05/20/2009
Decision
08/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
Connie McCaughey · cmccaughey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Crowbar Cross-country Ski Race SUPDecision Signed Date: 08/06/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Logan Ranger District · updated 8/6/2009
Providence Canyon, southeast of Logan Utah · Cache, Utah

Proposal is to construct a 1.7 mile stretch of non-motorized trail along the corridor of the Providence Canyon road.

Recreation management
Scoping Start
05/20/2009
Decision
08/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Connie McCaughey · cmccaughey@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Providence Canyon Non-Motorized Trail ConstructionDecision Signed Date: 08/06/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Benmore Pastures Completed
Decision Memo · Spanish Fork Ranger District · updated 7/27/2009
Benmore Pastures in the Vernon Management Unit · Tooele, Utah

Treat approximately 1000 acres of sagebrush with a Dixie Harrow - Obliterate 1 mile of non-system roads and trails and seed these with native grasses and forbs.

Fuels managementWildlife, fish, rare plants
Scoping Start
10/06/2008
Comment Period
10/06/2008
Decision
07/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Karen Hartman · khartman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Benmore Pastures Habitat ImprovementDecision Signed Date: 07/22/2009 Legal Notice Date: 07/25/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S, R5W, Sections 4-8, and 17-20
Strongs Peak Fuels Completed
Environmental Assessment · Ogden Ranger District · updated 7/22/2009
Bonnevile Shoreline trail between Stongs and Beus Canyon · Weber, Utah

Thinning of Oakbrush vegetation along sections of the Bonneville Shoreline trail in between Strongs and Beus Canyon.

Fuels management
Scoping Start
07/16/2008
Objection Period Start
03/14/2009
Decision
07/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
Eric LaMalfa · elamalfa@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
Strongs Peak Fuels TreatmentDecision Signed Date: 07/17/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Decision Memo · Salt Lake Ranger District · updated 6/29/2009
Alta Ski Lifts, Little Cottonwood Canyon · Salt Lake, Utah

Alta is proposing to improve their snowmaking system by finishing it as a loop and to add a spur that would allow them to make snow on the Sugarbowl run off the top of Sugarloaf. The total disturbance area would be approximately 2.6 acres.

Special use managementRecreation management
Scoping Start
10/24/2008
Decision
06/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Special Use Authorizations
Collins/Sugarloaf Loop Snowmaking and Cross Tow GradingDecision Signed Date: 06/22/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR2E, T2S, Sec. 9
Decision Memo · Salt Lake Ranger District · updated 6/29/2009
Farmington, UT · Salt Lake, Utah

Benchland is proposing to construct a 20 acre-foot open top concrete storage reservoir with associated water lines on NFS land, located generally east of the right-of-way for the Weber Basin Water Conservancy Districts aqueduct

Special use management
Scoping Start
10/24/2008
Decision
06/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Benchland Water District - Shepard Creek ReservoirDecision Signed Date: 06/12/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land Descriptionwest ? corner of Section 7, T3N, R1E
Decision Memo · Salt Lake Ranger District · updated 6/29/2009
Brighton Ski Area, Big Cottonwood Canyon · Salt Lake, Utah

Brighton would like to extend a line down the run to a drainage channel in order to make snow in this area and drain the system. Total length of the extension is approximately 1,000.

Special use managementRecreation management
Scoping Start
05/09/2008
Decision
06/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Thunder Road Snowmaking Extension - Brighton ResortDecision Signed Date: 06/22/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E, T2S, Sec. 35
Environmental Assessment · Ogden Ranger District · updated 6/29/2009
Road and water storage tank are located just east of Ogden City limits at appx. 28th st. · Weber, Utah

Authorizes Ogden City to construct, operate, and maintain an adminitrative access road to a 300,000 gal. water storage tank, which they are constructing on Private Land. The access road will be appx. 15 ft. wide and will cross appx. 700 ft. NFS Land.

