Environmental Assessment · La Grande Ranger District · updated 4/13/2026
Project area near National Forest System Road 4300 · Union, Oregon
Develop an allotment management plan for cattle
Grazing management
Scoping Start
10/2024 (Estimated)
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 5/30/2025
Meadow Creek, along NFSR 2120 · Union, Oregon
Project managers propose the installation of 3 new surface water streamgage stations along Meadow Creek and 20-30 piezometer groundwater wells along the creek's floodplain. Installation is proposed for the summer of 2025.
Wildlife, fish, rare plantsWatershed managementResearch
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 5/8/2025
Pine Lakes Trail #1880 above Cornucopia Lodge in Halfway, OR (45.020982�, -117.198770�) · Baker, Oregon
Replacing first trail bridge on Pine Lakes trail after the previous bridge reached failure.
Recreation management
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 5/6/2025
The proposed treatments are within the footprint of the Town Gulch Fire T8S R45E S4, 5, 6, 7, 10, 11, 15, 14, 13 and T7S R45E S31, 32 · Baker, Oregon
Salvage 250 acres of fire affected trees by the 2024 Town Gulch Fire, as well as harvest hazard trees and road maintenance trees on 10.4 miles of open system roads.
Road management
Comment Period
11/08/2024
Decision
03/2025 (Estimated)
Implementation
04/2025 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 5/6/2025
Eagle Creek area about eight miles North Northwest of Richland, OR · Baker, Oregon
The Whitman District interdisciplinary team proposes salvage logging up to 250 acres of dead and/or dying trees and removing 10.5 miles of danger trees within 150 feet of the road in the Town Gulch Fire footprint.
Forest productsFuels managementRoad management
Decision
03/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 4/30/2025
Elkhorn Ridge Communication Site/ Unity · Baker, Oregon
The Pacific Northwest Seismic Network (pnsn.org)is interested in partnering with the Wallowa-Whitman National Forest to install seismic monitoring stations at Mt Fanny and Elkhorn Ridge communication sites.
Special use management
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T13S, R35.5E, Sec16 |
Environmental Assessment · Whitman Ranger District · updated 4/21/2025
Halfway, Oregon · Baker, Oregon
The purpose and need of this project is to improve forest health, resiliency to disturbance, reduce the risk of high intensity fire and to provide economic benefit to the local economy.
Forest productsVegetation management (other than forest products)Fuels management
Comment Period
08/14/2023
Objection Period Start
02/2025 (Estimated)
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T06S,R45E,Sec23-26,35,36, T06SR46E,Sec21-29,32-36,T06S,R47E,Sec28,29,32-34,T07S,R45E,Sec1-5,8-12,13-16,22-24,T07S,R46E,Sec1-24,T07S,R47E,Sec4,5,8,9,17,20 |
Environmental Assessment · Hells Canyon NRA · updated 3/20/2025
The project area is in the vicinity of the USFS Pittsburg Landing recreational access area within the HCNRA on the Idaho side of the Snake River, approximately 17 miles northwest of Riggins, Idaho. · Idaho, Idaho
The Forest Service proposes to issue a special use permit which would provide terms and conditions under which Idaho Power Company could build and operate a housing facility on approximately 3.5 acres of National Forest Service lands at Circle C.
Special use management
Comment Period
05/29/2019
Objection Period Start
04/2023 (Estimated)
Decision
06/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Township 27N Range 1W Section 33 |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 3/18/2025
Deems Loop Road to McEwen, parallelling highway 7 · Baker, Oregon
Oregon Trail Electric Company (OTEC) will clear ROW and landings of boulders and vegetation in order to replace 27 /- electrical poles. An estimated 1.69 /- miles of ROW road and vegetation cleaning, hazard tree reduction and pole replacement.
Special use management
Decision
01/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Electric Transmission; Forest Vegetation Improvements; Special Use Authorizations; Road Maintenance |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T10S, R38E, Sec. 15-18 |
Decision Memo · La Grande Ranger District · updated 12/19/2024
National Forest system roads 3120-500 and 3120 · Union, Oregon
This project is designed to reduce fuels and increase wildfire resistance along the Mt. Emily Ridgeline.
Vegetation management (other than forest products)Fuels management
Decision
12/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 10/3/2024
Both bridge projects are approximately 20 miles south of Lostine, OR. · Wallowa, Oregon
There is a need to replace the North Minam and East Lostine Trail Bridges. The bridges have failed and are no longer usable.
Recreation management
Decision
09/2024 (Estimated)
Implementation
08/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 9/17/2024
National Forest Road 7785 mile 2.8 · Union, Oregon
Repair a section of streambank from an uprooted dead tree adjacent to National Forest System Road 7785 to prevent further erosion.
Road management
Decision
09/2024 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Whitman Ranger District · updated 6/24/2024
Pine Creek Watershed · Baker; Wallowa, Oregon
Four grazing allotments on the Whitman Ranger District of the Wallowa-Whitman National Forest and Hells Canyon National Recreation Area.
Grazing management
Comment Period
08/2024 (Estimated)
Objection Period Start
11/2024 (Estimated)
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · R1 - Northern Region All Units · updated 6/12/2024
The Nez Perce National Historic Trail is approximately 2,184 miles, extending from the vicinity of Wallowa Lake in eastern Oregon to the Bear Paw Battlefield, about 16 miles south of Chinook, MT. · Clark; Clearwater; Fremont; Idaho; Lemhi; Lewis; Nez Perce; Beaverhead; Blaine; Carbon; Chouteau; Fergus; Gallatin; Golden Valley; Lewis and Clark; Missoula; Phillips; Ravalli; Stillwater; Wheatland; Yellowstone; Wallowa; Asotin; Park; Teton, Idaho; Montana; Oregon; Washington; Wyoming
This analysis identifies the visitor use capacity on National Forest System lands only, on the Nez Perce National Historic Trail to assist in the protection and management of trail resources.
Heritage resource managementRecreation management
Comment Period
06/03/2022
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Custer Gallatin National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Shoshone National Forest; Salmon-Challis National Forest; Caribou-Targhee National Forest; Wallowa-Whitman National Forest |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Custer Gallatin National Forest All Units; Lewis And Clark National Forest All Units; Plains/Thompson Falls Ranger District; Nez Perce-Clearwater National Forest All Units; Shoshone National Forest All Units; Salmon-Challis National Forest All Units; Caribou-Targhee National Forest All Units; Wallowa-Whitman National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Wallowa-Whitman National Forest All Units · updated 6/11/2024
Wallowa-Whitman National Forest · Baker; Grant; Umatilla; Union; Wallowa, Oregon
Comprehensive plan for motorized recreation on the Wallowa-Whitman National Forest (except for HCNRA). Will include designated routes for all motorized vehicles except snowmobiles.
Recreation management
NOI in Federal Register
05/03/2007
DEIS NOA in Federal Register
06/19/2009
FEIS NOA in Federal Register
04/2017 (Estimated)
Decision
06/2027 (Estimated)
Implementation
06/2027 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Plan Amendment; Travel Management |
| Wallowa-Whitman National Forest Travel Management Plan Record of Decision | Decision Signed Date: 02/21/2012 (FS Withdrawn) Legal Notice Date: 03/16/2012 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District; La Grande Ranger District; Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 5/23/2024
Baker County · Baker, Oregon
East site only- previous disturbed ground from Placer Mining, an area of 40%u2019x 200%u2019 will be tested using backhoe/excavator. Total area of disturbance will be about a acre in size. 10-20 lodge pole trees will be removed.
Minerals and geology
Scoping Start
02/2023 (Estimated)
Decision
08/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | TS7S, R36E, section7, Lat Long 44.94965547, -118.352766 |
Decision Memo · Whitman Ranger District · updated 5/23/2024
(Transmission Line Rebuild) Mainly replacing old power poles with new poles (3) between California Gulch to Auburn Gulch, approx. 1/4 mile rebuild on FS ground · Baker, Oregon
(Transmission Line Rebuild) Mainly replacing old power poles with new poles (3) between California Gulch to Auburn Gulch, approx. 1/4 mile rebuild on FS ground. OTEC will be replacing an additional 3 /- poles on maintenance,
Special use management
Decision
04/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Replacement T10S, R39E, sec19, terminating T10S, R39E, sec22 and Pole replacement T10S, 39E Sec21. |
Decision Memo · Whitman Ranger District · updated 5/23/2024
Halfway, Oregon area · Baker, Oregon
Bury a new 1.5" HDPE pipeline in the same location as the existing on the ground pipeline at a depth of 24x1/4 mile in length. A trace of wire placed in trench to be able to locate pipeline in the future.
Special use management
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T8S R45E Section 13 Halfway, Oregon |
Environmental Assessment · La Grande Ranger District · updated 3/5/2024
22 miles SW of La Grande, OR · Union, Oregon
Vegetation management using commercial harvest, non-commercial thinning, and prescribed burning.
Forest productsVegetation management (other than forest products)Fuels management
Comment Period
09/02/2021
Objection Period Start
02/19/2022
Decision
03/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 5&6S, R 35E |
Decision Memo · Whitman Ranger District · updated 2/12/2024
Approximately 6 miles north of Halfway, OR 44.967516?, -117.125044? FS Rd. 6600-040 · Baker, Oregon
Clear Creek Sno-Park was constructed in 1994 and was intended to accommodate use for approximately 5 years, with a target of approximately 25-50 vehicles.
Recreation management
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T7S. R46E. Sec. 7 SE/SE |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 1/29/2024
Baker Compound: 3285 11th St, Baker City, OR 97814 · Baker, Oregon
Replace an existing communications tower to meet FAA and NEC Regulations
Special use management
Decision
01/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Whitman Ranger District · updated 12/4/2023
Near Halfway, Oregon in the Pine Creek drainage on the Whitman Ranger District. · Baker, Oregon
This project proposes to conduct placer mining operations and reclamation of new and legacy mining disturbance in the Pine Creek drainage in the Whitman Ranger District on National Forest System (NSF) lands.
Minerals and geology
Comment Period
05/16/2023
Objection Period Start
08/08/2023
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 10/20/2023
The Grande Ronde River near National Forest System Road 5125, directly downstream of the Forest Service boundary on private land. · Union, Oregon
This project would construct a combination of channel spanning and habitat structures in the stream and floodplain using locally sourced materials.
Watershed managementWildlife, fish, rare plants
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 9/20/2023
The proposed project area is 27 miles SW of La Grande along NFS road 5160. · Union, Oregon
This project is designed to restore access to high quality habitat for federally listed summer steelhead by restoring floodplain connectivity. This will be accomplished by replacing an aquatic passage and relocating 0.5 miles of NFS road.
Wildlife, fish, rare plantsWatershed management
Decision
09/2023 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (25), 36 Cfr 220.6(E)(25) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 9/13/2023
Little Beaver Creek within the Lower Beaver Creek subwatershed · Union, Oregon
This project would exclude livestock from streams by placing wood within the riparian area, allowing the riparian area to recover and streambank stabilization, in Little Beaver Creek. Listed fish species are present.
Grazing managementWatershed management
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R36E, section 18 and 19 |
Decision Memo · La Grande Ranger District · updated 9/13/2023
Sturdivan Meadow, Sheep Creek area · Union, Oregon
Modify a water gap for cattle by adding rock to streambank and streambottom to create a stable base for cattle to cross, and also reduce siltation.
Grazing managementWildlife, fish, rare plants
Decision
03/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Grazing Structural Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S R35E section 12 |
Decision Memo · Malheur National Forest All Units · updated 8/3/2023
Complete fiber route will run from the Izee, OR area to the Unity, OR area along roads and utility corridors across the Malheur and Wallowa Whitman National Forests. · Grant, Oregon
Adding fiber to existing conduit and insulation of new buried conduit and vaults.
Special use management
Decision
08/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| OTC 2023: Unity to Izee | Decision Signed Date: 08/01/2023 |
| Forests | Malheur National Forest; Wallowa-Whitman National Forest |
| Districts | Blue Mountain Ranger District; Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa Valley Ranger District · updated 8/3/2023
Swamp and Davis Creek Area · Wallowa, Oregon
This project proposes the construction of approximately two miles of fence. Additionally, the unneeded fence would be removed. This project is designed to increase fish habitat quality.
Grazing managementWildlife, fish, rare plants
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Grazing Structural Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 7/31/2023
East of Imnaha, OR. · Wallowa, Oregon
The purpose of this project is to remove hazards to life and property and recover the value of fire-damaged trees in a timely manner. These actions are needed to assure public safety.
Forest productsFuels managementRoad management
Decision
07/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 7/25/2023
Near National Forest System Road 5164 - 070 · Union, Oregon
Harvest trees for use in the upcoming Vey Meadows stream restoration project. This harvest unit was analyzed under unit 42 of the Sheep Creek Vegetation Management project.
Vegetation management (other than forest products)Watershed managementWildlife, fish, rare plants
Decision
07/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 3/22/2023
Catherine Creek Summit · Union, Oregon
Paving the existing parking lot at the Catherine Creek Summit SnoPark
Road management
Decision
03/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Road Improvements/Construction |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 3/3/2023
Sheep Creek · Union, Oregon
Floodplain and meadow restoration, improve hydrologic function and fish habitat by installing beaver dam analogues, channel grading, riparian conifer thinning, and deciduous planting.
Wildlife, fish, rare plantsWatershed management
Decision
03/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 5S, R 35E, S 1, 2, 11, 14 |
Decision Memo · Hells Canyon NRA · updated 2/22/2023
The Kirkwood Historic Ranch is located approximately 18 air miles NW of Riggins, Idaho. · Idaho, Idaho
This proposal includes two different bridges located at the Kirkwood Historic Ranch. The Kirkwood Pack Bridge and the Kirkwood Foot Bridge. The bridges are rotting and in need of replacement.
Facility managementRecreation management
Decision
10/2022 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Trail Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T26N, R1W, Sec 30 |
Environmental Assessment · Ochoco National Forest All Units · updated 2/1/2023
National Forests in Oregon, east of the Cascade Mountain Range. · Baker; Crook; Deschutes; Grant; Harney; Klamath; Lake; Malheur; Umatilla; Union; Wallowa; Asotin; Columbia; Garfield; Walla Walla, Oregon; Washington
The USFS will evaluate alternatives to the wildlife standard of the Eastside Screens that limits harvest of trees greater than 21 inches for the Umatilla, Wallowa-Whitman, Malheur, Ochoco, Deschutes, and Fremont-Winema National Forests.
Vegetation management (other than forest products)Wildlife, fish, rare plants
Comment Period
08/11/2020
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Deschutes National Forest; Fremont-Winema National Forest; Malheur National Forest; Ochoco National Forest; Umatilla National Forest; Wallowa-Whitman National Forest |
| Districts | Bend/Fort Rock Ranger District; Crescent Ranger District; Sisters Ranger District; Bly Ranger District; Lakeview Ranger District; Paisley Ranger District; Silver Lake Ranger District; Chiloquin Ranger District; Malheur National Forest All Units; Ochoco National Forest All Units; Umatilla National Forest All Units; Wallowa-Whitman National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 10/19/2022
The claim is located approximately 5miles northeast of Hereford, Oregon, near Pine Creek%u2013County Road 731 (Pine Creek Road) and FSR 1135-414. · Baker, Oregon
Mining operator proposes to complete a small-scale testing and exploration operations that will disturb less than one acre and process less than 5000 cubic yards of material. The operator proposes to excavate and explore six sites.
