Decision Memo Completed

Solitude to Brighton Aerial Fiber Line Installation and Power Pole Replacement

Uinta-Wasatch-Cache National Forest Salt Lake, Utah Uinta-Wasatch-Cache All Units

Proposal to install fiber optic line within the existing RMP powerline and replace two power poles within the current linear right of way in Solitude Area.

Location

Upper Solitude condominiums, following Pacificorp dba Rocky Mountain Power permitted power line linear right of way, terminating at Brighton Resort.

Project timeline

1
Scoping Start
12/02/2019
2
Decision
12/2019 (Estimated)
3
Implementation
12/2019 (Estimated)

NEPA / regulatory detail

Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
BCC Fiber DMDecision Signed Date: 12/16/2019
ForestsUinta-Wasatch-Cache National Forest
DistrictsSalt Lake Ranger District
Legal Land DescriptionNot Applicable
Special use management