Bury a new 1.5" HDPE pipeline in the same location as the existing on the ground pipeline at a depth of 24x1/4 mile in length. A trace of wire placed in trench to be able to locate pipeline in the future.
Location
Halfway, Oregon area
Project timeline
1
Scoping Start
11/15/2022
2
Decision
09/2023 (Estimated)
3
Implementation
09/2023 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Christman Water Conveyance | Decision Signed Date: 09/25/2023 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T8S R45E Section 13 Halfway, Oregon |