Minerals and geology
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T. 11 S., R. 39 E. Sec. 34, and T.12 S. R. 39 E. Sec. 3,Willamette Meridian |
Decision Memo · Whitman Ranger District · updated 10/19/2022
Summit Ridge Communications Site/ Halfway, Oregon · Baker, Oregon
T-Mobile is proposing cell antennas on ATC owned tower. Antennas will be installed on existing tower and ground equipment will be installed inside new equipment building. New solar panels will be installed to provide power.
Special use management
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T8S, R45E, Sec24 |
Decision Memo · La Grande Ranger District · updated 9/22/2022
Grande Ronde River · Union, Oregon
Add large wood into the channel to improve fish habitat
Watershed managementWildlife, fish, rare plants
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 4S, R 35E, S 26, 35, T 5S, R 35E, S 1, 2, 12, 13, 18 |
Decision Memo · La Grande Ranger District · updated 8/10/2022
East Fork Grande Ronde River, Meadowbrook Creek, Little Fly Creek, Lookout Creek, Squaw Creek · Union, Oregon
Mechanically place debris jams into 3.75 miles of streams using wood within 200' of the stream.
Watershed managementWildlife, fish, rare plants
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 5/4/2022
Mine Tailings reach of the upper Grande Ronde River · Union, Oregon
Install piezometers to gather baseline water level data before beginning a stream restoration project.
Watershed management
Decision
05/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (8), 36 Cfr 220.6(E)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Whitman Ranger District · updated 4/5/2022
Approximately 3 air miles southwest of Sumpter, Oregon and approximately 21 air miles southwest of Baker City, Oregon. · Baker, Oregon
Improve forest health, the landscape%u2019s resiliency to disturbance, and increase the structural complexity and species diversity of vegetation to provide habitat for a wider range of wildlife species.
Forest productsFuels managementVegetation management (other than forest products)
Comment Period
04/29/2021
Objection Period Start
11/04/2021
Decision
03/2022 (Estimated)
Implementation
04/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | 9S35 1/2E,9S36E,10S35 1/2E, 10S35E,10S36E, 11S35 1/2E, 11S36E,11S37E, 12S36E,12S37E |
Decision Memo · La Grande Ranger District · updated 3/22/2022
Fly Creek River Miles 7-9 · Union, Oregon
Mechanically place wood and boulders to construct debris jams and fish habitat structures at 68 sites from Fly Creek river miles 7-9.
Wildlife, fish, rare plantsWatershed management
Decision
03/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 5S, R 35R, S 8, 17, 20, 27, 28, 29 |
Decision Memo · La Grande Ranger District · updated 1/24/2022
Smith Creek, within the Starkey experimental forest · Union, Oregon
The project involves placing wood into a channel spanning log jam configuration using excavators within Smith Creek. Materials would be hand thinned from two precommercial thinning units within the project area. One culvert is proposed for removal.
Wildlife, fish, rare plantsWatershed management
Decision
01/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S R34E S17-20 |
Decision Memo · La Grande Ranger District · updated 8/11/2021
Summit Mt. Emily on the 3106 Road · Union, Oregon
Remove windthrown trees from previously analyzed mechanical vegetation management units.
Forest productsFuels management
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S R36E Sec. 11,12,13,14,24 and T2S R37E Sec. 18,19 |
Decision Memo · La Grande Ranger District · updated 8/11/2021
Oregon Trail Interpretive Park · Union, Oregon
Removal of windthrown trees within 200 feet of NFS Road 1843
Fuels managementForest products
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S R36E Sec. 16 |
Decision Memo · La Grande Ranger District · updated 8/5/2021
Blue Mountain Translator District facility on Mt.Fanny · Union, Oregon
Install early earthquake detection equipment at an existing facility on Mt. Fanny.
Special use management
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 7/20/2021
5 air miles NW of La Grande, OR · Union, Oregon
Fuels reduction on approximately 3,000 acres of wildland urban interface. Management activities include commercial harvest, noncommercial thinning, and prescribed burning.
Fuels managementForest productsVegetation management (other than forest products)
Decision
07/2021 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (9) |
| Special Authority | Hfra Title Vi: Wildfire Resilience Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | 2S 37E |
Decision Memo · La Grande Ranger District · updated 7/6/2021
44.987N 118.532W 45.291N 118.603W - near the Meadowbrook Creek and Smith Creek confluence · Union, Oregon
Replacing culvert with ATV bridge on Smith Creek to access Starkey fence
Wildlife, fish, rare plants
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 4/22/2021
Lower Fly Creek Watershed · Union, Oregon
Increase stream channel complexity by adding large wood, coarse substrate, and quality pool habitat.
Watershed managementWildlife, fish, rare plants
Decision
04/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 5S, R 35.5E, S 3, 4, 8, 9 |
Decision Memo · La Grande Ranger District · updated 2/16/2021
Upper Grande Ronde River (1 mi), Little Fly Creek (3 mi), Squaw Creek (3 mi) · Union, Oregon
Improve spring/summer chinook and summer steelhead habitat and stream function by adding large woody debris into channels using mini-excavators.
Wildlife, fish, rare plantsWatershed management
Decision
02/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 6S, R36E, S 10, 11, & 12/T 5S, R 35 E, S 4 & T 6S, R 35E, S 3, 4, 9/T 5S, R 35 E, S 15, 22 & T 5S, R 34E, S 21 & 28 |
Decision Memo · Wallowa Valley Ranger District · updated 1/21/2021
Approximately 39 miles northeast of Joseph, OR · Wallowa, Oregon
The project would replace wood poles with poles with self-weathering steel poles. The replacement of these poles will require new construction of two and three-pole steel structures, guy wires, anchors, and steel shield wire.
Special use management
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Township 3N, Range 48E Section 1, Township 4N, Range 49E Section 19, 18, 30, 31, 36 |
Environmental Assessment · La Grande Ranger District · updated 1/11/2021
Project area is from Flagstaff Butte and West Eagle Meadows to Eagle Creek, Two Color Guard Station and Tamarack Campground in the West Eagle, Upper Eagle, and Eagle-Bennett subwatersheds. · Baker, Oregon
Mechanical thinning, slash busting, prescribed fire, piling and burning to manage and improve vegetative health and sustainability and to treat fuels near wildland urban interface, private lands, and the Eagle Cap Wilderness.
Fuels managementForest productsVegetation management (other than forest products)
Comment Period
07/05/2019
Objection Period Start
08/23/2019
Decision
01/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5-6S, R42-43E |
Decision Memo · La Grande Ranger District · updated 12/11/2020
5125 Road on Limber Jim Creek · Union, Oregon
Replace existing culvert with an updated design to meet ODFW fish passage criteria.
Wildlife, fish, rare plantsWatershed management
Decision
12/2020 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S R36E Section 32 |
Decision Memo · Eagle Cap Ranger District · updated 10/28/2020
The Lostine Falls Fish Entrapment Mitigation is located upstream from the Pole Bridge recreation site, approximately eight miles south of Lostine, Oregon. · Wallowa, Oregon
The Lostine Falls Entrapment Mitigation project is intended to reduce the mortality of bull trout and Chinook salmon at Lostine Falls. The project is proposing to move the boulders at the head of the falls that divert fish into the pocket pools.
Wildlife, fish, rare plants
Decision
04/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | T2S, R43E, Section 15 |
Decision Memo · Wallowa Valley Ranger District · updated 10/7/2020
The project area is located at Township 3 North, Range 44 East, parts of sections 16, 21, 20 and 29, Willamette Meridian, Wallowa County, Oregon. · Wallowa, Oregon
The Wallowa-Whitman National Forest, Wallowa Valley Ranger District is proposing to construct 3.8 miles of permanent fence on the Buck Creek Allotment in the Orchard and McCubbin pastures.
Grazing management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Project area is located at Township 3 North, Range 44 East, parts of sections 16, 21, 20 and 29, Willamette Meridian, Wallowa County, Oregon. |
Decision Memo · Wallowa Valley Ranger District · updated 10/6/2020
The Muddy Sled Prescribed Fire Project is located on the Wallowa Valley Ranger District. Approximately 23 miles north of Enterprise, Oregon. · Wallowa, Oregon
The Wallowa-Whitman National Forest proposes to prescribe burn approximately 1,123 acres within the Muddy Sled Prescribed Fire Project area.
Fuels management
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Township 3N, Range 44E, Sections 16,20,21,28-34. |
Decision Memo · La Grande Ranger District · updated 8/28/2020
5125 Reach of the upper Grande Ronde River · Union, Oregon
Mechanically place large wood and structures into 1 mile of the upper Grande Ronde River.
Wildlife, fish, rare plantsWatershed management
Scoping Start
09/2020 (Estimated)
Decision
12/2020 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S R36E S9, 10 |
Decision Memo · La Grande Ranger District · updated 8/25/2020
Southern boundary: 4305 Rd to Park Saddle, Northern boundary: forest boundary adjacent to private lands, Eastern boundary: 4305 220 Rd, Western boundary: 5110 Rd. · Union, Oregon
This project has been cancelled due to a change in the Wallowa-Whitman National Forest program of work priorities.
Vegetation management (other than forest products)Fuels managementWildlife, fish, rare plants
Decision
06/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S R36E Sections 21-35 |
Decision Memo · La Grande Ranger District · updated 8/25/2020
Catherine Creek Summit, near Highway 203. · Union, Oregon
This project proposes harvest for thinning in two units, to achieve stocking level. The two units were treated with prescribed burning in South Fork WUI project. The units are South Fork WUI Unit 2, 14 acres, and South Fork WUI Unit 1, 31 acres.
Vegetation management (other than forest products)
Decision
06/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S, R41E, Section 27 |
Environmental Assessment · Wallowa-Whitman National Forest All Units · updated 8/25/2020
La Grande/Union County Airport · Union, Oregon
Provide office & ware house space, vehicle & helicopter parking, for newly formed Grande Ronde Rappel Crew at La Grande airport. Facility would be constructed by Union County on county-owned lands; to be leased by USFS.
Facility management
Decision
03/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| DN and FONSI for the La Grande-Union County Airport USFS Rappel Base | Decision Signed Date: 03/28/2017 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa-Whitman National Forest All Units |
| Legal Land Description | T3S, R38E, Sec. 24, NW1/4 of SW1/4 |
Decision Memo · La Grande Ranger District · updated 8/25/2020
Near NFS Road 7700. · Union, Oregon
Restore user created routes by tree felling, decompacting soils, and installing berms. Actions would protect sites from illegal dumping and invasive species as well as enhance cultural resources, fish and wildlife habitat, and quiet recreation.
Watershed managementWildlife, fish, rare plants
Decision
08/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S R41E Sections 35 and 36. T5S R42E Sections 32 and 33. T6S R42E Sections 4, 5 and 6. |
Environmental Assessment · Hells Canyon NRA · updated 4/29/2020
The Cold Elk Range Analysis are is located approximately 48 miles north of Enterprise, Oregon. · Wallowa, Oregon
The purpose of this project is to implement the direction of the Wallowa-Whitman National Forest Plan by providing grazing on National Forest System lands where suitable.
Grazing management
Comment Period
10/09/2019
Objection Period Start
12/25/2019
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Environmental Assessment · La Grande Ranger District · updated 4/13/2020
Located along a portion of the Grande Ronde River, adjacent to Hwy 244 on national forest land and private lands, in the vicinity of Spring Creek and Longley Meadows. · Union, Oregon
Phase II of the Bird Track Springs Fish Enhancement Project. The objective is to enhance 1.55 miles of fish habitat for salmonids by creating an active and available floodplain, relocating channels, enhancing riparian vegetation and wetlands.
Wildlife, fish, rare plantsWatershed management
Comment Period
08/21/2019
Decision
04/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R36E, Sections 11,12, 14 |
Decision Memo · La Grande Ranger District · updated 4/10/2020
10 air miles west of La Grande within the Upper Grande Ronde River watershed. · Union, Oregon
Exploration effort to determine size gradations and quantities of materials along proposed channel alignments and at potential borrow sites to determine suitability for riffle construction in the Longley Meadows Fish Enhancement Project.
Wildlife, fish, rare plantsWatershed managementSpecial use management
Decision
04/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R36E, Sections 11, 12, and 14 |
Decision Memo · La Grande Ranger District · updated 3/11/2020
Headwaters of Chicken Creek · Union, Oregon
Wood will be inserted into 2.5 miles of Upper Chicken Creek, 1.5 miles of West Fork Chicken creek and 0.5 miles of North Fork West Chicken Creek to promote floodplain interaction and create habitat complexity.
Watershed managementWildlife, fish, rare plants
Decision
03/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S, R35.5E, Sections 10, 11, 14, 15, 15, 23 |
Decision Memo · La Grande Ranger District · updated 3/11/2020
Limber Jim Creek, a tributary to the Grande Ronde River · Union, Oregon
This project proposes to place large woody debris within the channel to improve habitat for summer steelhead, spring Chinook, bull trout and redband trout.
Wildlife, fish, rare plantsWatershed management
Decision
03/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S R35E S32 |
Decision Memo · La Grande Ranger District · updated 2/26/2020
Project area is 14 miles SE of Union, Oregon and adjacent to west side of Hwy 203 on south side of Catherine Creek summit and adjacent to private lands. · Union, Oregon
70 acre commercial thinning treatment (HTH) designed to modify fire behavior and intensity, expand DFPZs, accelerate the stand toward HRV, improve stand tolerance to insect and disease, and provide for landscape and local connectivity corridors.
Vegetation management (other than forest products)Fuels managementForest products
Decision
09/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S R36E Section 4 |
Decision Memo · La Grande Ranger District · updated 2/25/2020
Lower Fly Creek Subwatershed, a tributary to the Grande Ronde River · Union, Oregon
This project intends to restore floodplain function and fish habitat through instream and floodplain wood placement on approximately 3.5 miles of Fly Creek.
Watershed managementWildlife, fish, rare plants
Decision
02/2020 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R35E, Sections 23, 27, 34 and T4S, R35E, Sections 1, 12, 13 |
Decision Memo · La Grande Ranger District · updated 2/24/2020
1/2 mi SW of Flagstaff Butte · Union, Oregon
Commercially remove downed trees that were killed during a 2019 wind event
Fuels managementForest products
Decision
02/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S R42E S6, 7, 11 |
Environmental Impact Statement · Wallowa-Whitman National Forest All Units · updated 12/10/2019
Union County, Oregon, along Interstate 84. · Union, Oregon
Idaho Power is proposing to construct and operate a 500 kV transmission line between Boardman, Or and Murphy, Id. BLM is the lead agency.
Special use management
NOI in Federal Register
07/27/2010
DEIS NOA in Federal Register
12/19/2014
FEIS NOA in Federal Register
06/30/2017
Objection Period Start
06/06/2018
Decision
11/2018 (Estimated)
Implementation
02/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S R36E |
Decision Memo · Wallowa Valley Ranger District · updated 12/10/2019
Little Sheep Creek (5 miles), Salt Creek (1 mile), and Big Sheep Creek (1 mile) entirely on Wallowa-Whitman National Forest administered lands. · Wallowa, Oregon
The Forest Service proposes to construct fence on the Divide Cattle and Horse Allotment to control livestock distribution, reduce fine sediment deposition in Little Sheep, Big Sheep, and Salt Creeks and to decrease riparian grazing effects.
Wildlife, fish, rare plantsGrazing management
Comment Period
08/22/2012
Decision
12/2012 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management; Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T3S, R46E, sections 29 and 32; T4S, R46E, sections 5916, 21, 22, 27 Willamette Meridian |
Decision Memo · Hells Canyon NRA · updated 12/10/2019
Five Mile fire area along the Hat Point Road (FS 4240), Wallowa County, Oregon · Wallowa, Oregon
Recover value of fire-caused tree mortality by salvaging burned trees on approximately 20 acres adjacent to the Hat Point road.
