Chippewa National Forest — Project Detail

409 projects with crawled detail · milestones · contacts · documents

Chippewa National Forest

R09 Eastern · 409 projects · crawled 2026-08-01
Completed 389 Cancelled 20
Decision Memo 372 Environmental Assessment 34 Categorical Exclusion 2 Environmental Impact Statement 1
405 with documents 94 with comments page
Environmental Assessment · Blackduck Ranger District · updated 1/13/2026
south of Pennington to Hwy 2 and west of Lake Winnie to the Forest boundary · Beltrami; Cass, Minnesota

Vegetation management of the 107,000 acre Pennington South Planning area located between Pennington and HWY 2, West of Lake Winnibigoshish.

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
10/01/2024
Comment Period
06/15/2025
Objection Period Start
01/2026 (Estimated)
Decision
03/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Samuel Ainsley · samuel.ainsley@usda.gov
NEPA / regulatory detail
Special AuthorityNational Fire Plan - Healthy Forests Initiative Alternative Consultation Arrangements
Notice and Comment Regulation219 (2012)
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Special Area Management; Scenery Management; Timber Sales (Salvage); Travel Management; Timber Sales (Green); Watershed Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Categorical Exclusion · Deer River Ranger District · updated 1/6/2026
South of Burrows Lake, North of Lost Moose Lake · Itasca, Minnesota

Use and maintenance of a private road crossing NFS lands.

Special use management
NEPA Start Date
12/8/2025
Finding/Decision Date
1/6/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date1/6/2026
Categorical Exclusion · Deer River Ranger District · updated 1/6/2026
South of Highway 2, East of Bena · Cass, Minnesota

GLGT is requesting to conduct a federally mandated integrity dig. Routine inspections detected anomalies along pipe segments that may require maintenance. The dig will provide visual inspection and the ability to perform required maintenance. The work will be conducted on Line 100.

Special use management
NEPA Start Date
12/1/2025
Finding/Decision Date
12/11/2025
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date12/11/2025
Decision Memo · Walker Ranger District · updated 12/15/2025
T141N, R31W, Sec 27 · Cass, Minnesota

To issue a special use road permit to the Eckman Drive Road Association to provide legal access to their private parcels.

Special use management
Scoping Start
02/14/2025
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 12/11/2025
Howard Lake Area · Cass, Minnesota

Installation and maintenance of 972 feet of line to be installed in a 36-inch-wide corridor to reach a residence. Trees will be cleared along the corridor route. This project is outside of the reservation boundary.

Special use management
Scoping Start
11/04/2024
Decision
03/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R31W, Section 31
Decision Memo · Chippewa National Forest All Units · updated 12/11/2025
Howard Lake Area · Cass, Minnesota

Installation and maintenance of 972 feet of line to be installed in a 36-inch-wide corridor to reach a residence. Trees will be cleared along the corridor route. This project is outside of the reservation boundary.

Special use management
Scoping Start
01/24/2025
Decision
03/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R31W, Section 31
Decision Memo · Deer River Ranger District · updated 12/11/2025
Little Cut Foot Sioux Recreation Residence Tract, Lot 5 · Itasca, Minnesota

Replacement of roofing on cabin and garage. On Reservation.

Special use management
Scoping Start
06/01/2022
Decision
09/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 36
Decision Memo · Deer River Ranger District · updated 12/9/2025
Latitude 47.073, Longitude -94.021. From Remer, MN travel North on County Rd 4 for 5.0 miles. Turn left on to FR2117 and travel 1.8 miles. Turn left on to FR2085 for 1.4 miles. On Reservation. · Cass; Itasca, Minnesota

Paul Stangler is requesting winter access to a state timber sale that requires the creation of a new temporary road off the end of FR2085. Paul has flagged the location of the proposed temp road for review.

Special use management
Scoping Start
12/20/2023
Decision
01/1970 (Estimated)
Implementation
01/2024 (Estimated)
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date07/02/2026
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT142N R27W Sec 25} {T142N R26W Sec 30&31
Decision Memo · Walker Ranger District · updated 12/4/2025
North of the Supervisor's Office in Cass Lake. · Cass, Minnesota

CR 151 needs to be graded to provide for proper drainage by removing the old road and replacing it with appropriate materials and construction.

Special use management
Scoping Start
02/26/2025
Decision
04/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionTownship 145N, Range 31 W, Sec. 16
FR3334 Road Permit Cancelled
Decision Memo · Chippewa National Forest All Units · updated 12/4/2025
East of Island Lake · Itasca, Minnesota

Issuing a special use road permit for construction, access, and maintenance of FR3334. Proposed road would cover approximately 1.3 acres.

Special use management
Scoping Start
05/09/2022
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT150N, R26W, Sec 9
Decision Memo · Chippewa National Forest All Units · updated 8/28/2025
The entire Chippewa National Forest · Beltrami; Cass; Itasca, Minnesota

Decision to approve the CPF System Road Maintenance Project which includes forest wide road maintenance activities within the existing roadway and adjacent clearing zones.

Road management
Scoping Start
08/02/2024
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Trapper Marshall · Trapper.Marshall@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 7/3/2025
Longville Area · Cass, Minnesota

Installation and maintenance of 53,211 ft of line to be installed using a vibratory plow or directional bore under roadways and water ways. Much of the line is existing and is to be upgraded to better meet demands. partly within reservation.

Special use management
Scoping Start
09/29/2023
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 6/18/2025
East side of Pike Bay · Cass, Minnesota

Replacement of septic system at West Pike Bay Lot 3 recreation residence

Special use management
Scoping Start
07/15/2024
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R31W, Section 25
Decision Memo · Chippewa National Forest All Units · updated 6/10/2025
T146, R30W, Section 15 · Cass, Minnesota

.25-mile interpretive trail. The trails width of approximately 8ft would involve clearing brush and small trees. portions of the trail will be widened for Interpretive displays. Project will avoid sensitive areas involving Lady Slippers, or other spe

Recreation management
Scoping Start
12/18/2023
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Cole Van Beusekom · Cole.VanBeusekom@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146, R30W, Section 15
Decision Memo · Chippewa National Forest All Units · updated 6/3/2025
The approximate location starts where the current NCT intersects State Highway 6, follows along State Highway 6, and ends at the forest boundary just north of Willow Lake · Cass, Minnesota

The trail reroute section is 10 miles. Decommission old NCT segments. Constructing two parking areas and two dispersed campsites, which will include fire grates, wilderness latrines, and tent pads.

Recreation management
Scoping Start
06/20/2024
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Scott Shipley · scott.shipley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionWest termini T 142N, R 25W, section 21. East termini T 143N, R 25W, section 25
Decision Memo · Blackduck Ranger District · updated 6/3/2025
primarily along the Mississippi River between Cass Lake and Lake Winnibigoshish · Cass, Minnesota

Thin about 269 acres of pine plantations. Prescribed fire on about 1,500 acres. Brushing, planting, and seeding as needed within the project area.

Land management planningSpecial area managementVegetation management (other than forest products)Watershed management
Scoping Start
08/14/2024
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Cory Mlodik · cory.mlodik@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Special Area Management; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land Description146N, R29W and 146N, R30W
Decision Memo · Deer River Ranger District · updated 5/22/2025
Marcell area · Itasca, Minnesota

Installation and maintenance of 9,756 feet of line to be installed using a vibratory plow or directional bore under roadways and water ways.

Special use management
Scoping Start
05/22/2025
Decision
05/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT148N, R25W. T59N, R26W
Decision Memo · Deer River Ranger District · updated 5/22/2025
East side of Turtle Lake and west of state highway 38 approximately 3 miles north of Marcell. Directly west of West Johnson Lake Road. · Itasca, Minnesota

To use and maintain an existing private road crossing CPF by adding gravel, grading, and plowing in the winter to access their residence. The portion of the road crossing forest is approximately 1,250 feet long.

Special use management
Scoping Start
03/17/2025
Decision
04/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R26W, Section 32
Decision Memo · Deer River Ranger District · updated 4/22/2025
Southeast side of Lake Winnibigoshish Lake by Winnie Dam, 17221 Winnie Dam Rd NE. -94.056, 47.428 degrees · Cass, Minnesota

Replace cabin 7 with 28%u2019x30%u2019 slab on grade three bedroom, ADA compliant cabin.

Special use management
Scoping Start
04/08/2025
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Section 26
Decision Memo · Walker Ranger District · updated 4/22/2025
North side of Twin Lake and east of County Road 129. Approximately 8 miles west of Remer. · Cass, Minnesota

Use and maintain an existing private road crossing CPF land by adding gravel, grading, and plowing in the winter to access their residence. The portion of the road crossing forest is approximately 1,200 ft long and 16 ft wide.

Special use management
Scoping Start
03/28/2025
Decision
04/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R27W, Section 14
Decision Memo · Chippewa National Forest All Units · updated 4/15/2025
Bimijiwan Campground and the West Winnie Boat Launch on the Blackbuck District · Beltrami; Itasca, Minnesota

Implementing a tree spade to move nursery stock to the Bimijiwan and West Winnie recreation sites.

Recreation managementVegetation management (other than forest products)
Scoping Start
01/16/2025
Decision
04/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Scenery Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionSection 21 Township 146 North, Range 30 West (Bimijiwan) and Section 35 Township 146 North, Range 29 West (West Winnie)
Decision Memo · Deer River Ranger District · updated 4/15/2025
Inger area. Within LLBO reservation. · Itasca, Minnesota

Installation of Pedestals, Cabinets and Markers along fiber optic line

Special use management
Scoping Start
09/03/2024
Decision
04/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R26W, Sections 9, 16, and 17
Decision Memo · Walker Ranger District · updated 3/25/2025
Near HQ Bay of Leech Lake · Cass, Minnesota

Maintenance of FR3110 and the construction of four passing lanes and a turn around to increase accessibility to HQ Bay.

Road management
Scoping Start
04/26/2024
Decision
02/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Audrey Mays · audrey.mays@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 3/11/2025
Within 250 feet of existing rare plant populations as recorded in the Forest Service Natural Resource Manager (NRM) Threatened, Endangered, and Sensitive Species (TESP) database. · Beltrami; Cass; Itasca, Minnesota

Project cancelled because the same project already exists on the SOPA

Wildlife, fish, rare plants
Scoping Start
09/08/2023
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Justin Tufts · justin.tufts@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 2/10/2025
Marcell area. Within LLBO reservation. · Itasca, Minnesota

Installation of fiber optic cable and pedestals in Marcell area, 63,946 feet long.

Special use management
Scoping Start
08/08/2024
Decision
02/2025 (Estimated)
Implementation
03/2025 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 2/3/2025
East side of Highway 46, just south of Little Cut Foot Sioux Lake, 44394 State Hwy 46, Deer River Lat/Long (-94.044, 47.515) · Itasca, Minnesota

Remodel cabin 1 with new siding, windows, deck and roof to match the other cabins on the resort. Reconfigure resort playground area by repositioning it and building a 20'x24' open-air pavilion with concrete floor.

Special use management
Scoping Start
12/15/2023
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 25. On Reservation.
Decision Memo · Blackduck Ranger District · updated 1/24/2025
T145N, R29-31W; T146N, R28-31W; T147N, R28-31W; T148N, R28-31W; T149N, R26-31W; T150N, R26-28W · Beltrami; Cass; Itasca, Minnesota

Remove stems from multi-stemmed oaks by hand using a brush saw, chainsaw, or similar equipment. In stands where oak stump sprouts are competing with other deciduous trees, the competing saplings would also be cut to release the oak.

Wildlife, fish, rare plants
Scoping Start
05/01/2023
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Cory Mlodik · cory.mlodik@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 1/24/2025
North Side of Noma Lake · Itasca, Minnesota

New Roof on cabin, staining siding and painting trim

Special use management
Scoping Start
05/05/2023
Decision
07/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N, R26W, Sec 3
Decision Memo · Chippewa National Forest All Units · updated 1/24/2025
Located on the west side of Star Island. · Beltrami, Minnesota

Foundation Repair and roof replacement

Special use management
Scoping Start
08/21/2023
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Section 35
Decision Memo · Chippewa National Forest All Units · updated 1/24/2025
South West Side of Star Island · Beltrami, Minnesota

Removing old storage buildings and building a new shed as well as installing a septic system.

Special use management
Scoping Start
10/03/2024
Decision
12/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Section 34
Decision Memo · Deer River Ranger District · updated 1/24/2025
East shore of Lake Winnibigoshish approximately 2.5 miles south/southwest of Tamarack Point, 17081 South Highbanks Road NE. -94.145, 47.419 degrees · Itasca, Minnesota

After the fact staircase installation to lakeshore at recreation residence cabin and removal of old staircase

Special use management
Scoping Start
12/05/2023
Decision
06/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Section 31
Decision Memo · Blackduck Ranger District · updated 1/24/2025
Tassel Rd. · Itasca, Minnesota

wo temporary roads have been requested to access timber sale off of Forest Road 3312E . Approximate road locations are depicted in the resource review form along with KML attached in folder.

Special use management
Scoping Start
05/15/2024
Decision
05/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N R28W Sec 3
Decision Memo · Deer River Ranger District · updated 1/14/2025
North side Copenhagen Lake on the south side of FR 2487 (West Slauson Lake Road). Approximately 0.80 miles east of FR 2181 (Clubhouse Lake Road) · Itasca, Minnesota

Permittee proposes to use and maintain an existing natural surface private road/trail crossing Chippewa National Forest land to access their private cabin. The portion of the road crossing NFS land is approximately 3,084 feet long and 12 feet wide.

Special use management
Scoping Start
11/05/2024
Decision
01/2025 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N, R26W, Section 1
Decision Memo · Deer River Ranger District · updated 12/23/2024
The Greely area is located at: T147, R27, Sec.4 (47.566340�, -94.110025�) The Jessie area is located at: T147, R25, Sec.4 ( 47.580223�, -93.848360�) · Itasca, Minnesota

Prospecting to determine the existence of minerals inside and adjacent to the currently active USFS Greely and Jessie Gravel Pits. Prospecting will be performed using an excavator. No tree cutting. Low brush disturbance. Within LLBO reservation.

Minerals and geology
Scoping Start
07/18/2024
Decision
12/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Trapper Marshall · Trapper.Marshall@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147, R27, Sec.4 ; T147, R25, Sec.4
Decision Memo · Deer River Ranger District · updated 12/16/2024
Peninsula on south side of North Star Lake. 46580 North Star Lake Road. Lat/Long (-93.664, 47.552) · Itasca, Minnesota

New outhouse installation and capping of existing outhouse.

Special use management
Scoping Start
11/26/2024
Decision
12/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N, R26W, Section 32
Decision Memo · Deer River Ranger District · updated 11/21/2024
Southwest shore of Little Cut Foot Sioux Lake, 55990 Little Cut Foot Sioux Summer Homes Rd. -94.034, 47.502 degrees. Within LLBO Reservation. · Itasca, Minnesota

Replace failing septic system. New system will utilize compliant tank of existing system and have a new lift tank and pressure bed installed. Old non-compliant drainfield will be abandoned.

Special use management
Scoping Start
10/21/2024
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R26W, Section 31
Decision Memo · Deer River Ranger District · updated 11/20/2024
Southeast side of Cut Foot Sioux Lake by Williams Narrows, 43357 Williams Narrows Rd, -94.065, 47.502 degrees · Itasca, Minnesota

Drill new well, seal old well, and trench waterline from new well to existing well pit. On Reservation

Special use management
Scoping Start
08/07/2024
Decision
11/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 35
Decision Memo · Deer River Ranger District · updated 11/20/2024
46500 North Star Lake Road, NF 2147. Peninsula on southeast side of North Star Lake. Not on LLBO reservation. · Itasca, Minnesota

Recreation residence cabin staining and deck replacement.

Special use management
Scoping Start
08/06/2024
Decision
11/2024 (Estimated)
Implementation
12/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N, R26W, Section 32
Decision Memo · Chippewa National Forest All Units · updated 10/29/2024
Enbridge Line 3 corridor south of Highway 2. Within LLBO Reservation. · Itasca, Minnesota

Hand auger testing at 8 locations along the Line 3 decomissioning project. These tests a for the future removal of sections of the original Line 3 pipeline

Special use management
Scoping Start
10/22/2024
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 10/28/2024
Southeast side of Lake Winnibigoshish Lake near Winnie Dam, 4314 Winnie Dam Lane NE. -94.059, 47.428 degrees. Within LLBO reservation. · Itasca, Minnesota

Build new 1,008 square foot cabin with the exterior matching existing buildings on the property including utility line extensions, driveway extension, and new septic system. Within LLBO reservation.

Special use management
Scoping Start
07/23/2024
Decision
10/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Section 26
Decision Memo · Chippewa National Forest All Units · updated 10/10/2024
Approximately 9 miles Northwest of Remer, MN on Tobique Road NE at Boy River Bridge · Cass, Minnesota

Replacing a bridge on CSAH 53 aprox 9 miles northwest of Remer, MN

Road management
Scoping Start
02/21/2024
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Road Improvements/Construction
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R27W, Sec. 33
Decision Memo · Deer River Ranger District · updated 10/10/2024
East side of Highway 46, just south of Little Cut Foot Sioux Lake, 44394 State Hwy 46, Deer River Lat/Long (-94.044, 47.515) · Itasca, Minnesota

Remodel cabin 1 with new siding, windows, deck and roof to match the other cabins on the resort. Reconfigure resort playground area by repositioning it and building a 20'x24' open-air pavilion with concrete floor.

Special use management
Scoping Start
12/15/2023
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 25. On Reservation.
Decision Memo · Chippewa National Forest All Units · updated 10/10/2024
Stony Point · Cass, Minnesota

Dredge the small harbor on Lot 6 of Big Rock recreation residence tract and deposit dredge material on FS land

Special use management
Scoping Start
04/10/2024
Decision
06/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 10/10/2024
Marcell area. Outside of LLBO Reservation. · Itasca, Minnesota

Installation and maintenance of 97,838 feet of lie using a vibratory plow or directional bore under road and water ways. Much of the line is existing and is planned to be upgraded. Construction planned in 2024.

Special use management
Scoping Start
08/15/2023
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 10/10/2024
Southwest of Caribou Lake · Itasca, Minnesota

Reissuing a road permit on an existing road to new permittees.

Special use management
Scoping Start
02/28/2024
Decision
04/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT. 58N, R.26W, Section 10
Decision Memo · Chippewa National Forest All Units · updated 10/10/2024
West Pike Bay Rec Residences · Cass, Minnesota

Replacement of septic system at West Pike Bay Lot 3 recreation residence

Special use management
Scoping Start
05/15/2024
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Section 10
Decision Memo · Deer River Ranger District · updated 8/29/2024
Bigfork area · Itasca, Minnesota

Installation and maintenance of 18,226 feet of line to be installed using a vibratory plow or directional bore under roadways and water ways.

Special use management
Scoping Start
03/25/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT149N, R25W, Sec. 7, 8, 10, 11, 15, 17, & 21, T60N, R26W, Sec. 31 and T59N, R25W, Sec. 6
Decision Memo · Deer River Ranger District · updated 8/19/2024
North side of Cutfoot Sioux Lake in East Seelye Bay, 58671 Eagle Nest Road. -94.087, 47.527 degrees · Itasca, Minnesota

Cabin #4 replacement and waterline replacement.

Special use management
Scoping Start
08/18/2023
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 22
Decision Memo · Deer River Ranger District · updated 8/19/2024
East shore of Lake Winnibigoshish. Directly south of winter lake access point, 39039 Plughat Point Rd, -94.054, 47.441 degrees. Within LLBO reservation. · Itasca, Minnesota

Drill new well with yard spigot, remove existing well, and trench new waterline to cabin.

Special use management
Scoping Start
06/04/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Section 24
Decision Memo · Chippewa National Forest All Units · updated 8/15/2024
Campground is located on Leech Lake at the end of Stony Point Camp Road off of Onigum Road · Cass, Minnesota

replace large lighted fee board, restroom interior remodel, septic lift station replacement, well house replacement, septic system upgrade, RV dump station upgrades removal of sewer lagoon remnants, and campsite electric pedestal upgrade to 50 amp.

Recreation managementFacility management
Scoping Start
04/12/2022
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Nicholas Edington · nicholas.edington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, S3/10
Decision Memo · Chippewa National Forest All Units · updated 8/15/2024
Mabel Lake Campground, South Pike Bay Campground, Stony Point Campground · Cass, Minnesota

Campground maintenance at South Pike, Stony Point and Mabel Lake consisting of campsite spur maintenance, gate removal and replacement and stump grinding. South Pike Day use site will have the vault toilet replaced.

Recreation management
Scoping Start
12/07/2023
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
David Johnson · david.e.johnson3@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionMabel Lake: Township: 141, Range: 27, Section: 10-Stony Point: Township: 142, Range: 30, Section: 10 South Pike Bay: Township: 145, Range: 31, Section: 35
Decision Memo · Chippewa National Forest All Units · updated 8/5/2024
Chippewa National Forest general use areas · Beltrami; Cass; Itasca, Minnesota

Cut approximately 100 trees per year for 5 years (late summer to fall). Trees will average 5-10" DBH. Any tree species is available for seed collection. Trees may be climbed to gather seed. Tree seed may be collected from ground-level.

Vegetation management (other than forest products)
Scoping Start
07/23/2024
Decision
07/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 8/5/2024
Proposed transfer land parcels are located within the boundary of the Leech Lake Band of Ojibwe Reservation and within Cass County, MN. · Cass, Minnesota

The purpose of this project is to implement the direction established by the Leech Lake Band of Ojibwe Reservation Restoration Act. In the Act, Congress transfers approximately 11,760 acres of federal land to be held in trust by the BIA

Land ownership management
Scoping Start
08/11/2023
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Michael Stearly · michael.stearly@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 8/2/2024
West of Deer River off Hwy 2 · Itasca, Minnesota

geo-technical soil boring at 4 locations which will temporarily use 10,000 sq ft of land within existing utility corridors. 3" diameter and up to 50' down for boring holes. No waste material left on site. Holes backfilled with native soil.

Special use management
Scoping Start
05/14/2024
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R25W, Sec. 12 & 24 and T146N, R25W Sec. 3
Decision Memo · Deer River Ranger District · updated 7/16/2024
West of Deer River off Hwy 2 · Cass, Minnesota

Enbridge would like to install additional leak detection sensors around the Line 4 (48in) valve site at mile post (MP) 986.44 (Lat: 47.322125, Long: -93.964499).

Special use management
Scoping Start
03/04/2024
Decision
07/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT144N, R26W, Sec. 4
Decision Memo · Deer River Ranger District · updated 6/11/2024
East shore of Lake Winnibigoshish approximately 2.5 miles south/southwest of Tamarack Point, 17081 South Highbanks Road NE. -94.145, 47.419 degrees · Itasca, Minnesota

Replace failing septic system as part of requirements for cabin sale. New system will be placed where the existing system is located. Within LLBO reservation.

Special use management
Scoping Start
05/10/2024
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Section 31
Decision Memo · Deer River Ranger District · updated 5/22/2024
Bena area · Cass, Minnesota

Installation and maintenance of 1,625%u2019 of line to be installed using a directional bore. Trees will be cleared around the bore pit area where the cable will start and stop. Within reservation.

Special use management
Scoping Start
02/26/2024
Decision
05/2024 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT145N, R28W, Sec. 25 and 26
Decision Memo · Walker Ranger District · updated 5/21/2024
East side of Big Rice Lake · Cass, Minnesota

In response to EAB being detected at Big Rice Lake we are proposing a project that would include up to 250 acres of salvage harvests, up to 250 acres of sanitation harvests, planting of native species, and the release of parasidtoids.

