Payette National Forest — Project Detail

32 projects with crawled detail · milestones · contacts · documents

Payette National Forest

R04 Intermountain · 32 projects · crawled 2026-06-17
In Progress 3 Developing Proposal 6 On Hold 2 Completed 21
Decision Memo 18 Categorical Exclusion 9 Environmental Assessment 4 Environmental Impact Statement 1
30 with documents 13 with comments page
Categorical Exclusion · Weiser Ranger District · updated 6/15/2026 · decision 3/2026 (Estimated)
Approximately 15 miles northwest of Cambridge, Idaho via State Highway 71. T16N, R4W, sections 19, 20, and 30. · Washington, Idaho

Kennecott Exploration plans to drill for copper and related mineralization from up to 8 sites via existing and temporary roads and up to 3 sites via helicopter.

Minerals and geology
NEPA Start Date
9/22/2025
Finding/Decision Date
PAUL KLASNER · paul.klasner@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-32d-USFS
Categorical Exclusion · Council Ranger District · updated 6/4/2026
Indian Mountain C&H Allotment within the Lava Fire Area · Adams; Gem; Valley; Washington, Idaho

Reconstruction of twelve livestock watering facilities and 3.5 miles of rangeland fences destroyed/compromised by the Lava Fire of 2024 in the Indian Mountain C&H Allotment.

Grazing management
NEPA Start Date
7/1/2025
Finding/Decision Date
6/1/2026
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-33d-USFS
Decision Signed Date6/1/2026
Categorical Exclusion · New Meadows Ranger District · updated 6/1/2026
North of New Meadows, near Round Valley. Project is located on and adjacent to NFSR 51669 and 517044500. · Adams, Idaho

The Forest Service proposes to permit Idaho Department of Lands (IDL) to reconstruct 0.68 miles of road on National Forest System lands on 4 acres.

Forest productsRoad management
NEPA Start Date
1/7/2026
Finding/Decision Date
4/23/2026
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-35d-USFS
Decision Signed Date4/23/2026
Categorical Exclusion · Council Ranger District · updated 5/6/2026 · decision 4/2025 (Estimated)
Throughout the Council Ranger District · Adams; Baker; Wallowa; Washington, Idaho; Oregon

Regeneration of an area to native tree species, including site preparation which does not involve the use of herbicides or result in vegetation type conversion

Forest products
NEPA Start Date
10/11/2024
Finding/Decision Date
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-29d-USFS
Environmental Assessment · Krassel Ranger District · updated 5/6/2026 · decision 10/2022 (Estimated)
East Fork South Fork Salmon River watershed and the Thunder Mountain area in the headwaters of Middle Fork Salmon River east of Monumental Summit. · Valley, Idaho

This project will define the minimum necessary road system and provide motorized vehicle use and dispersed recreation opportunities; and update the Forest Motor Vehicle Use Map accordingly.

Recreation managementRoad management
NEPA Start Date
10/21/2021
Finding/Decision Date
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
Categorical Exclusion · New Meadows Ranger District · updated 5/6/2026 · decision 10/2024 (Estimated)
Fall Creek/Whitebird C&H allotment near Pollock Mountain. · Adams, Idaho

The 2018 Rattlesnake Fire burned the cow camp cabin the livestock permittee used for managing livestock in the Fall Creek/Whitebird C&H allotment. The permittee is requesting to reconstruct the original cabin.

Special use management
NEPA Start Date
4/29/2024
Finding/Decision Date
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Council Ranger District · updated 5/6/2026 · decision 11/2026 (Estimated)
Wildhorse/Crooked River C&H Allotment, Dick Ross Cabin Area, Road 50511 · Adams, Idaho

Construction of a gathering and holding pasture in the Wildhorse/Crooked River C&H Allotment.

Grazing management
NEPA Start Date
5/6/2026
Finding/Decision Date
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-33d-USFS
Categorical Exclusion · New Meadows Ranger District · updated 5/6/2026 · decision 7/2026 (Estimated)
Approximately 14 miles north of New Meadows, Idaho. The project lies west of Highway 95 within Management Area (MA) 5 (Middle Little Salmon River) · Adams, Idaho

The New Meadows Ranger District proposes approximately 1,753 acres of commercial vegetation treatments within the 3,702-acre Little Round HFRA Project Area.

Forest products
NEPA Start Date
1/14/2026
Finding/Decision Date
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionSection 605 of HFRA (16 U.S.C.6591d)
Lucky Ben Mine Investigation Developing Proposal
Categorical Exclusion · McCall Ranger District · updated 5/6/2026 · decision 11/2026 (Estimated)
Near Warren, Idaho within the Warren Mining District. · Idaho, Idaho

Move material from 2 small waste rock dumps to private land for milling.