Forest products
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Five Mile Fire Salvage | Decision Signed Date: 05/29/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 12/10/2019
Approximately 8 miles southeast of the town of Imnaha, in Wallowa County, Oregon. · Wallowa, Oregon
Thin approximately 50 acres of forested stands along the Hat Point Road, Wallowa County, Oregon.
Forest productsFuels management
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Grazing Authorizations |
| Hat Point Thinning Project | Decision Signed Date: 05/29/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T10S, R48E, Sec 1, 26, 35 |
Environmental Impact Statement · Wallowa-Whitman National Forest All Units · updated 12/10/2019
The southern boundary of the project is located approximately 4 miles north of the town of Enterprise, OR in Wallowa County. The northern boundary is approximately 40 miles north of Enterprise, OR. · Wallowa, Oregon
The Lower Joseph Creek Restoration Project proposes to restore, maintain and enhance forest and rangeland resilience to natural disturbance and contribute to the local economic and social vitality of the area.
Forest productsVegetation management (other than forest products)Fuels managementWatershed management
NOI in Federal Register
01/09/2014
DEIS NOA in Federal Register
11/14/2014
FEIS NOA in Federal Register
07/15/2016
Objection Period Start
07/15/2016
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Rangeland Vegetation Improvements; Timber Sales (Green); Watershed Improvements |
| Lower Joseph Creek Restoration Project Record of Decision | Decision Signed Date: 03/17/2017 |
| Establishment of Haystack Rock and Horse Pasture Ridge RNAs (Lower Joseph) | Decision Signed Date: 04/17/2017 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T1NR45ES4-9;15-23;26-36, T1SR45ES1-11;14-18;21-23;26-28, T2N44ES1-2;11-14; 23-26;35-36, T2NR45ES5-8;16-20;29-33, T3NR44ES1;11-14;23-26;35-36, T3NR45ES1-32, T3NR46ES6-7;18-19, and T4N 5N and 6N. |
Environmental Assessment · Whitman Ranger District · updated 12/10/2019
23 miles in the Elkhorn Mountains approximately 15 miles west of Baker City. · Baker, Oregon
Replace existing 100 yr old water transmission line, providing potable water to the residents of Baker City.
Special use management
Comment Period
03/11/2016
Objection Period Start
06/10/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other; Ira - Inventoried Roadless Area Activities Requiring Chief's Approval |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Facility Improvements/Construction; Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 9 S, R 38 E; T 9 E, R 39 E |
Environmental Assessment · Hells Canyon NRA · updated 12/10/2019
T7S, R47E, Sec 2 WM · Wallowa, Oregon
Restore portions of North Pine Creek channel, adjacent to Forest Road 39. Affected area is less than one acre, and is approximately 1150 ft long by 26 ft long.
Wildlife, fish, rare plants
Comment Period
02/25/2015
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements |
| North Pine Creek Channel Restoration Decision Notice | Decision Signed Date: 07/08/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Environmental Assessment · Whitman Ranger District · updated 12/10/2019
The allotments are located northeast of the town of Halfway, in the Hells Canyon Recreation Area. · Baker, Oregon
Analysis of ongoing range use for management of the Snake River, Double Pine, and North Pine grazing allotments.This project was scoped with Boulder/Eagle grazing; two analyses were done due to Snake/Pine's location in the Hells Canyon NRA.
Grazing management
Comment Period
07/26/2013
Decision
09/2013 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management |
| Snake/Pine Rangeland Allotment Management Plans | Decision Signed Date: 09/22/2011 (FS Withdrawn) Legal Notice Date: 10/26/2011 |
| Snake/Pine Rangeland Allotment Plans | Decision Signed Date: 09/26/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T. 5S, R. 47E; T. 6S, R. 47E; T. 7S, R. 47E; |
Decision Memo · Whitman Ranger District · updated 12/10/2019
T 14 S R 35 � E Approximately 5 miles west of Unity Oregon in Baker County · Baker, Oregon
Removal of lodgepole pine within stands that are currently at the highest risk of increased beetle attack.
Vegetation management (other than forest products)
Decision
08/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 12/10/2019
Project involves 2 miles of McCoy Creek, in Upper McCoy Creek Subwatershed (170601040203) · Union, Oregon
Project activities include machine wood placement and planting along 2 miles of McCoy Creek within existing big game exclosures.
Wildlife, fish, rare plantsWatershed management
Decision
01/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 3S, R 34E, Sections 1, 2, and 3 |
Decision Memo · Eagle Cap Ranger District · updated 12/10/2019
McCully area of Alder Slope Wallowa County · Wallowa, Oregon
This project proposes to reduce stand densities by thinning and piling, followed by pile burning on approximately 70 acres.
Fuels management
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 11/22/2019
Lostine River Corridor (portions not within the Eagle Cap Wilderness) · Wallowa, Oregon
The primary purpose is to address the public safety issues within the Lostine corridor, as well as mitigate or minimize risks to the other values, including infrastructure (homes, cabins, recreation improvements, roads), the natural resource values.
Special area managementRecreation managementRoad managementFacility managementFuels management
Decision
04/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Fuel Treatments (Non-Activity Fuels); Dispersed Recreation Mgmt.; Facility Maintenance; Road Maintenance; Special Area Management; Scenery Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Those portions of T. 2S., R. 43E., 33; T. 3S., R. 43E., 33; T. 4S., R. 43E., 33; T. 4S., R. 44E., 33; that are not contained within the Eagle Cap Boundary |
Environmental Assessment · Hells Canyon NRA · updated 9/16/2019
The project area is located at the Hells Canyon Creek Recreation Site along the Wild and Scenic Snake River in the Hells Canyon National Recreation Area in Wallowa County, Oregon. · Wallowa, Oregon
The Wallowa Whitman proposes to repair the Hells Canyon Creek Boat Ramp. Over the last quarter of a century, the rock material under and around the boat ramp and apron has eroded away, leaving the ramp and apron partially unsupported.
Recreation management
Comment Period
05/29/2019
Objection Period Start
07/24/2019
Decision
09/2019 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 8/23/2019
S. Fork Limber Jim Creek, N. Fork W. Chicken Creek, N. Fork Limber Jim Creek, Dry Creek, and Sheep Creek Tributary. · Union, Oregon
The objective is to improve spring/summer chinook, summer steelhead, and bull trout habitat through instream wood placement, livestock exclusion, fencing and seeding.
Watershed managementWildlife, fish, rare plants
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 8/14/2019
NFS road 3120-510 · Union, Oregon
Convert NFS road 3120-510 into an OHV trail
Road managementRecreation management
Scoping Start
05/2019 (Estimated)
Decision
09/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa Valley Ranger District · updated 8/8/2019
The site is located approximately 2 miles northwest of the Wallowa Lake Trailhead on private land. The site is within a trail easement owned by the U.S. Forest Service. · Wallowa, Oregon
The proposed bridge would replace the BC Bridge that was washed out in 2002. The crossing is on the heavily used Chief Joseph Trail (#1803). The bridge would be replaced as a single span foot traffic only bridge to allow safe crossing for visitors.
Recreation management
Decision
08/2019 (Estimated)
Implementation
07/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| BC Bridge Replacement Approved | Decision Signed Date: 08/08/2019 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T3S R45E Section 29 |
Decision Memo · Hells Canyon NRA · updated 8/5/2019
The proposed project is located in Wallowa County, Oregon in the Freeze Out Creek and Butte Creek Snake River sub basins. The project is located on summit ridge at the headwaters of Freeze Out Creek. · Wallowa, Oregon
The purpose for the project is to move and reconstruct a fence to distribute cattle away from heritage resources and to decrease the effect of grazing on Jensen Spring.
Grazing management
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Township 3 South, Range 3 West, near the boundary of sections 18 and 19, |
Decision Memo · La Grande Ranger District · updated 7/15/2019
Sheep Creek and Sheep Creek tributaries · Union, Oregon
The objective is to improve spring/summer chinook, summer steelhead, and bull trout habitat through instream wood placement.
Watershed managementWildlife, fish, rare plants
Decision
07/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Wallowa-Whitman National Forest All Units · updated 6/25/2019
the project area lies within the Blue Mountains ecoregion of northeast Oregon and southeast Washington. It covers 13 counties and includes shared boundaries with private, tribal, state and other lands · Baker; Crook; Grant; Malheur; Morrow; Umatilla; Union; Wallowa; Wheeler; Asotin; Columbia; Garfield; Walla Walla, Oregon; Washington
The Blue Mountains Forest Resiliency Project will propose thinning and prescribed burning on approximately 610,000 acres on the Ochoco, Umatilla and Wallowa-Whitman National Forests.
Vegetation management (other than forest products)Fuels management
NOI in Federal Register
02/05/2016
DEIS NOA in Federal Register
02/06/2016
FEIS NOA in Federal Register
04/2020 (Estimated)
Objection Period Start
01/2020 (Estimated)
Decision
04/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Ochoco National Forest; Umatilla National Forest; Wallowa-Whitman National Forest |
| Districts | Ochoco National Forest All Units; Umatilla National Forest All Units; Wallowa-Whitman National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 6/24/2019
Mt. Fanny communication site · Union, Oregon
New authorization to replace missing file record and/or history of agreements for the site. Changes are only administrative.
Special use management
Decision
06/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S R41E S18 |
Decision Memo · La Grande Ranger District · updated 4/30/2019
Middle Grande Ronde River mile 156-158 and 0.5 miles of Fly Creek · Union, Oregon
Instream and floodplain wood placement on 2.5 miles of the Grande Ronde River and lower Fly Creek to improve fish habitat for listed species.
Wildlife, fish, rare plantsWatershed management
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R35E, S 14, 23, 26 |
Decision Memo · Wallowa Valley Ranger District · updated 4/8/2019
10 miles East of Joseph, Oregon · Wallowa, Oregon
Fuels reduction and thinning in WUI
Fuels managementVegetation management (other than forest products)
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T. 3 S., R 46 E., Sec. 23 & 24, 26 & 27 |
Decision Memo · La Grande Ranger District · updated 4/1/2019
Sheep Creek is a tributary to the Uppper Grande Ronde River. The project is on 3.0 miles of Sheep Creek in reaches 1-2. Union County. · Union, Oregon
This project is designed to improve spring/summer Chinook habitat, summer steelhead habitat, and migratory habitat for bull trout. Project activities include building 45 woody stream structures, 2 culvert replacements, planting, fencing, and seeding.
Watershed managementWildlife, fish, rare plants
Decision
12/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S, R35E, S1/2/11/14 |
Decision Memo · La Grande Ranger District · updated 3/25/2019
Upper Grande Ronde River · Union, Oregon
Restoration project on 2.5 miles of the Upper Grande Ronde River (Woodlee Reach) to improve hydrologic function and habitat for spring/summer chinook, summer steelhead, and bull trout.
Watershed managementWildlife, fish, rare plants
Decision
03/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6D, R36E, S4/5/9 |
Environmental Assessment · Whitman Ranger District · updated 2/26/2019
FS 1090 Rd approximately 1/2 mile south of Hwy 7, about 4 miles southwest of Sumpter, OR. · Baker, Oregon
ODOT has proposed approx. 45 acre mineral material site for development and an a 11 acre storage site within an overall site area of 135 acres.
Minerals and geology
Scoping Start
06/2016 (Estimated)
Comment Period
05/2017 (Estimated)
Objection Period Start
07/2017 (Estimated)
Decision
09/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 10 S, R 37 E, Sec 15 & 16 |
Decision Memo · Whitman Ranger District · updated 2/19/2019
Phillips Reservoir at Mason Dam, southwest of Baker City, Oregon · Baker, Oregon
Reconstruct the Mason Dam Boat Launch ramp located at Phillips Reservoir. It would be replaced with a concrete structure in the same location. This work would be accomplished in partnership with the Oregon State Marine Board.
Recreation management
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Facility Maintenance |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T. 10 S., R. 38E, NE/SW of Section (44.677472, -118.006697) |
Environmental Impact Statement · Wallowa Valley Ranger District · updated 12/13/2018
Six allotments located west of State Highway 3 · Wallowa, Oregon
Authorize commercial livestock grazing on six allotments located west of State Highway 3
Grazing management
NOI in Federal Register
01/08/2008
DEIS NOA in Federal Register
06/26/2009
FEIS NOA in Federal Register
05/28/2010
Decision
04/2010 (Estimated)
Implementation
10/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T4N R43E, T3N R43E, T3N R44E, WM |
Decision Memo · La Grande Ranger District · updated 10/16/2018
North and west of the FSR 2100 and 2155 junction · Union, Oregon
This small timber sale is proposed to promote resiliency within an overstocked stand in the Spring Creek Area. Treatment would help benefit sensitive wildlife species that depend on single story large diameter stands.
Wildlife, fish, rare plantsVegetation management (other than forest products)Forest products
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S, R36E, Section 4 |
Decision Memo · Whitman Ranger District · updated 9/27/2018
Boundary Creek, located in the Granite Creek Watershed, is approximately 4 miles northeast of the town of Granite, OR, and 2 miles north of the Boundary Creek Guard Station. · Grant, Oregon
Replacement of two culverts to improve fish passage. Priority project for threatened and endangered fish species.
Wildlife, fish, rare plantsWatershed management
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T9S, R35.5E, Section 12 and T9S, R36E, Section 6 |
Environmental Assessment · Wallowa Valley Ranger District · updated 9/25/2018
Approximately 16 miles east of Enterprise, Oregon on the Big Sheep Divide. · Wallowa, Oregon
Environmental analysis to authorize livestock grazing for 4 allotments on the Wallowa Valley Ranger District.
Grazing management
Comment Period
03/23/2016
Objection Period Start
11/22/2017
Decision
09/2018 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 9/24/2018
Approximately 8 miles southwest of Unity, OR in the South Fork Burnt River drainage. · Baker, Oregon
Repair post-fire flood damage of approximately 0.2 miles of Forest Service Road (FSR) 2640 and shift the alignment to raise the roadbed above the adjacent Last Chance Creek and out of the floodplain.
Watershed managementRoad management
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (11), 36 Cfr 220.6(E)(11) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 13S, 36E, Sec 30 (Willamette Meridian) |
Environmental Assessment · Wallowa Valley Ranger District · updated 9/20/2018
1989 Canal Fire Area and adjoining unburned area near Cold Springs · Wallowa, Oregon
Reduce fuel loading and return stands to their historic structure while recovering biomass for local industry in the vicinity of the Canal Fire and Cold Springs.
Fuels managementForest products
Comment Period
03/25/2015
Objection Period Start
09/16/2015
Decision
12/2015 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Special Products Sales; Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T3S R46E and T4S R46E, WM |
Decision Memo · La Grande Ranger District · updated 8/29/2018
Stand is west of Bird Track Springs Campground · Union, Oregon
Harvest 70 acres in stand by Bird Track Springs Campground, with the objective of achieving stocking level and forest health. Use trees from adjacent unit for stream restoration.
