Categorical Exclusion · Munising Ranger District · updated 8/7/2026
For better maps, see project documents. Rock River Canyon Wilderness - Trail to Ice Caves · Alger, Michigan
Develop formal access to the Eben Ice Caves through the establishment of a National Forest System trail from the ice caves to both the public and private access sites.
Recreation managementSpecial area management
NEPA Start Date
5/15/2026
Finding/Decision Date
8/5/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-26d-USFS |
| Decision Signed Date | 8/5/2026 |
Categorical Exclusion · Rapid River Ranger District · updated 8/7/2026
Haymeadow Recreation Area, Haymeadow Trailhead T42N R20W, NE1/4 Sec 19 · Delta, Michigan
Replace the decommissioned bridge at the Haymeadow Recreation Area.
Recreation management
Finding/Decision Date
8/4/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-44d-USFS |
| Decision Signed Date | 8/4/2026 |
Categorical Exclusion · Sault Ste. Marie Ranger District · updated 8/6/2026 · decision 1/2027 (Estimated)
Along County Road H-63 from St. Ignace north to forest boundary. T41N R4W secs 1, 12, 24, and 36, T42N R3W secs 4, 8, 9, 13, 14, 17-20, 22, 23, 27, 31, 33, 34, and 36, T42N R4W sec 36, · Mackinac, Michigan
The Sault Ste. Marie Tribe of Chippewa Indians (the "Tribe") is proposing construction and installation and issuance of a special use authorization for operation, use, and maintenance of a new, buried fiber optic cable within the pre-disturbed road rights-of-way of County Road H-63/Makinac Trail.
Special use management
NEPA Start Date
7/20/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
Categorical Exclusion · Rapid River Ranger District · updated 7/24/2026 · decision 11/2026 (Estimated)
Rapid River Area - See project file for site specific map · Delta, Michigan
The Little Bay Project is comprised of 114 stands totaling approximately 2,749 acres. The treatments for these selected stands will result in increased forest health and resilience.
Vegetation management (other than forest products)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-47d-USFS |
Categorical Exclusion · St. Ignace Ranger District · updated 6/30/2026
Section 32, T41N, R 4W · Mackinac, Michigan
Proponent has requested a right-of-way authorization for an existing road to allow all-season vehicle access for the reasonable use and enjoyment of his private property.
Special use management
Finding/Decision Date
6/23/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 6/23/2026 |
Environmental Assessment · Munising Ranger District · updated 6/10/2026
See PALS #67452, project maps in Pinyon Public Project Record · Alger; Chippewa; Delta; Schoolcraft, Michigan
Long-term vegetation management of Jack Pine ecosystems. Multi-year forest-wide project designed to identify, develop, and maintain jack pine ecosystem for Kirtland's warbler habitat, and maintain or create fuelbreaks for neighboring infrastructure.
Fuels managementVegetation management (other than forest products)Wildlife, fish, rare plants
Finding/Decision Date
5/27/2026
Project documents
NEPA / regulatory detail
| Decision Signed Date | 5/27/2026 |
Categorical Exclusion · Manistique Ranger District · updated 6/10/2026
Indian River Campground: Lat: 46.15436889 Long: -86.40376611. Colwell Lake Campground-across from site 18: Lat: 46.22147278 Long: -86.43363833 · Schoolcraft, Michigan
Removal and replacement of 2 concrete outhouse and vaults, and accessible pathways, one each, at Indian River and Colwell Lake Campgrounds. To view documents related to this proposal, copy and paste link to internet browser: https://usfs-public.box.com/s/oke451p99wz333yj8nmzi1pba1dk8gig
Recreation management
NEPA Start Date
3/11/2026
Finding/Decision Date
4/29/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-44d-USFS |
| Decision Signed Date | 4/29/2026 |
Decision Memo · Munising Ranger District · updated 4/10/2026
Grand Island National Recreation Area; Murray Bay Day Use Area and Campsites, Juniper Flats Groupsite, and Mather Lodge Historic Site · Alger, Michigan
Make improvements to the existing water systems at Murray Bay, Juniper Flats, Mather Lodge, and Farrell Cottage. Installation of new wellhouses and associate infrastructure at Murray Bay and Juniper Flats, and upgrades at Mather and Farrell
Recreation managementSpecial area managementFacility management
Decision
04/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Special Area Management |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Grand Island NRA - Murray Bay Day T47N, R19W, Sec 14. Juniper Flats T47N, R19W, Sec 9. Mather Lodge T48N, R19W, Sec 4 |
Categorical Exclusion · St. Ignace Ranger District · updated 4/8/2026
Mackinac and Chippewa Counties, St. Ignace and Sault Ste. Marie Districts · Chippewa; Mackinac, Michigan
Install one holding tank at the host site in Bay View Campground and two holding tanks in Brevoort Lake Campground, one at each host site.
