Repair road damage at milepost 4.0 resulting from the May 2011 flood, by replacing a failed pipe with multiple pipes, and using heavy equipment to reduce channel definition on both sides of the road and spread water across the meadow.
Location
Headwaters of Frost Creek in the Taneum Creek watershed.
Project timeline
1
Scoping Start
12/20/2011
2
Comment Period
06/16/2012
3
Decision
09/2012 (Estimated)
4
Implementation
10/2012 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Categorical Exclusion Forest Service Road 3120 Mile Post 4.0 Flood Repair | Decision Signed Date: 09/06/2012 Legal Notice Date: 09/07/2012 |
| Forests | Okanogan-Wenatchee National Forest |
| Districts | Cle Elum Ranger District |
| Legal Land Description | Section 10, Township 18 North, Range 15 East, W.M. |