Wildlife, fish, rare plantsWatershed managementVegetation management (other than forest products)
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R36E, Section 16. |
Decision Memo · Eagle Cap Ranger District · updated 8/9/2018
T.03S., R.44E., Sec. 2,3; · Wallowa, Oregon
Forest Service conducting NEPA to gather information about a possible small tract land sale located at T.3S., R.44E., Sections 2 and 3;
Land ownership management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Exchanges |
| Decision Decided Date | 06/07/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | T.03S., R.44E., Sec. 2,3; |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 8/9/2018
South of Mt. Howard on East Peak in the Eagle Cap Wilderness. lat/long cords: 45 degrees 14' 52" , -117 degrees 10' 48" · Wallowa, Oregon
Forest Service is conducting NEPA to gather information about the proposal to implement the GLORIA project,to monitor mountain biodiversity, in the Eagle Cap Wilderness
Research
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Whitman Ranger District · updated 8/9/2018
Granite Creek Watershed · Baker; Grant, Oregon
Analyze proposed mining plans of operations within the Granite Creek Watershed on the Umatilla and Wallow-Whitman NFs.
Minerals and geology
NOI in Federal Register
10/11/2011
DEIS NOA in Federal Register
02/20/2015
FEIS NOA in Federal Register
03/16/2016
Objection Period Start
03/16/2016
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Minerals Or Geology Plans Of Operations |
| Forests | Umatilla National Forest; Wallowa-Whitman National Forest |
| Districts | North Fork John Day Ranger District; Whitman Ranger District |
| Legal Land Description | T8-10S R34-36 E WM |
Decision Memo · Eagle Cap Ranger District · updated 8/9/2018
Located off Forest System Road 8205 (Hurricane Creek Road) and provide access to tax lot 1100. The access road is estimated to be approximately 33ft by 180ft located within: T.03 S R.44 E · Wallowa, Oregon
Request for an access road located off Forest System Road 8205 (Hurricane Creek Road) to tax lot 1100. The access road is estimated to be approximately 33ft by 180ft located within: T.03 S R.44 E , Sec 3.
Special use management
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Improvements/Construction |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 8/9/2018
Muir Creek at 5125 road · Union, Oregon
This project would replace an undersized, partial fish passage barrier with a properly sized open arch or box culvert. A slight channel relocation would occur to fit the new culvert.
Watershed management
Decision
02/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Population Enhancements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 6S, R 36E, Section 9 |
Decision Memo · Hells Canyon NRA · updated 8/9/2018
92 campsites along the Snake river corridor between river mile 245 and 176 · Wallowa, Oregon
Poison Ivy control at 92 campsites along the Snake River corridor using approved herbicides.
Vegetation management (other than forest products)
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Facility Maintenance |
| Decision Decided Date | 08/11/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 8/9/2018
Southwest of Wallowa Lake at T.3S and R45E, Section 20 and 21 · Wallowa, Oregon
Analysis of proposal for Forest Service to collaborate with Wallowa Lake State Park in designating a user created trail a connector trail between the State Park and National Forest.
Recreation management
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 7/31/2018
Spring Creek Winter Range off of the 2100 and 2155-106 Roads. · Union, Oregon
Improve winter range for elk by installing approximately 1 mile of wire fence connecting 3 gates that are consistently breached during seasonal closures.
Wildlife, fish, rare plants
Decision
07/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R36E, Sections 4,5,8 |
Environmental Assessment · La Grande Ranger District · updated 6/13/2018
Project is located along a portion of the Grande Ronde River, along Hwy. 244, on national forest land and private lands, in the vicinity of Bird Track Springs. · Union, Oregon
To enhance fish habitat for salmonids by creating active and available floodplain, relocating channel, enhancing side channels and existing channel, enhancing floodplain roughness, enhancing riparian and upland vegetation and wetlands.
Wildlife, fish, rare plants
Comment Period
09/15/2017
Objection Period Start
10/27/2017
Decision
06/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R36E, Sections 11, 12, 14, 15, 16 |
Decision Memo · Whitman Ranger District · updated 6/13/2018
Approximately 10 miles southwest of Unity, OR in the South Fork Burnt River drainage. · Baker, Oregon
Repair post-fire flood damage to FSR 6015 by raising the roadbed above the adjacent ephemeral stream and out of the floodplain.
Watershed managementRoad management
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (11), 36 Cfr 220.6(E)(11) |
| Special Authority | National Fire Plan - Healthy Forests Initiative Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 13S, 35.5E, Sec 36 (Willamette Meridian) |
Decision Memo · La Grande Ranger District · updated 6/7/2018
One section due south of Mt. Emily towers · Union, Oregon
Permit renewal for maintaining and operating two spring water boxes and water pipe lines to supply spring water to adjacent private land.
Special use management
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S R38E Section 5 |
Decision Memo · La Grande Ranger District · updated 6/7/2018
The culvert is on West Chicken Creek, NFS Road 5175 · Union, Oregon
This project would replace an undersized and partial fish passage barrier with a properly sized open arch culvert on NFS Road 5175 to provide adequate fish passage for all life stages.
Wildlife, fish, rare plantsWatershed management
Decision
03/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S, R35.5E, S15 |
Decision Memo · Whitman Ranger District · updated 4/5/2018
The project area is located on the Wallowa Whitman National Forest approximately 5 miles west of Unity, Oregon. · Baker, Oregon
Reforestation across approximately 2800 acres of lands that experienced high levels of tree mortality as a result of the 2016 Rail Fire. Activities include hand planting of native tree species utilizing seed sources collected from the local area.
Vegetation management (other than forest products)
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Township 13S Range 35 ? E, Portions of Sections: 10 thru 14, 23 thru 26, 35 & 36 Township 13S Range 36E, Portions of Sections 18 thru 20, 29 thru 31 Township 14S Range 35 ?, E Portions of Section 1 Township 14S Range 36 E, Portions of Sections 4,5,8,9 |
Decision Memo · La Grande Ranger District · updated 3/22/2018
North of the 2100 and 2155.600 junction and west of the 2155.100 and 2155 · Union, Oregon
Small timber sale to promote resiliency in the Spring Creek area using ground based systems.
Vegetation management (other than forest products)Fuels managementForest products
Scoping Start
06/2018 (Estimated)
Decision
09/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S, R36E, S4 |
Decision Memo · Whitman Ranger District · updated 3/21/2018
12 miles west of Unity, Oregon on the Whitman Ranger District, Wallowa-Whitman National Forest. · Baker, Oregon
Issue a new Communications Use Lease authorizing Baker County Sheriff to continue to utilize the Elkhorn Communication facility for a 20-year term, which will allow continued operation and maintenance of the facility.
Special use management
Decision
03/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T. 13 S., R. 35 E., Section 6. |
Decision Memo · Whitman Ranger District · updated 3/21/2018
Approximately 5 miles west of Unity, Oregon. · Baker, Oregon
issue a Special Use Permit for a term of 20 years that authorizes Idaho Power to occupy and use National Forest System lands for the purpose of operation and maintenance of a 7.2 kV electric distribution line and the necessary appurtenances thereto.
Special use management
Decision
01/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T. 13 S. R. 36 E. Sec 22, arriving at Elkhorn Communication Site at T. 16 S. R. 35 E. Sec 16. |
Decision Memo · La Grande Ranger District · updated 2/12/2018
The western boundary is the 4300-250 on a ridge above the Beaver Creek Roadless Area. The eastern boundary is formed by the 4300 and 4300 220 roads. · Union, Oregon
This project proposes to target specific areas for commercial harvest, pre-commercial thinning/fuels reduction treatments using either manual or mechanical methods. The purpose is to create a fuels break opportunity along the 4300-250 road.
Vegetation management (other than forest products)Fuels managementForest products
Decision
03/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S, R36E, sections 10, 11, 14 |
Environmental Impact Statement · Hells Canyon NRA · updated 1/18/2018
Four existing grazing allotments in the Lower Imnaha (Lone Pine, Cow Creek, Rhodes Creek, and Toomey) · Wallowa, Oregon
Authorize commercial livestock grazing on four allotments (Lone Pine, Cow Creek, Rhodes Creek, and Toomey Allotments) located in the lower portion of the Imnaha River.
Grazing management
NOI in Federal Register
08/26/2011
DEIS NOA in Federal Register
03/28/2014
FEIS NOA in Federal Register
03/18/2015
Objection Period Start
03/18/2015
Decision
09/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T4N R48E, T4N R49E, T3N R48E, T3N R49E, T2N R49E, T2N R50E, WM |
Decision Memo · La Grande Ranger District · updated 1/11/2018
5125 Road south of Vey Ranch · Union, Oregon
Renewal of a special use permit for an existing fish acclimation site on the Upper Grande Ronde River.
Special use managementFacility management
Decision
01/2018 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · North Fork John Day Ranger District · updated 1/2/2018
This project is located within the Granite Creek Watershed on the Umatilla and Wallowa-Whitman National forests · Grant, Oregon
This fuels reduction project is located within the Granite Creek Watershed on the Umatilla and Wallowa-Whitman National forests and is located in Grant County, Oregon.
Fuels management
NOI in Federal Register
08/22/2014
DEIS NOA in Federal Register
10/21/2016
FEIS NOA in Federal Register
06/23/2017
Objection Period Start
06/23/2017
Decision
12/2017 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Ten Cent Community Wildfire Protection Project, Record of Decision (PART A) | Decision Signed Date: 12/29/2017 |
| Forests | Umatilla National Forest; Wallowa-Whitman National Forest |
| Districts | North Fork John Day Ranger District; Whitman Ranger District |
| Legal Land Description | The project area is located in Grant County, Oregon, in the: Southeast corner of Township 8, South Range 34 East |
Environmental Assessment · La Grande Ranger District · updated 11/16/2017
Vey Meadows · Union, Oregon
4.5 miles of the 51 road would be reconstructed. The road is narrow with blind corners and no shoulders. Lanes will be widened, sharp corners will be straightened, and the road surface will be improved.
Road management
Comment Period
10/2015 (Estimated)
Objection Period Start
11/2015 (Estimated)
Decision
11/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S, R35E, section 24, 25, 26, 34, 35 and T5S, R36E, section 18 and 19 |
Decision Memo · Whitman Ranger District · updated 10/23/2017
The burning would take place at various locations across the Whitman Ranger District. · Baker, Oregon
The Whitman Ranger District is proposing maintenance burning of previously treated forested stands particularly stands in the Wildland Urban Interface portions of the District.
Fuels management
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 10 S. R37 E., T10 S. R36E., T11S R37 E., T11S. R38E. |
Decision Memo · La Grande Ranger District · updated 10/20/2017
Dark Canyon Creek, in Dark Canyon Creek subwatershed. · Union, Oregon
The project will include fish structure construction, planting, and plant protection, to provide fish passage.
Wildlife, fish, rare plants
Decision
01/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R35E, Sections 2, 11, 14, 26, and 35. |
Environmental Assessment · Whitman Ranger District · updated 8/22/2017
Located within the Powder sub-basin, south of Forest road 7700, in the Eagle Creek area. · Baker, Oregon
Goal is to create sustainable, diverse, and resilient forest vegetation using commercial timber harvest, non-commercial thinning, fuels reduction, aspen restoration, prescribed burning and underburning.
Forest productsFuels management
Comment Period
01/23/2017
Objection Period Start
04/21/2017
Decision
08/2017 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T7&8S, R43-45E |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 7/20/2017
Forest-Wide · Idaho; Nez Perce; Baker; Grant; Umatilla; Union; Wallowa, Idaho; Oregon
Proposal to amend the Wallowa-Whitman National Forest Land and Resource Management Plan, as amended (Forest Plan, 1990) by adding aminopyralid to the list of herbicides approved to treat invasive plants.
Land management planning
Comment Period
04/07/2017
Objection Period Start
05/12/2017
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (16), 36 Cfr 220.6(E)(16) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Amendment |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa-Whitman National Forest All Units |
| Legal Land Description | Not Applicable |
Environmental Assessment · La Grande Ranger District · updated 7/20/2017
In Briggs Pasture and Meadow Cr Pasture of Starkey Cattle and Horse Allotment. · Union, Oregon
It will authorize livestock grazing in Briggs and Meadow Creek Pastures in Starkey Cattle and Horse Allotment, to facilitate a grazing research study in Meadow Cr on Starkey Experimental Forest and Range. Will construct 1.5 miles of fence on Hwy 244.
Grazing management
Comment Period
03/07/2016
Objection Period Start
04/08/2016
Decision
07/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Grazing Allotment Management; Grazing Authorizations; Grazing Structural Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R35E, Sections 7, 8, 18, and T3S, R34E, Sections 26, 27, 28, 32, 33, and 34. |
Decision Memo · La Grande Ranger District · updated 7/18/2017
Mt. Emily Communication Site. · Union, Oregon
The BPAs Mt. Emily facility needs reissuance of an expired permit in advance of site maintenance scheduled for the summer of 2017.
Special use managementFacility management
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T1S, R37E, S32 |
Decision Memo · Wallowa Valley Ranger District · updated 7/18/2017
Big Sheep Creek within the Marr Flat Allotment · Wallowa, Oregon
This projects purpose is to build approximately 7 miles of fence to distribute cattle away from Endangered Species Act listed critical fish habitat, along Big Sheep Creek within the Marr Flat Allotment.
Grazing managementWatershed management
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 6/12/2017
The project is located in West Chicken Creek, in the Chicken Creek Sub-watershed. · Union, Oregon
Project will replace one culvert on FS Road 5175. The culvert is on a tributary to West Chicken Creek with the project objective of providing fish passage.
Wildlife, fish, rare plants
Decision
03/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S, R 35.5E, Sections 10 and 15. |
Decision Memo · Whitman Ranger District · updated 3/15/2017
5 miles northwest of Halfway, Oregon along FS Rd. 7700, 4 miles north of Halfway along FS Rd. 6625, and 5 miles northeast of Halfway along FS Rd. 3992 on the Whitman Ranger District · Baker, Oregon
Issue Pine Telephone System a new Special Use Permit for a 20-year term, which will allow PTS to continue to maintain and operate the telephone lines.
Special use management
Decision
11/2016 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Pine Telephone System Special Use Permit Renewal - Halfway Lines | Decision Signed Date: 11/04/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 3/15/2017
East Pine Creek drainage north of Halfway, OR. · Baker, Oregon
Renewal of a 20-year lease that expires 12/31/2016. 3.3 miles of buried telephone line located in the East Pine Creek drainage north of Halfway, OR.
Special use management
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 12/19/2016
Approximately 5 miles west of Unity, OR within the boundary of the Rail Fire that is on the Whitman Ranger District. · Baker, Oregon
Salvage of up to 250 acres of fire killed trees.
Forest products
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Rail Fire Salvage Decision Memo | Decision Signed Date: 12/15/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa Valley Ranger District · updated 12/15/2016
Wallowa Valley Ranger District · Wallowa, Oregon
Outfitting and guiding with horses and mules, summer progressive and hunting. 175 user days Wallowa Valley Ranger District
Special use management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 12/15/2016
Eagle Cap Ranger District and Wallowa Valley Ranger District · Wallowa, Oregon
Outfitting and guiding with horses and mules, summer progressive and hunting. 285 user days Eagle Cap Ranger District and 160 days Wallowa Valley Ranger District.
Special use management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 12/15/2016
Hells Canyon National Recreation Area and Eagle Cap Ranger District · Wallowa, Oregon
Outfitting with fixed-wing aircraft. 75 landings Eagle Cap Ranger District and 120 landings Hells Canyon National Recreation Area. All use occurs on airstrips open to public use.
Special use management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 12/15/2016
Eagle Cap Ranger District, Hells Canyon National Recreation Area, and Wallowa Valley Ranger District · Wallowa, Oregon
Outfitting and guiding using vehicles and/or foot travel, hunting only. 20 user days Eagle Cap Ranger District, 20 days Hells Canyon National Recreation Area and 30 days Wallowa Valley Ranger District.
