Categorical Exclusion · Bienville Ranger District · updated 8/12/2026 · decision 12/2026 (Estimated)
The existing right-of-way access is located off FSR 521-A in Section 20 T6N R7E of Smith County, Mississippi, in Compartment 273. · Smith, Mississippi
Morgan Zerbe is requesting a permit to cross National Forest System land using an existing right-of-way access located off FSR 521-A in Section 20 T6N R7E of Smith County, Mississippi, in Compartment 273.
Special use management
NEPA Start Date
6/29/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
Categorical Exclusion · Chickasawhay Ranger District · updated 8/11/2026
Sections 21, 22, & 29, T05, R07W, Greene County · Greene, Mississippi
Singing River Electric is requesting to amend an existing permit to replace and install new power poles to accommodate an upgrade to an existing power line within the existing right-of-way (ROW) along HWY 42 in Greene County, within the Chickasawhay Ranger District.
Special use management
NEPA Start Date
6/12/2026
Finding/Decision Date
7/6/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 7/6/2026 |
Categorical Exclusion · Bienville Ranger District · updated 7/17/2026
Smith County, MS · Smith, Mississippi
Southern Pine Electric Cooperative is seeking authorization for a new Special Use Permit to construct an aerial single-phase distribution power line right-of-way across Bienville National Forest.
Special use management
Finding/Decision Date
7/8/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 7/8/2026 |
Categorical Exclusion · Bienville Ranger District · updated 7/14/2026 · decision 12/2026 (Estimated)
T3N; R6E, Section 10, 11, 12, 13, 14 T3N; R7E, Section 6, 7 T4N; R6E, Section 11, 12, 13, 14, 23, 24 T4N; R7E, Section 3, 5, 8, 17, 25, 26, 29, 31, 35, 36 T4N; R8E, Section 7, 32 T5N; R7E, Section 32 · Smith, Mississippi
Bay Springs Telephone Co./TEC/Fiber Smith is requesting to amend and add new fiber optic installation to the existing permit authorization. This is an approved funded project by the National Telecommunication and Information Administration (NTIA) program.
Special use management
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
Categorical Exclusion · Bienville Ranger District · updated 7/1/2026
Right-of-way access is located off US Highway 501 in Section 27 T6N R8E, CHOCTAW MERIDIAN, of Scott County in Forest, Mississippi, in Compartment 62 on the Bienville Ranger District. · Scott, Mississippi
Mr. William Pitman is requesting a permit to cross National Forest System land using an existing right-of-way access located off US Highway 501 in Section 27 T6N R8E, CHOCTAW MERIDIAN, of Scott County in Forest, Mississippi. The request expresses the need for year-round access to his new property.
Special use management
NEPA Start Date
4/10/2026
Finding/Decision Date
6/22/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 6/22/2026 |
Categorical Exclusion · Holly Springs Ranger District · updated 6/15/2026 · decision 11/2026 (Estimated)
Along the north side of County Road 211 in Yalobusha Co., MS. · Yalobusha, Mississippi
Tennessee Valley Authority (TVA) proposes to amend their existing special use permit to construct a new transmission line in Yalobusha Co., MS. A portion of this line will cross NFS lands.
Special use management
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
Categorical Exclusion · Tombigbee Ranger District · updated 6/12/2026
Adjacent to road in sections 2-4 and 10-11 of T 16N, R 11E, Choctaw meridian, in Choctaw County, Mississippi. · Choctaw, Mississippi
Permit amendment to authorize 2.4 miles of buried fiber optic telecommunications cable within existing right-of-way.
Special use management
Finding/Decision Date
6/12/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 6/12/2026 |
Categorical Exclusion · Tombigbee Ranger District · updated 6/1/2026
Adjacent to CR 112 and CR 114 in Chickasaw Co., Mississippi · Chickasaw, Mississippi
Amendment of an existing special use permit to construct and operate an additional 5900 ft of waterline
Special use management
NEPA Start Date
2/13/2026
Finding/Decision Date
5/28/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 5/28/2026 |
Environmental Assessment · De Soto Ranger District · updated 5/28/2026
Camp Shelby, Perry County, MS · Perry, Mississippi
Specially designed standard Automated Army Infantry Platoon Battle Course (IPBC) of permanent construction. Primary facilities include the IPBC, and nine (9) range support structures. Power and/or plumbing would go to any needed structures.
Facility managementSpecial use management
Project documents
Categorical Exclusion · Bienville Ranger District · updated 5/28/2026
Smith County, MS · Smith, Mississippi
Aging recreation facilities and low user visitation contributed to the proposal to withdraw use of the amenities. The facilities proposed for decommissioning are outdated and deteriorated, deeming un-safe for public and administrative use.
Facility managementRecreation management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Stone County, MS · Stone, Mississippi
AT&T proposes to place a fiber optic cable using directional boring along and adjacent to City Rd. ROW 10x758ft (0.17 ac.) Stone County, Mississippi.T4S R11W and Sections 14
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Greene County, MS · Greene, Mississippi
Authorize a special use permit to improve and maintain an existing 'woods' road, approx. 1008 feet long and 20 feet wide (0.5 acres), to access private land.
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Forrest County, MS · Forrest, Mississippi
Replace an existing bridge with new structure to meet current bridge standards. Widen right-of-way for construction activities and installation of temporary detour bridge.
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Jackson County, MS · Jackson, Mississippi
This proposal is to grant access to private land using an existing, paved, county-maintained road that has been the historic route of access to this property. approximately 0.008 mi ( 40' by 30' width)0.027 ac.
