Replace the existing 450 foot long steel guide beam; current boat dock attaches to with a 2-foot by 4-foot concrete guide that a new ADA accessible boat dock will attach to. All work will occur on existing concrete boat ramp during low water period.
Location
Hartish Boat Ramp of Applegate Lake.
Project timeline
1
Scoping Start
06/08/2017
2
Decision
08/2017 (Estimated)
3
Implementation
07/2017 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Decision Decided Date | 08/02/2017 |
| Forests | Rogue River-Siskiyou National Forest |
| Districts | Siskiyou Mountains Ranger District |
| Legal Land Description | Not Applicable |