Special use management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 12/15/2016
Eagle Cap Ranger District · Wallowa, Oregon
Outfitting and guiding using foot travel, summer progressive only. 400 user days Eagle Cap Ranger District.
Special use management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa Valley Ranger District · updated 12/15/2016
Wallowa Valley Ranger District · Wallowa, Oregon
Outfitting and guiding using foot travel, winter progressive only. 1400 user days Wallowa Valley Ranger District.
Special use management
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (9), 36 Cfr 220.6(D)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 11/29/2016
T3S-R45E-Sec. 33 · Wallowa, Oregon
Upper Prairie thinning project is a 150 acre thinning project approximately 6.5 air miles from the town of Joseph, Oregon in T3S-R45E-Sec. 33. The project area lies within both the Upper Prairie Creek and Upper Little Sheep Creek 6th field watershed
Vegetation management (other than forest products)
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 11/8/2016
Road 3960 from Indian Crossing to the junction of road 39 and road 3960 · Wallowa, Oregon
Provide for public and employee safety by reducing risk of likely, or imminent danger trees along forest road 3960. There is an opportunity for the removal and utilization of danger trees as timber products where appropriate.
Road management
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Decision Decided Date | 11/08/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 11/8/2016
Road 3960 from Indian Crossing to the junction of road 39 and road 3960 · Wallowa, Oregon
Provide for safety by reducing risk of likely, or imminent danger trees surrounding campgrounds and admin sites along the 3960 road. There is an opportunity for the removal and utilization of danger trees as timber products where appropriate
Recreation managementFacility management
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Dispersed Recreation Mgmt.; Facility Maintenance |
| Decision Decided Date | 11/08/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 10/26/2016
Hells Canyon National Recreation Area · Wallowa, Oregon
Outfitting and guiding with horses and mules, summer progressive and hunting. 200 user days Hells Canyon National Recreation Area.
Special use management
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 10/25/2016
Eagle Cap Ranger District and Whitman Ranger District · Wallowa, Oregon
Outfitting and guiding using foot travel, winter progressive only. 600 user days Eagle Cap Ranger District and 600 user days Pine Unit, Whitman Ranger District.
Special use management
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 10/25/2016
Eagle Cap Ranger District · Wallowa, Oregon
Outfitting and guiding with horses and mules, summer progressive and hunting. 450 user days Eagle Cap Ranger District.
Special use management
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 10/25/2016
Hells Canyon National Recreation Area · Wallowa, Oregon
Outfitting and guiding with horses and mules, summer progressive and hunting. 200 user days Hells Canyon National Recreation Area.
Special use management
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Environmental Assessment · Whitman Ranger District · updated 9/27/2016
The project is located in the following watersheds: Middle South Fork-Burnt River (12,120 acres), and the Upper South Fork Burnt River (17,561 acres). · Baker, Oregon
Address existing mountain pine beetle infestation - proposed activities would reduce the risk of a high intensity/high severity wildfire, improve public and fire fighter safety, and move the landscape toward more sustainable conditions.
Vegetation management (other than forest products)Forest productsFuels management
Comment Period
09/2016 (Estimated)
Objection Period Start
01/2017 (Estimated)
Decision
03/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 9/19/2016
Beaver Mountain, approximately 13 miles south of Baker City, OR. · Baker, Oregon
Renewal of a special use permit at Beaver Mountain communication site.
Special use management
Decision
08/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 11 S, R 40 E, Sec 23 |
Decision Memo · Eagle Cap Ranger District · updated 9/14/2016
Hells Canyon National Recreation Area and the Pine Unit of the Whitman Ranger District · Wallowa, Oregon
Outfitting and guiding with horses and mules, summer progressive and hunting. 415 user days Eagle Cap Ranger District, 100 days Hells Canyon National Recreation Area and 400 days Pine Unit, Whitman Ranger District.
Special use management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 9/14/2016
Hells Canyon National Recreation Area and Eagle Ranger District · Wallowa, Oregon
Outfitting and guiding with horses and mules, summer progressive and hunting. 550 user days Eagle Cap Ranger District and 350 days Hells Canyon National Recreation Area.
Special use management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle Cap Ranger District · updated 9/14/2016
Eagle Cap Ranger District and Hells Canyon National Recreation Area · Wallowa, Oregon
Outfitting and guiding with llamas, spring and summer progressive and hunting. 550 user days Eagle Cap Ranger District and 350 days Hells Canyon National Recreation Area.
Special use management
Decision
09/2016 (Estimated)
Implementation
09/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 8/17/2016
West of Durkee, OR south of Baker City, OR and north of Hereford, OR between Highways 84 and 7. · Baker, Oregon
Reforestation planting in the Cornet Windy Ridge fire area.
Vegetation management (other than forest products)
Decision
08/2016 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · La Grande Ranger District · updated 8/3/2016
20 miles south of La Grande, along the east face of the Elkhorns, between the 43 Road and the 73 Road. · Baker; Union, Oregon
Mechanical thinning, slash busting, prescribed fire, hand piling and burning to manage and improve vegetation and treat fuels near wildland urban interface and private/public land interface. May include some road construction, maintenance, closures.
Fuels managementForest products
Comment Period
10/07/2015
Objection Period Start
02/17/2016
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S, T6S, T7S. R36E, R37E, R38E. |
Decision Memo · Whitman Ranger District · updated 7/26/2016
Located about 17 miles northwest of Halfway, OR. · Baker, Oregon
Salvage up to 250 acres of fire killed trees.
Forest products
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Eagle Complex Fire Salvage | Decision Signed Date: 07/25/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 7/20/2016
The permitted area is located approximately 35 miles northwest of Baker City, Oregon on the Whitman Ranger District. · Baker, Oregon
This project will result in a special use permit for the operation and maintenance of the existing system at Anthony Lakes Mountain Resort.
Special use management
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Township 7 South, Range 36 East, Sections 12 and 13 Township 7 South, Range 37 East, Section 7 |
Decision Memo · Whitman Ranger District · updated 7/20/2016
Beaver Mtn, approximately 13 miles south of Baker City, OR and Elkhorn Mtn, approximately 12 miles west of Unity, OR. · Baker; Grant, Oregon
Verizon Wireless has proposed to upgrade the propane tanks at these two special use permitted sites with new 1000 gallon tanks.
Special use management
Decision
07/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 11 S, R 40 E, Sec 23 and T 13 S, R 35 1/2 E, Sec 16 |
Decision Memo · Whitman Ranger District · updated 7/20/2016
Approximately 13 miles south of Baker City, OR. · Baker, Oregon
Renewal of an existing communications permit at the Beaver Mountain site.
Special use management
Decision
04/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 7/20/2016
Approximately 5 miles north of Granite, OR · Grant, Oregon
Operation and maintenance of a buried communication cable and the necessary appurtenances.
Special use management
Decision
01/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 8 S, 35.5 E, Sections 10 & 15 |
Decision Memo · Whitman Ranger District · updated 7/20/2016
Beaver Mountain, approximately 13 miles south of Baker City, OR. · Baker, Oregon
Renewal of a special use permit at Beaver Mountain Communication site.
Special use management
Decision
06/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | 11 S, R 40 E, Sec 23 |
Environmental Impact Statement · Wallowa-Whitman National Forest All Units · updated 6/28/2016
Wallowa-Whitman National Forest, Northeast Oregon. · Adams; Nez Perce; Baker; Grant; Malheur; Umatilla; Union; Wallowa, Idaho; Oregon
Supplemental EIS will provide additional analysis of cumulative effects. Notice of Intent to prepare a supplemental EIS was published in the Federal Register on January 30, 2013.
Vegetation management (other than forest products)
NOI in Federal Register
01/30/2013
DEIS NOA in Federal Register
03/20/2015
FEIS NOA in Federal Register
01/15/2016
Objection Period Start
12/04/2015
Decision
03/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Noxious Weed Treatments |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa-Whitman National Forest All Units |
| Legal Land Description | Forest wide |
Decision Memo · La Grande Ranger District · updated 5/23/2016
The project will involve a portion of main stem Limber Jim, North Fork Limber Jim, and South Fork Limber Jim Creeks. · Union, Oregon
Project activities will include large wood placement, planting, culvert replacement, and dispersed recreation site management, in a portion of north fork, south fork and main stem Limber Jim Creeks.
Wildlife, fish, rare plants
Decision
05/2016 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 5/6/2016
Hells Canyon National Recreation Area · Idaho, Idaho
Project will repair and preserve Kirkwood Historic Museum structure for improvements in interpretive and educational programs. Preservation of this valued building will ensure availability to the public and education for future generations.
Facility management
Decision
05/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Decision Decided Date | 05/06/2016 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Hells Canyon NRA · updated 3/29/2016
92 campsites along the Snake River corridor between river mile 245 and 176. · Wallowa, Oregon
Poison ivy control at 92 campsites along the Snake River corridor using approved herbicides.
Vegetation management (other than forest products)
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Facility Maintenance |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 3/2/2016
The fire area is west of Durkee, south of Baker City, and north of Hereford, OR between Highways 84 and 7. This watershed is the southern portion of the fire area. · Baker, Oregon
This project will salvage up to 250 acres in the Burnt River Watershed. No salvage will occur in in Riparian Habitat Conservation Area.
Forest products
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Whitman Ranger District · updated 3/2/2016
The fire area is west of Durkee, south of Baker City, and north of Hereford, OR between Highways 84 and 7. This watershed is the northern portion of the fire area. · Baker, Oregon
This project will salvage up to 250 acres within the Powder River watershed. No salvage will occur in Riparian Habitat Conservation Areas.
Forest products
Decision
02/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Timber Sales (Salvage) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · La Grande Ranger District · updated 2/22/2016
15 miles southwest of La Grande, west of the La Grande Municipal Watershed, between Muir Creek and Limber Jim Creek. · Union, Oregon
Noncommercial fuel reduction,west boundary LaGrande City Watershed and key access routes to reduce down fuel and facilitate fire suppression. May include precommercial thinning, firewood areas, slash busting, prescribed fire, small commercial harvest
Fuels management
Comment Period
02/13/2015
Objection Period Start
04/20/2015
Decision
02/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S and T6S, R36E |
Environmental Impact Statement · Wallowa-Whitman National Forest All Units · updated 2/16/2016
Northwest of Richland and Halfway, Oregon, primarily within the Paddy Creek - Eagle Creek and Little Eagle Creek Subwatersheds. · Baker, Oregon
Supplemental EIS being prepared to clarify the project impacts to elk given the withdrawl of travel mgmt decision, as ordered by Court of Appeals - 9th Circuit (Opinion and Order on Preliminary Injunction signed May 2014).
Forest productsFuels management
NOI in Federal Register
08/06/2014
DEIS NOA in Federal Register
07/2015 (Estimated)
FEIS NOA in Federal Register
10/2015 (Estimated)
Objection Period Start
10/2015 (Estimated)
Decision
01/2016 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Special Products Sales; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 1/27/2016
Mt. Emily Communication site on Mt. Emily, La Grande Ranger District · Union, Oregon
Renew the current Special Use Permit for Verizon, which authorizes their infrastructure at the Mt. Emily communication site. Verizon's current Special Use Permit expires on 12/31/2016.
Special use management
Decision
01/2016 (Estimated)
Implementation
03/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T1S, R38E, Section 32 |
Decision Memo · Eagle Cap Ranger District · updated 1/25/2016
Wildland Urban Interface along Alder Slope in Wallowa County, NE Oregon. · Wallowa, Oregon
Thin trees to reduce fuels in the zone between the scenic Eagle Cap Wilderness and private lands in Wallowa Valley
Fuels management
Decision
11/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | T3S R45E, Sec. 23, 25, 26, 35, 36; T3S R44E, Sec. 2,3; T2S R44E, Sec. 19, 20, 28, 34; T2S R43E, Sec. 12, WM |
Decision Memo · Whitman Ranger District · updated 12/16/2015
Anthony Lakes Mountain Resort - trail extends from the summit to the lodge. · Baker; Union, Oregon
Reconstruction of an existing trail, seasonally used as a ski run, to accommodate mountain bikes.
Special use management
Decision
12/2015 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 7 S, R 37 E, Sec 18; T 7 S, R 36 E, Sec 13 |
Decision Memo · Whitman Ranger District · updated 12/16/2015
Approximately 12 miles west of Unity, OR. · Grant, Oregon
Renewal of a Special Use Permit for an existing communication site.
Special use management
Decision
12/2015 (Estimated)
Implementation
01/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 13 S, R 35.5 E, Sec 16 |
Decision Memo · Whitman Ranger District · updated 12/16/2015
Approximately 12 miles west of Unity. · Baker, Oregon
Special Use permit renewal to continue to maintain and operate cell tower.
Special use management
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 13 S, R 35.5 E, Sec 16 |
Decision Memo · Whitman Ranger District · updated 11/30/2015
The fire area is west of Durkee, south of Baker City, and north of Hereford, OR, between Highways 84 and 7. · Baker, Oregon
This project will address roadside danger trees on open Forest system roads within the fire area.
Forest productsRoad management
Decision
11/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Timber Sales (Salvage) |
| Cornet Windy Ridge Fire Roadside Danger Tree Abatement | Decision Signed Date: 11/20/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · La Grande Ranger District · updated 9/30/2015
Upper Ladd, Jordan, Whiskey, Lower Beaver Cr, Rock Cr watersheds. Excluding LaGrande Watershed. Near roads 4300, 220, 4305; north to forest boundary; west to 5100095, 105, 080 Rds · Union, Oregon
Non-mechanical thin old harvest and natural fuel units.Spacing 14x-20x. 10% of PCT units left untreated for wildlife. Species prefer w.larch, ponderosa pine, Douglas fir. Will burn slash piles.
Fuels managementWildlife, fish, rare plantsVegetation management (other than forest products)
Decision
07/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R36E, R37E, and R38E. T5S, R37E, and R38E. |
Environmental Assessment · Hells Canyon NRA · updated 9/11/2015
Puderbaugh Ridge and portions of the Imnaha River drainage. · Wallowa, Oregon
Reduce fuel loadings in the Puderbaugh Ridge vicinity and address Western Pine Beetle conditions in the upper Imnaha River Corridor.
Fuels managementForest products
Comment Period
02/05/2014
Objection Period Start
04/23/2014
Decision
07/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T4S R48E and T5S R48E, W.M. |
Environmental Assessment · La Grande Ranger District · updated 9/11/2015
Upper Catherine Creek Watershed, southeast of Union, Oregon. · Union, Oregon
A combination of mechanical thinning, slash busting, hand piling/burning, and prescribed burning would be used to mange vegetation and fuels within the area. Benefits include healthier stands, reduced fire behavior potential and enhance public uses.
Vegetation management (other than forest products)Fuels managementForest products
Comment Period
08/21/2013
Objection Period Start
11/22/2013
Decision
02/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S, R42E |
Environmental Assessment · Whitman Ranger District · updated 8/31/2015
Located south and west of Baker City, south of Highway 7 and Phillips Lake. · Baker, Oregon
Analysis of fuels vegetation management needs in the area south of Phillips Lake; Little Dean Creek, Worley Springs, Black Mountain.