Minerals and geology
NEPA Start Date
5/6/2026
Finding/Decision Date
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-32d-USFS
Rock Fire Salvage Completed
Decision Memo · Council Ranger District · updated 4/23/2026
Southeast of the junction of Forest Service Roads 50218 & 51899 · Adams; Valley, Idaho

The lightning-caused Rock Fire started on August 13th, 2025. The Forest Service proposes timber salvage to consist of one (1) 46.68-acre unit.

Forest products
Scoping Start
12/16/2025
Decision
04/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (13), 36 Cfr 220.6(E)(13)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTimber Sales (Salvage)
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McCall Ranger District · updated 4/23/2026
Trail 120/122 from the Mackay Bar Bridge on the Main Salmon River to the private land on the South Fork Salmon River including the South Fork Salmon River Bridge. Public access for Trail 108/126. · Idaho, Idaho

The Forest proposes to issue special use permits or long term easements for motorized access to private property owners near the confluence of the Main Salmon-South Fork Salmon Rivers with reciprocal easements to the USFS for public access.

Special use management
Scoping Start
05/06/2019
Decision
05/2027 (Estimated)
Implementation
06/2027 (Estimated)
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsPayette National Forest
DistrictsMcCall Ranger District
Legal Land DescriptionTownship 23N, Range 8E, sections 5, 6, 7; Township 24N, Range 8E, sections 29, 32; Idaho County, Idaho
Environmental Assessment · McCall Ranger District · updated 4/15/2026
North and east of New Meadows, Idaho and north and west of McCall, Idaho · Adams; Idaho; Valley, Idaho

The Granite Goose Landscape Restoration Project is a landscape scale effort to improve conditions across multiple resource areas including vegetation, watersheds, roads, and recreation.

Recreation managementWildlife, fish, rare plantsForest productsFuels managementWatershed managementRoad management
Scoping Start
02/09/2023
Comment Period
01/05/2024
Objection Period Start
11/26/2025
Decision
04/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Dana Harris · dana.harris@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Trail Management; Roadless Area Management; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsPayette National Forest
DistrictsMcCall Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Weiser Ranger District · updated 2/20/2026
Approximately 17 miles northwest of Cambridge, Idaho via State Highway 71. · Washington, Idaho

Hercules Metals plans to drill for copper and related mineralization from up to 22 sites via existing roads that require varying levels of maintenance or reconstruction.

Minerals and geology
Scoping Start
12/10/2025
Decision
02/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Kathryn Goessel · kathryn.goessel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsPayette National Forest
DistrictsWeiser Ranger District
Legal Land DescriptionT17N, R4W, sections 29, 32, and 33 and T16N, R4W, sections 3, 4, and 5
Decision Memo · New Meadows Ranger District · updated 1/29/2026
T. 20 N., R. 1 W., sec. 35 · Adams, Idaho

Remove two existing dilapidated wood exclosure fences along the East Branch Weiser River and replace them with functional fencing.

Grazing managementWatershed management
Scoping Start
02/11/2025
Decision
01/2026 (Estimated)
Implementation
08/2026 (Estimated)
Project documents
Kara Kirkpatrick-Kreitinger · comments-intermtn-payette@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements; Watershed Improvements
ForestsPayette National Forest
DistrictsNew Meadows Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Krassel Ranger District · updated 1/23/2026
T20N, R6E, Sections 28 and 29. · Valley, Idaho

The purpose is to issue a new Special Use Permit (SUP). The new SUP includes modifications to the existing facility including reductions in the amount of water diverted, changes to the point of diversion, removal of the dam, and restoration.

Special use management
Scoping Start
04/07/2025
Decision
01/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Caleb Zurstadt · caleb.zurstadt@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Watershed Improvements
ForestsPayette National Forest
DistrictsKrassel Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Council Ranger District · updated 1/14/2026
Upper East Fork Weiser River immediately north of 165 road crossing. · Adams; Washington, Idaho

The purpose of this project is to isolate Bull Trout from Brook Trout and to limit the interactions of the two species on the East Fork Weiser River.

Wildlife, fish, rare plants
Scoping Start
05/15/2025
Decision
01/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Mark Fox · mark.fox@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionT. 16 N., R. 2, E., sec. 6 and T. 17 N., R. 2, E., sec 31, of the Boise Meridian
Decision Memo · Council Ranger District · updated 11/19/2025
Hornet Creek watershed, North Hornet C&H Allotment · Adams, Idaho

The purpose of this project is to repair, rebuild, and improve 2 ponds/reservoirs and 13 spring developments on the North Hornet C&H Allotment.