Special use management
Scoping Start
01/23/2009
Comment Period
01/30/2009
Decision
05/2009 (Estimated)
Implementation
05/2009 (Estimated)
Project documents
Chip Sibbernsen · csibbernsen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land Descriptionin SW quarter of NW quarter sec. 35, T6N, R1W, SLBM
Decision Memo · Salt Lake Ranger District · updated 6/29/2009
Snowbird Ski & Summer Resort, Little Cottonwood Canyon · Salt Lake, Utah

Snowbird Ski and Summer Resort is proposing to construct and operate a lower ability level mountain bike trail near the Big Emma ski run - approx 1.25 miles

Recreation managementSpecial use management
Scoping Start
10/24/2008
Decision
06/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.; Special Use Authorizations
Decision memo For Single-track mountain bike trail Snowbird Ski and SummerDecision Signed Date: 06/15/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR2E, T2S, Sec. 6
Decision Memo · Salt Lake Ranger District · updated 6/29/2009
Solitude Mountain Resort, Big Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

Ski run and terrain modofications in the Moonbeam Area

Special use management
Scoping Start
05/04/2009
Comment Period
05/04/2009
Decision
06/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
DECISION MEMO for Ski Run Modifications at Solitude Mountain ResortDecision Signed Date: 06/22/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT 2 S, R 3 E, Sec. 27
Decision Memo · Ogden Ranger District · updated 6/5/2009
Public Grove area near the Avon-Liberty Divide road · Cache, Utah

Proposal to realign up to 1.5 miles of motorized ATV trail on and around an existing seasonally-open route in the Public Grove area near the Avon-Liberty Divide road.

Recreation managementRoad management
Scoping Start
03/20/2008
Comment Period
03/22/2009
Decision
05/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Juan Barrientez · jbarrientez@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTrail Management; Travel Management
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionSec. 17, 18, and 20, T. 8 N, R. 1 E, Salt Lake BM
Decision Memo · Logan Ranger District · updated 5/20/2009
Upper Green Canyon, east of Logan, Utah · Cache, Utah

Proposal is to restore an 1800-foot segment of non-Wilderness trail with a trail machine and a 2000-foot segment in Wilderness using hand tools only. Existing trail is steep, poorly drained, and severely eroded.

Recreation management
Scoping Start
08/06/2008
Decision
05/2009 (Estimated)
Implementation
07/2009 (Estimated)
Project documents
Evelyn Sibbernsen · esibbernsen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Green Canyon - Mt. Naomi Trail ReconstructionDecision Signed Date: 05/19/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT12N, R2E, Sections 2,3
Decision Memo · Heber-Kamas Ranger District · updated 3/24/2009
Streeper Creek drainage, Strawberry Reservoir Unit · Wasatch, Utah

Mow sagebrush and seed where needed to improve ground cover and increase plant diversity.

Wildlife, fish, rare plantsWatershed management
Scoping Start
06/25/2008
Comment Period
06/25/2008
Decision
03/2009 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements; Rangeland Vegetation Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT8S, R6E, S34 , S35
Bennion Allotment Completed
Environmental Assessment · Spanish Fork Ranger District · updated 3/6/2009
Bennion Allotment in the Vernon Management Unit · Tooele, Utah

Authorize current livestock grazing management on the Bennion Allotment. The Bennion Allotment includes what used to be known as the Bennion Allotment and part of what used to be the Dunbar Allotment.

Grazing management
Scoping Start
06/06/2008
Comment Period
06/06/2008
Decision
02/2009 (Estimated)
Implementation
02/2009 (Estimated)
Project documents
Renae Bragonje · rbragonje@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityGrazing Authorizations
Bennion-Dunbar Allotments Grazing AuthorizationDecision Signed Date: 02/12/2009 Legal Notice Date: 02/15/2009
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT. 9 S., R. 5 W., Sections: 1,2,8-17,22-27, 34, and 35; and T. 9 S., R. 4 W., Sections 7, 18, and 19
Decision Memo · Heber-Kamas Ranger District · updated 12/30/2008
Badger Hollow area, Strawberry Reservoir Unit · Wasatch, Utah

Sage-grouse brood-rearing habitat enhancement, including Dixie harrow and mowing to reduce sagebrush density and improve forb cover and diversity. The project would improve approximately 1500 acres over a several year period.