Vegetation management (other than forest products)Forest products
Scoping Start
01/02/2024
Decision
05/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Douglas Putt · Douglas.Putt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (13), 36 Cfr 220.6(E)(13); 32.2 (14), 36 Cfr 220.6(E)(14)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N R26W Sec 22 & 27
Decision Memo · Walker Ranger District · updated 5/17/2024
Lat: 47.127323 Long: -93.921931 Township 54, Range 26, Section 11 · Cass, Minnesota

Culverts on the trail have raised out of the ground high enough that mowers are not able to progress on the trail. replacement of the culverts lower in the ground will fix the issue and puncheon would be built over the gap

Recreation management
Scoping Start
04/26/2024
Decision
01/1970 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
David Johnson · drjohnson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Decision Decided Date07/02/2026
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionTownship 54, Range 26, Section 11
Decision Memo · Chippewa National Forest All Units · updated 5/15/2024
Longville · Cass, Minnesota

Installation and maintenance of 15,556 feet of fiber optic cable and pedestals using a vibratory plow or directional bore under roadways and water ways. Much of the line listed is existing and is planned to be upgraded to better meet the demands.

Special use management
Scoping Start
04/10/2024
Decision
04/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R28W, Sec. 20, 29, 32, and 33, T142N, R28W, Sec. 27, 28, 29, and 34
Decision Memo · Chippewa National Forest All Units · updated 5/15/2024
Whipholt Area · Cass, Minnesota

Installation and maintenance of 46,758 ft of line to be installed using a vibratory plow or directional bore under roadways and water ways. Much of the line is existing and is to be upgraded to meet demands. Partly within reservation.

Special use management
Scoping Start
09/29/2023
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 4/10/2024
Stony Point on Leech Lake · Cass, Minnesota

Dredge the Harbor and deposit dredge material on FS land. The deposit location for the dredging material is the same as a previous dredging project

Special use management
Scoping Start
10/05/2023
Decision
11/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Section 10
Decision Memo · Chippewa National Forest All Units · updated 4/10/2024
South west side of Star Island · Beltrami, Minnesota

Rebuilding stairway down to the lake and adding rock to the shoreline.

Special use management
Scoping Start
10/05/2023
Decision
02/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Section 35
Decision Memo · Deer River Ranger District · updated 2/22/2024
Northeast of Grave Lake · Itasca, Minnesota

Installation and maintenance of pedestals and 3,404 feet of fiber optic communication cable northeast of Grave Lake.

Special use management
Scoping Start
09/01/2023
Decision
02/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N, R26W, Sec. 9
Decision Memo · Deer River Ranger District · updated 2/22/2024
In the Bigfork Area · Itasca, Minnesota

Installation and maintenance of 50,702 ft of line using a vibratory plow or directional bore under road and water ways. Segments of the line are pre-existing and whole line will be upgraded. Construction planned in 2024.

Special use management
Scoping Start
08/14/2023
Decision
02/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 2/22/2024
East of Burns Lake · Itasca, Minnesota

Installation and maintenance of pedestals and 9,187 ft of fiber optic communication cable east of Burns Lake within an 8 ft ROW. This project is outside of the reservation boundary.

Special use management
Scoping Start
08/02/2022
Decision
02/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Peoples Telephone Arvig, East Burns Lake, Amendment 9Decision Signed Date: 02/22/2024
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N, R26W, Sec. 1, 2, 11, 12 and T60N, R26W, Sec. 35
Decision Memo · Chippewa National Forest All Units · updated 1/24/2024
The project is located east of Blackduck along county road 30 heading east towards Alvwood MN · Beltrami, Minnesota

Construction of a new snowmobile trail with portions on national forest lands along county road 30 east of Blackduck. Clearing of the path will be completed by small mechanized equipment tools avoiding removal of vegetation when possible.

Recreation management
Scoping Start
12/19/2023
Decision
01/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Cole Van Beusekom · Cole.VanBeusekom@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 1/17/2024
T146, R30W, Section 15 · Beltrami; Cass, Minnesota

.25-mile interpretive trail. The trails width of approximately 8ft would involve clearing brush and small trees. portions of the trail will be widened for Interpretive displays. Project will avoid sensitive areas involving Lady Slippers, or other spe

Recreation management
Scoping Start
12/15/2023
Decision
04/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Cole Van Beusekom · Cole.VanBeusekom@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146, R30W, Section 15
Decision Memo · Chippewa National Forest All Units · updated 1/3/2024
T146N, R31W, Section 35 · Cass, Minnesota

Replacement of roof

Special use management
Scoping Start
04/12/2022
Decision
12/2023 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Section 25
Decision Memo · Chippewa National Forest All Units · updated 12/13/2023
North side of Cutfoot Sioux Lake in East Seelye Bay, 58671 Eagle Nest Road. -94.087, 47.527 degrees · Itasca, Minnesota

Replace 14 old windows in Cabins 8, 9, and 10 and reside all of Cabin 10 and all but the lakeside of Cabin 9 with 2x8 full log siding.

Special use management
Scoping Start
09/29/2023
Decision
11/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 22
Decision Memo · Chippewa National Forest All Units · updated 12/13/2023
Whipolt area · Cass, Minnesota

LCP is requesting to replace overhead lines with single phase underground in the existing corridor for a length of 0.25 miles .

Special use management
Scoping Start
02/01/2023
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT141N, R29W, Section 17
Decision Memo · Deer River Ranger District · updated 12/12/2023
T147N, R27W, Section 25 · Itasca, Minnesota

Addition of gravel to existing driveway

Special use management
Scoping Start
09/01/2022
Decision
09/2022 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 25
Decision Memo · Deer River Ranger District · updated 12/6/2023
West of Deer River off Hwy 2 · Cass, Minnesota

3 maintenance digs on Line 4. 2.5 acre temporary workspace and access outside of the current permit area for a 1 year term with vegetative restoration. All wetland areas will be fully matted with wood timber mats. no tree removal greater than 6 inch

Special use management
Scoping Start
11/02/2023
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT145N, R26W, Sec. 31 & 33
Decision Memo · Walker Ranger District · updated 12/4/2023
North of Broadwater Bay on Woman Lake · Cass, Minnesota

New Road permit on an existing road.

Special use management
Scoping Start
10/25/2023
Decision
11/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R28W, Section 32
Decision Memo · Chippewa National Forest All Units · updated 12/4/2023
Stony Point on Leech Lake · Cass, Minnesota

Dredge the Harbor and deposit dredge material on FS land. The deposit location for the dredging material is the same as a previous dredging project

Special use management
Scoping Start
10/05/2023
Decision
11/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Section 10
Decision Memo · Walker Ranger District · updated 12/4/2023
South of Lower Trelipe Lake · Cass, Minnesota

Temporary road permit for FR2564D and the construction, use, and maintenance of a private driveway off of FR2564D

Special use management
Scoping Start
11/06/2023
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R27W, Section 35
Decision Memo · Chippewa National Forest All Units · updated 12/4/2023
Marcell area · Cass, Minnesota

Installation and maintenance of 97,838 feet of line to be installed using a vibratory plow or directional bore under roadways and water ways. Much of the line listed is existing and is planned to be upgraded to better meet the demands.

Special use management
Scoping Start
09/28/2023
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 12/4/2023
On Little Cutfoot Sioux Lake · Itasca, Minnesota

Installation of new septic system

Special use management
Scoping Start
09/03/2021
Decision
09/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 36
Decision Memo · Chippewa National Forest All Units · updated 12/4/2023
Southeast side of Cass Lake, Pike Bay · Cass, Minnesota

Installation and maintenance of a bank of mailboxes located on the the Takagami Loop Road at the junction of Pike Bay Road. The design includes the installation of 2 or 3 4x4 posts inserted into the ground. A 2x6 plank will be affixed to the top.

Special use management
Scoping Start
06/05/2023
Decision
07/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R31W, Sec. 36
Environmental Assessment · Blackduck Ranger District · updated 11/20/2023
The project extends from the northwestern corner of the Forest near Hines, MN, east to Moose Creek and south to Kitchi Lake. The project is outside the Leech Lake Band of the Ojibwe reservation. · Beltrami; Itasca, Minnesota

Multiple resource management project including forest vegetation, wildlife, and watershed improvements, as well as fuels and travel management activities. Some improvement and management activities will include the sale of forest products.

Forest productsWildlife, fish, rare plantsFuels managementRoad managementWatershed managementVegetation management (other than forest products)
Scoping Start
02/02/2021
Comment Period
08/13/2022
Objection Period Start
07/08/2023
Decision
11/2023 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Douglas Putt · Douglas.Putt@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147-149N, R29-31W
Decision Memo · Chippewa National Forest All Units · updated 11/8/2023
West of Bowstring Lake · Cass, Minnesota

The transfer of an existing road permit authorization to a new permit holder. The project is within the external boundaries of the LLBO Reservation.

Special use management
Scoping Start
09/27/2023
Decision
11/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R26W, Section 10
Decision Memo · Chippewa National Forest All Units · updated 11/8/2023
The proposed route includes FR 3274, North side of FR2423 and west of Itasca Highway 38. Near Jingo Lake · Itasca, Minnesota

Approximate 5 mile snowmobile trail reroute over Forest System roads, including approximately 2500 feet of an old temporary or decommissioned road segment.

Recreation management
Scoping Start
08/22/2023
Decision
11/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R26W, Sections 6, 7 and 8. T60N, R27W, Sections 1 and 12. T60N, R26W, Section 31
Decision Memo · Chippewa National Forest All Units · updated 11/2/2023
From Remer MN %u2013 South on Hwy 6, then West on Co RD 7, then North on FR2063 ending at Big Rice Site · Cass, Minnesota

Establishment of Big Rice gravel pit near Big Rice Lake by Remer Mn. Not on LL reservation.

Special use management
Scoping Start
11/01/2023
Decision
11/2023 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionSE/4 -S33-T141-R26
Decision Memo · Chippewa National Forest All Units · updated 10/24/2023
Boy River/Remer area · Cass, Minnesota

Installation and maintenance of fiber optic distribution lines in existing corridor for 25,000 feet. Will use direct burial plowing methods and low impact direction drilling will be used for crossing all streams and roads.

Special use management
Scoping Start
06/21/2023
Decision
10/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionT142N, R26W, Sec. 21, 27, and 28 & T143N, R25W, Sec.18 & T143N R26W, Sec. 13, 22, 27, and 34
Decision Memo · Chippewa National Forest All Units · updated 10/24/2023
Within 250 feet of existing rare plant populations as recorded in the Forest Service Natural Resource Manager (NRM) Threatened, Endangered, and Sensitive Species (TESP) database. A shapefile is provided. · Beltrami; Cass; Itasca, Minnesota

Seed collection, propagation, and out-planting of rare plants within existing populations.

Wildlife, fish, rare plants
Scoping Start
09/04/2023
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Justin Tufts · justin.tufts@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Population Enhancements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 10/5/2023
Northern Research Center & FS Communication Site (Locations are approximately 700%u2019 apart from each other on FR2143/Wilderness Trail) · Cass, Minnesota

Installation of a new service feed by 500ft directional bore and then south 70ft of bore to current meter location. Install of a new cable 120ft directional bored east to FS communication equipment. Clearing and installing new cabinets in ROWs.

Special use management
Scoping Start
09/21/2023
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N, R25W, Sec. 11 & 14
Decision Memo · Walker Ranger District · updated 9/29/2023
Onigum area · Cass, Minnesota

East Ottertail Telephone Arvig is requesting to install fiber optic communications cable and pedestals in the existing corridor for a length of 17,459 feet. Within the external boundary of the LLBO reservation.

Special use management
Scoping Start
05/04/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N R31W Section 11, 13, 14, & 24 and T142N R30W Section 15, 16, 17, & 34
Sugarbush Project Completed
Decision Memo · Blackduck Ranger District · updated 9/29/2023
Between Cass Lake and Big Lake Between Cass Lake and Big Lake Between Cass Lake and Big Lake · Beltrami, Minnesota

Improve accessibility of site that is utilized for a sugar bush by the Addiction and Dependency program. The improvements will be to construct a pavilion and stairs with a handrails.

Special use management
Scoping Start
09/15/2023
Decision
09/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 9/28/2023
Along Lost 40 Road, FR2240 · Itasca, Minnesota

Installation and maintenance of 1531 feet of underground 7200-volt distribution line along existing roadway. Removing the existing overhead power line.

Special use management
Scoping Start
08/10/2023
Decision
08/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT150N, R27W, Sec. 35
Decision Memo · Chippewa National Forest All Units · updated 9/20/2023
East side of Lake Winnibigoshish on Plughat Point Raod. NF2160 -94.054, 47.441 degrees · Itasca, Minnesota

Winnie Dam Lot 6 driveway improvements, foundation painting, landscaping, windscreen installation, tree stump removals, brushing, and canoe garden removal

Special use management
Scoping Start
08/08/2023
Decision
09/2023 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Section 24
Decision Memo · Chippewa National Forest All Units · updated 7/25/2023
Chippewa National Forest Supervisor's Office · Cass, Minnesota

The geothermal well at the S.O. was part of the previous HVAC system and is no longer used. This infrastructure needs to be decommissioned to eliminate potential groundwater contamination and safety issues with aging underground construction.

Facility management
Scoping Start
06/28/2023
Decision
07/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Mac Salvage Completed
Decision Memo · Deer River Ranger District · updated 6/26/2023
west of jessie lake, east of the turtle river, south of Talmoon and north of bowstring store. · Itasca, Minnesota

Salvage of windthrown trees in the Mack project area to recover economic value of timber.

Forest products
Scoping Start
04/03/2023
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Samuel Ainsley · samuel.ainsley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT 147 S, R 25 E, SEC. 12-13; T 59 N, R 26 W, SEC. 22-23, 27-28
Ruby Salvage CE Completed
Decision Memo · Deer River Ranger District · updated 6/26/2023
In an area west of Burnt Shanty Lake, east of Caribou Lake, south of Ruby Lake and north of Trout lake. · Itasca, Minnesota

Salvage of storm damaged timber up to 250 acres and construction of up to one-half miles of temporary road. Salvaging down, root sprung, tipped (more than 15% lean), bent over, or broken off trees meeting utilization specifications

Forest products
Scoping Start
04/27/2023
Decision
06/2023 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Samuel Ainsley · samuel.ainsley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 5/24/2023
Variety of locations · Cass, Minnesota

Installation and maintenance of fiber optic distribution lines. The cable will be installed using direct burial plowing methods and low impact direction drilling will be used for crossing all streams and roads. within reservation.

Special use management
Scoping Start
09/24/2021
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R28W, Sec. 25, 23, 15, 2; T143N, R28W, Sec. 35; T142, R27W, Sec.6, 5, 8; T141, R28W, Sec. 12; T141, R27W, Sec. 7; T144N, R29W, Sec. 31, T144N, R30W, Sec. 36
Decision Memo · Blackduck Ranger District · updated 5/19/2023
Lot 2 of Sandy Beach tract on Cass Lake, North of Cass Lake Minnesota. · Beltrami, Minnesota

Install a mini-split cooling unit on the SW side of the cabin. This unit will be placed on a above ground concreate pad with no ground disturbance and not be visible from the lake side of the cabin. within reservation.

Special use management
Scoping Start
02/24/2022
Decision
05/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Cole Van Beusekom · Cole.VanBeusekom@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145, R31W, Sec. 2
Spruce Decline CE Completed
Decision Memo · Chippewa National Forest All Units · updated 2/23/2023
throughout the Chippewa National Forest · Beltrami; Cass; Itasca, Minnesota

Address a recent and developing combination of fungal, and insect induced disease issues causing high mortality rates in white spruce and balsam fir stands forest wide.

Vegetation management (other than forest products)
Scoping Start
06/13/2022
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Douglas Putt · Douglas.Putt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 2/7/2023
BlackDuck Ranger Station · Beltrami, Minnesota

Decommisioning and disposal of the existing North and south warehouses, oil shed, and pesticide shed at the Blackduck Ranger Station and the construction of new buildings as replacements.

Facility management
Scoping Start
12/06/2022
Decision
02/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Debrah Willey · debrah.willey@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N R31W Sec 13
Decision Memo · Chippewa National Forest All Units · updated 2/6/2023
2.5 miles South of Whipholt, 2 miles East of Pine Lake along Old Grade road (Forest Road 2312). · Cass, Minnesota

Reroute 2.25 miles of the Chippewa C snowmobile trail from its current alignment on Old Grade Road (FR 2312) and move it onto mostly county land except for approx. 500 feet of new construction on FS land and using 0.65 miles of FR2830

Recreation management
Scoping Start
10/17/2022
Decision
02/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
Nicholas Edington · nicholas.edington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionTownship 141 N, Range 29 W, Section 22
Decision Memo · Chippewa National Forest All Units · updated 1/25/2023
West of Remer · Cass, Minnesota

Replace overhead lines with single phase underground in the same route using a vibratory plow and directional boring in wet areas. The total length is is 0.65 miles.

Special use management
Scoping Start
01/25/2022
Decision
01/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT142N, R25W, Section 29
Decision Memo · Chippewa National Forest All Units · updated 12/16/2022
Southwest of Walker, Howard Lake Road · Cass, Minnesota

Reconstruction and realignment of County Road 83 to improve public safety.

Special use management
Scoping Start
10/18/2022
Decision
12/2022 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (24), 36 Cfr 220.6(E)(24)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land Description) T. 141 N., R. 31 W., Section 18, 19
Decision Memo · Deer River Ranger District · updated 11/21/2022
In the areas of the Cut Foot Visitor Center, Onegume CG, and the Williams Narrows CG · Itasca, Minnesota

Upgrade existing out-of-date copper lines to high-speed fiber lines.

Special use management
Scoping Start
07/20/2022
Decision
11/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 25; T147N, R27W, Section 35
Decision Memo · Chippewa National Forest All Units · updated 10/31/2022
Southeast of Bowstring Lake · Itasca, Minnesota

Reissue a road permit to new private landowners.

Special use management
Scoping Start
10/17/2022
Decision
10/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R25W, Sec. 34
Decision Memo · Deer River Ranger District · updated 10/4/2022
USDA Forest Service land adjacent to the Forest Service Schoolhouse Gravel Pit (see on attached map) The Schoolhouse Gravel Pit is located at - 4741'24.95"N, 94 4'22.47"W · Itasca, Minnesota

Chippewa National Forest Engineering is requesting approval to prospect for mineral resources in the area directly adjacent to the current active Schoolhouse Lake Gravel Pit using a small excavator

Minerals and geologySpecial use management
Scoping Start
08/23/2022
Decision
10/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Samuel Ainsley · samuel.ainsley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT149N R27W S26
Decision Memo · Chippewa National Forest All Units · updated 9/19/2022
Walker and Blackduck Districts · Cass; Itasca, Minnesota

Road permit reissues for permits expiring 12/31/2022

Special use management
Scoping Start
07/11/2022
Decision
08/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Walker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 9/19/2022
West of Remer · Cass, Minnesota

Installation and maintenance of fiber optic distribution cables

Special use management
Scoping Start
04/07/2022
Decision
07/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT. 141 N., R. 27 W., Sections 9, 10, 11, 15, 14 and T. 141 N. R. 26 W. Sections 3, 4 and T. 142 N., R. 26 W. Sections 10, 11, 23
Decision Memo · Chippewa National Forest All Units · updated 9/19/2022
East of Boy Lake · Cass, Minnesota

Installation and maintenance of fiber optic cable.

Special use management
Scoping Start
08/03/2022
Decision
08/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionT143N, R27W, S. 20, 33, 35, 26; T143N, R26W, S. 31, 32, 29; T142N, R26W, S 6, 8, 17, 18; T142N, R27W, S. 13, 23, 26
Decision Memo · Chippewa National Forest All Units · updated 9/19/2022
T142N, R28W, Section 5 & 8 · Cass, Minnesota

Road permit for access to private property, Little Stony Point Drive NE

Special use management
Scoping Start
08/01/2022
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R28W, Section 5 & 8
Decision Memo · Deer River Ranger District · updated 9/15/2022
West of Ball Club · Cass, Minnesota

Installation of clean grout bags and riprap to cover, protect, and minimize potential erosion for lines 1 and 2 across the Mississippi River. Less then 5 ac. distrubance

Special use management
Scoping Start
09/01/2022
Decision
10/2022 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 9/14/2022
Between Jessie Lake and FR2423 · Itasca, Minnesota

Rebuilding and maintaining approximately 4.4 miles of transmission line. Replace existing poles with taller poles, heavier conductor wire and shield wire will be utilized to enable monitoring and communication with the electric grid.

Special use management
Scoping Start
08/16/2022
Decision
09/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R25W, Sec. 1, 11, 12; T148N, R25W, Sec. 1, 12, 13, 24, 36; T60N, R27W, Sec. 9, 16, 21
Decision Memo · Walker Ranger District · updated 8/22/2022
South of Cass Lake · Cass, Minnesota

Removal of above ground power line and removing line from the permit. on reservation.

Special use management
Scoping Start
01/11/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N R31W Section 27
Decision Memo · Chippewa National Forest All Units · updated 8/16/2022
North end of Lydick Lake · Cass, Minnesota

Permanently close a user created road to a dispersed campsite located on Lydick Lake that is intended for access by boat only.

Recreation managementRoad management
Scoping Start
04/25/2022
Decision
08/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Kenneth Hansen · kenneth.hansen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Road Maintenance
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R29W, Sec 01
Decision Memo · Deer River Ranger District · updated 7/14/2022
The proposed project is to convey approximately 0.4 acres of National Forest System (NFS) land for appraised value in the Hatch Lake area. · Itasca, Minnesota

The proposed project is to convey approximately 0.4 acres of National Forest System (NFS) land for appraised value to the property owner, to correct an encroachment.The conveyance acreage is the min amount of NFS necessary to resolve the encroachment

Land ownership management
Scoping Start
02/11/2021
Decision
07/2022 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Patti Turecek · pturecek@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments
Decision Decided Date07/14/2022
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT. 60 N., R. 27 W., section 23
Decision Memo · Deer River Ranger District · updated 7/13/2022
West of Little North Star Lake · Itasca, Minnesota

Installation and maintenance of pedestals and 2640%u2019 of fiber optic communication cable in the ROW of FR2158 aka County Highway 262. Vibrational plow will be used except where noted, then directional bore will be the installation method.

Special use management
Scoping Start
04/01/2022
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N, R26W, Sec 19, 30
Decision Memo · Chippewa National Forest All Units · updated 7/12/2022
West side of Little Cutfoot Sioux · Itasca, Minnesota

LCP is requesting to remove overhead lines and replace them with underground in the same route. The underground will be plowed and directional bored in wet areas. The total length is 2.21 miles and is scheduled for the Summer of 2023.

Special use management
Scoping Start
06/10/2022
Decision
06/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147 N, R27W, Section 36
Decision Memo · Chippewa National Forest All Units · updated 7/12/2022
T58N, R25W, S. 2, 3, 4, 5, 6, 8, 10; T57N, R26W, S. 3, 4; T58N, R26W, S. 1, 2, 20, 21, 22, 28, 33, 34. · Itasca, Minnesota

Installation of underground line to provide telephone, tv, and internet to the area. Not within the Leech Lake Reservation.

Special use management
Scoping Start
07/07/2022
Decision
07/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 7/12/2022
T146N, R27W, Sect. 26, Govt Lot 9 · Itasca, Minnesota

36'X60', steel siding (Evergreen) and roof (Brown), Garage/Shop for vehicle and equipment maintenance and storage at Pines Resort and Campground. Located within the Leech Lake Reservation.

Special use management
Scoping Start
03/01/2022
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Pines Resort and Campground - New Garage/ShopDecision Signed Date: 06/01/2022
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 7/12/2022
T147N, R27W, Section 25 · Itasca, Minnesota

Replacement of septic line from cabin to septic tank. Project located on LLBO reservation.

Special use management
Scoping Start
02/02/2022
Decision
05/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 7/7/2022
Between Cass Lake and Lake Winnibigoshish · Beltrami; Cass, Minnesota

Enhance habitat for snowshoe hare using various management practices including thinning and felling trees create elevated slash piles, increasing coarse woody debris and hiding cover.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
02/16/2022
Decision
07/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Cory Mlodik · cory.mlodik@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Walker Ranger District
Legal Land DescriptionT44N, R29W Section 1; T145N, R29W Sections 11 and 14; T145N, R30W Section 1; and T146N R30W Sections 26 and 35
Decision Memo · Chippewa National Forest All Units · updated 6/16/2022
Boy Lake Area, Hwy 200 · Cass, Minnesota

Install new fiber optic distribution cables.

