Install a reliable water distribution system in the Dry Hole #3 Pasture by extending an existing water line from the adjacent Cut Off Summer Pasture. The water supply would originate from an existing water tank location in the Cut Off Summer Pasture and run east into the Dry Hole #3 Pasture.
Location
Cut Off Summer & Dry Hole #3 Pastures - FPNG
Project timeline
1
NEPA Start Date
1/6/2026
2
Finding/Decision Date
NEPA / regulatory detail
| Categorical Exclusion | USDA-33d-USFS |