Wildlife, fish, rare plants
Scoping Start
05/09/2008
Comment Period
05/09/2008
Decision
12/2008 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Michael Bornstein · mbornstein@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Badger Hollow Sage Grouse Habitat EnhancementDecision Signed Date: 12/10/2008 Legal Notice Date: 12/13/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT3S, R8E, S25,26,34,35,36, T4S,R8W,S1,2,3,11,12
Decision Memo · Salt Lake Ranger District · updated 12/12/2008
Brighton Loop, Big Cottonwood Canyon · Salt Lake, Utah

Brighton Properties/Silver Lake Estates #1 subdivision is proposing toreplace an existing 2 inch dia. galvanized steel water transmission line that supplies water from an existing spring box, to their 150,000 gal buried concrete storage tank.

Special use management
Scoping Start
10/24/2008
Decision
07/2009 (Estimated)
Implementation
08/2009 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E, T2S, Sec. 35
Decision Memo · Pleasant Grove Ranger District · updated 12/11/2008
Mill Canyon, Tibble Fork, Mud Springs trails in Tibble Fork area, American Fork Canyon · Utah, Utah

Reroute the Mill Canyon, Tibble Fork and Mud Spring trails in the Tibble Fork system. Parts of these motorized trails are eroding and impacting wetlands, and are slick and pose safety hazards to users when wet. Problem segments will be rerouted.

Recreation management
Scoping Start
03/05/2008
Decision
10/2008 (Estimated)
Implementation
11/2008 (Estimated)
Project documents
Joseph McFarlane · jmcfarlane@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Tibble Fork Trails RerouteDecision Signed Date: 10/02/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT4S, R2E, Sec. 7,8,17, 20, 29; T4S, R3E, Sec. 1, 3, 9, 10-12, 14-16, 21, 28
Decision Memo · Logan Ranger District · updated 10/24/2008
Located on Beaver Mountain, northeast of Logan, Utah · Cache, Utah

Proposal would issue a special use permit for installation and operation of a communication site for public safety communications.Facility would consist of a small building, tower, solar panel, and back-up propane tank;Area less than 1 acre.

Special use management
Scoping Start
08/06/2008
Decision
10/2008 (Estimated)
Implementation
11/2008 (Estimated)
Project documents
Evelyn Sibbernsen · esibbernsen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
UCAN Communication Site Special Use PermitDecision Signed Date: 10/22/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT14N, R3E, Section 12
Decision Memo · Salt Lake Ranger District · updated 9/30/2008
Alta Ski Area, Little Cottonwood Canyon · Salt Lake, Utah

Alta Ski Lifts is proposing to install five additional burried snowmaking hydrants on an existing line on the Home Run ski run and install a loading conveyor belt on the bottom terminal of the Supreme lift

Recreation managementSpecial use management
Scoping Start
05/02/2008
Decision
08/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo for Snowmaking Repairs on Homerun at Alta ski AreaDecision Signed Date: 08/06/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R3E
Environmental Assessment · Ogden Ranger District · updated 9/30/2008
Nordic Valley, Radford Hills, and Moose Mountain in the Ogden Valley · Weber, Utah

Construction of 0.34 mile of a mile non-motorized fuelbreak trail above Nordic Valley, Radford Hills, and Moose Mountain.

Fuels management
Scoping Start
03/20/2008
Objection Period Start
07/18/2008
Decision
08/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Elizabeth Corbin · ecorbin@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface
Notice and Comment Regulation218
Project ActivityFuel Treatments (Non-Activity Fuels)
Radford Hills/Nordic Valley Fuels TrailDecision Signed Date: 08/25/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Legal Land DescriptionT.6N, R.1E, Section 5, NE 1/4, SLM, in Weber County
Decision Memo · Salt Lake Ranger District · updated 9/30/2008
Solitude Mountain Resort, Big Cottonwood Canyon · Salt Lake, Utah

Solitude Mountain Resort is proposing to relocate their Yurt to a new location adjacent to the Sunrise lift and operate it year-round and to widen a corner at the intersection of Little Dollie and Pokey Pine ski runs to enhance the skier visibility.

