Race Cow Project Developing Proposal
Environmental Assessment · Salmon River Ranger District · updated 9/25/2025
The project area is located approximately 7 miles northwest of Riggins, Idaho, in Idaho County. · Idaho, Idaho

Improve forest resilience, reduce hazardous fuels, enhance native grasslands, improve road access, develop two rock pits, reduce sediment delivery, provide timber products. Requesting EAD under IIJA, comment period per IIJA offered if granted.

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementRoad management
Scoping Start
01/2026 (Estimated)
Decision
01/2027 (Estimated)
Implementation
06/2028 (Estimated)
Project documents
Jeffrey Shinn · jeffrey.shinn@usda.gov
NEPA / regulatory detail
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Salvage); Timber Sales (Green)
ForestsNez Perce-Clearwater National Forest; Wallowa-Whitman National Forest
DistrictsSalmon River Ranger District; Hells Canyon NRA
Legal Land DescriptionT27N, R1W, Sec. 36; T26N, R1W, Sec. 1, 2, 11-15, 21-28, 33-36; T25N, R1W, Sec. 1-5, 7-20, 22-27, 33-36; T24N, R1W, Sec.1-4, 9-12; T26N, R1E, Sec.6, 7, 18-21, 29-32; T25N, R1E, Sec. 5-8,17-20,29-32.
Decision Memo · Red River Ranger District · updated 7/22/2025
The Project is located approximately six miles southwest of Elk City, Idaho, in Idaho County. The project is located in the Deadwood Creek watershed. · Idaho, Idaho

The Red River District Ranger proposes to approve the operator's proposal for exploratory drilling at up to 19 sites, to determine if sufficient quantities of valuable minerals exist to warrant further development of a mining operation.

Minerals and geology
Scoping Start
05/27/2025
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Martin Jones · martin.jones@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsNez Perce-Clearwater National Forest
DistrictsRed River Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Nez Perce-Clearwater National Forest All Units · updated 1/10/2025
Central Idaho · Benewah; Clearwater; Idaho; Latah; Lewis; Nez Perce; Shoshone, Idaho

The Nez Perce and Clearwater National Forests are proposing to revise their two, individual forest plans as a single forest plan for the administratively combined Forests using the 2012 National Forest System Land Management Planning regulations.

Land management planning
NOI in Federal Register
07/15/2014
DEIS NOA in Federal Register
12/20/2019
FEIS NOA in Federal Register
01/10/2025
Objection Period Start
11/28/2023
Decision
01/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
Sara Daugherty · sara.daugherty@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Creation/Revision
Final Record of Decision Nez Perce-Clearwater NFs Forest Plan RevisionDecision Signed Date: 01/10/2025 Legal Notice Date: 01/10/2025
ForestsNez Perce-Clearwater National Forest
DistrictsNez Perce-Clearwater National Forest All Units
Legal Land DescriptionNot Applicable
End of the World Completed
Environmental Impact Statement · Salmon River Ranger District · updated 1/6/2025
Located south of Grangeville, ID in the Fish Creek, Cove Creek and North Fork White Bird Creek portions of the Forest. · Idaho, Idaho

The End of the World EA was remanded to the Forest for further evaluation to address old growth and cumulative effects. The Decision Notice was withdrawn. The 2024 Draft EIS provides updated information as directed by the court.

Forest productsVegetation management (other than forest products)Fuels managementWatershed management
NOI in Federal Register
02/16/2018
DEIS NOA in Federal Register
07/12/2024
FEIS NOA in Federal Register
12/06/2024
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Jeffrey Shinn · jeffrey.shinn@usda.gov
NEPA / regulatory detail
Special AuthorityHfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics); Hfra Title Vi: Insect And Disease Projects
Notice and Comment Regulation218 (2013) HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Timber Sales (Green); Watershed Improvements
End of the World FEISDecision Signed Date: 01/06/2025
ForestsNez Perce-Clearwater National Forest
DistrictsSalmon River Ranger District
Legal Land DescriptionT29N R3E Sections 12, 13-36; T29N R4E Sections 18, 19, 20, 28-32; T4N R2E Sections 1-4, 9-12, 13-15, 23, 24; T4N R3E Sections 1-29, 34-36; T4N R4E Sections 5-7, 18, 19, 30, 31 Boise Meridian
Dead Laundry Completed
Environmental Assessment · North Fork Ranger District · updated 12/23/2024
Township 39 North, Range 10 East %u2013 Sections 1-4 & 10-12. Township 39 North, Range 11 East %u2013 Sections 3-9 & 16-18. Township 40 North, Range 10 East %u2013 Sections 1-3, 9-16, 20-29, & 32-36. Township 39 N · Clearwater, Idaho