Special use management
Scoping Start
05/09/2022
Decision
06/2022 (Estimated)
Implementation
08/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R27W, Sec. 21, 27, 28, 29, 33; T144N, R28W, Sec. 15, 16, 17
Decision Memo · Walker Ranger District · updated 6/15/2022
Stony Point on Leech Lake · Cass, Minnesota

requesting repair of a wood retaining wall that has rotted and is leading to erosion. On reservation.

Special use management
Scoping Start
01/2022 (Estimated)
Decision
01/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Sec. 10
Decision Memo · Walker Ranger District · updated 6/15/2022
T142N, R30W, Section 10 · Cass, Minnesota

Requesting new dock. within reservation boundary

Special use management
Scoping Start
02/03/2022
Decision
03/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Section 10
Decision Memo · Walker Ranger District · updated 6/15/2022
T142N, R31W, Section 14 · Cass, Minnesota

Replacement of decking on shoreline dock

Special use management
Scoping Start
04/18/2022
Decision
05/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT146N, R31W, Section 25
Decision Memo · Walker Ranger District · updated 6/14/2022
Chub Lake/Mud Lake(MDRNR Lands), Pine Grove -Bowstring River, Bowstring Lake (LLBO Tribal Land), Oak Point Minnesota Island Access. · Cass; Itasca, Minnesota

place floating boardwalks across sensitive wetlands in order to provide safe access to important wild ricing areas for LLBO tribal members while reducing wetland damage due to foot and ATV traffic.

Heritage resource managementWatershed management
Scoping Start
01/20/2021
Decision
05/2022 (Estimated)
Implementation
06/2022 (Estimated)
Project documents
Todd Tisler · ttisler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (7), 36 Cfr 220.6(E)(7); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 5/24/2022
Trail bridge is located on the North Country Trail south of Anway Lake. Bridge crosses flowage from Anway Lake to Shingobee River. · Cass, Minnesota

The project will replace the existing Anway Trail Bridge on the North Country Trail with a new hiker/pedestrian bridge.

Recreation management
Scoping Start
04/07/2022
Decision
05/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Craig Taylor · craig.taylor@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R31W, S17
Decision Memo · Blackduck Ranger District · updated 4/12/2022
Project stands are located 0.8 and 2.1 miles east on USFS Road 2352 off of Cass County Road 10 (Scenic Highway) · Cass, Minnesota

Advance restoration of species diversity, structural diversity, and a native plant community in a historically fire dependent pine ecosystem through the implementation of prescribed fire as well as seeding and planting of native plant species.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
03/15/2022
Decision
04/2022 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Michael Bildeaux · michael.bildeaux@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R30W, Sections 10 and 12
Decision Memo · Walker Ranger District · updated 2/1/2022
NW corner at the intersection of Cuba Hill Rd. (FR 2133) and Ketchum Rd. (FR 2135) in the Oak Point Area · Cass, Minnesota

conduct a 53 acre prescribed burn to reduce the dense emergent vegetation to create openings to offer better staging habitat and increase the diversity of forage for waterfowl.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
11/18/2021
Decision
02/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Douglas Putt · Douglas.Putt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land Description144N 30W 17
Decision Memo · Deer River Ranger District · updated 1/31/2022
Aerial powerlines across the CNF in Cass and Itasca counties. · Cass; Itasca, Minnesota

Reissuance of 1 expired permit for multiple powerlines throughout the CNF. Improvements already on the ground. Changes to existing operations and facilities will not be authorized.

Special use management
Scoping Start
07/20/2020
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Christopher Worthington · christopher.worthngton@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Longville Airport Completed
Decision Memo · Walker Ranger District · updated 1/31/2022
North of the City of Longville · Cass, Minnesota

maintenance and removal of brush and trees on Forest Service land that penetrate protected FAA surfaces.

Special use management
Scoping Start
11/18/2021
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R28W, Sec. 35
Decision Memo · Chippewa National Forest All Units · updated 1/19/2022
Hwy 2 between Cass Lake and Deer River · Cass, Minnesota

The Chippewa National Forest proposes to thin evergreen trees along the south side of Trunk Highway 2. The treatments are designed to reduce shading which results in low road surface temperatures and decreases the effectiveness of road salt.

Vegetation management (other than forest products)
Scoping Start
12/14/2021
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Douglas Putt · Douglas.Putt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 1/11/2022
Line 4 at Mileposts 984.9495 and 984.9667 within the boundary of LLBO Reservation and the Chippewa National Forest in Cass County, Minnesota · Cass, Minnesota

Enbridge-Issuing a temporary work permit to perform maintenance on Line 4. This is within the Leech Lake Band of Ojibwe reservation Boundary

Special use management
Scoping Start
11/06/2020
Decision
01/2021 (Estimated)
Implementation
01/2021 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT144N R26W Section 5
Marshall Lake Road Completed
Decision Memo · Walker Ranger District · updated 1/11/2022
T141N R28W Section 7 · Cass, Minnesota

To issue a special use permit allowing the use and maintenance of PVT-P5394 across Forest Land. Project is within LLBO boundary.

Special use management
Scoping Start
09/08/2020
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Ojibway Lot # 31 Completed
Decision Memo · Walker Ranger District · updated 1/11/2022
Ojibway Summer Home Group · Cass, Minnesota

Cabin owner is requesting to replace the existing chimney using new brick of a different color. Project is within LLBO boundary.

Special use management
Scoping Start
09/15/2020
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 1/11/2022
Lot 7 of the South Winnie Summer Home Group · Cass, Minnesota

Updating and installing windows, siding, doors and deck. adding an outhouse and deck. This project in inside the exterior boundary of the Leech Lake Band of Ojibwe reservation.

Special use management
Scoping Start
09/30/2020
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT145N, R29W, Sec. 12
Decision Memo · Deer River Ranger District · updated 12/15/2021
General location is the North East area of the Forest, north of the Mac Road, East of County Road 29, to the East boundary of the Forest. Not within the exterior boundary of the Leech Lake reservation · Itasca, Minnesota

Change the allowed use of existing snowmobile trail to mixed use, including ATVs. Trails may have the tread reshaped to improve drainage, gravel added; culverts installed, and possibly some type of structure to cross wet areas.

Recreation management
Scoping Start
11/29/2019
Decision
10/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Kenneth Hansen · khansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 11/18/2021
East of Moon Lake · Itasca, Minnesota

Install new electric service underground following the north side of FR3518, Briezin Trail, continuing westerly on a new right of way on the South line of Government Lot 5. The total length of new line would be 0.57 miles and would be plowed in.

Special use management
Scoping Start
10/15/2021
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N, R25W, Section 2
Decision Memo · Blackduck Ranger District · updated 11/7/2021
East side of Cass Lake, south of Pennington · Beltrami, Minnesota

Star Island, Norway Bluff Lot 5 Shed Proposal. Located within Reservation boundary

Special use management
Scoping Start
05/27/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Sect34
Decision Memo · Deer River Ranger District · updated 10/7/2021
Southeast corner of the Chippewa · Cass, Minnesota

install new single phase underground cable 15 feet off the edge of FR2101C. A DNR underwater permit will be applied for to directional bore under Foley Brook. The length is 1455 feet and width is 15 feet. Tree clea

Special use management
Scoping Start
09/15/2021
Decision
10/2021 (Estimated)
Implementation
10/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT141N, R25W, Section 15
Decision Memo · Blackduck Ranger District · updated 9/21/2021
East side of Cass Lake, south of Pennington · Cass, Minnesota

Lot 7 Knutson Dam Shed and Addition Proposal. Located within Reservation boundary.

Special use management
Scoping Start
05/27/2021
Decision
06/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R38W, Sect21
Decision Memo · Walker Ranger District · updated 9/21/2021
Walker Bay Lot 13 · Cass, Minnesota

construction of a stairway leading to boat dock

Special use management
Scoping Start
03/13/2021
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 9/17/2021
South end of Cass Lake. · Cass, Minnesota

Install a gate leading to Strawberry Point lot 9. this project occurs within the LLBO reservation boundary.

Special area management
Scoping Start
02/09/2021
Decision
04/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R30W, Section 18
Decision Memo · Blackduck Ranger District · updated 9/16/2021
South side of Lake Winnibigosh · Cass, Minnesota

The existing overhead line will be converted (plowed) to underground wire to a meter on a pedestal on private property.

Special use management
Scoping Start
07/16/2021
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R27W, Section 26
Decision Memo · Deer River Ranger District · updated 8/17/2021
North of Turtle Lake · Cass; Itasca, Minnesota

Installation and maintenance of 2558 feet of fiber optic communications cable. Installation and maintenance of BD5 pedestals and 24 x 36 inch vaults

Special use management
Scoping Start
07/01/2021
Decision
07/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R26W, Section 31
Decision Memo · Chippewa National Forest All Units · updated 8/2/2021
T147N, R27W, Sec. 27, 22, 21;T142N, R30W, Sec 10, 15;T57N, R26W, Sec 2, 11, 14;T57N, R26W, Sec 13, 14, 24 · Cass; Itasca, Minnesota

Remove overhead lines and replace them with underground wire in four locations. Using vibration plow/earth and directional boring. All right-of-way widths will be 15%u2019. This project is within the Leech Lake Band of Ojibwe Reservation boundary.

Special use management
Scoping Start
01/28/2021
Decision
06/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 7/8/2021
West side of Cass Lake · Cass, Minnesota

To install and maintain 5437 ft of telecommunication line along the FR2138 corridor.

Special use management
Scoping Start
04/21/2021
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R31W, Sec 27/22
BLD410100 Completed
Decision Memo · Blackduck Ranger District · updated 7/7/2021
Northwest of Noma Lake · Itasca, Minnesota

To issue a road permit authorizing the use and maintenance of private drive across Forest land.

Special use management
Scoping Start
04/12/2021
Decision
04/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT150N, R26W, Section 33
Decision Memo · Blackduck Ranger District · updated 7/7/2021
North of Meadow Lake · Beltrami, Minnesota

Reconstruct a portion of CSAH 22 to a bituminous surface with a 12 ft lane and a 4 ft shoulder with additional slope easements.

Special use management
Scoping Start
01/28/2021
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N, R31W, Sec. 6
Decision Memo · Blackduck Ranger District · updated 7/7/2021
Northwest of Cass Lake and in and around the Little Moose Lake area. · Beltrami, Minnesota

WO 18561, 18535, and 18536 are requesting to remove overhead lines and install a total of 6830 ft of buried 7.2kV electric distribution line and 7010 ft of buried 12470kV electric distribution line.

Special use management
Scoping Start
02/25/2021
Decision
06/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N R30W Sec 3, Sec 10, Sec 11, Sec 12, Sec 13, Sec 14, Sec 15, Sec 21. section 21 on reservation; T146N, R31W Sec 21, Sec 22, Sec 27 -on reservation
Ojibway 31 Chimney Completed
Decision Memo · Walker Ranger District · updated 7/7/2021
East side of Pikes Bay · Cass, Minnesota

Request to rebuild chimney with new bricks. Within reservation boundary

Special use management
Scoping Start
03/24/2021
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R30W, Section 30
Decision Memo · Blackduck Ranger District · updated 7/7/2021
Trail%u2019s End Rd; Old Curry Rd and Chief Boyd Dr. · Beltrami, Minnesota

Install and maintain 918 ft of new line plowed in alongside FR2205 Spur B for broadband internet. Install and maintain 4128 ft of new line plowed in alongside FR2368A and install and maintain 4128 ft of new line plowed in alongside FR2368A.

Special use management
Scoping Start
05/26/2021
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N, R26W, Sec 10 SW1/4 of NE1/4; T146N, R31W, Sec 14&11
Road Permit FR3414 Completed
Decision Memo · Blackduck Ranger District · updated 7/7/2021
West of Gilstad Lake · Beltrami, Minnesota

To issue a road permit allowing for the use and maintenance of FR3414

Special use management
Scoping Start
05/14/2021
Decision
05/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT148N, R31W, Section 1
Decision Memo · Blackduck Ranger District · updated 7/7/2021
North of Kitchi Lake · Beltrami, Minnesota

Road permit reissue for FR2237A, no changes are being made to the scope or magnitude of authorized activities.- On reservation.

Special use management
Scoping Start
01/27/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N, R30W, Sec. 29
Decision Memo · Blackduck Ranger District · updated 7/7/2021
West of Natures Lake · Itasca, Minnesota

Road permit reissue for FR2239, no changes are being made to the scope or magnitude of authorized activities.

Special use management
Scoping Start
01/13/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N, R27W, Sec. 31
Decision Memo · Blackduck Ranger District · updated 7/7/2021
East of Schoolhouse Lake · Itasca, Minnesota

Road permit reissue for FR2428A, no changes are being made to the scope or magnitude of authorized activities.

Special use management
Scoping Start
01/27/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N, R27W, Sec. 23
Decision Memo · Blackduck Ranger District · updated 7/7/2021
East of Cass Lake on Lake Winnibigoshish · Cass, Minnesota

Drill a new well to replace the previous one

Special use management
Scoping Start
04/27/2021
Decision
04/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R29W, Sec. 12
Decision Memo · Blackduck Ranger District · updated 7/7/2021
North Allen's Bay on Cass Lake · Beltrami, Minnesota

issuing easement showing the correct alignment of the West Windigo Road SE

Special use management
Scoping Start
03/31/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N,R31W, Sec. 21
Decision Memo · Deer River Ranger District · updated 5/20/2021
This is within the Cut Foot Experimental Forest are of the Chippewa National Forest. · Itasca, Minnesota

This project would include salvaging wood, site preparation, and regeneration of forest stands affected in the August 9, 2020 wind event. This is within the boundary of the Leech Lake Band of Ojibwe reservation.

Forest products
Scoping Start
04/26/2021
Decision
05/2021 (Estimated)
Implementation
06/2021 (Estimated)
Project documents
Douglas Kastendick · dkastendick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 10
Arvig Hwy 38 Completed
Decision Memo · Deer River Ranger District · updated 5/10/2021
Little Smith Road and Hwy 38 Junction · Itasca, Minnesota

Installation and maintenance of 190 feet of fiber optic communications cable and the installation and maintenance of a BD5 pedestal in the Highway 38 corridor. This is outside the Leech Lake Band of Ojibwe Reservation boundary.

Special use management
Scoping Start
03/16/2021
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N, R26W, Section 33, SE1/4 NW1/4
Decision Memo · Deer River Ranger District · updated 5/4/2021
East of Lake Winnibigoshish · Cass, Minnesota

Removal of current shed, construction of a new 20%u2019x20%u2019 shed on the same site. Structure will be built on cinder block and require minimal ground disturbance. This project is within the Leech Lake Band of Ojibwe reservation boundary.

Special use management
Scoping Start
01/20/2021
Decision
05/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Sec. 31
Decision Memo · Blackduck Ranger District · updated 4/23/2021
Along north side of Winnie Road · Cass, Minnesota

Installation of approximately 2500 feet of underground fiber optic communication cable, one 24" x 36" x 24" vault and one 40" x 10" x 10" pedestals

Special use management
Scoping Start
01/20/2021
Decision
04/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT. 146 N., R. 29 W., section 34, 5th PM.
Decision Memo · Deer River Ranger District · updated 4/20/2021
Northeast side of Hatch Lake. · Itasca, Minnesota

Duplicate project

Land ownership management
Scoping Start
02/2021 (Estimated)
Decision
01/1970 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
Christopher Worthington · christopher.worthngton@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Use Adjustments
Decision Decided Date07/02/2026
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Blackduck Ranger District · updated 3/24/2021
Scattered stands across the Blackduck and Walker Ranger Districts in Beltrami, Cass and Itasca Counties. Includes areas in the Leech Lake Reservation. · Beltrami; Cass; Itasca, Minnesota

Thin red and white pine and white spruce plantations to allow for more live crown ratios, with multiple entries. Diversify composition and structure of plantations in response to LLBO plantation thin TFPA proposal.

Road managementVegetation management (other than forest products)Forest productsFuels management
Scoping Start
11/26/2019
Objection Period Start
02/01/2021
Decision
03/2021 (Estimated)
Implementation
05/2021 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Road Maintenance; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Walker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 3/1/2021
8 miles Northwest of Talmoon, MN and three miles Southwest of Wirt, MN on the headwaters of Fletcher Creek. The access is from Itasca 29, however there is no public vehicle access to the impoundment. · Itasca, Minnesota

Improve watershed conditions, reduce maintenance costs, and increase public safety by Impoundment including removing the control structure,culvert,and flood plain fill material and revegetating with native species.This is outside the LLBO reservation

Watershed managementWildlife, fish, rare plants
Scoping Start
06/17/2020
Decision
02/2021 (Estimated)
Implementation
02/2021 (Estimated)
Project documents
Eric Raitanen · eric.raitanen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionTownship 149N Range 25W Section 30 - NE SW
Decision Memo · Deer River Ranger District · updated 12/2/2020
between Hwy 38 and Horseshoe lake · Itasca, Minnesota

Issue a road permit for a private driveway crossing roughly 113 feet of FS land covering approximately 0.04 acres. This not inside the LLBO reservation boundary.

Special use management
Scoping Start
11/19/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N R26W Sec. 20
Decision Memo · Chippewa National Forest All Units · updated 11/30/2020
SW of Rice Lake · Itasca, Minnesota

Plow and/or bore a fiber optic cable across Forestry Land to provide internet and telephone service to an address on Co Rd 126. Approximately 2000' in the right of way on the East Side of Co Rd 126. This is inside the LLBO reservation.

Special use management
Scoping Start
11/24/2020
Decision
11/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT148N, R27W, Sec. 11
Decision Memo · Deer River Ranger District · updated 11/18/2020
Within the Pine Grove Resort permitted area. Resort is eligible for the National Historic Register. Resort is along the Bowstring River, adjacent to Sand Lake, north of Deer River, MN. · Itasca, Minnesota

Pine Grove Lodge has requested approval to add 20 feet to Cabin 5 This project is located on National Forest System lands outside the Leech Lake Band of Ojibwe reservation.

Special use management
Scoping Start
12/08/2017
Decision
09/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 6, T. 147N, R26W, Itasca County
Decision Memo · Deer River Ranger District · updated 11/18/2020
Lot #8 of the Winnie Dam Recreation Residence Tract located on Lake Winnibigoshish, West of Deer River. · Itasca, Minnesota

Build an approximately 32 ft.long by 4 ft. wide staircase and hand rail at 39023 Plughat Point Rd. This project is within the exterior boundary of the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
08/25/2020
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 11/12/2020
Northeast Side of Leech Lake · Cass, Minnesota

Reissuing permit WAL545904 for a private road on Forest Land. No changes to permitted activities. Project is within LLBO Reservation

Special use management
Scoping Start
10/12/2020
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Walker Bay 14 Well Completed
Decision Memo · Walker Ranger District · updated 10/20/2020
Lot 14 of the Walker Bay Summer Home Group · Cass, Minnesota

Permit Holder is requesting to install a new well. Project is within LLBO boundary

Special use management
Scoping Start
10/02/2020
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 10/13/2020
Norway Beach-Pike Bay and Pennington Area · Beltrami; Cass; Itasca, Minnesota

Upgrade existing copper lines with installation of fiber optic in the existing right of way to comply with FCC requirements and meet customer demands for broadband. Within LLBO boundary

Special use management
Scoping Start
08/13/2020
Decision
10/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Patti Turecek · patti.turecek@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 9/25/2020
Lot #16 of Ojibway tract on Cass Lake, Southeast of Cass Lake · Cass, Minnesota

Cabin owner is requesting to build two free standing decks. One will total 84 square feet and the other will be an irregular shape roughly 114 square feet. There will be no ground disturbance. This is within LLBO boundary.

Special use management
Scoping Start
09/02/2020
Decision
09/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Walker Ranger District · updated 9/23/2020
Highway 200 between MN 371 and MN 84. Project is within Leech Lake Band of Ojibwe Reservation · Cass, Minnesota

Reconstruction of a 15.6-mile segment of TH 200, an existing two-lane from MN 371 to MN 84. Roadway work includes repair/replacement of bridge 8136 over Cedar Creek and bridge 8533 over Bag Creek. FS would issue new 100' easement.

Special use managementRoad management
Scoping Start
05/21/2018
Decision
09/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 9/17/2020
Located in the Norway Beach Recreation Area, Wanaki Loop. · Cass, Minnesota

Installation of electrical cable service from existing Wanaki Loop transformer to new transformer and service connect in Wanaki Loop; located behind site 151. Work completed with plow and direct bury of cable.

Recreation managementFacility managementSpecial use management
Scoping Start
08/25/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Christopher Worthington · christopher.worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 9/17/2020
Sunlite Lane, FR3449 and FR 3449B, South of Blackduck and on the south side of South Twin Lake. · Beltrami, Minnesota

To extend existing facilities along Sunlite Lane in Beltrami County a member of Beltrami Electric that is land locked by Federal Lands. The proposed project includes burying 7.2 kV Electric Distribution line 2,812 feet

Special use management
Scoping Start
08/28/2020
Decision
09/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 9/16/2020
Located on the Deer River and Walker RD%u2019s in the Remer area, east of the Leech Lake Band Reservation area. · Cass, Minnesota

The proposed project is to place new fiber optic line in existing telephone right of way authorized under permit WAL401504

Special use management
Scoping Start
08/18/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Christopher Worthington · christopher.worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 9/9/2020
Marcell exchange area in Itasca County, MN This is outside the boundary of the Leech Lake Band of Ojibwe Reservation. · Itasca, Minnesota

Install, operate, and maintain buried fiber optic communications cable & associated appurtenances in existing road rights-of-way in the Marcell area. Installation will employ vibratory plowing & directional boring methods, & restoration.

Special use management
Scoping Start
07/10/2020
Decision
09/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Barb Knight · barb.knight@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSee maps
Strawberry Point 9 Completed
Decision Memo · Chippewa National Forest All Units · updated 9/2/2020
Lot #9 of Strawberry Point tract on Cass Lake, East of Cass Lake · Cass, Minnesota

Permittee is proposing to remove the existing 1,088 square foot cabin and rebuild a new 900 square foot cabin. The cabin outside dimensions would measure 24'x 37'and consist of 2x6 wood framing. Project is inside LLBO

Special use management
Scoping Start
08/28/2020
Decision
08/2020 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 8/25/2020
Lot #16 of Winnie Dam tract on Lake Winibigoshish, west of Deer River. This is within the exterior boundary of the Leech Lake Band of Ojibwe Reservation. · Itasca, Minnesota

Repairs to basement for cabin on Recreation Residence lot under Special Use Permit; Winnie Dam, Lot 16.

Special use management
Scoping Start
12/19/2019
Decision
07/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146, R27W, Sec. 24
Environmental Assessment · Walker Ranger District · updated 8/12/2020
West to east between the Boy River and Walker District boundary; north to south between Goose/Vermillion Lakes and the Forest boundary; completely outside of the Leech Lake Reservation. · Cass, Minnesota

Multiple resource management project including forest vegetation, wildlife, and watershed improvements, as well as fuels and travel management activities. Some improvement and management activities will include the sale of forest products.

Fuels managementVegetation management (other than forest products)Road managementWatershed managementWildlife, fish, rare plantsForest products
Scoping Start
06/19/2019
Comment Period
11/27/2019
Objection Period Start
06/12/2020
Decision
08/2020 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 7/13/2020
West of Walker, MN and south of Cedar Lake · Cass, Minnesota

Issue a special use permit for the Hendricks' 2019 FR2807 to access his property for approximately 0.25 miles (1,300 feet), and a non-system road segment (driveway) for about 35'long and about 16' wide. Project is inside LLBO reservation boundary.