Recreation managementSpecial use management
Scoping Start
05/02/2008
Decision
08/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo For Yurt Relocation And Trail Modifications At SolitudeDecision Signed Date: 08/06/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E, TT2S
Decision Memo · Salt Lake Ranger District · updated 9/30/2008
Brighton ski Resort, Big Cottonwood Canyon · Salt Lake, Utah

UDOT is proposing to relocate its cache for ammunition used in its highway military weapon avalanche control program to a new location within the Brighton Ski Resort.

Special use management
Scoping Start
05/02/2008
Decision
08/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo Utah Department Of Transportation Brighton Ammunition CacheDecision Signed Date: 08/06/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionTT2S, R3E, Sec. 34
Decision Memo · Salt Lake Ranger District · updated 9/29/2008
Upper Big and Little Cottonwood Canyons · Salt Lake, Utah

Re-issue an Outfitter and Guide permit from a five-year term to a ten-year term for Ski Utah Interconnect Adventure Tour

Recreation managementSpecial use management
Scoping Start
05/02/2008
Decision
08/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo for Ski Utah Adventure Interconnect TourDecision Signed Date: 08/21/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E, T2&3S
Decision Memo · Salt Lake Ranger District · updated 9/29/2008
Bountiful Peak (BP) residences in Davis County; Mill D (MD), Evergreen (E), and Brighton (B) residences in Big Cottonwood Canyon, Salt Lake County · Davis; Salt Lake, Utah

Renew existing permits set to expire on 12/31/08 for a term of 20 years in Bountiful Peak, Evergreen, Mill D, and Brighton tracts. Total of 75 permits

Recreation managementSpecial use management
Scoping Start
08/21/2007
Comment Period
08/21/2007
Decision
05/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
Al Soucie · asoucie@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Area Management
DM for Bountiful Pk., Evergreen, Brighton, Mill D Rec. ResidencesDecision Signed Date: 05/01/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionBP -T3N, R1E, Sec 26; E; E - R3E, T2S, Sec 26; B - T2S, R3E, Sec 35; MD - TT2S, R3E, Sec 17
Decision Memo · Salt Lake Ranger District · updated 9/29/2008
Snowbird Ski and Summer Resort, Little Cottonwood Canyon · Salt Lake, Utah

Snowbird, Wasatch Adaptive Sports, and the Steve Young Foundation propose to build a 20-by-20-foot covered picnic pavilion at the site of the adaptive playground, and to dredge the accessible fishing pond

Special use managementRecreation management
Scoping Start
05/02/2008
Decision
08/2008 (Estimated)
Implementation
08/2008 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
DECISION MEMO For Snowbird Accessible Playground Pavilion and Fish Pond/ChaDecision Signed Date: 08/21/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR3E, T3S, Sec. 6
Decision Memo · Logan Ranger District · updated 9/23/2008
Near Mantua, 4 miles east of Brigham City, Utah · Box Elder, Utah

Proposed project would issue an SUP to construct a 4,000 ft pipeline connection to the existing waste water collection system at the FS Box Elder Campground, connecting to the wastewater collection and treatment system operated by Brigham City

Recreation management
Scoping Start
10/30/2007
Decision
09/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Evelyn Sibbernsen · esibbernsen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Bel Mia Girl'sHome and Maple Springs Campground Sewer LineDecision Signed Date: 09/22/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Logan Ranger District · updated 9/23/2008
South of Mantua, Utah · Box Elder, Utah

Brigham City Archery Club desires to renew its SUP for operation of an archery range on National Forest. There would be no changes to authorized facilities or increases in the scope or intensity of authorized activities.