Grazing management
Scoping Start
05/08/2025
Decision
10/2025 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · McCall Ranger District · updated 11/17/2025
Project occurs within Brundage Mountain Resort's special use permit area. · Adams; Valley, Idaho

This project will re-route the existing Lower Grouse Trail and build a new trail connector between Grouse and Rock Creek trail within Brundage Mountain Resorts existing mountain bike trail system.

Special use management
Scoping Start
04/01/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Emily Simpson · emily.simpson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsPayette National Forest
DistrictsMcCall Ranger District
Legal Land DescriptionT 20 N, R 3 E, Sections 31 and 32
Categorical Exclusion · Weiser Ranger District · updated 11/13/2025 · decision 10/2025 (Estimated)
NE¼NW¼ sec. 22, T. 14 N., R. 4 W. · Washington, Idaho

Removal of a 1000-gallon concrete water tank and culvert valve box at the Justrite Campground.

Facility management
NEPA Start Date
5/1/2025
Finding/Decision Date
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-44d-USFS
Decision Memo · Krassel Ranger District · updated 9/30/2025
Trail bridges are located on Nick Creek and the NF Buckhorn Creek on existing two-wheeled motorized trails (NFST 089 and NFST 094). · Valley, Idaho

Replace two trail bridges National Forest System Trails 089 and 094 to facilitate safe and consistent stream crossings for all users.

Recreation managementWatershed management
Scoping Start
10/01/2023
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Joshua Simpson · joshua.simpson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsPayette National Forest
DistrictsKrassel Ranger District
Legal Land DescriptionT19N, R6E, section 30; T18N, R5E, section 1.
Decision Memo · Payette National Forest All Units · updated 9/29/2025
Along roads associated with the 2024 Lava Fire within the Little Weiser River Watershed, Adams County, Idaho. · Adams, Idaho

The Lava Fire burned approximately 23,000 acres on the Payette National Forest, Council Ranger District. There are approximately 106 miles of NFS roads in the fire area with fire killed trees adjacent to the roads.

Forest productsRoad management
Scoping Start
07/28/2025
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Mark Fox · mark.fox@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Timber Sales (Salvage)
Decision Decided Date09/29/2025
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Krassel Ranger District · updated 8/22/2025
Cottonwood Creek Trail #041 is located within the Frank Church River of No Return Wilderness within the Cottonwood Creek drainage. · Idaho, Idaho

Beaver presence and activity is increasing in the Cottonwood Creek Drainage. To provide for safe travel and ongoing access as well as to not impact the beaver population, there is a need to re-route Cottonwood Creek Trail #041.

Recreation management
Scoping Start
04/07/2025
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Joshua Simpson · joshua.simpson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsPayette National Forest
DistrictsKrassel Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Krassel Ranger District · updated 8/22/2025
A 4.5 mile stretch along NFSR 50375, "Thunder Mountain Road," Krassel Ranger District, Valley County, Idaho. · Valley, Idaho

Replace six road stream crossing structures and one bridge along Thunder Mountain Road (NFSR 50375).

Watershed managementRoad management
Scoping Start
02/17/2025
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
David Hogen · david.hogen@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18); 32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Improvements/Construction; Watershed Improvements
ForestsPayette National Forest
DistrictsKrassel Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Weiser Ranger District · updated 8/8/2025
East Brownlee Creek drainage approximately 12 miles northwest of Cambridge, Idaho · Washington, Idaho

Scout Discoveries proposes exploratory drilling at 17 sites over the course of one year utilizing existing roads.

Minerals and geology
Scoping Start
04/25/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Kathryn Goessel · kathryn.goessel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsPayette National Forest
DistrictsWeiser Ranger District
Legal Land DescriptionT16N, R4W, sections 2, 3, 10, 11
Decision Memo · Council Ranger District · updated 8/8/2025
Upper Hornet Creek drainage approximately 22 miles northwest of Council, ID. · Washington, Idaho

Silver Rock Resources proposes drilling at 25 sites using existing and temporary routes.

Minerals and geology
Scoping Start
04/25/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Kathryn Goessel · kathryn.goessel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionT17N, R3W, sections 17-18
Decision Memo · Council Ranger District · updated 5/15/2025
T18N, R3W, Sec 13, 14 · Adams, Idaho

Issuance of a special use permit for an existing road for private land access.

