The Southern California Edison Co. is proposing to replace 385 wood poles with light weight steel poles; replace, remove and install 200 anchors and down guys; and re-conductor the overhead 33kV line along the Doble Circuit.
Location
The proposed project is located west of Highway 18 in Lucerne Valley between the Cottonwood substation to the north and the Gold Hill substation to the south, in San Bernardino County, California.
Project timeline
1
Scoping Start
08/16/2017
2
Decision
10/2022 (Estimated)
3
Implementation
11/2022 (Estimated)
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Special Use Authorizations |
| Forests | San Bernardino National Forest |
| Districts | Big Bear Ranger District |
| Legal Land Description | Multiple sections of Township 3 North, Ranges 1 and @ East, SBBM |