Vegetation management (other than forest products)Fuels managementForest products
Comment Period
03/25/2015
Objection Period Start
07/10/2015
Decision
08/2015 (Estimated)
Implementation
10/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | in Townships 10 and 11 South, Ranges 37 and 38 East, |
Decision Memo · La Grande Ranger District · updated 7/23/2015
Near OR Hwy 244, near the Grande Ronde River, near the Starkey area. · Union, Oregon
Oregon Trail Electric Cooperative is proposing to relocate approx.900 feet of existing underground power line on National Forest land. The proposed work will be confined to the existing 20 ft. right-of-way authorized in the current special use permit
Special use management
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| OTEC Starkey Power line Relocation Project | Decision Signed Date: 07/15/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R35E, Section 36 |
Decision Memo · Eagle Cap Ranger District · updated 6/30/2015
Silver Creek Ditch, Minam Lake Dam, Allen Canyon Ditch, Horseshoe Creek Ditch · Union; Wallowa, Oregon
Convert authorization for existing irrigation ditches from special-use permits to easements.
Land ownership management
Decision
07/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | T2S R44E, T4S R44E, T1S 43E, T3S R41E, WM |
Decision Memo · Hells Canyon NRA · updated 6/30/2015
Summit Creek · Union, Oregon
Replace a fish passage barrier on Summit Creek.
Watershed managementWildlife, fish, rare plants
Comment Period
07/2015 (Estimated)
Decision
08/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T3S, R48E, Section 23 |
Decision Memo · La Grande Ranger District · updated 6/26/2015
FS roads 2100, 2100400, and 2100950. North boundary = 2100950 and 2100800 rds. East boundary = Private Property, South boundary = Bird Track Spring Camp Ground, 2100580. West boundary = 2100400 road. · Union, Oregon
Precommercial thinning and burning of overstocked pine stands in the Spring Creek area along FS Roads 2100, 2100-400, and 2100-950. Prescribed natural fuels underburn within and adajacent to previous Spring Creek Fire.
Fuels managementVegetation management (other than forest products)
Decision
01/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | National Fire Plan - Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Birdtrack Springs TSI and Maintenance Burn | Decision Signed Date: 01/20/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R36E, Sec 1,2,3,4,5, 9, 10, 11, 15 and 16, T2S, R36E, Sec 27, 28, 29, 33, 34, 35, 17, 18, 19, 20, 21, 28, 29, 30, 31, 32 and 33. T2S, R35E, Sec 23, 24, 25,26, 35,36. |
Decision Memo · La Grande Ranger District · updated 4/9/2015
On north side of FS Road 6220, just inside WWNF boundary, between Bridge Creek and Mill Creek, in vicinity of 241 Road on La Grande Ranger District. · Union, Oregon
Remove/salvage 5530 ft 18" water pipeline from diversion structure on Bridge Cr to diversion structure on Mill Cr, and install approx 5530 ft 18" HDPE pipe, and associated required access and road work, for City of Cove Special Use Permit
Special use management
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| City of Cove Water Pipeline Replacement Project | Decision Signed Date: 03/20/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R41E, Section 19 |
Decision Memo · Wallowa Valley Ranger District · updated 3/30/2015
Wallowa County, Oregon, on the west side of Highway 3 across from the Joseph Canyon Overlook. · Wallowa, Oregon
re-issuance of permit WAV418201, TDS Telecom, which was previously valid from 9/9/September 9,1986 to 12/31/December 31, 2006. The permit area includes .8 miles of buried telephone line in Sec 12 & 13, T4N, R44E, W.M.
Special use management
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Maintenance |
| Asotin Telephone Company dba TDS Telecom Special Use Permit Decision | Decision Signed Date: 03/25/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | Sec 12 & 13, T4N, R44E, W.M. |
Decision Memo · Wallowa Valley Ranger District · updated 3/30/2015
Segments of Devils Run Creek · Wallowa, Oregon
Improve stream conditions on Devils Run Creek between fenced sections by narrowing the gaps or hardening streambanks.
Wildlife, fish, rare plants
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T4N R47E Section 31 to T3N R47E Section 3, WM |
Decision Memo · Whitman Ranger District · updated 3/26/2015
Spring box and pipe located on NF land approximately 100 feet from private property. · Baker, Oregon
Special Use re-authorization
Special use management
Decision
03/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Dumars Spring and Pipeline | Decision Signed Date: 03/20/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T6S R44E Section 32 |
Decision Memo · La Grande Ranger District · updated 3/25/2015
Five Points Creek on La Grande Ranger District · Union, Oregon
Project involves: 6 miles of wood placement; 7 mi of riparian planting; seeding 75 ac; exclosure construction on .5 mi stream; and closing 3 mi of streambottom ATV use trails.
Wildlife, fish, rare plants
Decision
03/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S, R37E |
Decision Memo · Whitman Ranger District · updated 3/24/2015
Project will occur in the area surrounding the community of Granite on Corral Creek, Deep Creek, and Channel Creek within the Granite Creek watershed and Bullrun subwatershed. · Grant, Oregon
The project will improve fish habitat on Corral, Deep & Channel Creeks which are tributaries to Bullrun Creek and the North Fork of the John Day River. Activities will improve floodplain function, water storage, fish passage and habitat complexity.
Wildlife, fish, rare plantsWatershed management
Decision
02/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Bull Run Restoration Project Phase One | Decision Signed Date: 02/20/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 9 S, R 35.5E, S 1, 2 and T 9 S, R 36 E, S 8, 18 |
Decision Memo · Whitman Ranger District · updated 3/24/2015
Culverts are located throughout the area around the town of Granite, OR. Center of project area is T8S, R35E, Section 35 · Grant, Oregon
This project proposes to remove and replace 7 culverts with fish passage friendly structures.
Watershed managementWildlife, fish, rare plants
Decision
02/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Granite Creek Culvert Replacement | Decision Signed Date: 02/20/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 3/24/2015
Locations are on 4 allotments managed by the Whitman District: Black Mountain, Dean Huck, Snow Creek, and Ironside. · Baker, Oregon
This project proposes to construct 3 livestock water developments that consists of fencing the spring source and installing an aluminum water trough. Modification of existing fences, and construction of less than 10 miles of division fences.
Grazing management
Decision
02/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Dean Huck Livestock Water Developments | Decision Signed Date: 02/20/2015 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T11 R39E Sec 7; T10S R38E Sec 27; T10S R39E Sec 30; T10S R35E Sec 14,15,16,17; T14S R37E Sec 23,24,27 |
Decision Memo · La Grande Ranger District · updated 3/2/2015
Sheep Creek and East Fork Sheep Creek · Union, Oregon
A bottomless arch would replace the bridge which was over East Sheep Creek on 5184 to eliminate userbuilt roads and OHV use in East Sheep Creek. 2.9 miles of 5184 and 3.9 miles of road 5182 will be maintained. 3 more culverts would be installed.
Wildlife, fish, rare plantsRoad management
Decision
02/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements; Road Maintenance |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S,R35E, Sections: 11, 14, 22, 23, 25, 26, 27, 32, 33, 35, 36. T7S, R35E, Section 2. |
Decision Memo · Wallowa Valley Ranger District · updated 11/20/2014
previous vegetation management projects on the Wallowa Valley and Eagle Cap Ranger districts. · Wallowa, Oregon
Mechanical piling of fuels created by timber harvest activity. Machines will be limited to existing roads or skid trails.
Fuels management
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Wallowa Mountains Mechanical Piling Project | Decision Signed Date: 11/08/2014 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T1S R41E & 43E; T2S R42E; T 2N R43E; 3N R43E, R44E, 46E, & 47E; T4N R46E. |
Decision Memo · Whitman Ranger District · updated 9/30/2014
Adjacent to Hwy 24, 1 mile east of Granite. · Grant, Oregon
Approximately 3 acre storage for road maintenance activities.
Special use management
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Grant County Gravel Storage Area Permit Renewal | Decision Signed Date: 06/13/2014 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 9 S, R 35 1/2 E, Section 10 |
Decision Memo · Whitman Ranger District · updated 9/30/2014
Elkhorn Mountain Communication Site Unity, Oregon vicinity · Baker, Oregon
Upgrade and maintain communication site.
Special use management
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T13S, R35 1/2 E, Section 16 |
Environmental Assessment · La Grande Ranger District · updated 9/17/2014
By the La Grande Resevoir, near FS Road 4305270 in Beaver Creek; W Fk Beaver Creek, 12 air miles south of La Grande. Analysis area is 16,000 acres in Upper Beaver Creek subwatershed. · Union, Oregon
Provide fish passage in Beaver Cr by placing concrete weirs in spillway, rock grade-control structures at intake, and rock and weirs by diversion pool. Place rock to grade channel in Elk, Cove, W Fk Beaver Cr intakes. Install fish screens at intakes
Wildlife, fish, rare plants
Comment Period
05/24/2013
Decision
07/2014 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Townships 4, 5, and 6 south, Ranges 36 and 37 east. |
Decision Memo · La Grande Ranger District · updated 7/9/2014
This project is located at West Eagle Campground and trailhead, Moss Springs Campground and Guard Station, and Bird Track Springs Campground, on the La Grande Ranger District. · Union, Oregon
This project will remove hazardous trees from developed recreation sites, including approx. 55 trees at West Eagle Campground and Trailhead, approx. 38 trees at Moss Spr Campground and Guard Station, and approx. 20 trees at Bird Track Spr Campground.
Recreation managementForest products
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Timber Sales (Green) |
| Campground Hazard Tree Removal Project | Decision Signed Date: 07/07/2014 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S, R43E, Section 5; and T3S, R41E, Section 27 and 28; and T3S, R36E, Section 16. |
Decision Memo · Whitman Ranger District · updated 5/12/2014
The underground pipeline is located in the Marble Creek drainage, mainly in an abandoned roadbed. · Baker, Oregon
Reauthorize the existing Marble Creek Pipeline to provide high quality water for the Baker City Water System.
Special use management
Decision
05/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Baker City Marble Creek Pipeline | Decision Signed Date: 05/08/2014 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T9S, R38E, Sections 12 & 13; T9S, R39E, Section 7 |
Decision Memo · La Grande Ranger District · updated 5/5/2014
The project is located adjacent to Meadow Creek, a tributary to the Grande Ronde River, within the Meadow Cr Watershed (1706010402), Middle Meadow Cr subwatershed (170601040202), Reaches 1-3. · Union, Oregon
The project will improve spring/summer chinook and summer steelhead habitat through the development and/or reconstruction of 6 upland water sources (5 springs, 1 pond) for livestock and wildlife within the established 5 riparian pastures on Meadow Cr
Wildlife, fish, rare plants
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R34E, Sections 27, 29, 31, 32, 34, and T4S, R34E, Section 6. |
Decision Memo · La Grande Ranger District · updated 4/21/2014
Chicken Creek in La Grande Ranger District · Union, Oregon
The project will include 2 miles of deciduous planting (48 acres). It would restore riparian habitat and decrease high water temperatures. Wood would be placed in 1 mile of stream.
Wildlife, fish, rare plants
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Chicken Creek Large Woody Debris and Planting Project | Decision Signed Date: 04/18/2014 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S, R35.5E |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 3/31/2014
Near Greenhorn along the allotment boundary, generally running parallel to County Road 503. · Baker, Oregon
This project has been combined and is now part of Whitman Range Improvement Project (See PALS project #43200).
Grazing management
Scoping Start
01/2014 (Estimated)
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T10S R35E Sec 14, 15, 16, 17 |
Decision Memo · La Grande Ranger District · updated 3/20/2014
13 miles SW of La Grande, OR, on Beaver Creek. Permitted portion of pipelines extend from 1/2 mile above reservoir toward La Grande to national forest boundary · Union, Oregon
Reissue special use permit for 20 years, to reauthorize operation and maintenance of existing La Grande Reservoir, pipelines and buildings, to serve as contingent water source for La Grande city water system. No new construction or ground disturbance
Special use management
Comment Period
04/22/2013
Decision
11/2013 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R37E, Sections 19, 29, 30, 31, 32. And T5S, R37E, Sections 5, 6, 7, 8, 16, 17. |
Environmental Assessment · La Grande Ranger District · updated 3/20/2014
Grande Ronde River-Five Points Watershed, northeast of Interstate-84 · Union, Oregon
This project will improve forest health. Areas will have mechanical harvest/removal and prescribed burning, precommercial thinning, stocking density reduction, tree planting, hazard tree removal, road and soil restoration, and harvest removal.
Fuels managementForest productsVegetation management (other than forest products)
Comment Period
10/13/2012
Decision
07/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Trail Vegetation Management Project | Decision Signed Date: 07/01/2013 Legal Notice Date: 07/03/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S, R36E |
Decision Memo · Wallowa Valley Ranger District · updated 3/17/2014
The project area encompasses the Lick Creek subwatershed boundary. · Wallowa, Oregon
The project will address a suite of high priority restoration actions in the Lick Creek watershed that have been identified in the Lick Creek Watershed Restoration Action Plan.
Watershed managementWildlife, fish, rare plants
Comment Period
08/19/2013
Decision
03/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Lick Creek Aquatic Restoration Project Decision Memo | Decision Signed Date: 03/11/2014 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T4S, R46E, sec 25-27 and 34-36; T5S, R46E, sec 1-3, 10-15; T5S, R47E, sec 6,7 and 18. |
Environmental Assessment · La Grande Ranger District · updated 3/10/2014
Corral Creek along the 7787-600 road, South Fork Catherine Creek, and Pole Creek · Union, Oregon
This project does NOT have an objection period because no parties have standing to object. Ignore any posted Objection Start Dates. Obliterate, replace,and reconstruct this road, and replace 3 culverts
Road managementWatershed management
Comment Period
12/09/2013
Objection Period Start
01/03/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Road Maintenance; Road Improvements/Construction; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S, R42E, section 21 and 28 |
Decision Memo · La Grande Ranger District · updated 2/19/2014
In the upper Grande Ronde River Watershed (1706010401), in Chicken Creek Subwatershed (170601040104), on the 5178025 Road. · Union, Oregon
The purpose of this project is to provide dead western larch snags for stay and jack material for livestock exclosure and pasture fences. This project is being cancelled from the SOPA list, because it was entered on the SOPA list in error.
Grazing managementWildlife, fish, rare plants
Decision
01/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Habitat Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 6S, R 35.5E, Sections 24 and 25 |
Decision Memo · Eagle Cap Ranger District · updated 2/13/2014
The bridge is located approximately 4 miles from the Rock Springs trailhead on Forest Road 62 (Minam River Road). · Union, Oregon
The bridge crossing the Little Minam River along the popular Minam River Trail (#1637) would be replaced to assure safe crossing at the site. The replacement bridge would allow safe access for visitors and stock.
Recreation management
Comment Period
11/20/2013
Decision
01/2014 (Estimated)
Implementation
02/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management |
| Little Minam Bridge Replacement Project Decision Memo | Decision Signed Date: 01/08/2014 Legal Notice Date: 01/08/2014 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | T2S R41E Section 10 |
Decision Memo · Wallowa-Whitman National Forest All Units · updated 11/27/2013
Near Hilgard State Park · Union, Oregon
Renewal of a 20 year special use permit for the use and maintenance of the existing communication poles and associated communication lines across 500 feet of NFS lands.
Special use management
Comment Period
06/26/2013
Decision
11/2013 (Estimated)
Implementation
01/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| Frontier Communications Incorporated SUP Renewal | Decision Signed Date: 11/26/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | Township 2S, Range 37E, Section 31 |
Decision Memo · Blue Mountain Ranger District · updated 10/1/2013
The project area is located approximately 27 miles northeast of John Day on the Blue Mountain Ranger District of the Malheur National Forest and on the Whitman Ranger District of the Wallowa-Whitman · Baker; Grant, Oregon
OTC is proposing to install a new fiber optic line in conduit in their existing right-of-way between their Bates to Unity transfer stations to replace the original fiber optic cable installed in 1996.