Special use management
Scoping Start
06/04/2008
Decision
09/2008 (Estimated)
Implementation
10/2008 (Estimated)
Project documents
Connie McCaughey · esibbernsen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Brigham City Archery Club Archery Range SUPDecision Signed Date: 09/23/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Legal Land DescriptionT19N, R1W, Section 27
Decision Memo · Heber-Kamas Ranger District · updated 9/17/2008
Mill Hollow Campground · Wasatch, Utah

Sanitation-salvage harvest approximately 230 timbered acres focusing on removal of high risk, insect-infested, diseased, dead and hazardous trees within Mill hollow Campground and adjacent stands.

Forest products
Scoping Start
08/26/2007
Comment Period
08/26/2007
Decision
09/2008 (Estimated)
Implementation
11/2008 (Estimated)
Project documents
Stephen Penny · spenny@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT4S, R7E, Sections 1, 11, and 12; and T4S, R8E, Sections 6 and 7.
Environmental Impact Statement · Evanston-Mountain View RD · updated 6/27/2008
west end of Uinta Mountains in northeast Utah · Summit, Utah

Silivcultural treatment to restore age class diversity and species composition, construction and reconstruction of roads, and rehabilitation of dispersed recreation area. Decision withdrawn 2007, new decision will be made after EIS is supplemented.

Wildlife, fish, rare plantsVegetation management (other than forest products)
NOI in Federal Register
03/20/2002
DEIS NOA in Federal Register
03/14/2008
FEIS NOA in Federal Register
06/27/2008
Decision
06/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Larry Johnson · lljohnson01@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Dispersed Recreation Mgmt.; Road Improvements/Construction; Timber Sales (Green)
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Decision Memo · Salt Lake Ranger District · updated 6/26/2008
Mill Creek Canyon · Salt Lake, Utah

Renew existing permit to the Mill Creek Inn for a new term

Special use management
Scoping Start
05/02/2008
Decision
05/2008 (Estimated)
Implementation
09/2008 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decsion Memo for Bountiful Peak, Evergreen, Brighton, and Mill D RecreationDecision Signed Date: 05/02/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionR 2 E, T1 S, Sec. 33
Environmental Impact Statement · Ogden Ranger District · updated 6/24/2008
Big Creek watershed about 50 miles east of Ogden, Utah · Rich, Utah

The proposal is to treat about 4,000 acres within the 17,000 acre Big Creek watershed to implement the Revised Forest Plan and move towards properly functioning conditions across the landscape.

Fuels managementVegetation management (other than forest products)Forest products
NOI in Federal Register
05/16/2006
DEIS NOA in Federal Register
07/20/2007
FEIS NOA in Federal Register
05/09/2008
Decision
04/2008 (Estimated)
Implementation
07/2008 (Estimated)
Project documents
Chip Sibbernsen · csibbernsen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green)
ForestsUinta-Wasatch-Cache National Forest
DistrictsOgden Ranger District
Environmental Assessment · Salt Lake Ranger District · updated 6/24/2008
Mill Creek Canyon · Salt Lake, Utah

The FS propposes to authorize recreation residence use in 3 tracts (Porter Fork, Elbow Fork & Firs) involving 69 cabins in MIll Creek Canyon for a 20 year period. Existing permits expire at the end of 2008.

Recreation managementSpecial use management
Scoping Start
07/07/2006
Comment Period
06/28/2007
Decision
05/2008 (Estimated)
Implementation
01/2009 (Estimated)
Project documents
Al Soucie · asoucie@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Special Use Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionSections 25, 26, 27, 28, 34, T. 1.S, R. 2E.
Decision Memo · Evanston-Mountain View RD · updated 6/24/2008
Lower Gilbert Creek approximately 20 miles south of Mountain View, Wyoming. · Uinta, Wyoming

Remove pine beetle infested lodgepole pine and sanitation thin adjacent green trees that are susceptible to beetle infestation. Decision withdrawn in summer of 2007. A new decision will be issued in 2008.

