Replace the existing septic tank and lift tank with a 1500 combination tank with a mound system. The system would be placed on the back side of the cabin, away from the lake. The new septic will be located in the same location as old septic.
Location
Lot 4 of the South Winnie Recreation Residences, within the Leech Lake Band of Ojibwe Reservation.
Project timeline
1
Scoping Start
07/02/2018
2
Decision
07/2018 (Estimated)
3
Implementation
07/2018 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Lot 4 South Winnie Septic Replacement | Decision Signed Date: 07/12/2018 |
| Forests | Chippewa National Forest |
| Districts | Blackduck Ranger District |
| Legal Land Description | SE1/4 Sec 12, T. 145N, R. 29 W |