Proposal of vegetation management activities to reduce hazardous fuels, meet the need to improve forest health and resiliency in concurrence with desired conditions and objectives identified in the Forest Plan, and harvest wood products.

Forest productsFuels management
Scoping Start
03/11/2020
Comment Period
05/28/2021
Objection Period Start
04/27/2023
Decision
12/2024 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Thomas Spong · thomas.spong@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Timber Sales (Green)
ForestsNez Perce-Clearwater National Forest
DistrictsNorth Fork Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Salmon River Ranger District · updated 12/23/2024
T27N, R04E; T28N, R04E; R29N, 04E; (Boise Meridian) · Idaho, Idaho

The overall purpose is to: improve forest health; reduce potential risk to private property; maintain & improve wildlife habitat; and improve watershed conditions. Timber outputs will be used to offset treatment costs & support economic structure..

Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed management
NOI in Federal Register
02/12/2014
DEIS NOA in Federal Register
03/10/2023
FEIS NOA in Federal Register
09/08/2023
Objection Period Start
09/08/2023
Decision
12/2024 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Jeffrey Shinn · jeffrey.shinn@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Timber Sales (Green); Watershed Improvements
Hungry Ridge Restoration SEISDecision Signed Date: 12/23/2024
ForestsNez Perce-Clearwater National Forest
DistrictsSalmon River Ranger District
Legal Land DescriptionNot Applicable
Section 16 Completed
Environmental Assessment · Lochsa/Powell Ranger District · updated 12/4/2024
The Section 16 project is located in Idaho County approximately two miles north of Powell, Idaho. The main road access to the project area is via Forest Road 569 from the south via U.S. Highway 12. · Idaho, Idaho

Vegetation treatment in the Parachute Hill area on the Powell Ranger District.

Forest products
Scoping Start
03/16/2020
Comment Period
03/16/2020
Objection Period Start
04/23/2024
Decision
12/2024 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Karen Hardwick · Karen.Hardwick@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Green)
ForestsNez Perce-Clearwater National Forest
DistrictsLochsa/Powell Ranger District
Legal Land DescriptionTownship 37 North, Range 14 East, Section 16
Longleaf Completed
Environmental Assessment · Palouse Ranger District · updated 11/4/2024
The project is southeast of Bovill, Idaho and lies within the Long Meadow Creek and Lower Elk Creek sub-watersheds. · Clearwater, Idaho

Improve forest health and ecological function in project area through regen. harvest, commercial thinning, reforestation and non-commercial vegetation treatments (broadcast burning, hand work, machine work and chainsaw work), as well as road work.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
01/02/2023
Comment Period
01/12/2023
Objection Period Start
06/11/2024
Decision
11/2024 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Buddie Carroll · buddie.carroll@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsNez Perce-Clearwater National Forest
DistrictsPalouse Ranger District
Legal Land DescriptionT40N R1E Sections 22-23, 25-28, 34-36; T39N R1E Sections 1; T39N R2E Sections 6-9, 15-22, 27-30.
Big Burn Completed
Decision Memo · Salmon River Ranger District · updated 7/10/2024
FS Road 244 · Idaho, Idaho

Creation of a linear fuel break to change the nature and arrangement of fuels to provide a buffer between wildlands and urban interface, and increase options for wildland fire emergency responders.