Special use management
Scoping Start
09/18/2019
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 6/15/2020
The proposed project is to place new fiber optic line in the existing road right-of-way of Hwy. 6, CSAH-125 and 44, north of Deer River, MN. · Itasca, Minnesota

Installation of fiber optic lines. This project is within the boundary of the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
07/11/2019
Decision
05/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionExisting road right-of-way of Hwy. 6, CSAH-125 and 44, north of Deer River, MN. T146N, R25W, Sec. 28, E1/2NE, E1/2NESE, S1/2SWSW, Sec. 29,SESESE, Sec. 32, E1/2NENE; T146N, R25W, Sec. 3, NENW.
Decision Memo · Chippewa National Forest All Units · updated 5/27/2020
Crosses through the middle of the Forest; generally parallel to Hwy 2. On the Leech Lake Reservation. · Cass; Itasca, Minnesota

New term permit authorization of Enbridge Pipeline Permit CAL401902 which expired 12/31/17.

Special use management
Scoping Start
03/17/2017
Decision
05/2020 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Little Winnie Completed
Environmental Assessment · Deer River Ranger District · updated 5/27/2020
From the south east shores of Lake Winnibigoshish and continues south in scatter blocks along the south east border of the Chippewa National Forest · Cass; Itasca, Minnesota

This project will include vegetation management. It is within the boundary of the Leech Lake Band of Ojibwe Reservation boundary.

Forest productsWatershed managementWildlife, fish, rare plantsRoad management
Scoping Start
12/14/2018
Comment Period
10/09/2019
Objection Period Start
02/09/2020
Decision
05/2020 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Travel Management; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land Description146N R26-27W, 145N R26-28W, 144N R25-27W, 143N R25 and 26 W, 142N R 25 W, 141 N R 25 W
Environmental Assessment · Blackduck Ranger District · updated 4/22/2020
One-half mile west of County State Aid Highway 39 and 6 miles south of Blackduck, MN, in Beltrami County (legal description: T148N, R31N, sections12, 13; T148N, R30W, section 18. · Beltrami, Minnesota

Updates to the use and management of the CCC camp, including seasons of use, maintained buildings, and non-structural land uses.

Special use managementFacility managementRecreation management
Scoping Start
03/13/2011
Comment Period
07/26/2013
Objection Period Start
05/16/2014
Decision
09/2014 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFacility Improvements/Construction; Heritage Resource Management; Special Use Authorizations; Facility Maintenance
Rabideau CCC Camp Management ProjectDecision Signed Date: 09/30/2014 Legal Notice Date: 10/03/2014
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT148N R31N Sections 12 and 13, T148N R30W Section 18
Decision Memo · Chippewa National Forest All Units · updated 4/15/2020
Lot#8 of Highbanks tract on Lake Winnibigoshish, west of Deer River · Cass, Minnesota

Permittee proposes to build addition to existing cabin. Existing cabin is 640 square feet. The proposed addition would be 20%u2019x12%u2019 (24 sq. ft.) and located to the NE side. No grading will be required. Project is within LLBO boundary.

Special use management
Scoping Start
01/21/2020
Decision
04/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 3/30/2020
T142N, R31W, Sec 5, SESE T142N, R31W, Sec 4, SWSW Cass County, Minnesota. East side of State Highway 371, 3 miles north of Walker, MN · Cass, Minnesota

New permit to install 3 inch natural gas pipeline along 371 corridor. Disturbance on National Forest System lands will be 30 feet wide by 376 feet long, or approximately 0.33 acres. No timber will be removed.

Special use management
Scoping Start
09/04/2018
Decision
03/2020 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 3/25/2020
Star Island, north of Cass Lake. · Beltrami; Cass, Minnesota

Improvements to the existing facilities located on Star Island which is located in the counties of Cass and Beltrami. Proposed improvements include replacing 4.3 miles of single-phase overhead pole line. Project is within LLBO boundary.

Special use management
Scoping Start
01/07/2020
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145, R31W, Sec. 2; T146, R31W, S25, S27, S34, S35, S36
Decision Memo · Walker Ranger District · updated 3/25/2020
CSAH 157 and 128, north of Hwy. 200. Within the Leech Lake Indian Reservation. · Cass, Minnesota

The proposal is to widen and regrade segments of CSAH 157 and 128, to allow for safer passage and to improve drainage for the existing roadway. The proposed area on National Forest System (NFS) land for CR 157 is approx. 2.03 miles.

Special use management
Scoping Start
05/10/2019
Decision
03/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionSec. 1, SWNW, Sec. 2, E1/2SENE, E1/2SE, T141N, R28WSec. 23, NWSE, Sec. 25, SENW, SENE, Sec. 35, E1/2SE, E1/2SENE, Sec. 36, W1/2SW, W1/2SWNW, T142N, R28W.
Decision Memo · Chippewa National Forest All Units · updated 3/24/2020
Lot #21 of Walker Bay tract on Leech Lake, north of Deer River · Cass, Minnesota

Installation of a new water well for a residence. The project is within the boundary of the Leech Lake Band of the Ojibwe Reservation.

Special use management
Scoping Start
02/11/2020
Decision
03/2020 (Estimated)
Implementation
06/2020 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142, R31W, Sec.14
Decision Memo · Walker Ranger District · updated 2/20/2020
Lot #6 of West Pike Bay tract on Pike Bay, East of Cass Lake, MN · Cass, Minnesota

Installation of new septic system on Recreation Residence lot under Special Use Permit; West Pike Bay Tract, Lot #6. This project is within the boundary of the Leech Lake Band of Ojibwe reservation.

Special use management
Scoping Start
10/12/2018
Decision
05/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT149, R26W, Sec. 3
Decision Memo · Blackduck Ranger District · updated 12/10/2019
Cass County, MN. · Cass, Minnesota

Early thinning in young, overstocked, planted pine stands to restore plant diversity. A request from the Leech Lake Band of the Ojibwe (LLBO) under the Tribal Forest Protection Act (TFPA) dated April 17, 2014 and an Addendum dated June 30, 2014.

Vegetation management (other than forest products)
Scoping Start
07/01/2015
Decision
07/2015 (Estimated)
Implementation
12/2015 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Species Habitat Improvements; Timber Sales (Green)
Lydick West Red Pine Thinning ProjectDecision Signed Date: 07/16/2015
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N,R30W: E/2SE/4 and NE/4SE/4 Section 10; NW/4SW/4 Section 11, SW/4NW/4 Section 12
Decision Memo · Chippewa National Forest All Units · updated 10/25/2019
These permanent openings are located throughout the Chippewa National Forest, covering the span of Blackduck, Deer River, and Walker Ranger Districts. Portions within the Leech Lake Reservation. · Beltrami; Cass; Itasca, Minnesota

The Forest Staff has made initial determinations as to which wildlife openings will be actively managed. Management plans will be developed for the selected openings with consultation, collaboration, and internal and external review.

Vegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
08/01/2019
Decision
10/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Joseph Jordan · joseph.jordan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 10/24/2019
Along and near four Hunter Walking Trails: Carter Lake, Webster Lake, Tower Lake, and Morph Meadows. Portions within the Leech Lake Reservation. · Beltrami; Itasca, Minnesota

Improve habitat for ruffed grouse and other early successional species through patch clearcutting aspen (about 366 acres) and thinning white spruce plantations (about 117 acres) along and near Hunter Walking Trails.

Wildlife, fish, rare plants
Scoping Start
08/06/2019
Decision
10/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R30W, Sections 11, 12, 13, 14; T146N, R31W, Sections 5, 8, 17; T147N, R29W, Sections 21, 22; T148N, R29W, Section 31; T148N, R30W, Sections 19, 20, 21, 22, 27, 29, 30; T148N, R29W, Section 31.
Decision Memo · Deer River Ranger District · updated 10/18/2019
North of Grand Rapids, on Hwy 38, W on ITA-48. Property accessed is on NE corner of Grave Lake. · Itasca, Minnesota

Issue a special use permit for the Jones%u2019 to maintain FR3545. Permit will allow light surface maintenance (dragging), light brushing, and snow plowing. This project is outside the Leech Lake Band of Ojibwe Reservation boundary.

Special use management
Scoping Start
04/24/2018
Decision
05/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N, R26W, Sec. 8
Decision Memo · Blackduck Ranger District · updated 10/18/2019
Two miles south of Alvwood, MN · Itasca, Minnesota

The purpose of the project is to maintain and improve 37 acres of woodcock habitat in the Popple River Watershed.

Wildlife, fish, rare plants
Scoping Start
09/23/2012
Comment Period
09/24/2012
Decision
12/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N, R28W, Sections 20, 21
Ball Club Completed
Decision Memo · Deer River Ranger District · updated 10/18/2019
South East of Little Ball club lake and north of hwy 46 · Itasca, Minnesota

Salvage, Regeneration and site prep after a July 2012 windstorm

Forest products
Scoping Start
10/04/2012
Comment Period
10/04/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT 146N R26W and T145N R26W of Itasca county
Brushy Acres CE Completed
Decision Memo · Blackduck Ranger District · updated 10/18/2019
north of Hwy 2 near FSR2971 in Cass County, MN; north of Beltrami County 54 and west of Lake Winnebigosh · Cass, Minnesota

salvage, site preparation, and regeneration of storm-damaged timber stands

Forest products
Scoping Start
10/07/2012
Comment Period
10/07/2012
Decision
12/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Lisa Arbucci-Schmid · larbuccischmid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Brushy Acres ProjectDecision Signed Date: 12/07/2012 Legal Notice Date: 12/09/2012
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R29W & T146N, R29W
Cass Lake East CE Completed
Decision Memo · Blackduck Ranger District · updated 10/18/2019
north of Hwy 2 near Norway Beach National Forest Campground · Beltrami, Minnesota

salvage, site preparation, and regeneration of storm-damaged timber stands

Forest products
Scoping Start
10/07/2012
Comment Period
10/07/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Lisa Arbucci-Schmid · larbuccischmid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Cass Lake East Salvage ProjectDecision Signed Date: 11/16/2012 Legal Notice Date: 11/19/2012
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R30W Beltrami County, MN
East Missy Completed
Decision Memo · Deer River Ranger District · updated 10/18/2019
North of Hwy 2 and East of the Mississippi River · Itasca, Minnesota

Salvage, Regeneration and site prep after a July 2012 windstorm

Forest products
Scoping Start
10/04/2012
Comment Period
10/04/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT145N R26 & 27W in Itasca County
Environmental Assessment · Blackduck Ranger District · updated 10/18/2019
Partially within LLBO Reservation; Bounded on the north by Skimmerhorn Lake, on the south by Lake Winnie, on the east by Round Lake and on the west by Decker Lake · Beltrami; Itasca, Minnesota

Timber harvesting, reforestation, recreation, prescribed fire, wildlife management

Road managementForest productsRecreation managementWildlife, fish, rare plantsFuels management
Scoping Start
03/19/2012
Comment Period
12/13/2013
Objection Period Start
03/28/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Trail Management; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N R28-29W, T147N R27-30W, T148N R28-30W, and T149N R29-30W
Decision Memo · Walker Ranger District · updated 10/18/2019
Big Rock Recreation Residence Lot #1; 3439 Stony Pt. Camp Rd, Walker, MN. (inside Leech Lake Reservation) · Cass, Minnesota

Septic System proposal for Gabrielson Recreation Residence; Big Rock Lot #1. Install a new septic system. They are proposing a mound system on the south side of the driveway.

Special use management
Scoping Start
02/20/2018
Decision
02/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Gabrielson Septic System ProjectDecision Signed Date: 02/22/2018
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT 142N, R 30W, Section 10
Grass Lake CE Completed
Decision Memo · Blackduck Ranger District · updated 10/18/2019
north of county road 91& east of county road 39, Beltrami County; west of FSR 2169 near Grass Lake and Lydick Lake · Beltrami; Cass, Minnesota

salvage, site preparation, and regeneration of storm-damaged timber stands

Forest products
Scoping Start
10/07/2012
Comment Period
10/07/2012
Decision
12/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Lisa Arbucci-Schmid · larbuccischmid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Grass Lake ProjectDecision Signed Date: 12/07/2012 Legal Notice Date: 12/09/2012
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N R29W AND T146N R30W
Decision Memo · Walker Ranger District · updated 10/18/2019
Lot 2 of Big Rock Addition tract on Leech Lake, south of Stony Point Campground; inside the Leech Lake Reservation. · Cass, Minnesota

Installation of new septic system on Recreation Residence lot under Special Use Permit; Big Rock Addition Tract, Lot #2. Involves pump and fill of old tank, new 1500 combo tank, and new mound.

Special use management
Scoping Start
09/15/2017
Decision
01/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142, R30W, Sec.10
Highbanks Completed
Decision Memo · Deer River Ranger District · updated 10/18/2019
Between the Tamarack Point Road and Lake Winnibigoshish · Cass, Minnesota

Salvage, Regeneration and site prep after a July 2012 windstorm

Forest products
Scoping Start
10/04/2012
Comment Period
10/04/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N R27W
Environmental Assessment · Chippewa National Forest All Units · updated 10/18/2019
Highway 2 between Cass Lake and Deer River. Project is within Leech Lake Reservation. · Beltrami; Cass; Itasca, Minnesota

Construct 3 passing lanes, several turn lanes, and thin stands on south side of Highway 2 from Cass Lake to Ball Club to improve safety conditions. FS to issue easement along Hwy 2 corridor to MnDOT.

Special use managementRoad management
Scoping Start
01/28/2014
Comment Period
05/13/2014
Objection Period Start
06/28/2014
Decision
08/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Improvements/Construction
Trunk Highway 2 Corridor Improvement ProjectDecision Signed Date: 08/25/2014
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Little Ball Completed
Decision Memo · Deer River Ranger District · updated 10/18/2019
Between Little Winnibigoshish lake and Little Ball Club lake south of hsy 46 · Itasca, Minnesota

Salvage, Regeneration and site prep after a July 2012 windstorm

Forest products
Scoping Start
10/04/2012
Comment Period
10/04/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT145N R26W
McDonald CE Completed
Decision Memo · Walker Ranger District · updated 10/18/2019
south of Hwy 2 and west of Cuba Hill Road (FSR 2133) · Cass, Minnesota

salvage, site prep, and regeneration of storm damaged timber stands

Forest products
Scoping Start
10/03/2012
Comment Period
10/03/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
McDonald ProjectDecision Signed Date: 11/13/2012 Legal Notice Date: 11/14/2012
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R30W
Environmental Assessment · Chippewa National Forest All Units · updated 10/18/2019
Forest-wide · Beltrami; Cass; Itasca, Minnesota

Use an adaptive management driven multi-agency approach to 1) Prevent the further spread of NNIP 2). Prevent and reduce impacts from existing NNIP infestations in the area. 3). Restore the land's resistance to NNIP

Vegetation management (other than forest products)
Scoping Start
05/14/2008
Comment Period
07/10/2011
Decision
10/2011 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Thomas Heutte · theutte@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNoxious Weed Treatments
Non-native Invasive Plant ManagementDecision Signed Date: 10/03/2011 Legal Notice Date: 10/11/2011
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Decision Memo · Deer River Ranger District · updated 10/18/2019
N. side of Cut Foot Sioux Lake, N of Lake Winnibigoshish. SW side of Little Cut Foot Sioux Lake, near the Little Cut Foot summer homes. SE corner of Lake Winnibigoshish and near Plughat Point · Itasca, Minnesota

This will be an amendment to permit BLD401201 to replace existing copper lines with fiber optic cable. There will be no new (additional) lines added along the road ROW. This is inside the Leech Lake Band of Ojibwe Reservation boundary.

Special use management
Scoping Start
04/04/2018
Decision
07/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Sec 22, 36; T146N, R27W, Sec 24, 25 26, 35
Decision Memo · Deer River Ranger District · updated 10/18/2019
Within permit area of Cut Foot Sioux Inn Resort · Itasca, Minnesota

Issue Amendment to Paul Bunyan Telephone for new pedestal and communication lines at Cut Foot Sioux Inn Resort. This is inside the boundary of the Leech Lake Band of Ojibwe Reservations

Special use management
Scoping Start
04/04/2017
Decision
05/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionGL 13, Section 25, Township 147, Range 27
Decision Memo · Deer River Ranger District · updated 10/18/2019
Highbanks Summer home tract, Lot 8. East side of Lake Winnie off FR2219. This project is within the Leech Lake Band of Ojibwe Reservation. · Itasca, Minnesota

Cabin log replacement, cabin door/window replacement, 30%u2019x30%u2019 clearing, stair to shore replacement

Special use management
Scoping Start
06/08/2016
Decision
06/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Sec. 29
Decision Memo · Walker Ranger District · updated 10/18/2019
SOO Line Trail · Cass, Minnesota

Replace the existing dam on the Soo Line Trail, about 0.3 of a mile west of the junction with FR2131, with a natural grade control structure and span the newly constructed opening with a bridge or large culvert.

Watershed managementWildlife, fish, rare plants
Scoping Start
02/06/2012
Comment Period
04/11/2012
Decision
05/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
David Morley · damorley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityWatershed Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N R29W Sec36
SE Winnie Completed
Decision Memo · Deer River Ranger District · updated 10/17/2019
SE of Lwke Winnibigoshish on both sides of County hwy 9 · Cass, Minnesota

Salvage, Regeneration and site prep after a July 2012 windstorm

Forest products
Scoping Start
10/04/2012
Comment Period
10/04/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT145N, R 27 & 28 W
Santiago CE Completed
Decision Memo · Walker Ranger District · updated 10/17/2019
south of Hwy 2 and west of FSR 2133, Cass County, MN · Cass, Minnesota

salvage, site prep, and regeneration of storm-damaged timber stands

Forest products
Scoping Start
10/03/2012
Comment Period
10/03/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Santiago ProjectDecision Signed Date: 11/13/2012 Legal Notice Date: 11/14/2012
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R30W
Smiling Joe CE Completed
Decision Memo · Blackduck Ranger District · updated 10/17/2019
near intersection of Hwy 2 and county road 2169; near intersection of Hwy 2 and county road 2348 · Cass, Minnesota

salvage, site preparation, and regeneration of storm-damaged timber stands

Forest products
Scoping Start
10/07/2012
Comment Period
10/07/2012
Decision
12/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Lisa Arbucci-Schmid · larbuccischmid@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Smiling Joe ProjectDecision Signed Date: 12/07/2012 Legal Notice Date: 12/09/2012
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N R29W
Environmental Assessment · Walker Ranger District · updated 10/17/2019
South of Leech Lake to Forest boundary, between Ten Mile Lake and County Highway 125 · Cass, Minnesota

SLL2 area timber sale, reforestation, timber stand improvement, seeding/planting; road decommissioning for aquatic/soil resources; update MVUM; wildlife habitat maintenance/ improvement using fire; small projects to maintain/improve other resources

Road managementVegetation management (other than forest products)Watershed managementForest products
Scoping Start
01/19/2011
Comment Period
06/22/2011
Decision
08/2011 (Estimated)
Implementation
12/2011 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Heritage Resource Management; Noxious Weed Treatments; Road Maintenance; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N R28-31W and T142-145N R28-31W
Decision Memo · Walker Ranger District · updated 10/17/2019
west of FSR 3990 and south of FSR 3990D near Pike Bay Loop Road · Cass, Minnesota

salvage, site prep, and regeneration of sotrm-damaged timber stands

Forest products
Scoping Start
10/03/2012
Comment Period
10/03/2012
Decision
11/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
South Pike Pine Plantation ProjectDecision Signed Date: 11/13/2012 Legal Notice Date: 11/13/2012
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT144N, R31W Cass County, MN
Decision Memo · Walker Ranger District · updated 10/17/2019
south of Hwy 2 near FSR 2930 (West Sucker Road) · Cass, Minnesota

salvage, site prep, and regeneration of storm-damaged timber stands

Forest products
Scoping Start
10/03/2012
Comment Period
10/03/2012
Decision
11/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Sucker Lakes East Salvage ProjectDecision Signed Date: 11/28/2012 Legal Notice Date: 11/28/2012
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R29W
Decision Memo · Walker Ranger District · updated 10/17/2019
east of FSR 2133 in vicinity of Cuba Hill Road and north of FSR 3888 and near FSR 3888A · Cass, Minnesota

salvage, site prep, and regeneration of storm-damaged timber stands

Forest products
Scoping Start
10/03/2012
Comment Period
10/03/2012
Decision
11/2012 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
Sucker Lakes West Salvage ProjectDecision Signed Date: 11/28/2012 Legal Notice Date: 11/28/2012
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R29W Cass County, MN
Decision Memo · Deer River Ranger District · updated 10/17/2019
The project is located at The Pines Resort. · Itasca, Minnesota

The Pines Resort has requested permission to plant trees on their permitted resort. The resort is within the Leech Lake Reservation administrative boundary.

Special use management
Scoping Start
02/23/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Sections 25 and 26, 5th Principal Meridian
Decision Memo · Blackduck Ranger District · updated 10/17/2019
Inside the Leech Lake Reservation · Cass, Minnesota

Request to build a 41.7 square foot mudroom. The mudroom would have matching fiberglass shingles. The 105 square foot deck would consist of green treat with composite decking. Hand rails and steps would be composite.

Special use management
Scoping Start
05/16/2018
Decision
05/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R29W, Section 2 %u2013 Mississippi River Lot #7
Decision Memo · Walker Ranger District · updated 10/11/2019
Treatments stands would be scattered across the Chippewa National Forest and Leech Lake Indian Reservation. · Beltrami; Cass; Itasca, Minnesota

We propose to complete winter harvest of approximately 2,500 acres of priority tamarack stands to enhance age class diversity and reduce the effects of insect and disease infestations.

Vegetation management (other than forest products)
Scoping Start
05/02/2019
Decision
10/2019 (Estimated)
Implementation
09/2020 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (5)
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Qwest Amendment#3 Completed
Decision Memo · Walker Ranger District · updated 10/4/2019
The proposed project is to place new fiber optic line in the existing road right-of-way Pike Bay Loop Road and 3 pedestals along the south side of Highway 2. Project within the Leech Lake Reservation. · Cass, Minnesota

The proposed project is to place new fiber optic line in the existing road right-of-way Pike Bay Loop Road and 3 pedestals along the south side of Highway 2. T145N, R30W, Sec. 18, Lots 16-17; Sec. 19 Lots 1-4; Sec 30 Lots 1-2.

Special use management
Scoping Start
07/29/2019
Decision
10/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 10/1/2019
The project area is south of the Mississippi River and east of Cass Lake inside the Leech Lake Reservation Boundary. · Beltrami, Minnesota

Improve vigor and future acorn production by thinning young oak stump sprouts. The project area consists primarily of recent timber harvest areas.

Wildlife, fish, rare plants
Scoping Start
07/17/2019
Decision
09/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N R29W Sec 12; T145N R30W Sec 8; T146N R29W Sec 31, 32, and 33; T146N R30W Sec 25, 26, 35, and 36
Decision Memo · Blackduck Ranger District · updated 10/1/2019
About 2 mile Northwest of Lake Winnibigoshish. · Itasca, Minnesota

Enhance habitat for snowshoe hare using a variety of management practices including timber harvest and creating coarse woody debris on about 100 acres inside the Leech Lake Reservation.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
07/29/2019
Decision
09/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N-R29W, in portions of Sections 25, 26, 35, and 36
Decision Memo · Deer River Ranger District · updated 9/23/2019
Lot #8 of Highbanks tract on Lake Winnibigoshish, west of Deer River. · Cass, Minnesota

Installation of new septic system on Recreation Residence lot under Special Use Permit; Highbanks Tract, Lot #8 This project is within the boundary of the Leech Lake Band of Ojibwe Reservation

Special use management
Scoping Start
05/30/2019
Decision
06/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT145, R31W, Sec. 2
Decision Memo · Deer River Ranger District · updated 9/23/2019
Lot #7 of North Sioux tract on Cut Foot Sioux Lake north of Deer River, MN. This project is within the Boundary of the Leech Lake Band of Ojibwe Reservation. · Cass, Minnesota

The permitee has submitted a proposal to tear down the current cabin on North Sioux lot 7. He would have built a new cabin and new garage, the lot currently does not have a garage. Install a septic system and well, and bury the electrical Lines.

