Replace existing 8-foot by 12-foot 3-sided Adirondack-style shelter with a larger 3-sided shelter in the same location.
Location
The project site is near the end of the Blind River Rapids Trail which is 14 miles south of Petersburg on Mitkof Highway.
Project timeline
1
Scoping Start
09/21/2021
2
Decision
11/2021 (Estimated)
3
Implementation
04/2022 (Estimated)
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Blind River Rapids Shelter Replacement | Decision Signed Date: 11/15/2021 |
| Forests | Tongass National Forest |
| Districts | Petersburg Ranger District |
| Legal Land Description | Latitude: 56.6329, Longitude: -132.8912 |