Forest products
Scoping Start
02/16/2006
Comment Period
07/28/2006
Decision
04/2008 (Estimated)
Implementation
06/2008 (Estimated)
Project documents
Larry Johnson · lljohnson01@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Thunderbug Thinning ProjectDecision Signed Date: 04/11/2008 Legal Notice Date: 04/15/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSections 5, 6, 7, and 8 T12N, R115W and Section 12, T12N, R116W, 6th P.M.
Decision Memo · Heber-Kamas Ranger District · updated 3/31/2008
In and around Lodgepole Campground near Daniel's Summit on Highway 40 · Wasatch, Utah

Commercially harvest approximately 115 timbered acres in and around Lodgepole Campground to remove overstocked, suppressed and hazardous trees, and reduce stand densities to create healthier forest conditions.

Forest products
Scoping Start
08/26/2007
Comment Period
08/26/2007
Decision
02/2008 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Shawn Martin · samartin@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Lodgepole Timber SaleDecision Signed Date: 02/28/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT. 6 S., R. 6 E., sec. 9-10
Decision Memo · Spanish Fork Ranger District · updated 3/27/2008
Billies Mountain area located about 12 miles southeast of Spanish Fork, Utah · Tooele, Utah

Create openings in the oak/maple canopy with a bullhog/masticator or similar. Remove invading juniper trees. Create age, structural age class, and understory diversity; reduce fuel loadings; and close and reseed roads. Gate Road 116 for seasonal use.

Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)Watershed management
Scoping Start
11/01/2007
Comment Period
11/01/2007
Decision
01/2008 (Estimated)
Implementation
05/2008 (Estimated)
Project documents
Lanson Stavast · lstavast@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (10)
Special AuthorityNational Fire Plan - Healthy Forests Initiative Ce
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements
Billies Mountain Mechanical Fuels ReductionDecision Signed Date: 01/07/2008 Legal Notice Date: 01/10/2008
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT9S, R4E, Sections 14, 15, 16, 21, 22. 23, and 26, SLM, Utah County, Utah
Decision Memo · Logan Ranger District · updated 12/18/2007
west of Hells Hollow-Saddle Creek Road, north of Elk Valley Guard Station · Cache, Utah

The Proposal is to use prescribed fire and and mechanical treatment to treat about 1000 acres consisting mostly of sagebrush. The purpose of the project is to increase wildlife habitat diversity in sagebrush communities.

Wildlife, fish, rare plants
Scoping Start
07/07/2007
Comment Period
07/07/2007
Decision
09/2007 (Estimated)
Implementation
11/2007 (Estimated)
Project documents
Richard Williams · rlwilliams@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Evanston-Mountain View RD · updated 12/17/2007
Evanston and Mountain View Ranger Districts · Summit, Utah

Reauthorize grazing on six allotments (Red Castle on the Mt. View Ranger District and East Fork-Blacks Fork, Middle Fork-Blacks Fork, Lyman Lake, Little West Fork-Blacks Fork, Elizabeth Mtn. 2 on Evanston Ranger District)

Grazing management
Scoping Start
04/18/2007
Decision
09/2007 (Estimated)
Implementation
04/2008 (Estimated)
Project documents
Stephen Ryberg · sryberg@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Decision Memo · Evanston-Mountain View RD · updated 12/17/2007
Central portion of the Mountain View District on the north slope of the Uinta Mountains in Summit County, Utah · Summit, Utah

Authorize continued grazing on two grazing allotments.

Grazing management
Scoping Start
08/26/2005
Decision
09/2007 (Estimated)
Implementation
04/2008 (Estimated)
Project documents
Stephen Ryberg · sryberg@fs.fed.us
NEPA / regulatory detail
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Authorizations
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Environmental Impact Statement · Logan Ranger District · updated 12/17/2007
Vicinity of Logan Peak and Millville Peak roads · Cache, Utah

The proposal is to reconstruct about 5 miles of the Millville Peak and Logan Peak roads for public safety because a power cable buried beneath the road is becoming increasingly exposed and the road can no longer be maintained.