Climate change adaptationFuels management
Scoping Start
09/06/2023
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Jeremy Harris · jeremy.harris@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Road Maintenance; Timber Sales (Green)
ForestsNez Perce-Clearwater National Forest
DistrictsSalmon River Ranger District
Legal Land DescriptionSections 13,23,24,26,27,29,30,32,33,34 T30N, R5E; Sections 24,25,26 T30N, R4E; Section 4 T29N, R5E BM
Sing Lee Completed
Decision Memo · Red River Ranger District · updated 2/7/2024
FS Road 1858 near Newsome, Idaho · Idaho, Idaho

Creation of a linear fuel break to change the nature and arrangement of fuels to provide a buffer between wildlands and urban interface, and increase options for wildland fire emergency responders.

Fuels managementClimate change adaptation
Scoping Start
09/06/2023
Decision
02/2024 (Estimated)
Implementation
02/2024 (Estimated)
Project documents
Jeremy Harris · jeremy.harris@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Road Maintenance; Timber Sales (Green)
ForestsNez Perce-Clearwater National Forest
DistrictsRed River Ranger District
Legal Land DescriptionRoad 1858, Sections 30, 31 T30N, R7E; Sections 5, 8, 17, 20, 21, T29N, R7E BM
Deadwood Completed
Decision Memo · Red River Ranger District · updated 12/15/2023
FS Roads 522 and 9803 near Wheeler Mountain · Idaho, Idaho

Creation of linear fuel break to change the nature and arrangement of fuels to provide a buffer between wildlands and urban interface, and increase options for wildland fire emergency responders

Climate change adaptationFuels management
Scoping Start
09/06/2023
Decision
12/2023 (Estimated)
Implementation
12/2023 (Estimated)
Project documents
Jeremy Harris · jeremy.harris@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special Authority2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Special Products Sales; Road Maintenance; Timber Sales (Green)
Deadwood Fuel BreakDecision Signed Date: 12/15/2023
ForestsNez Perce-Clearwater National Forest
DistrictsRed River Ranger District
Legal Land DescriptionSections 1,4,5,8,9,10,11,12,13,14,15,16,17,18 T28N, R8E; Sections 6,7 T28N, R9E BM
Decision Memo · Palouse Ranger District · updated 4/14/2022
Meadow Creek Bridge: T43N, R3W, Sec 34; Graves Meadow Bridge: T42N, R2W, Sec 25; Latah County, Idaho · Latah, Idaho

Replace existing timber stringer bridges crossing Meadow Crk and Graves Meadow with new concrete or steel girder bridges. Existing bridge decks, abutments and back walls are in decay, and both bridges restrict flow during normal annual runoff.

Watershed managementWildlife, fish, rare plantsRoad management
Scoping Start
05/23/2018
Decision
04/2022 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Zoltan Kiss · zoltan.s.kiss@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
Decision Decided Date04/14/2022
ForestsNez Perce-Clearwater National Forest
DistrictsPalouse Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Palouse Ranger District · updated 1/3/2020
T40N, R2E, Section 11, Clearwater County, Idaho · Clearwater, Idaho

A culvert on FSR 382 would be replaced by two concrete box culverts. The District Ranger determined the project was road repair and maintenance, per CE category 31.12(4). The project was completed during the October 2017 Small NEPA IDT meeting.

Road managementWatershed management
Scoping Start
10/17/2017
Decision
05/2018 (Estimated)
Implementation
03/2018 (Estimated)
Project documents
Eric Crook · ecrook@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Watershed Improvements
Decision Decided Date05/07/2018
ForestsNez Perce-Clearwater National Forest
DistrictsPalouse Ranger District
Legal Land DescriptionNot Applicable
2026 Blowdown Emergency Developing Proposal
Nez Perce-Clearwater National Forest

In December 2025 and March 2026, Montana and Idaho were affected by severe wind events. Idaho Panhandle, Nez Perce-Clearwater, Lolo, Flathead, Bitterroot, and Kootenai Forests propose removal of wind damaged trees, fuel reduction, and replanting activities.

Forest productsFuels managementRegulations, directives, ordersVegetation management (other than forest products)