Recreation managementWatershed management
NEPA Start Date
2/23/2026
Finding/Decision Date
4/7/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-44d-USFS |
| Decision Signed Date | 4/7/2026 |
Categorical Exclusion · St. Ignace Ranger District · updated 4/1/2026
Located in Section 18, T42N, R4W, on FR-3445 about 700 feet West of Mackinac Trail. It is just north of the Carp River Campground. · Mackinac, Michigan
The St. Ignace Ranger District proposes to remove the existing 17-foot-wide by 90-foot-long, five span timber bridge, by the name of Carp River Bridge 3445-0.1, on FR3445 which spans the Carp River, and rehabilitate the riverbanks.
Road managementWatershed management
Finding/Decision Date
3/31/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-42d-USFS |
| Decision Signed Date | 3/31/2026 |
Decision Memo · Hiawatha National Forest All Units · updated 12/1/2025
Two Recreation Residence Tracts are involved, High Banks (East Zone) and Sturgeon River (West Zone). Line near RACO proposed, and Forest Service Campgrounds Colwell and Bear Lake. · Alger; Chippewa; Delta; Schoolcraft, Michigan
Install additional underground fiber for approximately 13.6 miles within a 10-foot right of way as an amendment to their existing authorization.
Special use management
Decision
10/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Munising Ranger District; Sault Ste. Marie Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Rapid River Ranger District · updated 8/27/2025
Behind the Rapid River Ranger District Office near Warehouse H. · Delta, Michigan
Proposed expansion is 50 feet x 90 feet for a total of 0.13 acres to expand parking for wildland fire vehicles and snowplowing.
Facility management
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · St. Ignace Ranger District · updated 8/21/2025
Proposed activities include vegetation management and a recreation component · Chippewa; Mackinac, Michigan
Vegetation Management and Recreation proposal
Forest products
Comment Period
01/04/2025
Objection Period Start
06/13/2025
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Hiawatha National Forest All Units · updated 8/21/2025
four separate project areas: Forest Rd 2231 (Sturgeon River to Rapid River) and adjacent; Brevoort Lake Communities; Pontchartrain Shores and adjacent communities; Forest Rd 3136, Teets Rd and adjacen · Chippewa; Delta; Mackinac, Michigan
The proposed action is needed to provide high speed, broadband internet to communities in Delta, Chippewa, and Mackinac counties through the Mobile Now Act. Rural communities in these locations are underserved.
Special use management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Hiawatha National Forest |
| Districts | Rapid River Ranger District; Manistique Ranger District; Sault Ste. Marie Ranger District; St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · St. Ignace Ranger District · updated 8/21/2025
Round Island Wilderness Area; Scout Camp and Northeast Sandy Beach Camping Areas · Mackinac, Michigan
Replace the two current wilderness toilet structures with moldering style toilet structures and decommission existing toilet structures.
Recreation management
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Wilderness Management |
| Forests | Hiawatha National Forest |
| Districts | St. Ignace Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 8/18/2025
Grand Island National Recreation Area, Mather Lodge Historic Building and Shoreline, Alger County, Munising, MI, Grand Island Township. · Alger, Michigan
The Forest Service is proposing to build alternative power infrastructure (i.e. solar) that would be used to power the infrastructure at Williams Landing and the Grand Island Maintenance Garage.
Recreation managementFacility management
Scoping Start
07/2025 (Estimated)
Decision
08/2025 (Estimated)
Implementation
08/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Munising Ranger District · updated 8/11/2025
Grand Island National Recreation Area, west shore · Alger, Michigan
This project includes bank stabilization along 200 feet of Lake Superior shoreline in front of the historic Mather-Klauer Lodge on Grand Island National Recreation Area.
Recreation managementHeritage resource managementSpecial area managementFacility management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (5), 36 Cfr 220.6(D)(5) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Improvements/Construction; Heritage Resource Management; Facility Maintenance; Special Area Management; Watershed Improvements |
| Forests | Hiawatha National Forest |
| Districts | Munising Ranger District |
| Legal Land Description | Grand Island National Recreation Area - T 48 N, R 19 W, Sec 4 |