Road management
NOI in Federal Register
04/12/2006
DEIS NOA in Federal Register
07/20/2007
FEIS NOA in Federal Register
12/14/2007
Decision
12/2007 (Estimated)
Implementation
05/2008 (Estimated)
Project documents
Evelyn Sibbernsen · esibbernsen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
Millville Peak/Logan Peak Road RelocationDecision Signed Date: 12/06/2007 Legal Notice Date: 12/15/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Decision Memo · Evanston-Mountain View RD · updated 12/17/2007
Lost, Spring, Poison, Fallon Creek, Cottonwood, Sage, and Lower Henrys Fork drainages about 25 miles south of Mountain View, Wyoming · Summit, Utah

Decide whether or not to allow cattle grazing on the Poison Mountain and Red Mountain Grazing Allotment

Grazing management
Scoping Start
08/26/2005
Decision
09/2007 (Estimated)
Implementation
04/2008 (Estimated)
Project documents
Stephen Ryberg · sryberg@fs.fed.us
NEPA / regulatory detail
Categorical ExclusionSec 339
Special AuthorityGrazing, Sec 339, 2005 Consolidated Appropriations Bill (Grazing Authorizations On An Allotment)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Authorizations
Poison Mountain and Red Mountain Livestock Grazing AllotmentsDecision Signed Date: 09/30/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Decision Memo · Heber-Kamas Ranger District · updated 9/28/2007
portions of T 1 S, R 10 W, T 2 S, R 10 W, T 1 S, R 11 W, T 2 S, R 11 W · Wasatch, Utah

Authorize current livestock grazing mangement on the Currant Creek Allotment.

Grazing management
Scoping Start
11/04/2006
Decision
09/2007 (Estimated)
Implementation
11/2007 (Estimated)
Project documents
Jim Percy · jpercy@fs.fed.us
NEPA / regulatory detail
Categorical ExclusionSec 339
Special AuthorityGrazing, Sec 339, 2005 Consolidated Appropriations Bill (Grazing Authorizations On An Allotment)
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management
Currant Creek Allotment DMDecision Signed Date: 09/24/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Decision Memo · Spanish Fork Ranger District · updated 9/28/2007
Base of Birch Canyon · Juab, Utah

Issue a special use permit for the continued use of a gravel pit.

Minerals and geology
Scoping Start
01/23/2007
Decision
09/2007 (Estimated)
Implementation
10/2007 (Estimated)
Project documents
Duane Resare · dresare@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Juab County Gravel Pit Permit ReissuanceDecision Signed Date: 09/21/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsSpanish Fork Ranger District
Legal Land DescriptionT. 12 S., R. 1 E., sec. 16
Decision Memo · Salt Lake Ranger District · updated 9/27/2007
Approximately 180 feet north of Red Pine Trail in White Pine Canyon, Little Cottonwood Canyon · Salt Lake, Utah

Ammend Utah Department of Transportation's special use permit to allow a new wilitary weapon for avalanche control in lower White Pine Canyon including constructing a permanent concrete pad (apprx. 12' x 15')

Special use management
Scoping Start
10/26/2006
Decision
07/2007 (Estimated)
Implementation
09/2007 (Estimated)
Project documents
Al Soucie · asoucie@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
UDOT White Pine Avalanche ControlDecision Signed Date: 07/03/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT2S, R3E, Sec. 11
Environmental Assessment · Uinta-Wasatch-Cache All Units · updated 9/20/2007
National Forest system lands currently open to over snow vehicle use · Juab; Utah; Wasatch, Utah

Proposal to amend the Forest plan to change the definition "over snow vehicle" to be consistent with the Travel Management Rule. The change would change the recreation opportunities for low-pressure-tired vehicles in the winter.

Land management planning
Scoping Start
05/18/2007
Comment Period
05/18/2007
Decision
08/2007 (Estimated)
Implementation
10/2007 (Estimated)
Project documents
857 West South Jordan Parkway · rpope@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityPlan Amendment
Winter Motorized Use Forest Plan Amendment and Travel Management DNDecision Signed Date: 08/10/2007 Legal Notice Date: 08/10/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsUinta-Wasatch-Cache All Units
Environmental Assessment · Salt Lake Ranger District · updated 6/29/2007
Albion Basin, Little Cottonwood Canyon, Salt Lake County, UT · Salt Lake, Utah