Special use management
Scoping Start
03/29/2023
Decision
08/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Kara Kirkpatrick-Kreitinger · kara.kirkpatrick-kreitinger@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Payette National Forest All Units · updated 5/5/2025
Payette National Forest · Adams; Idaho; Valley; Washington, Idaho

The proposed project would authorize prescribed burns across the Forest every year to restore health and resiliency to vegetation communities on the Payette National Forest.

Fuels management
Scoping Start
11/16/2022
Comment Period
09/27/2023
Objection Period Start
02/15/2024
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsPayette National Forest
DistrictsPayette National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Council Ranger District · updated 9/17/2024
Junction of Forest Roads 173, 165, 245, and 185 at Five Corners. · Adams, Idaho

Construct an accessible concrete ramp to a restroom and add drainage features to control intermittent water infiltration around concrete structures of the facility.

Recreation management
Scoping Start
10/21/2021
Decision
01/1970 (Estimated)
Implementation
09/2023 (Estimated)
Project documents
Jascha Zeitlin · jascha.zeitlin@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Decision Decided Date06/17/2026
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionTownship 17 N, Range 2 E, Section 29
Decision Memo · New Meadows Ranger District · updated 7/29/2021
Cold Springs, Grouse, Hazard Lake, Last Chance campgrounds · Adams; Idaho, Idaho

Complete deferred maintenance tasks on constructed features at the Cold Springs, Grouse, Hazard Lake and Last Chance campgrounds. Constructed features include picnic tables, fire rings, site marker posts, fee tubes, signs, vault toilets, and kiosks.

Recreation management
Scoping Start
04/08/2021
Decision
07/2021 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Michael Beach · michael.beach@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Decision Decided Date07/29/2021
ForestsPayette National Forest
DistrictsNew Meadows Ranger District
Legal Land DescriptionT 19 N, R 1 W, Sect. 27; T 20 N, R 2 E, Sect. 13 & 14; T 22 N, R 3 E, Sect. 31; T 19 N, R 2 E, Sect. 14 & 15.
Decision Memo · Payette National Forest All Units · updated 4/17/2019
The Mesa fire started along Hwy 95, four miles south of Council, Idaho. It burned 34,791 acres on state and private lands, and lands managed by the Bureau of Land Management and Forest Service. · Adams, Idaho

The Mesa Fire burned 16560 acres of NFS lands along 53 miles of open FS roads. Danger trees will be felled to reduce risk to the public. These trees may be utilized as timber products where feasible and management direction allows.

Road managementVegetation management (other than forest products)Recreation management
Scoping Start
09/11/2018
Decision
04/2019 (Estimated)
Implementation
01/2019 (Estimated)
Project documents
Mark Fox · mrfox@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance
Decision Decided Date04/17/2019
ForestsPayette National Forest
DistrictsCouncil Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Krassel Ranger District · updated 3/17/2010
Northwest - central portion of Payette National Forest and a portion of Boise NF in the South Fork Salmon River Subbasin · Valley, Idaho

Use a variety of treatment methods to control and contain noxious and invasive weeds within the South Fork Salmon River Subbasin. Separate decisions will be issued for the Payette (May 2007) and Boise National Forests (February 2010).

Vegetation management (other than forest products)
NOI in Federal Register
12/18/2003
DEIS NOA in Federal Register
11/04/2005
FEIS NOA in Federal Register
05/25/2007
Decision
03/2010 (Estimated)
Implementation
05/2010 (Estimated)
Project documents
Clayton Nalder · claytonnalder@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNoxious Weed Treatments
South Fork Salmon River Subbasin Noxious and Invasive Weed Management ProgDecision Signed Date: 03/08/2010 Legal Notice Date: 03/16/2010
ForestsBoise National Forest; Payette National Forest
DistrictsCascade Ranger District; McCall Ranger District; Krassel Ranger District
Environmental Assessment · Payette National Forest All Units · updated 9/4/2007
This project will be implemented across the Payette National Forest with the exception of the area within the SF Salmon River and the Frank Chruch River of No Return Wilderness. · Adams; Idaho; Valley; Washington, Idaho

This project is for the management of noxious and poisonous plants using an integrated approach. Control methods include herbicide, biological, and manual methods.

Vegetation management (other than forest products)
Scoping Start
06/01/1986
Comment Period
10/01/1986
Decision
06/1987 (Estimated)
Implementation
09/1987 (Estimated)
Project documents
Pete Grinde · pgrinde@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation215
Project ActivityNoxious Weed Treatments
The Payette National Forest Noxious Weed and Poisonous Plant Control PrograDecision Signed Date: 06/24/1987 Legal Notice Date: 06/25/1987
ForestsPayette National Forest
DistrictsPayette National Forest All Units