Special use management
Comment Period
06/26/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Special Use Authorizations |
| OTC Special Use Permit Amendment Fiber Optic Line Replacement Decision Memo | Decision Signed Date: 09/30/2013 Legal Notice Date: 09/30/2013 |
| Forests | Malheur National Forest; Wallowa-Whitman National Forest |
| Districts | Blue Mountain Ranger District; Whitman Ranger District |
| Legal Land Description | T. 11 S. R. 35 E. Sections 25-28; T. 11 S. R. 35 E. Sections 26-28, 35, 36; T. 12 S. R. 35.5 E. Section 1; T 12 S. R 36 E. Sections 6-9, 15, 16; Willamette Meridian |
Decision Memo · Whitman Ranger District · updated 9/30/2013
Anthony Lakes Ski Area · Baker, Oregon
This project will protect healthy mature whitebark pine from competition, bark beetles and wildfire.
Vegetation management (other than forest products)
Comment Period
08/30/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T7S R36E Sections 13, 24 |
Environmental Assessment · Whitman Ranger District · updated 9/20/2013
South and West of Baker City in the Big Creek watershed. The allotment is north of Hwy 245, east of the town of Hereford, and west of Dooley Mtn. · Baker, Oregon
This project will re-authorize grazing management on the Little Bald Mountain allotment within the Unity section of the Whitman Ranger District.
Grazing management
Comment Period
07/26/2013
Decision
09/2013 (Estimated)
Implementation
03/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management |
| Little Bald Mountain Allotment Rangeland Analysis | Decision Signed Date: 09/20/2013 Legal Notice Date: 09/20/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 11S, R 39E, S 21, 26, 27, 33, 34, 35 |
Decision Memo · Wallowa Valley Ranger District · updated 9/18/2013
The project area is approximately 30 miles northeast of Enterprise, Oregon. · Wallowa, Oregon
Proposal to use low intensity prescribed fire to improve elk forage in open grasslands and grass/forb/shrub understories in historical elk transition and summer range in the Chesnimnus Watershed.
Wildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
01/30/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements |
| Chesnimnus Elk Burn | Decision Signed Date: 09/12/2013 Legal Notice Date: 09/18/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T 4N, R 47E, Sections 27, 28, 33, 34; T 3N, R 47E Section 3; T 4N, R 48E, Sections 26, 35, 36; T 3N, R 48E Sections 1, 2, 11, 12, 13, 14 24, 25; T 4N, R 4W Section 31; T 3N, R 4W Sections 6, 7, 8, 17, |
Decision Memo · Wallowa Valley Ranger District · updated 9/18/2013
The proposed project is located in Wallowa County, Oregon in the Imnaha Subbasin approximately 10 miles southeast of Joseph, Oregon. · Wallowa, Oregon
Proposal to develop fourteen spring sites to improve livestock distribution in upland areas, decrease riparian grazing, improve riparian habitat and provide water for wildlife and livestock.
Wildlife, fish, rare plantsGrazing management
Comment Period
03/06/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management; Species Habitat Improvements; Rangeland Vegetation Improvements |
| Divide Allotment Water Developments | Decision Signed Date: 09/16/2013 Legal Notice Date: 09/18/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T3S R46E, T3S R47E, and T4S R46E of the Willamette Meridian, Wallowa County |
Environmental Assessment · Hells Canyon NRA · updated 9/18/2013
The Hells Canyon Creek Boat Launch along the Wild and Scenic Snake River in the Hells Canyon National Recreation Area. · Wallowa, Oregon
This project proposes to repair the damages to the Hells Canyon Creek Boat Launch and Visitor Center that resulted from the 2012 spring flood along Hells Canyon Creek.
Recreation managementFacility management
Comment Period
06/19/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Facility Maintenance |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T3N, R49E, Section 33 |
Decision Memo · Hells Canyon NRA · updated 9/10/2013
The Kirkwood Historic Ranch in Hells Canyon National Recreation Area. · Idaho, Idaho
Installation of up to 5 interpretive panels at the Kirkwood Historic Museum in the Hells Canyon Recreation Area. A segment of walking trail will be extended from an existing trail to access the new interpretive panels.
Recreation management
Comment Period
07/10/2012
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (4); 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Developed Site Management; Facility Improvements/Construction |
| Kirkwood Ranch Bighorn Sheep Interpretive Project | Decision Signed Date: 09/09/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T. 26 N, R. 1 W, Section 30, NE 1/4 |
Decision Memo · La Grande Ranger District · updated 8/26/2013
Balm Creek Reservoir area · Baker, Oregon
Salvage of timber blown down during a winter 2012/2013 wind event. Removal of trees would be from 2 units totalling 71 acres and for 100 feet on either side of forest road 7000 from the junction of road 7000640 to 7040. No road construction.
Forest products
Comment Period
07/05/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (13), 36 Cfr 220.6(E)(13) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage) |
| Balm Creek Blowdown Salvage Project | Decision Signed Date: 08/22/2013 Legal Notice Date: 08/26/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T7S, R43E, Sections 5-7 |
Environmental Assessment · Whitman Ranger District · updated 7/30/2013
The rock quarry is located ten miles west of Unity Oregon, adjacent to Oregon Highway 26. · Baker, Oregon
This would continue operations by Oregon Dept. of Transportation to produce and use crushed rock from this existing quarry.
Minerals and geology
Comment Period
05/01/2013
Decision
07/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| Lyman Quarry Project | Decision Signed Date: 07/25/2013 Legal Notice Date: 07/29/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T.12S, R. 36E, sec. 7 |
Environmental Assessment · Whitman Ranger District · updated 6/26/2013
Culverts are on NFS rds 7370, 7375 and 1305080 · Baker, Oregon
Replace 2 culverts on Bull Run Crk and 1 culvert on Deep Crk and re-align approx 300 feet of the 7370 road to allow the natural channel and flood plain to re-establish. 8+ miles of stream for fish passage and sediment reduction will be opened.
Watershed management
Comment Period
04/19/2013
Decision
06/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Bull Run Culvert Replacements | Decision Signed Date: 06/24/2013 Legal Notice Date: 06/26/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T9S, R36E, sec 18, 19; T10S, R35E, sec 2 |
Decision Memo · La Grande Ranger District · updated 5/16/2013
T6S, R35E, Sec 1 and 12. And T4S, R35E, Sec14 · Union, Oregon
Place wood structures along Sheep Creek, and plant deciduous seedlings and cuttings. It would improve habitat for spring Chinook salmon, summer steelhead, and bull trout. This is critical habitat for bull trout, a threatened species under ESA
Watershed managementWildlife, fish, rare plants
Comment Period
05/23/2012
Decision
04/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | The project is located along Upper Grande Ronde River and Sheep Creek which is a tributary to the Upper Grande Ronde. |
Decision Memo · La Grande Ranger District · updated 3/4/2013
NF Catherine Creek · Union, Oregon
NF Catherine Ck ford is currently a partial fish passage. This project would replace the existing ford with a full channel spanning bridge. All work will stay within the existing road prism and after project completion the site will be rehabilitated
Wildlife, fish, rare plants
Decision
02/2013 (Estimated)
Implementation
06/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Species Population Enhancements |
| North Fork Catherine Creek Ford/Bridge Replacement Project | Decision Signed Date: 02/20/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | NF Catherine Creek Subwatersheds 170601040501 & 170601040108 |
Decision Memo · La Grande Ranger District · updated 3/4/2013
Where 2120 road leaves Meadow Creek, near the 2100 road · Union, Oregon
Place large woody debris in 3.25 mi of Meadow Ck (30 structure sites). Planting for approx. 3 mi. 2 stream exclosure fences reconstructed. Construct additional exclosure fence. Construct 3.3 mi pasture fence. Construct 9 small exclosures in pastures
Wildlife, fish, rare plants
Comment Period
05/23/2012
Decision
03/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management; Species Habitat Improvements; Species Population Enhancements |
| Meadow Creek Wood Additions Phase II Project | Decision Signed Date: 03/04/2013 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T3S, R34E, S19, 29, 30 & 32 |
Decision Memo · La Grande Ranger District · updated 1/31/2013
Located near Forest Service Road 3106 and Pelican Creek · Union, Oregon
This project would allow a landowner to reroute an existing road outside of the riparian area which will cross the corner of Forest Service property for approximately 60 feet.
Land ownership management
Comment Period
05/22/2012
Decision
01/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T 2S, R 36E, Section 23 SE/NW |
Environmental Assessment · La Grande Ranger District · updated 12/21/2012
Located in Starkey Experimental Forest at Red Fir Spring and Briggs pasture. · Union, Oregon
Construct boundary fence and change kind and class of livestock grazed at Red Fir Spring. Construct boundary fence at Briggs pasture within the Starkey allotment boundary. The area is currently not designed for grazing with pasture rotation.
Grazing management
Scoping Start
01/2012 (Estimated)
Comment Period
08/2012 (Estimated)
Decision
10/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Allotment Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R34E, sec 29 & 32; T4S, R35E, sec 7 & 8 |
Environmental Impact Statement · Whitman Ranger District · updated 9/27/2012
The North Fork Burnt River Watershed, Unity Ranger District, Wallowa-Whitman National Forest · Baker, Oregon
Prepare a supplement to the April 2004 North Fork Burnt River Final Environmental Impact Statement to address the inefficiencies identified by the United States District Court of Oregon, August 4, 2006.
Minerals and geology
NOI in Federal Register
02/21/2007
DEIS NOA in Federal Register
09/24/2010
FEIS NOA in Federal Register
09/07/2012
Decision
08/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| North Fork Burnt River Mining | Decision Signed Date: 08/14/2012 Legal Notice Date: 09/07/2012 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T9S, 10S, 11S and 12S; R35E, 351/2E, 36E, and 37E; Willamette Meridian |
Decision Memo · La Grande Ranger District · updated 9/20/2012
Oregon Trail Interpretive Park · Union, Oregon
This project will remove approximately 20 bark beetle infested trees while the beetles are still in them so that they will not attack and kill more trees within in the Oregon Trail Interpretive Park.
Vegetation management (other than forest products)
Comment Period
08/06/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (14), 36 Cfr 220.6(E)(14) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Oregon Trail Interpretative Park Bark Beetle and Hazard Tree Removal Proj. | Decision Signed Date: 09/10/2012 Legal Notice Date: 09/19/2012 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S R36E Section 16 |
Decision Memo · La Grande Ranger District · updated 8/2/2012
Located in Starkey Experimental Forest, north of 2120737 road · Union, Oregon
Construct a new building near the existing well head and control panels adjacent to the fence. The existing buried tank will be removed.
Facility management
Comment Period
05/21/2012
Decision
08/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Facility Improvements/Construction |
| Starkey Elk Handling Facility water System Improvements | Decision Signed Date: 08/02/2012 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S, R34E, Sec 11 |
Environmental Impact Statement · WO - Washington Office - National headquarters · updated 7/10/2012
11 contiguous Western States (Arizona, California, Colorado, Idaho, Montana, New Mexico, Nevada, Oregon, Utah, Washington, and Wyoming) and Alaska. · Bonner; Aleutians East; La Paz; Columbia; Coos; Colusa; Denver; Douglas, Alaska; Arizona; California; Colorado; District of Columbia; Idaho; Kansas; Montana; North Dakota; Nebraska; New Mexico; Nevada; Oklahoma; Oregon; South Dakota; Texas; Utah; Washington; Wyoming
The Forest Service was a cooperating agency, assisting the Bureau of Land Management (BLM) in that Agency's geothermal leasing analysis and decision. The BLM issued a record of decision on 12/17/2008.
Regulations, directives, orders
NOI in Federal Register
06/13/2007
DEIS NOA in Federal Register
06/13/2008
FEIS NOA in Federal Register
10/24/2008
Decision
02/2010 (Estimated)
Implementation
03/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Nepa Document Prepared By Another Federal Agency |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Regulation Creation/Modification |
| Forests | Beaverhead-Deerlodge National Forest; Bitterroot National Forest; Clearwater National Forest; Custer National Forest; Custer Gallatin National Forest; Helena National Forest; Lewis And Clark National Forest; Lolo National Forest; Nez Perce-Clearwater National Forest; Grand Mesa, Uncompahgre and Gunnison National Forests; Medicine Bow-Routt National Forest; Rio Grande National Forest; Arapaho and Roosevelt National Forests; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands; San Juan National Forest; White River National Forest; Apache-Sitgreaves National Forests; Carson National Forest; Cibola National Forest; Coronado National Forest; Gila National Forest; Lincoln National Forest; Santa Fe National Forest; Tonto National Forest; Boise National Forest; Bridger-Teton National Forest; Dixie National Forest; Fishlake National Forest; Manti-Lasal National Forest; Payette National Forest; Salmon-Challis National Forest; Sawtooth National Forest; Caribou-Targhee National Forest; Humboldt-Toiyabe National Forest; Uinta-Wasatch-Cache National Forest; Angeles National Forest; Cleveland National Forest; Eldorado National Forest; Inyo National Forest; Klamath National Forest; Lassen National Forest; Los Padres National Forest; Mendocino National Forest; Modoc National Forest; Plumas National Forest; San Bernardino National Forest; Sequoia National Forest; Shasta Trinity National Forest; Sierra National Forest; Tahoe National Forest; Deschutes National Forest; Fremont-Winema National Forest; Gifford Pinchot National Forest; Malheur National Forest; Mt Baker-Snoqualmie National Forest; Mt. Hood National Forest; Ochoco National Forest; Rogue River-Siskiyou National Forest; Umatilla National Forest; Umpqua National Forest; Wallowa-Whitman National Forest; Okanogan-Wenatchee National Forest; Willamette National Forest; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
| Districts | Beaverhead-Deerlodge National Forest All Units; Bitterroot National Forest All Units; Clearwater National Forest All Units; Custer National Forest All Units; Custer Gallatin National Forest; Custer Gallatin National Forest All Units; Helena National Forest All Units; Lewis And Clark National Forest All Units; Lolo National Forest All Units; Nez Perce-Clearwater National Forest All Units; Grand Mesa Uncompahgre and Gunnison National Forest All Units; Medicine Bow-Routt National Forest All Units; Rio Grande National Forest All Units; Arapaho and Roosevelt National Forests All Units; Pike and San Isabel National Forests and Cimarron and Comanche National Grasslands All Units; San Juan National Forest All Units; White River National Forest All Units; Apache-Sitgreaves National Forests All Units; Carson National Forest All Units; Cibola National Forest All Units; Coronado National Forest All Units; Gila National Forest All Units; Lincoln National Forest All Units; Santa Fe National Forest All Units; Tonto National Forest All Units; Boise National Forest All Units; Bridger-Teton National Forest All Units; Dixie National Forest All Units; Fishlake National Forest All Units; Manti-La Sal National Forest All Units; Payette National Forest All Units; Salmon-Challis National Forest All Units; Sawtooth National Forest All Units; Caribou-Targhee National Forest All Units; Humboldt-Toiyabe National Forest All Units; Uinta-Wasatch-Cache All Units; Angeles National Forest All Units; Cleveland National Forest All Units; Eldorado National Forest All Units; Inyo National Forest All Units; Klamath National Forest All Units; Lassen National Forest All Units; Los Padres National Forest All Units; Mendocino National Forest All Units; Modoc National Forest All Units; Plumas National Forest All Units; San Bernardino National Forest All Units; Sequoia National Forest All Units; Shasta Trinity National Forest All Units; Sierra National Forest All Units; Tahoe National Forest All Units; Deschutes National Forest All Units; Fremont-Winema National Forest All Units; Gifford Pinchot National Forest All Units; Malheur National Forest All Units; Mt Baker-Snoqualmie National Forest All Units; Mt. Hood National Forest All Units; Ochoco National Forest All Units; Rogue River-Siskiyou National Forest All Units; Umatilla National Forest All Units; Umpqua National Forest All Units; Wallowa-Whitman National Forest All Units; Okanogan-Wenatchee National Forest All Units; Willamette National Forest All Units; R10 - Alaska Region All Units; WO - Washington Office - National headquarters |
Decision Memo · La Grande Ranger District · updated 6/25/2012
Chicken Creek subwatershed within the Upper Grande Ronde River watershed. · Union, Oregon
The Chicken Ck culvert on the 51 road is undersized and is a passage barrier for fish. This project would replace the culvert with a new bottomless arch culvert. This would improve passage for fish to reach their spawning grounds.