Amend winter travel plan to to provide exemptions for homeowner use of over the snow vehicles in Albion Basin. The purpose is to provide access to private land while addressing safety issues within Alta Ski Area

Recreation management
Scoping Start
06/15/2005
Comment Period
01/07/2006
Decision
03/2007 (Estimated)
Implementation
11/2007 (Estimated)
Project documents
Steve Scheid · sscheid@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTravel Management
Albion Basin Winter Travel Management Plan AmendmentDecision Signed Date: 03/28/2007 Legal Notice Date: 04/06/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionT.4S., R.3E., sec's 4 9
Decision Memo · Logan Ranger District · updated 6/26/2007
Hells Hollow · Cache, Utah

The Forest Service proposes to reduce hazardous fuels and improve vegetation diversity and wildlife habitat over approximately 4,000 acres of aspen, sagebrush, and mountain brush communities.

Wildlife, fish, rare plantsFuels managementVegetation management (other than forest products)
Scoping Start
08/12/2005
Comment Period
10/17/2005
Decision
05/2007 (Estimated)
Implementation
10/2007 (Estimated)
Project documents
Evelyn Sibbernsen · esibbernsen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Species Population Enhancements; Rangeland Vegetation Improvements
Hells Hollow Prescribed Burn ProjectDecision Signed Date: 05/07/2007 Legal Notice Date: 05/10/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsLogan Ranger District
Environmental Assessment · Heber-Kamas Ranger District · updated 6/19/2007
Near Daniels Summit; east side of Highway 40 · Wasatch, Utah

Approximately 280 acres of lodgepole pine and aspen forest types would be treated using a combination of commercial thinning, group selection, and mechanical fuels reduction treatments.

Fuels managementForest products
Scoping Start
12/14/2006
Comment Period
12/14/2006
Decision
05/2007 (Estimated)
Implementation
09/2007 (Estimated)
Project documents
Stephen Penny · spenny@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Green)
Telephone Hollow DN/FONSIDecision Signed Date: 05/04/2007 Legal Notice Date: 05/08/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsHeber-Kamas Ranger District
Legal Land DescriptionT. 6 S., R 6 E., sec. 10 & 15; T 2 S., R. 12 W., sec. 9, 16, 21, & 22
Environmental Assessment · Pleasant Grove Ranger District · updated 3/30/2007
American Fork Canyon - between North Mill and Little Mill Campgrounds · Utah, Utah

Install a new bridge across the American Fork River to connect the North Mill Campground to the Little Mill Campground and install a new exit bridge.

Recreation management
Scoping Start
11/21/2006
Comment Period
11/21/2006
Decision
03/2007 (Estimated)
Implementation
06/2007 (Estimated)
Project documents
Larry Velarde · lvelarde@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management
Little Mill Campground Bridge Construction Project DNDecision Signed Date: 03/27/2007 Legal Notice Date: 03/30/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsPleasant Grove Ranger District
Legal Land DescriptionT 4 S, R 2 E, SE 1/4 Section 24, SW 1/4 Section 24, NW 1/4 Section 25, NE 1/4 Section 26, Salt Lake Meridian
Decision Memo · Evanston-Mountain View RD · updated 3/29/2007
Lower Sage Creek approximately 15 miles south of Mountain View, Wyoming · Uinta, Wyoming

Regenerate aspen and sagebrush to improve wildlife habitat in lower Sage Creek. Timber harvest would remove conifers on about 180 acres and create fuels for prescribed burning on about 450 acres.

Wildlife, fish, rare plants
Scoping Start
02/16/2006
Comment Period
02/16/2006
Decision
02/2007 (Estimated)
Implementation
04/2007 (Estimated)
Project documents
Daniel Jauregui · djauregui@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Lower Sage Wildlife ProjectDecision Signed Date: 02/06/2007 Legal Notice Date: 02/09/2007
ForestsUinta-Wasatch-Cache National Forest
DistrictsEvanston-Mountain View RD
Legal Land DescriptionSections 30, 31, and 32, T13N, R114W adn Section36, T13N, R115W, 6th P.M.