Special use management
Scoping Start
02/25/2019
Decision
07/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147, R27W, Sec. 22
Decision Memo · Blackduck Ranger District · updated 8/28/2019
Project area is located on the east side of CSAH 39, beginning at the intersection of New Maple Ridge NE road, and traaveling 0.25 miles north. · Beltrami, Minnesota

The proposal is part of the final reconstruction of CSAH 39 (Lady Slipper Highway), and the segment on National Forest System land is on the east side of the highway for approx. 0.25 miles on the very northern end of the route.

Special use management
Scoping Start
06/25/2019
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionSec.19, SWSW, T149N, R30W
Decision Memo · Blackduck Ranger District · updated 8/28/2019
North side of US Highway 2 from West Winnie Road NE (Big Fish) east 2.13 miles to Old Housing Drive NE. Within the Leech Lake Indian Reservation. · Cass, Minnesota

Paved 10' Trail West of Bena. Includes clearing approximately half an acre of National Forest System lands.

Special use management
Scoping Start
06/21/2019
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionSections 27-28-29, T.145N, R.28W, Cass County
Decision Memo · Walker Ranger District · updated 8/28/2019
West side of Sucker Bay Road, North sides of Lake Shore Drive and West Shore Drives. · Cass, Minnesota

Provide fiber optic for customers in the Sucker Bay Area. Project will include Fiber Communications Line, 10 feet wide, w,180 feet long, 1.88 acres.

Special use management
Scoping Start
09/28/2018
Decision
08/2019 (Estimated)
Implementation
10/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 8/28/2019
NE of Lake Winnibigoshish southwest of Inger, MN off County Road 35. Within Leech Lake Indian Reservation. · Itasca, Minnesota

Improvement and widening of 0.23 miles of Womack Road

Special use management
Scoping Start
06/21/2019
Decision
08/2019 (Estimated)
Implementation
09/2019 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSections 16-17-21, T. 147N, R.26W, Itasca County
Decision Memo · Blackduck Ranger District · updated 8/26/2019
Sugar Lake impoundment west of Lake Winnie. Within the Leech Lake Reservation. · Cass; Itasca, Minnesota

Removal of the Sugar Lake impoundment to restore wetlands.

Wildlife, fish, rare plantsWatershed management
Scoping Start
07/01/2019
Decision
08/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Eric Raitanen · ericraitanen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionSugar lake Impoundment: T146 R29 Sec 22.
Decision Memo · Walker Ranger District · updated 8/23/2019
The project is located inside the Leech Lake Reservation, roughly 3.5 miles south of Cass Lake, MN. · Cass, Minnesota

The project includes removing two impoundment structures between Pike Bay and Moss Lake to restore fish passage. The structure on the outlet of Moss Lake would be replaced with a larger diameter culvert to increase flow capacity.

Watershed managementWildlife, fish, rare plants
Scoping Start
04/30/2019
Decision
06/2019 (Estimated)
Implementation
08/2020 (Estimated)
Project documents
David Morley · david.morley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Watershed Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionW 1/2 Township 145N, Range 31W, Section 5
Decision Memo · Deer River Ranger District · updated 7/25/2019
Along Itasca County Hwy 7, SW of Scenic State Park · Itasca, Minnesota

Amendment to permit to construct electric transmission line along Itasca County Highway 7 corridor. This is outside the Leech Lake Band of Ojibwe reservation boundary

Special use management
Scoping Start
02/26/2019
Decision
07/2019 (Estimated)
Implementation
11/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R26W, SE1/4 SW1/4 Sec 4T60N, R26W SE1/4 SW1/4 Sec 3T60N, R26W, SE1/4 SE1/4 Sec 3T60N, R26W SW1/4 Sec 1
Decision Memo · Deer River Ranger District · updated 7/24/2019
Lot #9 of Little Cut Foot Sioux tract on Cut Foot Sioux Lake north of Deer River, MN · Itasca, Minnesota

Replacing staircase to the lake, and replacing roof with metal roofing on Recreation Residence lot under Special Use Permit; Little Cut Foot Sioux Tract, Lot #9. This project is within the Leech Lake Band of Ojibwe Reservation boundary.

Special use management
Scoping Start
02/25/2019
Decision
03/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147, R27W, Sec. 22
Decision Memo · Deer River Ranger District · updated 7/23/2019
Deck proposed to be installed on the Lake side of cabin in Lot 5, South Winnie Tract. · Itasca, Minnesota

Proposal to install new 199 square foot deck attached to the existing cabin on Lot 5, South Winnie Tract This is within the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
11/06/2017
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSE1/4 Section 12, Township 145N, Ranger 29W
Decision Memo · Walker Ranger District · updated 7/17/2019
Within the Ojibway Resort permitted area. Cabin 4 and Cabin 5 are in the second row of cabins, not directly on the shoreline. Resort Located on east side of Pike Bay on Cass Lake,SE of Cass Lake,MN · Cass, Minnesota

Ojiway Resort requested approval to tear down cabins 4 and 5 and replace with one new cabin 5. The resort also plans to move the fish cleaning station.

Special use management
Scoping Start
04/15/2019
Decision
06/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R30W, Sec 30, Cass County
Decision Memo · Chippewa National Forest All Units · updated 7/9/2019
Lot#15 of Sandy Beach tract in Star Island, North of Cass lake, MN. Within the Leech Lake Band of Ojibwe Reservation. · Cass, Minnesota

Installation of new septic system on Recreation Residence lot under Special Use Permit; Sandy Beach Tract, Lot #15. Permittee requests to move drain field to higher ground. The old field will be eliminated.

Special use management
Scoping Start
06/06/2019
Decision
07/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Sunken Lake Completed
Decision Memo · Deer River Ranger District · updated 6/26/2019
Within the Sunken Lake Candidate Research Natural management Area and adjoining Cutfoot Experimental Forest. · Itasca, Minnesota

Restoring fire dependent ecosystems that were historically common on sandy soils throughout the region. This project is within the boundaries of the Leech Lake Band of Ojibwe Reservation.

Vegetation management (other than forest products)Fuels management
Scoping Start
10/12/2018
Decision
05/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Carl Crawford · ccrawford@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT 147 N, R 27 W, Sections 9, 16, 21
Decision Memo · Chippewa National Forest All Units · updated 6/12/2019
Lot #6 of Highbanks tract on Lake Winnibigoshish, west of Deer River, within the Leech Lake Band of Ojibwe Reservation · Cass, Minnesota

Installation of new septic system on Recreation Residence lot under Special Use Permit; Highbanks Tract, Lot #6. The current system will remain in place.

Special use management
Scoping Start
05/28/2019
Decision
06/2019 (Estimated)
Implementation
08/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 5/29/2019
The project is located on Forest Road 2182 where it crosses the Rice River, also referred to as the Farm Camp Bridge. · Itasca, Minnesota

The project proposes to rehab the Rice River Bridge on Forest Road 2182 to address maintenance and safety deficiencies.

Watershed managementRoad management
Scoping Start
08/27/2018
Decision
05/2019 (Estimated)
Implementation
07/2019 (Estimated)
Project documents
David Morley · david.morley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT 60 N R 26 W Sec 26
Decision Memo · Deer River Ranger District · updated 4/24/2019
North of Grand Rapids, east of Murphy Lake · Itasca, Minnesota

Permit use of existing U4113 roadway and maintain FS3541.Permit will allow snowplowing and light surface maintenance. Tree removal or mechanical brushing would require prior approval. Project is outside the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
03/18/2019
Decision
04/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N, R25W, S12 NWNW, 4th PM
Decision Memo · Deer River Ranger District · updated 3/14/2019
East of Marcell on the Chippewa National Forest in the Clubhouse Lake area · Itasca, Minnesota

About 4.3 miles of the existing CSAH 45 alignment will be regarded, realigned to meet current design standards and complete the connection between Trunk Highway 38 and Scenic Hwy 7. Project is outside the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
03/27/2018
Decision
03/2019 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Descriptionthroughout Sections 13, 14, 15, 22, 23, and 24, all in Township 59 North, Range 26 West (T59N-R26W)
Decision Memo · Blackduck Ranger District · updated 2/13/2019
The proposed project is in the Leech Lake Band of Ojibwe Reservation Boundary and is situated south of the Mississippi River between Cass Lake and Lake Winnie, extending down to U.S. Highway 2. · Beltrami; Cass, Minnesota

This project proposes timber stand and wildlife habitat improvement in primarily young, dense red pine, jack pine, and white spruce plantation, as well as reclamation of National Forest System lands currently occupied by non-system roads.

Vegetation management (other than forest products)Road managementWildlife, fish, rare plants
Scoping Start
07/27/2018
Decision
12/2018 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Karen Lessard · klessard@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Travel Management; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionSeveral sections of Townships 144 through 146N and Ranges 26 through 30W.
Decision Memo · Deer River Ranger District · updated 11/20/2018
Within the Eagle Nest Lodge permitted area. Resort is along the Cut Foot Sioux Lake, north of Deer River, MN. · Itasca, Minnesota

Eagle Nest Lodge proposes to install two concrete patios adjacent to Cabin 6 and move a deck from Cabin 6 to the playground area. This project is inside the Leech Lake Band of Ojibwe reservation.

Special use management
Scoping Start
10/05/2018
Decision
11/2018 (Estimated)
Implementation
04/2019 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Eagle Nest Lodge ProjectsDecision Signed Date: 11/15/2018
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 21, T. 147N, R27W, Itasca County
Decision Memo · Walker Ranger District · updated 11/8/2018
Lot #14 of Walker Bay tract on Leech Lake, North of Walker, MN · Cass, Minnesota

Remove and rebuild staircase to lake on Recreation Residence lot under Special Use Permit; Walker Bay Tract, Lot #14. This project is inside the boundary of the Leech Lake Band of Ojibwe reservation.

Special use management
Scoping Start
10/09/2018
Decision
11/2018 (Estimated)
Implementation
05/2019 (Estimated)
Project documents
Jessica Dilley · jessicadilley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142, R31W, Sec. 14
Decision Memo · Deer River Ranger District · updated 10/29/2018
Located around the north side of Cut Foot Sioux Lake, Itasca County. · Itasca, Minnesota

Replacement of Lines/Poles and Clearing in Existing Right Of Way

Special use management
Scoping Start
07/26/2018
Decision
10/2018 (Estimated)
Implementation
11/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionItasca County see posted maps
Decision Memo · Walker Ranger District · updated 10/11/2018
T145N, R28W, Sec 33 and 34 Cass County, MN. South of Highway 2, south of Bena, MN off Highway 8. Within the Leech Lake Indian Reservation. · Cass, Minnesota

Amendment to Enbridge%u2019s existing permit to increase fence area around valve sites near Bena.

Special use management
Scoping Start
08/20/2018
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 10/11/2018
Located within the Walker Office compound, Cass County. · Cass, Minnesota

WAL400903 MN Power Underground Line Amendment 1

Special use management
Scoping Start
09/04/2018
Decision
10/2018 (Estimated)
Implementation
10/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionSection 23, T142N, R31W, Cass County
Decision Memo · Deer River Ranger District · updated 9/28/2018
Located east of Burrows and Sand Lakes in NE Itasca County. · Itasca, Minnesota

Installation of Fiber Optic Cable on NFS lands This project is within the boundary of the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
06/18/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Qwest Permit Amendment 2 Install fiber optic linesDecision Signed Date: 07/23/2018
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionMultiple locations in Sections 10, 11, 15, 21, 22, 27 of T. 58, R. 25
Decision Memo · Chippewa National Forest All Units · updated 9/28/2018
In the vicinity of Sand Lake, Lost Moose Lake and Burrows Lake along National Forest System roads 2143, 3755, 3850 and 3510. · Itasca, Minnesota

**duplicate to project number 54216**Install new fiber optic lines in rural areas within existing utility cooridors for customers as part of the Connect America Fund broadband project sponsored by the US government.

Special use management
Scoping Start
06/18/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 8/16/2018
Located approximately 30 miles north of Grand Rapids, east of Hwy 38 and west of Johnson Lake, Itasca County. · Itasca, Minnesota

Eckert Road Permit Request near Johnson Lake. This project is completely outside the Leech Lake Band of Ojibwe reservation boundary.

Special use management
Scoping Start
07/10/2018
Decision
08/2018 (Estimated)
Implementation
08/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionN1/2NE, S5, T59N, R26E
Decision Memo · Walker Ranger District · updated 8/9/2018
Blackduck R.D. in T148N, R30W, Section 3 and Walker R.D. in T142N, R27W, Sections 23 and 26. · Beltrami; Cass, Minnesota

Shear upland brush, lowland brush, and young aspen in Turtle River and Boy River watersheds to maintain early successional habitat for golden-winged warblers and American woodcock, and other associated wildlife species.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
09/28/2015
Decision
02/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionBlackduck R.D. in T148N, R30W, Section 3 and Walker R.D. in T142N, R27W, Sections 23 and 26.
Decision Memo · Deer River Ranger District · updated 7/23/2018
Former developed recreation site on the northeast shore of Cass Lake. (inside the Leech Lake Reservation) · Itasca, Minnesota

Voyageurs Area Council of the Boy Scouts of America has applied for renewal of their existing permit. There will be no ground disturbance. They will continue to utilize a former developed recreation site on the northeast shore of Cass Lake.

Special use management
Scoping Start
02/21/2018
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Dani Swantic · dswantic@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R30W, and Section 28
Northeast Completed
Environmental Assessment · Deer River Ranger District · updated 7/19/2018
This project is centered near Marcell and extends to the east, north and south to the forest boundary of the Deer River RD. It is outside the boundary of the Leech Lake Band Ojibwe Reservation. · Itasca, Minnesota

Vegetation management to improve resiliency of the forest, improve water quality and aquatic habitats, provide wildlife and botanical enhancements, address road needs and other.

Road managementWatershed managementForest productsWildlife, fish, rare plants
Scoping Start
06/08/2017
Comment Period
06/08/2017
Objection Period Start
05/17/2018
Decision
07/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Special AuthorityHfra Title Vi: Insect And Disease Projects
Notice and Comment Regulation218 (2013) HFRA
Project ActivityForest Vegetation Improvements; Travel Management; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N R25W S2-4, 9-20, 13,14, T58N R25W S1-11,14-23. 27,28,34-35 & 26W S1,12-14,24, T59N R25 S 6,7,18 & 26W S1,2,5,9,11-15, 21-24, 26-28, 34,35, T50N R26 S4-9, 13-24, 26-35 & 27W S1, 12-13,25
Decision Memo · Chippewa National Forest All Units · updated 7/17/2018
Lot 4 of the South Winnie Recreation Residences, within the Leech Lake Band of Ojibwe Reservation. · Cass, Minnesota

Replace the existing septic tank and lift tank with a 1500 combination tank with a mound system. The system would be placed on the back side of the cabin, away from the lake. The new septic will be located in the same location as old septic.

Special use management
Scoping Start
07/02/2018
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionSE1/4 Sec 12, T. 145N, R. 29 W
Decision Memo · Blackduck Ranger District · updated 7/5/2018
East side of Star Island, on Cass Lake and inside the Leech Lake Reservation. · Beltrami, Minnesota

Deck work on Blake Recreation Residence; Start Island East Beach tract, Lot #18. Remove 8%u2019x10%u2019 deck off front of cabin and add 5%u2019x14%u2019 deck on back of cabin.

Special use management
Scoping Start
10/18/2017
Decision
07/2018 (Estimated)
Implementation
07/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Sec. 36
Decision Memo · Deer River Ranger District · updated 6/26/2018
South side of Lake Winnibigoshish, just west of the Winnie Dam. · Cass, Minnesota

New buyers of The Pines Resort have applied for 20 year permit. No changes to any structures at this time. This project is within the boundary of the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
04/01/2018
Decision
06/2018 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Dani Swantic · dswantic@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
The Pines Resort Special Use Permit Re-authorizationDecision Signed Date: 06/06/2018
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionTownship 146N, Range 27W, Sections 25 & 26
Environmental Assessment · Blackduck Ranger District · updated 4/25/2018
The Norway Beach Recreation Area is 7 miles east of Cass Lake, MN, 1 mile north of U.S. Highway 2, on southeast side of Cass Lake. Located within the Leech Lake Reservation Boundary. · Cass, Minnesota

Replacement of the existing wastewater treatment system with 3 localized systems, replacement of vault toilets, and campsite redesign to improve public safety/enjoyment and efficiency of facilities management/maintenance.

Facility managementRecreation management
Scoping Start
04/11/2017
Comment Period
04/11/2017
Objection Period Start
10/06/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Kenneth Hansen · khansen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction
Norway Beach Recreation Area - Campground Rehabilitation ProjectDecision Signed Date: 12/05/2017
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 4/25/2018
About 2 miles Southwest of Round Lake · Itasca, Minnesota

Remove the tops of 20 older aspen trees using blasting to improve wildlife habitat by increasing structural diversity in a 34 acre mixed aspen stand. The project is within the Leech Lake Reservation.

Wildlife, fish, rare plants
Scoping Start
06/2018 (Estimated)
Decision
08/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT148N, R28W, Section 35
Decision Memo · Walker Ranger District · updated 4/5/2018
North east shore of Cass Lake,covers 6.4 acres,and located in Cass County. (within the Leech Lake Reservation) · Cass, Minnesota

Norway Beach Resort will soon be selling to a new owner, Jimmy Williams. The current permit is issued to Richard Hendry and has an expiration date of December 31, 2023.

Special use management
Scoping Start
02/21/2018
Decision
04/2018 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Dani Swantic · dswantic@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT147 N, R30 W, and section 18
Decision Memo · Walker Ranger District · updated 3/26/2018
Road FS2067 on south side of Big Sand Lake, near Remer, MN. Outside the Leech Lake Reservation. · Cass, Minnesota

FR 2067 will be used as an access road to private property. New land owner requested to plow snow, and generally keep the road maintained by dragging it and keeping brush trimmed back. No other plans to change the surface or alter the road.

Special use management
Scoping Start
09/28/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R26W, S9
Decision Memo · Walker Ranger District · updated 3/26/2018
E on Hwy 200 from Walker, on S side of Leech Lake. Also known as the Jack Lake Road. Inside the Leech Lake Reservation. · Cass, Minnesota

Issue a special use permit for the Hartkopf family to maintain FR2666. Permit will allow light surface maintenance (dragging), light brushing, and snow plowing.

Special use management
Scoping Start
10/18/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
FS 2666 Hartkopf Road PermitDecision Signed Date: 12/13/2017
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R30W, Sec. 3
Decision Memo · Deer River Ranger District · updated 3/26/2018
The roads are north of Turtle Lake, between Bello Lake and Hatch Lake. This project is outside the boundary of the Leech Lake Band of Ojibwe reservation. · Itasca, Minnesota

Permit to maintain FR2455, FR2455C and FR2455CA. Permit will allow light surface maintenance (dragging), light brushing of the normal 15%u2019-16%u2019 width, and snow plowing. Tree removal or mechanical brushing would require prior approval.

Special use management
Scoping Start
01/29/2018
Decision
02/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R27W, Sec.23 4th principal meridian
Decision Memo · Deer River Ranger District · updated 2/7/2018
The 0.75 acre forest clearing covered by this decision is located on Forest Road 2101, 0.23 miles southeast of Minnesota State Hwy 6. · Cass, Minnesota

Using an existing upland forest clearing as a disposal site for earth fill removed from the Pine Tree Impoundment dam during the decommissioning process. The site will be re-vegetated with native grasses and forbs. Outside LLBO reservation boundary.

Vegetation management (other than forest products)
Scoping Start
12/12/2017
Decision
02/2018 (Estimated)
Implementation
09/2018 (Estimated)
Project documents
Craig Taylor · cstaylor@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (19), 36 Cfr 220.6(E)(19)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSE , SW , Section 21, Township 142 N, Range 25 W
Decision Memo · Walker Ranger District · updated 1/29/2018
Road FS2564E on south side of Lower Trelipe Lake · Cass, Minnesota

Existing road permit WAL544202 is being transferred to new owner. New owner requested to plow snow, and generally keep the road maintained by dragging it and keeping brush trimmed back. This project is not on the Leech Lake Reservation.

Special use management
Scoping Start
08/01/2017
Decision
08/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3); 32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R27W, S34
Environmental Assessment · Blackduck Ranger District · updated 1/24/2018
Northeastern portion of Blackduck District and extends into northwestern part of Deer River district. Project area lies between Big Fork and Dora Lake. Project is outside Leech Lake Reservation. · Itasca, Minnesota

Management of: vegetation composition/age class through harvest, site prep, planting; wildlife/pollinator habitats through diversity planting, seeding; riparian/wetland through harvest, diversity planting; forest system roads.

Wildlife, fish, rare plantsWatershed managementForest productsRoad management
Scoping Start
07/08/2016
Comment Period
05/12/2017
Objection Period Start
09/29/2017
Decision
01/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
David Morley · damorley@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Deer River Ranger District
Legal Land DescriptionT149N R25-27W and T150N R 25 -27W
Decision Memo · Chippewa National Forest All Units · updated 1/11/2018
NE part of Forest in Itasca County in 60N-26W; 59N-26W; 59N-27W; 147N-25W and 142N-25W, Itasca County. All but three forties in 147N-R25W are off the LL Reservation · Itasca, Minnesota

Northern Fiber has applied for renewal of their existing permit. There will be no ground disturbance. The fiber optic lines are located in several parcels This project is on the Leech Lake Band of Ojibwe reservation

Special use management
Scoping Start
12/07/2017
Decision
01/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description60N-26W; 59N-26W; 59N-27W; 147N-25W and 142N-25W, Itasca County, MN
Decision Memo · Walker Ranger District · updated 1/10/2018
Located along Oak Point Road, south of Cass Lake, MN, on Steamboat Bay of Leech Lake. · Cass, Minnesota

Extend existing porches at the Snowy Owl and Bear Cub cabins. Installation of concrete pads and wooden posts are included in the designs. Projects occur inside the Leech Lake Reservation.

Special use management
Scoping Start
08/23/2017
Decision
01/2018 (Estimated)
Implementation
02/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT143N, R31W, S26, 5th PM
Decision Memo · Blackduck Ranger District · updated 1/8/2018
Within Mississippi River Lot #3; outside of the Leech Lake Reservation · Itasca, Minnesota

Issue permit to Al Spears to maintain 1.2 miles of FR 2691 (Mikes Lake Road.

Special use management
Scoping Start
09/15/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
Swadner vault toilet install project, Special Use Permit CAL560103Decision Signed Date: 12/20/2017
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionMississippi River Summer Home Tract, 2-145-29, Itasca County, Minnesota
Decision Memo · Deer River Ranger District · updated 12/20/2017
The Edminster cabin is located on Highbanks Recreation Residence Tract, Lot 1, on the east shore of Lake Winnibigoshish about 7 miles northeast of Bena, MN. · Cass, Minnesota

Issue permit to Ron and Kathy Edminster to add onto cabin and replace shed. This is located within the Leech Lake Band of Ojibwe reservation.

Special use management
Scoping Start
06/29/2017
Decision
09/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, S29, 5th Principal Meridian
Decision Memo · Deer River Ranger District · updated 12/20/2017
Highbanks Resort request to add 3 additional RV sites to existing permitted area. · Cass, Minnesota

Highbanks Resort is requesting approval to add 3 seasonal RV sites within their existing resort permit area. This project is within the boundary of the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
10/11/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, S30, GL2, Cass County, Minnesota
Decision Memo · Deer River Ranger District · updated 12/20/2017
NE part of Forest in Itasca County · Itasca, Minnesota

Paul Bunyan has requested a permit amendment to install fiber optic along existing road right of ways in the NE part of the Forest. This project is outside the Leech Lake Band of Ojibwe reservation.

Special use management
Scoping Start
12/07/2017
Decision
12/2017 (Estimated)
Implementation
01/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionAreas within townships 58N, Rangers 25 & 26 in Itasca County
Decision Memo · Chippewa National Forest All Units · updated 12/8/2017
Two south side Forest, one north side of Forest · Cass; Itasca, Minnesota

MNDNR to monitor three plots on NFS lands on Walker and Blackduck Ranger Districts.Actual ground disturbance is less than 5 acres. The project is inside the Leech Lake Reservation. Permit action where No Decision Memo required under 7CFR 1b.3(a)(3).

