Categorical Exclusion Developing Proposal

Singing River Electric Cooperative Fiber Optic Project (Aerial)

National Forests in Mississippi Forrest; George; Harrison; Jackson; Pearl River; Perry; Stone, Mississippi De Soto Ranger District

Singing River Electric Cooperative. All fiber optic lines will utilize existing pole routes with no new routes being constructed. There will be approximately 27 aerial miles of fiber optic line installed on the existing pole routes; 32 acres.

Location

Desoto Ranger District

Project timeline

1
NEPA Start Date
2
Finding/Decision Date
Special use management