Watershed management
Comment Period
04/06/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Species Population Enhancements; Watershed Improvements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S, R35.5E, sec 3 |
Environmental Impact Statement · Whitman Ranger District · updated 3/30/2012
The project area encompasses 3 subwatersheds in an area located north and northwest of Halfway and Richland Oregon. · Baker, Oregon
Analysis of vegetation and fuels management needs in the Little Eagle Creek, Eagle Creek Paddy and Middle Goose Creek subwatersheds. Forest Plan Amendments for Screens.
Vegetation management (other than forest products)Fuels management
NOI in Federal Register
12/03/2008
DEIS NOA in Federal Register
04/15/2011
FEIS NOA in Federal Register
03/30/2012
Decision
03/2012 (Estimated)
Implementation
05/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Plan Amendment; Road Maintenance; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T. 7S, R. 44E, all sections T. 8S, R.44 E, most sections |
Environmental Assessment · La Grande Ranger District · updated 12/28/2011
Cove WUI, Moss Springs, Mt Fanny, Camp Creek · Baker; Union, Oregon
Respond to fire risk by modifying fire potential on public lands and respond to ecological risk with active management to restore fire-adapted ecosystems. Protect adjacent urban development, reduce hazardous fuels and restore fire-adapted systems.
Vegetation management (other than forest products)Fuels management
Objection Period Start
09/16/2011
Decision
11/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Plan Amendment; Special Products Sales; Species Population Enhancements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S, 40/41E and T3S 40/41E |
Environmental Assessment · Wallowa Valley Ranger District · updated 12/14/2011
West of Highway 3 in the Sled Springs Vicinity · Wallowa, Oregon
Reduce fuel loading and improve forest health through mechanical treatments and prescribed fire. Provide defensible space around the Sled Springs Guard Station to reduce the risk of loss due to wildfire.
Forest productsVegetation management (other than forest products)Fuels management
Comment Period
12/18/2009
Decision
11/2011 (Estimated)
Implementation
03/2012 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T3N R44E, W.M. |
Environmental Assessment · Wallowa Valley Ranger District · updated 6/22/2011
North end of Wallowa Valley Ranger District · Wallowa, Oregon
Development of OHV trail system and access plan for motorized travel on existing roads in the area west of Sled Springs.
Recreation managementRoad management
Comment Period
03/23/2006
Decision
05/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Road Decommissioning; Dispersed Recreation Mgmt.; Trail Management; Travel Management |
| Sled Springs OHV Trail System and Road Management Plan | Decision Signed Date: 05/29/2009 Legal Notice Date: 06/04/2009 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
Environmental Assessment · Eagle Cap Ranger District · updated 4/7/2011
Rock Creek Trail #1905 and Chief Joseph Trail #1803 · Union, Oregon
Replace the existing trail bridge on Trail #1905 with another trail bridge using a helicopter to transport materials to the site.
Recreation management
Comment Period
02/05/2010
Decision
03/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Trail Management; Wilderness Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | Eagle Cap Ranger District |
| Legal Land Description | T 4S, R42E, Section 14, and T 3S, R45E, Section 29, WM |
Decision Memo · La Grande Ranger District · updated 2/23/2011
Located on the Spring Creek, Big Creek, Pole Creek, and Five Point Allotments · Union, Oregon
This project is located at various allotments. Improvements such as stock pond construction, spring development, cattleguards, and riparian exclosure fences to project riparian areas and keep livestock inside allotments.
Grazing management
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S,R36E sec 33; T5S, R34E, sec 21 & 35; T2S, R36E, sec 15 |
Environmental Assessment · La Grande Ranger District · updated 10/25/2010
Sheep Creek and Lower Fly Creek subwatersheds · Union, Oregon
Reduce suface and ladder fuels through mechanical thinning (chainsaws) and precribed burning within the Blue Fly WUI.
Fuels management
Objection Period Start
09/18/2010
Decision
10/2010 (Estimated)
Implementation
11/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Blue Fly Fuels Reduction | Decision Signed Date: 10/25/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T5S, R35E, sec 15-17, 20-23, and 26-30 |
Environmental Assessment · Whitman Ranger District · updated 10/20/2010
Thirty small aspen units across Pine District in both the Pine and Eagle Creek Watersheds. · Baker, Oregon
This project proposes to remove coniferous competition from approximately 120 acres of aspen stands identified across Pine and Eagle Creek watersheds. The project would include removal of overstory conifers over 21 inches in diameter (dbh).
Vegetation management (other than forest products)
Comment Period
04/30/2009
Decision
08/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Plan Amendment; Species Population Enhancements; Timber Sales (Green) |
| Tremble Aspen DN | Decision Signed Date: 08/26/2010 Legal Notice Date: 10/18/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
Environmental Assessment · Hells Canyon NRA · updated 10/6/2010
Mink Allotment is near Marr Flat and Schleur Allotment is along the Imnaha River near College Creek and on Middle Point Divide · Wallowa, Oregon
Authorize commercial livestock grazing on the Mink Allotment and the Schleur Allotment.
Grazing management
Comment Period
02/25/2010
Decision
09/2010 (Estimated)
Implementation
12/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Grazing, Rescissions Act Of 1995 |
| Notice and Comment Regulation | 215 |
| Project Activity | Grazing Authorizations |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District; Hells Canyon NRA |
| Legal Land Description | Mink - T3S, R47E; Schleur - T1N, R48E and T1S, R48E; WM |
Environmental Assessment · Whitman Ranger District · updated 9/21/2010
The proposed mining is located in the Elk Creek drainage, Powder/Sutton creek watershed on the Whitman Ranger District, Wallowa-Whitman NF. · Baker, Oregon
The KC Two Placer operation has entered in a plan for testing and small scale placer mining in the Elk Creek drainage.
Minerals and geology
Comment Period
05/03/2010
Decision
07/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Minerals Or Geology Plans Of Operations |
| KC Placer Mining | Decision Signed Date: 07/07/2010 Legal Notice Date: 07/09/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T 9S, R 39E, section 32 |
Environmental Assessment · La Grande Ranger District · updated 8/16/2010
South of Vey Meadow, Chicken Hill Area · Union, Oregon
Commercial thinning, non-commercial thinning, prescribed burning.
Fuels managementForest products
Comment Period
05/27/2010
Decision
08/2010 (Estimated)
Implementation
09/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Rooster Vegetation Management EA | Decision Signed Date: 08/11/2010 Legal Notice Date: 08/13/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T6S R35 & 36E |
Environmental Impact Statement · Wallowa-Whitman National Forest All Units · updated 6/29/2010
All areas under the administration of the Wallow-Whitman National Forest · Adams; Idaho; Nez Perce; Baker; Grant; Malheur; Umatilla; Union; Wallowa, Idaho; Oregon
Treatment of known and newly discovered invasive plants using herbicide, manual, mechanical, biological, and/or cultural methods. The Forest has approx. 25,000 acres of invasive plants.
Vegetation management (other than forest products)
NOI in Federal Register
04/13/2006
DEIS NOA in Federal Register
03/06/2009
FEIS NOA in Federal Register
05/21/2010
Decision
04/2010 (Estimated)
Implementation
08/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Noxious Weed Treatments |
| Wallowa-Whitman National Forest Invasive Plants Treatment Project | Decision Signed Date: 04/02/2010 Legal Notice Date: 05/21/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa-Whitman National Forest All Units |
| Legal Land Description | Forest wide |
Environmental Assessment · Whitman Ranger District · updated 6/24/2010
Located north and west of the town of Unity at the boundary of the Wallowa-Whitman, Umatilla and Malheur Forests. · Baker, Oregon
Analysis of hazardous fuels and vegetation needs in proximity to private land and recreational structures in the historic Greenhorn mining district.
Vegetation management (other than forest products)Fuels management
Objection Period Start
05/03/2010
Decision
06/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (12), 36 Cfr 220.6(E)(12) |
| Special Authority | Hfra Title I: Wildland-Urban Interface |
| Notice and Comment Regulation | 218 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments |
| Greenhorn WUI | Decision Signed Date: 06/15/2010 Legal Notice Date: 06/16/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | Township 10 South, Range 40 East |
Environmental Assessment · La Grande Ranger District · updated 5/3/2010
2120 road crossing to major forks of Bear Creek · Union, Oregon
The project will add large wood to 4.5 mi of Bear Creek, restore the disconnected floodplain, and remove portions of the railroad grade that impinge on the stream channel and block Bear Creek access to the floodplain.
Wildlife, fish, rare plants
Comment Period
03/26/2010
Decision
04/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (7), 36 Cfr 220.6(E)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Species Habitat Improvements; Species Population Enhancements |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T4S - R34E, sections 3, 4, 9, 16, lower Meadow Creek subwatershed and Sullivan Gulch |
Environmental Assessment · La Grande Ranger District · updated 4/14/2010
Walker Ridge, Three Cabin, and Sugar Loaf Mountain · Umatilla; Union, Oregon
Commercial thinning, non-commercial thinning, slash buster, and prescribed burning.
Fuels managementForest products
Comment Period
11/17/2008
Decision
04/2010 (Estimated)
Implementation
07/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Plan Amendment; Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S, R36 & 37E |
Decision Memo · La Grande Ranger District · updated 1/25/2010
Pelican Creek is located within the Five Points Subwatershed. 1.8 miles NW of Hilgard. · Baker; Union, Oregon
Place a temp bridge on an existing abuttment to provide the landowner with a better crossing for the landowner to remove there timber.
Wildlife, fish, rare plants
Decision
01/2010 (Estimated)
Implementation
04/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Land Use Adjustments; Watershed Improvements |
| Pelican Creek Temporary Bridge | Decision Signed Date: 01/04/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T2S, R36E, sec 30 NW/SW |
Decision Memo · La Grande Ranger District · updated 1/25/2010
Catherine Creek and Upper Grande Ronde River watersheds · Union, Oregon
Pre-commercially thin (chainsaws) in previously harvested areas. These units are located within 500 feet of Class I through Class IV streams.
Watershed managementVegetation management (other than forest products)
Decision
01/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Watershed Improvements |
| Upper Grande Ronde River & Catherine Creek TSI | Decision Signed Date: 01/25/2010 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
Decision Memo · Whitman Ranger District · updated 12/18/2009
Located in the City of Cove, Oregon · Union, Oregon
Maintenance and operation of water diversions, weirs, pipelines, roads, and a temporary bridge associated with Federal Energy Regulatory Commissions' City of Cove Project No. 5390-002.
Special use management
Decision
12/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (15) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| City of Cove Special Use Permit Water Transmission Pipeline and Weir | Decision Signed Date: 12/10/2009 |
| Forests | Wallowa-Whitman National Forest |
| Districts | La Grande Ranger District |
| Legal Land Description | T. 3 S, R. 41 E, sections 19 and 30 |
Environmental Assessment · Whitman Ranger District · updated 12/3/2009
South of Baker City on the Burnt River side of Dooley Mountain. · Baker, Oregon
Analysis of vegetation and fuels management needs in the Denny Creek, Dooley Mountain, and Dark Canyon areas near the Dooley Burn.
Fuels managementVegetation management (other than forest products)Forest products
Comment Period
05/19/2009
Decision
08/2009 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Timber Sales (Green) |
| Sundry/Rooster Rock vegetation Management Project | Decision Signed Date: 08/05/2009 Legal Notice Date: 08/07/2009 |
| Sundry Rooster Rock Vegetation Management Project | Decision Signed Date: 08/05/2009 Legal Notice Date: 08/07/2009 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T11S, Ranges 39 and 40E |
Decision Memo · Hells Canyon NRA · updated 11/30/2009
The portion of Forest Road 39 from Duck Creek to State Highway 86 · Baker, Oregon
Repair and resurface a portion of Forest Road 39.
Road management
Decision
10/2009 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Improvements/Construction |
| North Pine Creek Road 39 Reconstruction Project | Decision Signed Date: 10/05/2009 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Hells Canyon NRA |
| Legal Land Description | T6S, R47E and T7S, R47E, WM |
Environmental Assessment · Wallowa Valley Ranger District · updated 9/24/2009
Simmons Draw near Powwatka Ridge · Wallowa, Oregon
Reduce fuel loading adjacent to private land to reduce threat of wildfire.
Fuels management
Comment Period
07/02/2009
Decision
08/2009 (Estimated)
Implementation
12/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Salvage); Timber Sales (Green) |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T3N, R43E, WM |
Environmental Assessment · Wallowa Valley Ranger District · updated 9/24/2009
Headwaters of Tyee Creek and Grouse Creek near Tyee Butte · Wallowa, Oregon
Reduce fuels in the Tyee Butte area through mechanical treatments. The agency has been enjoined from using CE#10 and the project will be covered under selection of Alternative B from the Spooner EA.
Forest productsFuels management
Comment Period
10/02/2008
Decision
09/2009 (Estimated)
Implementation
11/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (10) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Timber Sales (Salvage); Timber Sales (Green) |
| Tyee Vegetation Management Project | Decision Signed Date: 09/16/2009 Legal Notice Date: 09/17/2009 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T4S R47E, W.M. |
Decision Memo · Whitman Ranger District · updated 9/16/2009
Anthony Lakes Summer Homes Area · Baker, Oregon
Develop proposals for fuels treatments on and adjacent to leased recreation lots with cabins in the Anthony Lakes area of the Whitman Unit
Vegetation management (other than forest products)
Comment Period
07/17/2009
Decision
09/2009 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Forest Vegetation Improvements |
| Floodwater Flats Hazardous Fuels Reduction Project | Decision Signed Date: 09/14/2009 Legal Notice Date: 09/16/2009 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Whitman Ranger District |
| Legal Land Description | T7S, R37E, S7 |
Environmental Assessment · Wallowa Valley Ranger District · updated 6/18/2009
Billy Creek and Peavine Creek drainages · Wallowa, Oregon
Reduce fuel loading through mechanical treatment and prescribed fire. This project area now includes the adjacent Red Vine Vegetation Management Project, for which a decision was signed using CE #10. The agency was enjoined from using this category
Watershed managementFuels managementWildlife, fish, rare plantsForest products
Comment Period
04/02/2009
Decision
05/2009 (Estimated)
Implementation
09/2009 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 215 |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Timber Sales (Green) |
| B-Vine Vegetation Management Project | Decision Signed Date: 05/21/2009 Legal Notice Date: 05/21/2009 |
| Forests | Wallowa-Whitman National Forest |
| Districts | Wallowa Valley Ranger District |
| Legal Land Description | T 4N, R46E, W.M. |