Special use management
Scoping Start
08/23/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Walker Ranger District
Legal Land DescriptionWalker Ranger District (Sec.. 24-T.143-R.28 & Sec.12-T142-R26); Blackduck Ranger District (Sec.14-T.149, R.28)
Welsh Road Permit Completed
Decision Memo · Blackduck Ranger District · updated 10/19/2017
Private roadway into peninsula on Kitchi Lake; inside the Leech Lake Reservation · Beltrami, Minnesota

Issue permit to Private road in S. 6 & 7, T. 146N, R. 30W

Special use management
Scoping Start
09/27/2017
Decision
10/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R26W, S32, GL4, Itasca County, Minnesota
Decision Memo · Deer River Ranger District · updated 9/27/2017
Private driveway near Little Ball Club Lake. · Itasca, Minnesota

Issue permit to Private road in S32, T146, R26 This is not on the Leech Lake Band of Ojibwe Reservation

Special use management
Scoping Start
09/19/2017
Decision
09/2017 (Estimated)
Implementation
10/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R26W, S32, GL4, Itasca County, Minnesota
Decision Memo · Deer River Ranger District · updated 9/27/2017
This project area is located along MN Highway 38 near Caribou Lake, about 4  - 5 miles southeast of Marcell, MN. · Itasca, Minnesota

Issue permit to Itasca County to reconstruct two junctions to provide safer intersections. This project is not within the boundary of the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
08/31/2017
Decision
09/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Audrey Gustafson · argustafson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Improvements/Construction
County Road 48 and 49 RealignmentDecision Signed Date: 09/27/2017
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N, R26W, Sections 4 (NE ) and 9 (SE ), 4th Principal Meridian
Decision Memo · Deer River Ranger District · updated 9/20/2017
This project area is located on the north side (and within the existing cleared right-of-way) of Itasca County Road 7, about 3-4 miles southeast of Bigfork, MN. · Itasca, Minnesota

Issue permit to Paul Bunyan Telephone to install fiber optic cable to provide service to the Bigfork Hospital. This project is outside the Boundary of the Leech Lake Reservation.

Special use management
Scoping Start
07/31/2017
Decision
09/2017 (Estimated)
Implementation
11/2017 (Estimated)
Project documents
Audrey Gustafson · argustafson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Install fiber optic cable and copper cableDecision Signed Date: 09/15/2017
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R26W, Sections 1 (SWSW and SESW) and 3 (SESW and SESE), 4th Principal Meridian, Itasca County, Minnesota
Decision Memo · Deer River Ranger District · updated 9/19/2017
FR 2691 (Mikes Lake Road) is located about 5 miles ENE of Marcell, MN, north of Clubhouse Lake and Clubhouse Lake campground. · Itasca, Minnesota

Issue permit to Al Spears to maintain 1.2 miles of FR 2691 (Mikes Lake Road). This is not on the Leech Lake Band of Ojibwe Reservation

Special use management
Scoping Start
06/23/2017
Decision
09/2017 (Estimated)
Implementation
09/2017 (Estimated)
Project documents
Audrey Gustafson · argustafson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
Forest Road 2691 (Mike Lake Road) Forest Road PermitDecision Signed Date: 09/13/2017
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N, R26W, S12; T59N, R25W, S7, Itasca County, Minnesota
Environmental Assessment · Deer River Ranger District · updated 7/31/2017
This project is located south of Hwy 2 and North of the National Forest boundary and on the very eastern side of the Forest. · Cass, Minnesota

This purpose of the project is to move toward achieving Landscape Ecosystem vegetation objectives, and restoring conditions more representative of native vegetation communities. Outside the LLBO reservation boundary

Forest productsRoad managementWildlife, fish, rare plantsWatershed management
Scoping Start
02/03/2016
Comment Period
08/31/2016
Objection Period Start
12/15/2016
Decision
07/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Travel Management; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionT141N R25W Sec3-6, 8-9, 13-17, 20-36;T142N R25W Sec3-6,8-11,18-22,28-34; T143N R25W Sec1,3,4-6,8-17,19-24,26,28-33; T143N R26W Sec1&24; T144N R25W Sec5-9,16-23,26-36; T144N R26W Sec12-14, 23-26-36
Decision Memo · Walker Ranger District · updated 7/20/2017
Project located on north side of Hwy 200, approximately 7.5 east of the junction of Hwy 371 and Hwy 200. · Cass, Minnesota

Install approximately 1320 feet of underground telephone line 55 feet from centerline of North side of Hwy 200, east of Walker, MN. Project is within the Leech Lake Reservation.

Special use management
Scoping Start
05/01/2017
Decision
06/2017 (Estimated)
Implementation
07/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R29W, S8, GL3 (NENW)
Decision Memo · Walker Ranger District · updated 7/20/2017
South of US Highway 2, near Nushka Lake · Cass, Minnesota

Creation of a temporary workspace on CNF land to facilitate shutting off flow during Line 4 replacement on adjacent MN DNR land. The project occurs within the Leech Lake Reservation.

Special use management
Scoping Start
04/01/2017
Decision
06/2017 (Estimated)
Implementation
06/2018 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionSec 4, T144, R26W, 5th PM; Sec 32 & 34, T145, R27W, 5th PM; Sec 34, T145, R28W, 5th PM
Decision Memo · Blackduck Ranger District · updated 7/18/2017
Along Pike Bay Loop road, east side of pike bay on Cass Lake. The project is inside the Leech Lake Reservation Boundary. · Cass, Minnesota

Issue approval to build two decks on the front and back of the cabin as well as a new garage. The Leech Lake band of Ojibwe tract of summer homes are eligible for National Register Status.

Special use management
Scoping Start
04/03/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionSec 30, T145, R30W, 5th PM
Decision Memo · Deer River Ranger District · updated 7/18/2017
Off Highway 46, South side of Little Cutfoot Sioux Lake, Itasa County, Minnesota · Itasca, Minnesota

Issue new 20 year permit to Jake and Amanda Perrington, dba Cut Foot Sioux Inn Resort, as a new permittee upon their purchase of the Resort. The resort is within the Leech Lake Band of Ojibwe Reservation.

Recreation managementSpecial use management
Scoping Start
03/02/2017
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionS25, T147N, R27W, 5th PM
Decision Memo · Blackduck Ranger District · updated 7/18/2017
On the west side of Star Island on Cass Lake and inside the Leech Lake Reservation. · Beltrami, Minnesota

Issue approval for new 16x25 shed at a recreation residence located on Star Island, tract Norway Bluff Lot #14. This recreation residence is under permit with the Chippewa National Forest, in Beltrami County, located at T145N R31W Sec. 34

Special use management
Scoping Start
05/15/2017
Decision
05/2017 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N R31W Sec. 34, 5th PM
Decision Memo · Deer River Ranger District · updated 7/18/2017
Off Highway 46, North side of Cut Foot Sioux Lake, Itasca County, Minnesota · Itasca, Minnesota

Issue approval for installation of a new septic system to replace existing system which is out of compliance for Richard and Judith Bertram on Lot 2, North Sioux Recreation Residence Lot Within the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
03/02/2017
Decision
04/2017 (Estimated)
Implementation
05/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionS27, T147N, R27W, 5th PM
Decision Memo · Deer River Ranger District · updated 7/18/2017
Off Highway 9, South side of Lake Winnibigoshish, Cass County, Minnesota · Cass, Minnesota

Issue new 20 year permit to Jon & Doreen Seekon, dba The Pines Resort upon their request due to refinancing their loan and bank is requesting the 20 year term to match their loan term This is within the Leech Lake Band of Ojibwe reservation Boundary

Recreation managementSpecial use management
Scoping Start
03/02/2017
Decision
04/2017 (Estimated)
Implementation
04/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionS25/26, T146N, R27W, 5th PM
Environmental Assessment · Blackduck Ranger District · updated 4/25/2017
Project is 10 black ash stands within CNF on Deer River and Walker Ranger Districts. Three stands are within the Leech Lake Reservation boundary. · Cass; Itasca, Minnesota

The primary activity is harvesting and planting other tree species in ten lowland black ash stands to improve species diversity in anticipation of potential mortality by the emerald ash borer. Collaborative project with LLBO,MN DNR,County,USFS.

Vegetation management (other than forest products)
Scoping Start
01/09/2015
Comment Period
05/29/2015
Objection Period Start
07/31/2015
Decision
10/2015 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Gary Swanson · ghswanson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 3/16/2017
The project area is south of the Mississippi River and east of Lydick Brook on the Blackduck Ranger District, Cass County, Minnesota. The entire project area is within the boundary of the Leech Lake Band of Ojibwe Reservation. · Cass, Minnesota

Increase stand heterogeneity and complexity that is associated with older age red pine forests within a Large Upland Mature Patch. The project area consists almost entirely of 50 year old red pine plantations. Prescribe burn & commercial harvest.

Wildlife, fish, rare plants
Scoping Start
07/01/2016
Decision
02/2017 (Estimated)
Implementation
02/2017 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT. 145 N. R. 29 W., Sections 4, 5, and 9 and T. 146 N. R. 29 W., Section 33.
Decision Memo · Blackduck Ranger District · updated 3/6/2017
Fishermans Road from Dixon Lake Resort to Third River Flowage on Lake Winnie · Beltrami, Minnesota

Road permit to use and maintain FR2171, FR2384 and FR2794

Special use management
Scoping Start
08/01/2016
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land Description5th PM, T147N, R28W, S6, S7, S8, S17, S20, S29
Decision Memo · Walker Ranger District · updated 3/6/2017
Slater Township, Cass County, Minnesota · Cass, Minnesota

Issue easement to Slater Township for a section of an existing road that cross National Forest land for access to private property by local landowners

Road managementSpecial use management
Scoping Start
11/22/2016
Decision
02/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Travel Management
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R26W, S11, N1/2NW1/4
Decision Memo · Deer River Ranger District · updated 3/2/2017
Project is located in Wabana Township · Itasca, Minnesota

Amend an existing permit to install approx. 1496 feet of underground power line 5 to 10 feet off the north side of Doan Lake Road to serve existing customers. Project is not within the Leech Lake Band of Ojibwe Reservation boundary.

Special use management
Scoping Start
11/23/2016
Decision
02/2017 (Estimated)
Implementation
03/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N, R25W, S18, W1/2SE1/4
Decision Memo · Deer River Ranger District · updated 3/2/2017
Along Winnie Dam Lane NE ending at Tamarack Point Drive NE · Cass, Minnesota

Install approx. 3.8 miles of underground electric line and remove overhead lines and poles in existing ROW. This is within the Leech Lake Band of Ojibwe Reservation.

Special use management
Scoping Start
08/25/2016
Decision
12/2016 (Estimated)
Implementation
01/2017 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, S26, S27, S28, S29, S34, S35
Decision Memo · Deer River Ranger District · updated 2/22/2017
TH38 north-south corridor between Pughole Lake to Marcell · Itasca, Minnesota

Construct a new road pavement, replace 41 and repair 9 culverts,repair the eroding inslope at 7 locations, raise the road surface at milepost 26, lower the crest hill at milepost 14.5, tree removal a some areas. Outside the LLBO reservation.

Road management
Scoping Start
11/25/2015
Decision
02/2017 (Estimated)
Implementation
05/2018 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 12/16/2016
Located on Tamarack Point on Lake Winnibigoshish · Cass, Minnesota

Renew a permit issued to K & R Development, Inc. authorizing the continued construction, operation and maintenance of Highbanks resort/marina, including a lodge, 11 cabins, garage, and other ancillary facilities on NF lands is in the LLBO reservation

Special use management
Scoping Start
09/27/2016
Decision
11/2016 (Estimated)
Implementation
12/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description5th PM, T146N, R27W, S20 and S29
Decision Memo · Blackduck Ranger District · updated 11/2/2016
Install line along CSAH 39 aka Scenic Highway. Remove line across Mississippi River near Knutson Dam. · Beltrami, Minnesota

Install approx. 1350 feet of underground electric line in NWSE of S22, T146N, R30W and remove overhead lines and poles in Lot 3, S21, T146N, R30W.

Special use management
Scoping Start
09/01/2016
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R30W, S21, Lot 3; S22, SENW
Decision Memo · Walker Ranger District · updated 11/2/2016
The project is located in Kego Township, 2 miles northwest of Longville, MN. · Cass, Minnesota

Amend an existing permit to install approximately 1,700 feet of underground telephone line 15 feet off the north side of Old Grade Road NE to serve a new customer.

Special use management
Scoping Start
10/03/2016
Decision
11/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R28W, S20, N1/2 NE1/4
Decision Memo · Deer River Ranger District · updated 10/27/2016
Daley Larson Road South of Bello Lake · Itasca, Minnesota

Road permit to use and maintain FR2455 and FR2455B This permit is completely outside of the Leech Lake Band of Ojibwe reservation boundary.

Special use management
Scoping Start
10/20/2016
Decision
10/2016 (Estimated)
Implementation
11/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description4th PM, T60N, R27W, S23 N1/2SE1/4
Decision Memo · Walker Ranger District · updated 10/25/2016
The project is along County Road 38 and northwest of Walker, Minnesota. Off the Leech Lake Reservation. · Cass, Minnesota

Paul Bunyan Telephone would like to install 2,205 feet of underground fiber optic cable along the south side of County Road 38 in Cass County, MN.

Special use management
Scoping Start
10/03/2016
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Paul Bunyan Rural Telephone Cooperative Amendment 12Decision Signed Date: 10/24/2016
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R31W, S7
Decision Memo · Deer River Ranger District · updated 10/5/2016
Marcell Township, Itasca County, Minnesota · Itasca, Minnesota

Issue easement to Marcell Township for one section of existing road that crosses National Forest land for access private property by local landowners. Project is outside the Leech Lake Band of Ojibwe Reservation boundary.

Special use managementRoad management
Scoping Start
09/29/2016
Decision
10/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Travel Management
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description4th PM, T59N, R26W, S33
Decision Memo · Walker Ranger District · updated 10/3/2016
The project is located along Tobique Road, Chippewa National Forest. · Cass, Minnesota

This permit amendment will authorize Lake Country Power to install underground electrical line 10 feet off the of Tobique Road Right of Way. This is inside the Leech Lake Reservation.

Special use management
Scoping Start
08/01/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Lake Country Power Install Underground PowerlinesDecision Signed Date: 08/02/2016
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT147N, R27W, S4 and S5
Decision Memo · Deer River Ranger District · updated 9/29/2016
Stokes Township, Itasca County, Minnesota · Itasca, Minnesota

Issue easement to Stokes Township for 6 sections of existing road that cross National Forest land for access to cemetery and private property by local landowners. Not within Leech Lake Band of Ojibwe Reservation.

Special use managementRoad management
Scoping Start
09/08/2016
Decision
09/2016 (Estimated)
Implementation
10/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Travel Management
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description60N, R26W, S8, S9, S10, S20, S29 and T60N, R27W, S25
Decision Memo · Deer River Ranger District · updated 8/3/2016
The project is located on Lot 13, Winnie Dam summer home group, Deer River, MN. · Itasca, Minnesota

The Williams have requested permission to install a 500 gallon above ground propane tank and gas line to their cabin on Lot 13, Winnie Dam Tract. The lot is within the Leech Lake Reservation administrative boundary.

Special use management
Scoping Start
02/23/2016
Decision
08/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Sections 24, 5th Principal Meridian
Decision Memo · Deer River Ranger District · updated 8/1/2016
Discovery Center and Marcell Lodge off Highway 38 in Marcell · Itasca, Minnesota

The old Marcell Ranger district facilities have been operating under a special use permit issued to Northern Joint Itasca Powers Board since 2014. Edge of wilderness Discovery Center has taken over the operations resulting in new permit.

Special use management
Scoping Start
06/15/2016
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description4th PM, T59N, R26W, Sec. 18
Decision Memo · Blackduck Ranger District · updated 7/25/2016
The project is located on CSAH 55 in Beltrami County just south of Blackduck. · Beltrami, Minnesota

Beltrami County has applied for an easement to rebuild CSAH 55 where it crosses Chippewa National Forest land in 3 places. The affected lands are located in Beltrami County, Chippewa National Forest and outside the Leech Lake Reservation administrat

Special area managementRoad management
Scoping Start
02/24/2016
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Special Area Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 7/14/2016
Leech River Watershed, Bear Brook sub watershed;Ball Club sub-watershed, tributary to Ball Club Lake;Big Fork Watershed, Big Fork Watershed, Upper Bigfork River. Fletcher Creek sub-watershed · Cass; Itasca, Minnesota

Remove all control structures and wetland fill and re-vegetate to a natural condition. Bear Brook will be replaced with a suitable culvert or bridge that meets standards for aquatic organism passage.

Wildlife, fish, rare plantsWatershed management
Scoping Start
02/08/2016
Decision
07/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Eric Raitanen · ericraitanen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Maintenance; Watershed Improvements
Bear Brook Ball Club and Holland Impoundment RemovalDecision Signed Date: 07/08/2016
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionBall Club Impoundments: T145 R26 Sec 8, Bear Brook Impoundment: T144 R27 Sec 15, Holland Lake Impoundment T149R25 Sec 7
Decision Memo · Deer River Ranger District · updated 6/30/2016
Camp Fire USA organization camp on west shore of Bluewater Lake. This project is NOT on the LLBO Reservation · Itasca, Minnesota

Replace roof on craft center building. Place locked gate on FR2065E at permitted area boundary

Special use managementRoad management
Scoping Start
06/08/2016
Decision
06/2016 (Estimated)
Implementation
08/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Travel Management
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N, R25W, sec. 18, Lot 1
Decision Memo · Deer River Ranger District · updated 6/30/2016
Highbanks Resort off of FR 2205 · Itasca, Minnesota

Request to conduct pig race July 2016 and clear an area in the woods for storage under resort permit. This project is not within the LLBO Reservation boundary.

Special use management
Scoping Start
03/22/2016
Decision
06/2016 (Estimated)
Implementation
07/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description5th PM, T146N, R27W, Sec 20 and Sec. 29
Decision Memo · Deer River Ranger District · updated 6/27/2016
The project is located on Lot 7, Little Cut Foot Sioux summer home group, Deer River, MN · Itasca, Minnesota

The Holmgrens need to replace the septic system for their cabin on Lot 7, Little Cut Foot Sioux Tract. The lot is within the Leech Lake Reservation administrative boundary.

Special use management
Scoping Start
04/18/2016
Decision
04/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 36, 5th Principal Meridian
Decision Memo · Blackduck Ranger District · updated 5/31/2016
Knutson Dam campground, site 12 · Beltrami, Minnesota

installation of a 1,000 gallon wastewater holding tank at Knutson Dam Campground host site

Facility management
Scoping Start
07/15/2013
Decision
04/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Kenneth Hansen · khansen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 5/20/2016
The project is located at The Pines Resort at 17221 Winnie Dam Road NE, Deer River, MN. · Itasca, Minnesota

The Pines Resort has requested permission to enlarge 2 cabins on their permitted resort. The resort is within the Leech Lake Reservation administrative boundary.

Special use management
Scoping Start
02/23/2016
Decision
05/2016 (Estimated)
Implementation
06/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
The Pines Resort Cabin AdditionsDecision Signed Date: 05/18/2016
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Sections 25 and 26, 5th Principal Meridian
Decision Memo · Blackduck Ranger District · updated 4/29/2016
Mississippi River summer home group off FR 2235 · Cass, Minnesota

Construct a garage and expand a cabin on a permitted recreation resident lot, Mississippi Tract, Lot 7

Special area management
Scoping Start
03/22/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Menth Garage and Cabin Addition DMDecision Signed Date: 04/26/2016
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Horn Windows Completed
Decision Memo · Deer River Ranger District · updated 4/13/2016
North Sioux summer home group on Cut Foot Sioux Lake · Itasca, Minnesota

Request to replace windows on a cabin on a permitted recreation resident lot, North Sioux Tract, Lot 5 This project is located within the LLBO Reservation

Special use management
Scoping Start
03/29/2016
Decision
04/2016 (Estimated)
Implementation
05/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Horn Window Replacement ProjectDecision Signed Date: 04/13/2016
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description5th PM, T147N, R27W, Sec 22
Decision Memo · Deer River Ranger District · updated 2/29/2016
The resort is located on Tamarack Point on Lake Winnibigoshish · Cass, Minnesota

This permit will authorize the continued construction, operation and maintenance of a resort/marina, including a lodge, 11 cabins, garage, and other ancillary facilities on National Forest lands. Project is within the Leech Lake Reservation boundary.

Special use management
Scoping Start
10/22/2015
Decision
02/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Highbanks Resort Special Use Permit RenewalDecision Signed Date: 02/05/2016
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Sec 20 and 29
Environmental Assessment · Deer River Ranger District · updated 2/9/2016
The Chippewa National Forest boundary. · Beltrami; Cass; Itasca, Minnesota

To maintain lowland forest cover and structure on the landscape by diversifying ash-dominated stands prior to the arrival of Emerald Ash Borer. This is a forest wide project which includes all of the Leech Lake Band of Ojibwe reservation boundary.

Forest productsVegetation management (other than forest products)
Scoping Start
05/07/2015
Comment Period
10/22/2015
Objection Period Start
12/17/2015
Decision
02/2016 (Estimated)
Implementation
02/2016 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Ash Diversification ProjectDecision Signed Date: 02/09/2016
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Walker Ranger District · updated 9/30/2015
Project area is west-southwest area of the Chippewa National Forest, includes Oak Point and Stony Point on Leech Lake and the area west of Highway 371 in the vicinity of Walker, MN. · Cass, Minnesota

Vegetation management 3,203 acres with volume 44,756 CCF; wildlife habitat (up to 16 openings), riparian management (150 acres)

Forest productsRecreation managementWatershed managementVegetation management (other than forest products)Wildlife, fish, rare plants
Scoping Start
06/11/2014
Comment Period
04/30/2015
Objection Period Start
08/05/2015
Decision
09/2015 (Estimated)
Implementation
06/2017 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionThe Project encompasses all or portions of the following townships: T. 141 N. R. 30 W., T. 141 N. R. 31 W., T. 142 N. R.30 W., T. 142 N. R. 31 W., T. 143 N. R. 30 W., T. 143 N. R. 31 W., T. 144 N. R. 30 W. and T. 144 N. R. 31.W.
Decision Memo · Deer River Ranger District · updated 8/17/2015
The project is located west of Sand Lake off of County Road 158, Chippewa National Forest · Itasca, Minnesota

Owners of the Pine Grove Lodge are requesting approval to remove an existing propane tank and bait house and construct a 47%u2019 x 69%u2019 residence/office. Project is within the Leech Lake Reservation administrative boundary.

Special use management
Scoping Start
06/23/2015
Decision
08/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description5th P.M., T147N, R26W, Sec. 6
Decision Memo · Blackduck Ranger District · updated 7/28/2015
The project is located east of Bass Lake, Chippewa National Forest. · Itasca, Minnesota

Authorizes E Lake Road Association to use and maintain an existing private road across NFS land to access private property. Location Itasca County, Chippewa National Forest and outside the Leech Lake Reservation admin boundary.

Special use management
Scoping Start
05/19/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N, R26W, S22, NE1/4NW1/4, 5th Principal Meridian
Decision Memo · Walker Ranger District · updated 7/8/2015
Within LLBO Reservation, Forest Road 2131, roughly 3 miles south of the junction with US Hwy 2 · Cass, Minnesota

The Project would replace the existing box culvert on Portage Road (Forest Road 2131) with a bridge at a point roughly 3 miles south of the junction with US Hwy 2.

Watershed managementWildlife, fish, rare plants
Scoping Start
10/30/2013
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
David Morley · damorley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 6/26/2015
Project will take place on Lot 6 of the North Sioux Summer Home group. These units are on the northeast side of Cut Foot Sioux Lake. · Itasca, Minnesota

Cabin owner is prposing to build a 20' x 20' garage.

