Replace the existing aerial transmission line with a buried transmission line along State Route 101 to maintain power to Hardware Ranch and reduce risk to the line from wildfire.
Location
State Route 110 east of Hyrum near Hardware Ranch WMA
Project timeline
1
Scoping Start
03/25/2025
2
Decision
03/2025 (Estimated)
3
Implementation
06/2025 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Hyrum City-Hardware Ranch Electric Transmission Line Relocation | Decision Signed Date: 03/25/2025 |
| Forests | Uinta-Wasatch-Cache National Forest |
| Districts | Logan Ranger District |
| Legal Land Description | Not Applicable |