Special use management
Scoping Start
05/05/2014
Decision
05/2014 (Estimated)
Implementation
06/2014 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
North sioux Lot 6 Summer Home Garage ProjectDecision Signed Date: 05/29/2014
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N R27W Sec 22 5th PM
Environmental Assessment · Deer River Ranger District · updated 6/15/2015
This project area is located in the eastern part of the Deer River District on the Chippewa National Forest. · Itasca, Minnesota

This purpose of the project is to move toward achieving Landscape Ecosystem vegetation objectives, and restoring conditions more prepresentative of native vegetation communities. Outside the LLBO reservation boundary

Forest products
Scoping Start
12/10/2013
Comment Period
01/08/2015
Objection Period Start
04/16/2015
Decision
06/2015 (Estimated)
Implementation
07/2015 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Laurentian Vegetation Management ProjectDecision Signed Date: 06/15/2015
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N R25-26W; T58N R25-27W; T59N R26W; T60N R 26-27 W; and T149N R 25-26W
Decision Memo · Deer River Ranger District · updated 6/2/2015
The project is located 1) along Alice Lake and 2) NE of Jessie Lake, Chippewa National Forest. · Itasca, Minnesota

This permit amendment will authorize North Itasca Electric Coop to remove existing overhead power lines and install underground power lines in two locations across Chippewa National Forest. The project is within the Leech Lake Reservation boundary.

Special use management
Scoping Start
04/16/2015
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
North Itasca Electric Cooperative, Inc. amendment to Permit DER400301Decision Signed Date: 05/27/2015
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT148N, R25W, S22, SESW; T148N, R27W, S31, NW; T148N, R28W, S36, NE, 5th PM
Decision Memo · Deer River Ranger District · updated 5/29/2015
The project is located northwest of Sugar Lake, Chippewa National Forest · Itasca, Minnesota

This permit will authorize Bruce & Mary Richey to use and maintain existing private road 3448 and FR3463 across NF land to access private property. The location is outside the Leech Lake Reservation boundary.

Special use management
Scoping Start
05/19/2015
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N, R26W, S4 & S9, 4th Principal Meridian
Decision Memo · Deer River Ranger District · updated 5/29/2015
The resort is located on Cut Foot Sioux Lake · Itasca, Minnesota

This permit will authorize the continued use, operation and maintenance of five cabins partially on National Forest lands; a storage yard for boats and temporary docks; and a septic leach field system. Within the Leech Lake Reservation boundary.

Special use management
Scoping Start
12/03/2014
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Williams Narrows Resort Special Use Permit RenewalDecision Signed Date: 05/15/2015
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT. 147 N., R. 27 W., Sec. 35, Lot 6
Decision Memo · Blackduck Ranger District · updated 5/28/2015
The affected lands are in Beltrami County, Chippewa National Forest and within the Leech Lake Reservation administrative boundary. The project is located on the northeast side of Cass Lake. · Beltrami, Minnesota

This permit will authorize the Edgren's to construct a screened porch and storage shed on their leased recreation residence lot on National Forest land.

Special use management
Scoping Start
05/04/2015
Decision
05/2015 (Estimated)
Implementation
08/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R25W, S21, SW1/4, 5th Principal Meridian
Decision Memo · Blackduck Ranger District · updated 5/18/2015
The project is located south of Silver Lake and East of Cass Lake, Chippewa National Forest. The affected lands are located in Beltrami County, Chippewa National Forest and within the Leech Lake Reservation administrative boundary. · Beltrami, Minnesota

This permit will authorize Century Lint to install phone line in the existing road and power line right-of-way across National Forest land.

Special use management
Scoping Start
03/02/2015
Decision
05/2015 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Century Link Buried Cable InstallationDecision Signed Date: 05/13/2015
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, S16, NWSW, NENE, SENE; S21, NWSE, NESE, S22, SENW, SWNW, 5th Principal Meridian
Decision Memo · Blackduck Ranger District · updated 4/27/2015
The project is south of Big Lake, Beltrami County, MN, Chippewa National Forest and within Leech Lake Reservation administrative boundary. · Beltrami, Minnesota

Permit authorizes Brian and Michelle Olson to use and maintain existing private driveway across NFS land to access private property.

Special use management
Scoping Start
04/13/2015
Decision
04/2015 (Estimated)
Implementation
05/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Rich Private Road PermitDecision Signed Date: 04/15/2015
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, S4, NE1/4 NE1/4, 5th Principal Meridian
Decision Memo · Deer River Ranger District · updated 4/13/2015
The project is located northwest of Sugar Lake, Chippewa National Forest · Cass, Minnesota

This permit will authorize Chris & Caryn Rich to use and maintain an existing private road across National Forest land to access private property.The affected lands are located in Cass County, Chippewa NF, outside the Leech Lake Reservation boundary.

Special use management
Scoping Start
03/25/2015
Decision
04/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT143N, R25W, S33, SE 1/4 NW 1/4, 5th Principal Meridian
Decision Memo · Walker Ranger District · updated 3/20/2015
Within LLBO Reservation boundary, roughly 3.5 miles southwest of Bena, MN. Begins near FSR 2126 and extends northwesterly to intersection with FSR 3036. · Cass, Minnesota

Reconstruct FSR3036 (now open to all vehicles) to accommodate the range of motorized uses currently on the Soo Line Trail; scarify old trail bed, then seed with native grasses and forbs; install signs; close decommissioned access points (boulders).

Road managementWildlife, fish, rare plantsWatershed management
Scoping Start
02/12/2014
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
David Morley · damorley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Decommissioning; Trail Management; Road Improvements/Construction
Soo Line Trail - FSR3036 Reroute ProjectDecision Signed Date: 03/20/2015
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 3/19/2015
The project is located south of Amen Lake & east of Crane Lake, Chippewa National Forest · Itasca, Minnesota

This permit will authorize Royal Oyster to use and maintain an existing private road across National Forest land to access private property. The affected lands are located in Itasca CO., Chippewa National Forest,outside the Leech Lake Reservation.

Special use management
Scoping Start
03/06/2015
Decision
03/2015 (Estimated)
Implementation
04/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N, R26W, S15, SE 1/4 SW 1/4, 4th Principal Meridian
Decision Memo · Deer River Ranger District · updated 3/5/2015
The project is located on Forest Road 2520 Chippewa National Forest.Located within the Leech Lake Reservation administrative boundary. · Itasca, Minnesota

Application to use and maintain existing Forest Road 2520 to access private residence located T148N R26W Sec15, Itasca County, Chippewa National Forest.FR2520 is currently closed to motorized vehicles,replacing the berm blocking the road with a gate.

Special use management
Scoping Start
06/26/2014
Decision
07/2014 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description5th Principal Meridian, T. 148 N., R. 26 W., Sec. 15
Decision Memo · Blackduck Ranger District · updated 2/11/2015
Chippewa National Forest · Beltrami; Cass; Itasca, Minnesota

FSH 2709.14.53.1(q) directs forest units to convert holders of 1- year guide and outfitter permits to 10-year permits. Four 1-year permits will be converted to 10-year terms. All additional terms contained in the permits remain the same.

Special use management
Scoping Start
01/05/2015
Decision
02/2015 (Estimated)
Implementation
09/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Bear Guiding and Outfitting Special Use PermitsDecision Signed Date: 02/04/2015
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Bena Bike Trail Completed
Decision Memo · Blackduck Ranger District · updated 2/9/2015
Location: west of Winnie Store and follows 3,233 feet westerly to public housing road. · Cass, Minnesota

SUP authorization within US Hwy 2 ROW along the old road corridor. Trail: 995 feet long x 12 feet wide across NFS lands; some timber removal needed in corridor.

Recreation managementSpecial use management
Scoping Start
11/21/2014
Decision
02/2015 (Estimated)
Implementation
03/2015 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityHeritage Resource Management; Special Use Authorizations; Trail Management
Construction of a Bike Trail in Bena, aka Bena Bike TrailDecision Signed Date: 02/04/2015
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionSection 27, T145 N, R 28 W
Decision Memo · Deer River Ranger District · updated 2/6/2015
The project is located on Forest Road 3368, Chippewa National Forest. · Itasca, Minnesota

This permit will authorize Buck Club Road Association to use and maintain existing FR3368 and a private driveway to access private property. Located in Itasca County, outside the Leech Lake Reservation administrative boundary.

Special use managementRoad management
Scoping Start
12/02/2014
Decision
01/2015 (Estimated)
Implementation
01/2015 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
Buck Club, Inc. FR3368 PermitDecision Signed Date: 01/21/2015
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R27W, S3, Lot 5 and S4, Lot 1
Decision Memo · Blackduck Ranger District · updated 1/27/2015
Popple River Watershed, Chippewa National Forest. · Itasca, Minnesota

The Project treats about 20 acres of speckled alder/young aspen to improve woodcock habitat. The units would be sheared using equipment similar to a hydro-axe brush cutter.

Wildlife, fish, rare plants
Scoping Start
08/01/2014
Decision
01/2015 (Estimated)
Implementation
02/2015 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT 149 N, R 28 W, Section 20
Decision Memo · Deer River Ranger District · updated 12/4/2014
The project is located on forest road 2153, also known as Orange Lake Road, Chippewa National Forest · Itasca, Minnesota

Owners of the Eagle Nest Lodge are requesting approval to replace cabins 4 and 6 with new cabins on a slightly larger footprint. Is located within the Leech Lake Reservation administrative boundary.

Special use management
Scoping Start
10/10/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Sec. 22
Decision Memo · Deer River Ranger District · updated 12/4/2014
The project is located on Forest Road 2308 Chippewa National Forest. · Itasca, Minnesota

This permit will authorize use, maintenance and widening of existing FR2308 to allow the Holts to access their private property. This location is outside the Leech Lake Reservation administrative boundary.

Special use managementRoad management
Scoping Start
10/09/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT. 142 N., R. 25 W., Sec. 31
Decision Memo · Deer River Ranger District · updated 12/4/2014
The project is located on forest road 2153, also known as Orange Lake Road, Chippewa National Forest · Itasca, Minnesota

Reissue a permit to allow sled dogs to pull an ATV on FR 2153 during non-snow season and allow maintenance of FR2153 in order to access private property.Outside the Leech Lake Reservation administrative boundary.

Special use managementRoad management
Scoping Start
10/09/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT57N R26W, T58N R26W, and T57N 27W
Decision Memo · Deer River Ranger District · updated 12/4/2014
The project is located on the Blue Ox, Bowstring, Pines and Squaw Lake Spur snow mobile trails in the Chippewa National Forest · Itasca, Minnesota

This permit will authorize use of existing snow mobile trails; Blue Ox, Bowstring, Pines and Squaw Lake Spur; over NFS lands for the annual Voyageurs Classic sled dog race the week-end of 1/9 and 1/10/2015. Partially within the Leech Lake Reservation

Special use management
Scoping Start
10/13/2014
Decision
11/2014 (Estimated)
Implementation
12/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 11/6/2014
The project is located on Forest Road 2710 & 2710A Chippewa National Forest · Itasca, Minnesota

This permit will authorize use of existing FR2710 & 2710A to allow Potlatch to access their private property. The road is located T. 148 N., R. 26 W., Sec. 30 and 31, Itasca County, Chippewa NF and is within the Leech Lake Reservation boundary.

Road managementSpecial use management
Scoping Start
10/03/2014
Decision
10/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description5th Principal Meridian, T. 148 N., R. 26 W., Sec. 30 and 31
Environmental Assessment · Blackduck Ranger District · updated 10/17/2014
Dam in located on the Mississippi River at the outlet of Cass Lake. · Cass, Minnesota

Project focuses on structural maintenance needs of current dam structure in order to prevent possible structural failure. Improvements would allow for passage of aquatic organisms. Project is within LLBO Reservation.

Watershed managementWildlife, fish, rare plants
Scoping Start
11/15/2013
Comment Period
04/25/2014
Objection Period Start
06/13/2014
Decision
10/2014 (Estimated)
Implementation
11/2015 (Estimated)
Project documents
Eric Raitanen · ericraitanen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityWatershed Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 10/2/2014
A section of the Marcell Snowmobile trail that is north of Hwy 38 and south of Marcell. · Itasca, Minnesota

This reroute would move a section of the Marcell snowmobile trail to avoid a parcel of private property where the landowner is no longer willing to allow transit across. This re-route is totally off the LLBO reservation boundary.

Recreation management
Scoping Start
06/20/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Marcell South Snowmobile Trail Re-route ProjectDecision Signed Date: 09/30/2014
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N R26W Sections 20 & 21
Decision Memo · Deer River Ranger District · updated 9/16/2014
Located in North Star Summer Home Group Chippewa National Forest. This is not within the Leech Lake Reservation administrative boundary. · Itasca, Minnesota

This decision will modify a recreation resident special permit to allow the installation of new mound septic system on Lot 15 North Star Lake Summer Home Group.

Special use management
Scoping Start
09/11/2014
Decision
09/2014 (Estimated)
Implementation
10/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionLot is located in 4th Principal Meridian, T. 59 N., R. 26 W., Sec. 32
Decision Memo · Deer River Ranger District · updated 7/25/2014
This study is located on the Cutfoot Experimental Forest of the Chippewa National Forest · Itasca, Minnesota

Research in red pine stands to study the effects of silvicultural treatements designed to increase forests resistance, resilience, and adaptability to climate change. Inside the LLBO reservation boundary.

Research
Scoping Start
05/30/2013
Decision
07/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.3 (2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N R 27 W Sections 9,10,14,15
Decision Memo · Deer River Ranger District · updated 7/21/2014
The project is located on private road P1321 at Highway 91, West side Lake Winnebigoshish, Chippewa National Fores. · Cass, Minnesota

Reissue a permit for an existing private road crossing National Forest lands to access private property. Road located in Cass County, Chippewa National Forest and is within the Leech Lake Reservation administrative boundary.

Special use managementRoad management
Scoping Start
07/15/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description5th Principal Meridian, T. 146 N., R 29 W., Sec. 34
Decision Memo · Deer River Ranger District · updated 7/17/2014
Outside the Leech Lake Reservation administrative boundary. The project is located on private road P3426 near North Star Lake, Chippewa National Forest · Itasca, Minnesota

This permit will authorize use of an existing private road to cross National Forest lands in order to access private residences owned by members of the Little Lake Road Association.

Special use managementRoad management
Scoping Start
07/09/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description4th Principal Meridian, T. 58 N., R. 26 W., Sec. 4
Decision Memo · Deer River Ranger District · updated 7/10/2014
The project is located on Forest Road 2065F Chippewa National Forest. FR2065F is located within the Leech Lake Reservation administrative boundary. · Itasca, Minnesota

This permit will replace a permit issued for the same road to Jan and Patrick Adams in 1982. The Adams use FR2065F to access their private residence located in T. 57 N., R. 25 W., Sec. 18, Itasca County, Chippewa National Forest.

Special use managementRoad management
Scoping Start
06/27/2014
Decision
07/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Road Maintenance
Adams 2065F Road PermitDecision Signed Date: 07/10/2014
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land Description4th Principal Meridian, T. 57N., R. 25 W., Sec. 18
Decision Memo · Deer River Ranger District · updated 6/27/2014
This project is within the LLBO reservation boundary. The project is located at The Pines Resort, Winnie Dam Road NE, Deer River, MN. · Itasca, Minnesota

Remove a gravel from 120 feet of an existing driveway and replace it with topsoil and seed it with grass seed.

Special use management
Scoping Start
06/03/2014
Decision
06/2014 (Estimated)
Implementation
07/2014 (Estimated)
Project documents
Laura Underhill · laurabunderhill@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W,Sections 25 and 26, 5th Principal Meridian
Decision Memo · Deer River Ranger District · updated 6/3/2014
Project will take place on Lot 3 of the little Cut Foot Sioux Summer Home group. There units are on the South side of Little Cut Foot Sioux Lake. · Itasca, Minnesota

Cabin owner is proposing to install a 250 gallon propane tank and run buried lines to the cabin. The tank will be located next to the garage with lines running to the cabin.

Special use management
Scoping Start
05/05/2014
Decision
06/2014 (Estimated)
Implementation
09/2014 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N R27W Sec 35, 5th PM
Decision Memo · Blackduck Ranger District · updated 4/23/2014
three separate short roads on Chippewa National Forest · Beltrami; Itasca, Minnesota

Issue 3 SUPs for existing roads across Forest Service lands, into privately owned properties.

Special use management
Scoping Start
03/11/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Donna Schackman · djschackman@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionS1, T149N R27W; S21 T146N R31W; S15 & 22 T148N R28W
Environmental Assessment · Blackduck Ranger District · updated 4/22/2014
Within LLBO Reservation, end of Winnie Campground Road (FR 2163) on West Shore of Lake Winnibigoshish · Itasca, Minnesota

The purpose of the West Winnie Boat Launch Project is to reduce the risk of transporting the aquatic invasive faucet snail (Bithynia tentaculata) to other bodies of water on boats/trailers and improve launch safety.

Wildlife, fish, rare plantsRecreation managementFacility management
Scoping Start
05/07/2012
Comment Period
09/20/2013
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other; Stewardship Contract, Consolidated Appropriations Resolution Of 2003
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Facility Improvements/Construction
West Winnie Boat Launch ProjectDecision Signed Date: 04/14/2014
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionTWP 146N RNG 29W SEC 35
Decision Memo · Deer River Ranger District · updated 4/16/2014
Winnie Dam/Plug Hat Point Area · Itasca, Minnesota

Approval, modification, or continuation of minor special uses of National Forest System lands that require less than five contiguous acres of land. Installation of a well and bored lines to cabin and garage in Lot #4 of the Winnie Dam tract

Special use management
Scoping Start
03/06/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
James Davis · jamesdavis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Winnie Dam, Lot 4 New well installation ProjectDecision Signed Date: 04/10/2014
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N R27W Sec 25 5th P.M.
Decision Memo · Blackduck Ranger District · updated 4/2/2014
Within the LLBO Reservation; along Forest System Roads 2383 and 3139 north of Lake Winnibigoshish in T147N, R28W, Sections 15 and 18. · Itasca, Minnesota

The purpose is to regenerate mountain maple stands to improve white-tailed deer winter range by increasing the availability of winter browse. Activities are hand cutting about 8 acres of mountain maple in two stands.

Wildlife, fish, rare plants
Scoping Start
01/31/2014
Decision
04/2014 (Estimated)
Implementation
05/2014 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
DM North Winnie Mountain MapleDecision Signed Date: 04/01/2014
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N, R28W, Sections 15 and 18
Birch Lake Tornado Completed
Decision Memo · Deer River Ranger District · updated 3/28/2014
T141N R25W East of Remer and north of highway 200 · Cass, Minnesota

Salvage, site preparation and regeneration of up to 250 acrees of Tornado damaged stands. Outside the LLBO reservation boundary.

Forest products
Scoping Start
10/03/2013
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT141 N R 25 W
Decision Memo · Deer River Ranger District · updated 3/20/2014
West of Nature Lake off Forest Road 2028A · Itasca, Minnesota

Re-issue of road permit inside the LLBO reservation Boundary

Special use management
Scoping Start
01/23/2014
Comment Period
02/06/2014
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
James Davis · jamesdavis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT148N R27W S5 & 9
Decision Memo · Deer River Ranger District · updated 3/20/2014
Located between Rush island and Sand Lakes · Itasca, Minnesota

Re-issue road use permit inside the LLBO reservation boundary

Special use management
Scoping Start
01/23/2014
Comment Period
02/06/2014
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
James Davis · jamesdavis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT148N R26W S21
Maki Road Permit Completed
Decision Memo · Deer River Ranger District · updated 3/20/2014
East of Whitefish Lake off of County Road 29 · Itasca, Minnesota

Re-issue of a special use road permit outside the LLBO reservation boundary

Special use management
Scoping Start
01/23/2014
Comment Period
02/06/2014
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
James Davis · jamesdavis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT149N R26W S35
McCabe Road Permit Completed
Decision Memo · Deer River Ranger District · updated 3/20/2014
West of Bowstring Lake off forest road 3213 · Itasca, Minnesota

Re-issue road use permit inside the LLBO reservation Boundary

Special use management
Scoping Start
01/23/2014
Comment Period
02/06/2014
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
James Davis · jamesdavis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N R26W S15
Decision Memo · Deer River Ranger District · updated 3/20/2014
Off forest road 2721 and 2721C · Itasca, Minnesota

Re-issue of road permit outside the LLBO reservation boundary

Special use management
Scoping Start
01/23/2014
Comment Period
02/06/2014
Decision
03/2014 (Estimated)
Implementation
04/2014 (Estimated)
Project documents
James Davis · jamesdavis@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT142N R25W S11& 2, T143N R25W S 34&35
Environmental Assessment · Deer River Ranger District · updated 12/18/2013
Deer River and Walker District · Cass, Minnesota

Stands of ash with low species diversity were identified on NF lands and adjacent ownerships. Introduction of other species through harvest and regeneration, using a collaborative approach, is planned to minimize future effects of emerald ash borer.

Vegetation management (other than forest products)
Scoping Start
06/06/2012
Comment Period
09/2012 (Estimated)
Decision
10/2012 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Gary Swanson · ghswanson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Decision Memo · Walker Ranger District · updated 11/22/2013
3495 Stony Point Camp Rd. NW, Walker, MN 56484 and is in Cass County, south of Stony Point Campground on the shore of Leech Lake in T142N, R30W, Section 10, and is within the LLBO Reservation boundary. · Cass, Minnesota

The purpose of this action is to authorize, by amending an existing special use permit, construction of a septic system and drainfield on NFS lands.

Special use management
Scoping Start
10/02/2013
Comment Period
10/02/2013
Decision
11/2013 (Estimated)
Implementation
12/2013 (Estimated)
Project documents
Steven Frick · scfrick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Lot8 Big Rock Summer Home Tract SepticDecision Signed Date: 11/15/2013 Legal Notice Date: 11/20/2013
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 10/18/2013
T 59N R26W Section 18 · Itasca, Minnesota

Project responds to a maintenance need by updating the current septic system to meet new code requirements.

Special use management
Scoping Start
08/01/2013
Comment Period
08/14/2013
Decision
09/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Michelle Heiker · mheiker@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Septic System Improvement Marcell Log House Septic System ImprovementDecision Signed Date: 09/30/2013
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59 N R 26 W Section 18
Decision Memo · Walker Ranger District · updated 9/17/2013
Cass County Highway 4: strip parallel to roadway 50-75 feet wide in two locations · Cass, Minnesota

power line clearing and maintenance along Cass County Highway 4 (50 feet to 75 feet wide)

Special use management
Scoping Start
08/07/2013
Comment Period
08/07/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Steven Frick · scfrick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityElectric Transmission
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionSE1/4-SW1/4 and SW1/4-SE1/4, Section 27, T142N, R26W; NW1/4-NW1/4 and Government Lot 4, Section 28, T142N, R26W
Decision Memo · Walker Ranger District · updated 9/17/2013
Lot 1 of the Big Rock Summer Home tract · Cass, Minnesota

installation of a water well on NFS lands for house

Special use management
Scoping Start
07/10/2013
Comment Period
07/10/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Steven Frick · scfrick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Lot 1, Big Rock Summer Home TractDecision Signed Date: 08/16/2013 Legal Notice Date: 08/16/2013
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Section 10
Decision Memo · Walker Ranger District · updated 9/17/2013
Cedar Point Road NW, Walker, MN, on the east shore of Walker Bay of Leech Lake · Cass, Minnesota

install a new septic system and drainfield

Special use management
Scoping Start
08/07/2013
Comment Period
08/07/2013
Decision
09/2013 (Estimated)
Implementation
10/2013 (Estimated)
Project documents
Steven Frick · scfrick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Lot 12, Walker Bay Summer Home Tract Septic ProjectDecision Signed Date: 09/10/2013 Legal Notice Date: 09/11/2013
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R31W, Section 14
Decision Memo · Blackduck Ranger District · updated 8/26/2013
Beltrami County, near Pennington, T147N, R30W, Section 33 · Beltrami, Minnesota

Construction of an elevated 4-foot-wide boardwalk trail (221 feet long) that connects to another trail on the bog loop in the wetland. The boardwalk is adjacent to a new wayside rest area on the Lady Slipper Scenic Byway.

Recreation management
Scoping Start
05/19/2013
Comment Period
05/19/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Ann Long-Voelkner · alongvoelkner@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction; Trail Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N, R30W, Section 33, Beltrami County
Decision Memo · Deer River Ranger District · updated 8/23/2013
South Highbanks Lot #2 · Itasca, Minnesota

Proposal to build a 10 by 16 foot deck.

Special use management
Scoping Start
05/27/2013
Comment Period
07/03/2013
Decision
08/2013 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Rebecca Wilkinson · rwilkinson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
South Highbanks, Lot 2 Deck ProjectDecision Signed Date: 08/13/2013 Legal Notice Date: 08/19/2013
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT 146 N R 27 W Section 31
Environmental Assessment · Deer River Ranger District · updated 8/8/2013
eastern portion of the Chippewa National Forest · Itasca, Minnesota

located in the eastern portion of the Chippewa National Forest

Forest products
Scoping Start
11/22/2011
Comment Period
06/14/2012
Decision
08/2012 (Estimated)
Implementation
01/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Talmoon Vegetation Managment ProjectDecision Signed Date: 08/29/2012 Legal Notice Date: 08/30/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionTownship 58 North, Range 26 West; Township 59 North, Range 26-27 West; Township 60 North, Range 26-27 West; T147N R 25-26 W; T148N R 25–26 W; T149N R25-26W
Environmental Assessment · Chippewa National Forest All Units · updated 7/31/2013
Damage area is roughly 10 miles by 40 miles through the middle of the Forest and on either side of Hwy 2. · Beltrami; Cass; Itasca, Minnesota

July 2012 wind storm resulted in approximately 20,000 acres of moderate/severe blowdown. Project focuses on ecosystem restoration, some salvage, reforestation activities, and landscape level burns.

Fuels managementVegetation management (other than forest products)Forest products
Scoping Start
11/14/2012
Comment Period
05/01/2013
Decision
07/2013 (Estimated)
Implementation
11/2013 (Estimated)
Project documents
Sharon Klinkhammer · sklinkhammer@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Salvage); Timber Sales (Green)
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 7/31/2013
Lot 4, Ojibway Summer Home Tract, Cass County, South of US Hwy. 2 and on the east shore of Pike Bay in T145N, R30W Section 19. · Cass, Minnesota

Activities include minor ground leveling and constructing a 12 foot by 18 foot garage and foundation.

Special area management
Scoping Start
06/12/2013
Comment Period
06/12/2013
Decision
07/2013 (Estimated)
Implementation
08/2013 (Estimated)
Project documents
Steven Frick · scfrick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityHeritage Resource Management; Special Use Authorizations
Ojibway Summer Home Tract Garage ProjectDecision Signed Date: 07/23/2013 Legal Notice Date: 07/23/2013
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R30W Section 19.
Environmental Assessment · Deer River Ranger District · updated 6/10/2013
Off Hwy 6, 2 1/2 miles south of Jesse Lake · Itasca, Minnesota

Expand the gravel pit area and restore/reclaim exhausted pit areas.

Minerals and geology
Scoping Start
08/16/2012
Comment Period
04/25/2013
Decision
05/2013 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityMinerals Or Geology Plans Of Operations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT14N R25W Sec4
Environmental Assessment · Deer River Ranger District · updated 3/28/2013
Deer River administrative site, 1037 Division Street, Deer River, MN · Itasca, Minnesota

Build a tree cooler on the Chippewa National Forest at the Deer River administrative site.

Facility managementVegetation management (other than forest products)
Scoping Start
04/11/2012
Comment Period
06/14/2012
Decision
03/2013 (Estimated)
Implementation
05/2013 (Estimated)
Project documents
Gregory Van Orsow · gvanorsow@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFacility Improvements/Construction
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Decision Memo · Walker Ranger District · updated 3/27/2013
South of Hwy 2 and north of Bud Lake on the north end of the Walker RD. · Cass, Minnesota

Maintenance and improvement of 12 acres of woodcock habitat in the Portage Creek watershed. This includes shearing decadent alder and allowing it to regenerate. This project would be completed in winter under frozen ground conditions.

Wildlife, fish, rare plants
Scoping Start
11/21/2012
Comment Period
11/21/2012
Decision
02/2013 (Estimated)
Implementation
02/2013 (Estimated)
Project documents
Cory Mlodik · corymlodik@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
White Rock Lane Completed
Decision Memo · Walker Ranger District · updated 3/27/2013
existing road located west of Cass County Road 39 and east of Leech Lake · Cass, Minnesota

Issue SUP for private road across NFS lands

Road management
Scoping Start
02/06/2013
Comment Period
02/06/2013
Decision
03/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Steven Frick · scfrick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
White Rock Lane Private Road Special Use PermitDecision Signed Date: 03/18/2013 Legal Notice Date: 03/20/2013
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionCass County, T141N, R29W Section 1, Gov’t. Lot 2
Decision Memo · Deer River Ranger District · updated 3/22/2013
Ruby Lake Camp building #4 · Itasca, Minnesota

proposed roof-only covered storage on the east side of building #4 (supply/shop)

Special use management
Scoping Start
06/11/2012
Comment Period
10/01/2012
Decision
12/2012 (Estimated)
Implementation
11/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Ruby Lake Camp StorageDecision Signed Date: 12/21/2012 Legal Notice Date: 12/27/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 8, T58N
David Road Use Completed
Decision Memo · Deer River Ranger District · updated 3/14/2013
T59N R26W S31 · Itasca, Minnesota

Use permit for road use on Forest Service land.

Special use management
Scoping Start
12/14/2012
Comment Period
12/14/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT59N R26W S31
Erik road permit Completed
Decision Memo · Deer River Ranger District · updated 3/14/2013
T145 N R26 W S 21 · Itasca, Minnesota

Special use permit for use of road on Forest Service land.

Special use management
Scoping Start
12/14/2012
Comment Period
12/14/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Erik Road permitDecision Signed Date: 02/26/2013 Legal Notice Date: 03/14/2013
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Mario Road Use Completed
Decision Memo · Deer River Ranger District · updated 3/14/2013
S31 T149N R25W & S6 T148N R25W · Itasca, Minnesota

Use permit for road use on Forest Service land.

Special use management
Scoping Start
12/14/2012
Comment Period
12/14/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionS31 T149N R25W & S6 T148N R25W
Decision Memo · Deer River Ranger District · updated 3/14/2013
T57 N R25W S12 · Itasca, Minnesota

Use permit for road use on Forest Service land.

Special use management
Scoping Start
12/14/2012
Comment Period
12/14/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Ronald Road Use Completed
Decision Memo · Deer River Ranger District · updated 3/14/2013
T148N R25W S1&2 · Itasca, Minnesota

Use permit for road use on Forest Service land.

Special use management
Scoping Start
12/14/2012
Comment Period
12/14/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionS1&2 T148N R25W
SE Jessie Road Use Completed
Decision Memo · Deer River Ranger District · updated 3/14/2013
T147N R25W S12 · Itasca, Minnesota

Use permit for road use on Forest Service land.

Special use management
Scoping Start
12/14/2012
Comment Period
12/14/2012
Decision
02/2013 (Estimated)
Implementation
03/2013 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionS12 T147N R25W
Decision Memo · Walker Ranger District · updated 12/20/2012
STH 371 entrance to Walker Ranger District Office · Cass, Minnesota

widening lanes on STH 371, realigning the entrance/exit from the Walker District Office, construction of a bike tunnel under STH 371 and connecting bike/foot trail from tunnel to admin site and bike trail network into city of Walker

Recreation managementFacility management
Scoping Start
10/31/2012
Comment Period
10/31/2012
Decision
12/2012 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Facility Improvements/Construction
State Highway 371 Safety Enhancement ProjectDecision Signed Date: 12/17/2012 Legal Notice Date: 12/19/2012
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R31W, section 23
West Missy Completed
Decision Memo · Deer River Ranger District · updated 11/15/2012
West of the Mississippi River and south of Lake Winnibigoshish · Cass, Minnesota

Salvage, Regeneration and site prep after a July 2012 windstorm

Forest products
Scoping Start
10/04/2012
Comment Period
10/04/2012
Decision
11/2012 (Estimated)
Implementation
12/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityTimber Sales (Salvage)
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N R27W
Decision Memo · Deer River Ranger District · updated 10/1/2012
Walker and Deer River Ranger Districts, south of US Hwy 2 · Cass, Minnesota

proposed issuance of a special use permit to Johnson Telephone for existing lines on National Forest lands

Special use management
Scoping Start
04/12/2012
Decision
09/2012 (Estimated)
Implementation
10/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Decision Memo · Chippewa National Forest All Units · updated 9/13/2012
10 x 40 mile wide corridor along Hwy 2 . Includes Norway Beach, Pike Bay area, Tamarack Point, and South Winnie. · Beltrami; Cass; Itasca, Minnesota

Remove blowdown and hazard trees along FS system roads and access roads to recreation residences; around residences, admin sites, and in campgrounds; and along system trails. Merchantable trees salvaged will be sold. Slash will be removed from sites

Road managementFuels managementForest products
Scoping Start
07/03/2012
Comment Period
07/24/2012
Decision
09/2012 (Estimated)
Implementation
09/2012 (Estimated)
Project documents
Todd Tisler · ttisler@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityDeveloped Site Management; Fuel Treatments (Non-Activity Fuels); Facility Maintenance; Timber Sales (Salvage)
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Environmental Impact Statement · Chippewa National Forest All Units · updated 9/13/2012
Upper Mississippi River between Bemidji and St. Paul · Beltrami; Cass; Itasca, Minnesota

Operation of Federal dams and coordination with operators of non-Federal dams in the headwaters of the Mississippi River area between Bemidji and St. Paul

Watershed managementRecreation managementWildlife, fish, rare plants
NOI in Federal Register
12/12/2003
DEIS NOA in Federal Register
08/26/2008
FEIS NOA in Federal Register
10/02/2009
Decision
06/2012 (Estimated)
Implementation
06/2010 (Estimated)
Project documents
Luke Rutten · lrutten@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityWatershed Improvements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Environmental Assessment · Walker Ranger District · updated 9/12/2012
project area encompasses the Walker Ranger District, Cass County, Minnesota · Cass, Minnesota

Commercially thin plantation origin conifer on the Walker Ranger District to improve growth and vigor, forest health, and species diversity.

Forest productsWatershed managementFuels managementVegetation management (other than forest products)
Scoping Start
12/07/2011
Comment Period
04/11/2012
Decision
06/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green); Watershed Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land Descriptioneast from Cass Lake to Bena along Hwy 2, south to Federal Dam then easterly to T141N, R26W, to the south Forest boundary
Decision Memo · Deer River Ranger District · updated 8/13/2012
East McAvity summer home tract, Lot#5 · Itasca, Minnesota

for issuance of a recreation residence permit

Special use management
Scoping Start
05/01/2012
Comment Period
05/17/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issue SUP Recreation Residence EMcAvityLot5Decision Signed Date: 08/01/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 35, T147N R27W
Decision Memo · Deer River Ranger District · updated 8/13/2012
Little Cut Foot Sioux summer home tract, Lot#5 Section 36, T147N R27W · Itasca, Minnesota

A proposal is for issuance of a recreation residence permit to a new owner & termination of the current permit under the sellers name, there are no changes or increases in the scope or intensity of authorized activities.

Special use management
Scoping Start
06/06/2012
Comment Period
06/28/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issue Term SUP for Recreation Residence Little Cut Foot Sioux, Lot #5Decision Signed Date: 08/01/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 36, T147N R27W
Decision Memo · Deer River Ranger District · updated 8/13/2012
North Star Lot #1 · Cass, Minnesota

To issue a special use permit for recreation residence at North Star Lot #1

Special use management
Scoping Start
06/05/2012
Comment Period
06/28/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issue Term SUP for Recreation Residences North Star, Lot #1Decision Signed Date: 08/01/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Decision Memo · Deer River Ranger District · updated 8/13/2012
Section 31, T146N R27W South Highbanks summer home tract Lot #3 · Itasca, Minnesota

for issuance of a recreation residence permit to a new owner & termination of the current permit under the sellers name

Special use management
Scoping Start
05/16/2012
Comment Period
06/07/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issue SUP Recreation Residence SHighLot3Decision Signed Date: 08/01/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 31, T146N R27W
Decision Memo · Deer River Ranger District · updated 8/10/2012
Eagle Nest Lodge Section 22, T147N R27W · Itasca, Minnesota

This proposal is for installing a new above ground gas tank at Eagle Nest Lodge.

Special use management
Scoping Start
05/01/2012
Comment Period
06/28/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Installation of Above-Ground Gas Tank Eagle Nest LodgeDecision Signed Date: 08/09/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 22, T147N R27W
Decision Memo · Deer River Ranger District · updated 8/10/2012
On Lake Winnibigoshish, Section 3, T146N R27W · Itasca, Minnesota

This proposal is for the issuance of a new special use authorization for a new term to replace an expired authorization for a marina on Lake Winnibegoshish.

Special use management
Scoping Start
06/04/2012
Comment Period
06/28/2012
Decision
08/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issue Term Special Use Permit for Resort/Marina toDecision Signed Date: 08/09/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 3, T146N R27W
Lake County Power Completed
Decision Memo · Deer River Ranger District · updated 8/3/2012
Cass County at CR 9 and US Hwy 2; Itasca County along CR 49 in Section 27, T58N R25W · Cass; Itasca, Minnesota

The supporting analysis for the proposed installation of a street light located in Cass County at CR 9 and US Hwy 2; and the proposed rerouting of underground electric cable in Itasca County along CR 49 in Section 27, T58N R25W

Special use management
Scoping Start
04/19/2012
Comment Period
04/26/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Lake Country Power ProjectDecision Signed Date: 06/04/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Decision Memo · Deer River Ranger District · updated 8/3/2012
Cass County, Section 29, T146N R27W, Lot#9 Highbanks Summer Home Tract · Cass, Minnesota

Proposed addition to Mr. O’Brien’s cabin on Lot#9 of the Highbanks summer home tract.

Special use management
Scoping Start
04/11/2012
Comment Period
04/26/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Highbanks Summer Home Tract, Lot#9Decision Signed Date: 06/01/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Decision Memo · Deer River Ranger District · updated 8/3/2012
Section 31, T146N R27W in South Highbanks summer home tract Lot# 2 · Itasca, Minnesota

for issuance of a recreation residence permit to a new owner & termination of the current permit under the sellers name

Special use management
Scoping Start
05/16/2012
Comment Period
06/07/2012
Decision
08/2012 (Estimated)
Implementation
07/2013 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issue SUP Recreation Residence SHighLot2Decision Signed Date: 08/01/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 31, T146N R27W
Decision Memo · Deer River Ranger District · updated 8/3/2012
Section 32, T59N R26W · Itasca, Minnesota

the proposed installation of a well in Section 32, T59N R26W

Special use management
Scoping Start
05/24/2012
Comment Period
06/07/2012
Decision
07/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Well - North Star Summer Home Tract, Lot#10Decision Signed Date: 07/11/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSection 32, T59N R26W Lot#10 North Star summer home tract
Decision Memo · Deer River Ranger District · updated 8/1/2012
Section 20, T60N R26W · Itasca, Minnesota

This proposal is for the issuance of a permit on an existing driveway across Forest Service lands

Special use management
Scoping Start
04/05/2012
Comment Period
04/26/2012
Decision
06/2012 (Estimated)
Implementation
07/2012 (Estimated)
Project documents
Mary Humenberger · mhumenberger@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecial Use Authorizations
Issue Private Road SUP to Edward Grewe ProjectDecision Signed Date: 06/04/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Decision Memo · Deer River Ranger District · updated 6/4/2012
The Marcel experimental forest on the Deer River District of the Chippewa National Forest · Itasca, Minnesota

Northern Research study the effects of thinning on red pine, white spruce and European larch to develop quality saw logs.

ResearchVegetation management (other than forest products)
Scoping Start
12/06/2011
Comment Period
04/26/2012
Decision
06/2012 (Estimated)
Implementation
06/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT 58 N, R 25 E Section 12
Six Mile Dam Completed
Decision Memo · Deer River Ranger District · updated 6/1/2012
Deer River Range District Cass County, MN · Cass, Minnesota

Six mile dam is dilapidated and not functioning and is a barrier to fish migration. This project will replace the dam with a structure that passes fish and has low maintenance.

Wildlife, fish, rare plants
Scoping Start
04/09/2010
Comment Period
04/26/2012
Decision
05/2012 (Estimated)
Implementation
08/2012 (Estimated)
Project documents
Eric Raitanen · ericraitanen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivitySpecies Habitat Improvements
Six Mile Lake Aquatic Passage ProjectDecision Signed Date: 05/31/2012
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT144N R27W S17
Decision Memo · Deer River Ranger District · updated 12/22/2011
East of County Road 34 on forest roads 2539 and 2539A · Itasca, Minnesota

20 acres of thinning contrasting standard row thinning, a ”variable density thinning”- gap and reserve approach, and a control area in a mid-rotatation, overstocked, Red pine stand.

Vegetation management (other than forest products)ResearchForest products
Scoping Start
09/08/2011
Decision
12/2011 (Estimated)
Implementation
01/2012 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Green)
Variable Density Thinning Research AReasDecision Signed Date: 12/22/2011
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT 148 N, R 27 W, Sections 25, 36, 26;T 147 N, R 27 W, Sections 13, 14;T 147 N, R 27 W, Section 4
Environmental Assessment · Blackduck Ranger District · updated 10/12/2011
Between Island Lake, Round Lake, and Wagner Creek · Itasca, Minnesota

Timber sale, reforestation, and various other associated projects.

Wildlife, fish, rare plantsVegetation management (other than forest products)Forest products
Scoping Start
12/19/2010
Comment Period
08/01/2011
Decision
10/2011 (Estimated)
Implementation
09/2013 (Estimated)
Project documents
Linda Burke · lburke@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green)
Wagner Resource Management Environmental AssessmentDecision Signed Date: 10/07/2011 Legal Notice Date: 10/09/2011
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT148N R27, 28, 29W; T149N R27, 28, 29W; and T150N R27, 28N
Decision Memo · Chippewa National Forest All Units · updated 8/31/2011
Across the Forest · Beltrami; Cass; Itasca, Minnesota

Six special use permits for phone lines, powerlines, well and sewage lines have expired. A decision is needed to renew permits for these utilities.

Special use management
Scoping Start
11/09/2010
Decision
08/2011 (Estimated)
Implementation
09/2011 (Estimated)
Project documents
Christine Brown · christinembrown@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (15)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Renewal of Expiring Utility PermitsDecision Signed Date: 08/31/2011
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Decision Memo · Deer River Ranger District · updated 8/24/2011
Deer River Ranger District · Cass; Itasca, Minnesota

Removal and revegetation of six non-functioning impoundments on the Deer River Ranger District.

Wildlife, fish, rare plants
Scoping Start
03/21/2011
Decision
08/2011 (Estimated)
Implementation
07/2011 (Estimated)
Project documents
Eric Raitanen · ericraitanen@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Spruce EA Completed
Environmental Assessment · Deer River Ranger District · updated 6/13/2011
Southern unit of the Marcell Experimental Forest · Itasca, Minnesota

Research project with climate change manipulation focusing on the combined response of multiple levels of warming at ambient or elevated CO2 levels.

Research
Scoping Start
05/13/2010
Comment Period
03/10/2011
Decision
06/2011 (Estimated)
Implementation
06/2011 (Estimated)
Project documents
Randall Kolka · rkolka@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityResearch And Development
SPRUCE EADecision Signed Date: 06/10/2011 Legal Notice Date: 06/10/2011
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT158N R25W
Environmental Assessment · Blackduck Ranger District · updated 9/25/2009
County Road 33 between County 8 and County 12 · Beltrami, Minnesota

County Road 33 will be widened and have 6 corners straightened. Wider shoulders will be made. This is a cooperative analysis between Leech Lake Band of Ojibwe, Beltrami County, the State, and the Forest Service.

Road management
Scoping Start
02/15/2009
Comment Period
07/05/2009
Decision
08/2009 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Leo Johnson · ljohnson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Improvements/Construction
County Road 33 (Mission Road) Reconstruction EADecision Signed Date: 08/20/2009 Legal Notice Date: 08/23/2009
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N R31W Sections 10, 11, 14, 15, 20, 21, 22, 29, and 30
Environmental Assessment · Walker Ranger District · updated 9/22/2009
East side of Chippewa national Forest, Walker Ranger District, bounded by Leech Lake on west and Leech Lake River on north. Coutny Roads bound south and east sides · Cass, Minnesota

Vegetation management that includes timber harvest, prescribed fire, wildlife, watershed, and transportation system management activities.

Fuels managementVegetation management (other than forest products)Forest productsRoad management
Scoping Start
02/11/2009
Comment Period
07/15/2009
Decision
09/2009 (Estimated)
Implementation
12/2009 (Estimated)
Project documents
Deborah Overton · doverton@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green); Watershed Improvements
ForestsChippewa National Forest
DistrictsDeer River Ranger District; Walker Ranger District
Legal Land DescriptionT144N, R28W; T143N, R26,27,28W; T142N, R27,28W, T141N, R27,28W
Environmental Assessment · Deer River Ranger District · updated 9/15/2009
The project area encompasses an area from the northeast shore of Lake Winibigoshish to the southern half of Rice Lake centered on Hwy 46 and north to Rice Lake. · Itasca, Minnesota

Vegetation Management that includes timber harvest, prescribed fire, wildlife and impoundment management and transportation system management activities.

Fuels managementForest productsVegetation management (other than forest products)Road management
Scoping Start
12/11/2008
Comment Period
06/18/2009
Decision
08/2009 (Estimated)
Implementation
01/2010 (Estimated)
Project documents
Barb Knight · bknight@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management
Upper East Winnie Vegetation Management ProjectDecision Signed Date: 08/19/2009 Legal Notice Date: 08/20/2009
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Environmental Assessment · Blackduck Ranger District · updated 6/26/2009
South of Blackduck to Pimushe Lake and east to Moose Creek · Beltrami; Itasca, Minnesota

Timber sale and related reforestation and timber stand improvement projects in the Continental Divide area of the Blackduck Ranger District. Also includes updating of the transportation system and small projects in other resource areas.

Forest productsVegetation management (other than forest products)Road management
Scoping Start
10/31/2008
Comment Period
03/29/2009
Decision
05/2009 (Estimated)
Implementation
10/2009 (Estimated)
Project documents
Leo Johnson · ljohnson@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityRoad Decommissioning; Forest Vegetation Improvements; Timber Sales (Green)
ALL PROJECTS EXCEPT TRANSPORTATION SYSTEM CHANGES - CONTINENTAL DIVIDE RESODecision Signed Date: 05/28/2009 Legal Notice Date: 05/31/2009
TRANSPORTATION SYSTEM CHANGES AND GATING OF FR 2514 - CONTINENTAL DIVIDE REDecision Signed Date: 05/28/2009 Legal Notice Date: 05/31/2009
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N, R29 to 31 W; T148N R29-31W; and T149N R29-31W
Environmental Assessment · Blackduck Ranger District · updated 6/26/2009
North of Lake Winibigoshish. North side of FR 2171 between FR 2382 and 2384. · Itasca, Minnesota

Forest Plan Amendment changing the boundary of the North Winnie Semi-primitive Non-motorized area. Moves south boundary to a road. Develops a trail system and decommissions more unclassified roads.

Land management planningSpecial area managementRecreation management
Scoping Start
04/28/2008
Comment Period
02/08/2009
Decision
06/2009 (Estimated)
Implementation
06/2009 (Estimated)
Project documents
Nancy Salminen · nsalminen@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityPlan Amendment; Travel Management
North Winnie SPNM Boundary Change and Trail ProjectDecision Signed Date: 06/04/2009 Legal Notice Date: 06/07/2009
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N R28W Sections 13-17 and 20-24