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Greene County, MS · Greene, Mississippi
Authorize a special use permit to improve and maintain an existing 'woods' road, approx. 774 feet long and 20 feet wide, for access to private land. Project area .036 ac.
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Perry County, MS · Perry, Mississippi
Access private land and residence using an existing gravel driveway, 110foot long and 30foot wide. UXO area, gravel only
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Forrest County · Forrest, Mississippi
Authorize a special use permit for improvement and maintenance of an existing 'woods' road, approx. 610 feet long and 20 feet wide, for access to private land. Project acres of .28
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Desoto Ranger District · Forrest; George; Greene; Harrison; Jackson; Perry; Stone, Mississippi
Installation of aerial fiber optic line within the existing aerial powerline right-of-way (ROW). The portion of the project crossing National Forest lands will consist of 251 aerial miles of fiber optic line to be installed on the existing poles.
Special use management
Project documents
Categorical Exclusion · De Soto Ranger District · updated 5/27/2026
Desoto Ranger District · Forrest; George; Harrison; Jackson; Pearl River; Perry; Stone, Mississippi
Singing River Electric Cooperative. All fiber optic lines will utilize existing pole routes with no new routes being constructed. There will be approximately 27 aerial miles of fiber optic line installed on the existing pole routes; 32 acres.
Special use management
Project documents
Categorical Exclusion · Holly Springs Ranger District · updated 5/26/2026
Holly Springs Ranger District, Chickasaw Meridian, T3S, R2E, Section 33 in Benton Co., Mississippi. · Benton, Mississippi
Special Use Permit for an access road to Rolison private property
Special use management
NEPA Start Date
1/13/2026
Finding/Decision Date
2/25/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 2/25/2026 |
Categorical Exclusion · Holly Springs Ranger District · updated 5/26/2026
North side of Pine Mountain Road in section 12 of T4S, R2W in Marshall Co. · Marshall, Mississippi
Proposal to authorize special use permit to grant access to private property across NFS lands in Marshall Co.
Special use management
Finding/Decision Date
4/8/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 4/8/2026 |
Decision Memo · Bienville Ranger District · updated 4/30/2026
T3N, R6E SECTION 10, 11, 12, 13, 14; T3N, R7E SECTION 6, 7; T4N R6E SECTION 11, 12, 13, 14, 23, 24; T4N R7E SECTION 3, 5, 8, 17, 25, 26, 29, 31, 35, 36; T4N R8E SECTION 7, 32; T5N R7E SECTION 32. · Smith, Mississippi
Bay Springs/TEC/Fiber Smith is requesting to amend and add new installation to the existing permit authorization. The proposed project will be funded by the National Tele-communication and Information Administration (NTIA) program
Special use management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | Bienville Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Tombigbee Ranger District · updated 3/13/2026 · decision 9/2026 (Estimated)
Davis Lake Recreation Area · Chickasaw, Mississippi
Replacement of approximately 2500 ft of existing waterline that supplies potable water to Davis Lake Recreation Area
Facility managementRecreation management
NEPA Start Date
3/12/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-44d-USFS |
Environmental Assessment · Bienville Ranger District · updated 1/12/2026
This project analysis area will encompass the Bienville National Forest in stands where the Jackson Prairie and Woodland intersects Forest Service lands. · Jasper; Scott; Smith, Mississippi
The Bienville National Forest is proposing a restoration and maintenance project for the Jackson Prairie and Woodland ecological system on National Forest System land in Scott, Smith, and Jasper Counties.
Special area managementWildlife, fish, rare plantsVegetation management (other than forest products)
Comment Period
01/2026 (Estimated)
Objection Period Start
01/2026 (Estimated)
Decision
02/2026 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | National Forests In Mississippi |
| Districts | Bienville Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bienville Ranger District · updated 1/12/2026
Scott County, Mississippi in Sections 34 in Township 5 North, Range 8 East. · Smith, Mississippi
Mr. Kerry M. Boykin has requested a special use permit to cross National Forests System land using gated Forest Service Road 570 for access to his private property in Scott County, Mississippi.
Special use management
Decision
12/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | Bienville Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bienville Ranger District · updated 12/4/2025
Township 6 North, Range 8 East in Section 19 in Scott County, Mississippi · Smith, Mississippi
Mr. Thomas C. Reid has requested a special use permit for access across gated Forest Service Road 566B to his 80-acre private properties.
Special use management
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | Bienville Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Homochitto Ranger District · updated 9/9/2025
Approximately 138,000 acres across the Homochitto National Forest. · Adams; Amite; Franklin; Jefferson; Lincoln; Wilkinson, Mississippi
Vegetation management of pine-dominated ecosystems across the Forest, including forest health, longleaf restoration, and habitat management.
Forest productsVegetation management (other than forest products)Fuels management
Comment Period
09/06/2023
Objection Period Start
06/20/2025
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Hfra Title I: Wildland-Urban Interface; Hfra Title I: Threats To Ecosystem Components (Such As Insect Or Disease Epidemics) |
| Notice and Comment Regulation | 218 (2013) HFRA |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements; Noxious Weed Treatments; Road Maintenance; Timber Sales (Green) |
| Forests | National Forests In Mississippi |
| Districts | Homochitto Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bienville Ranger District · updated 8/28/2025
The project area is located in Newton County in T5N R10E Section 27-28 and in Jasper County, MS in T4N R10E Section 3. · Jasper; Newton, Mississippi
Bay Springs Telephone Company/TEC/Delta Fiber is requesting to amend an existing authorization to install aerial fiber optic on existing Southern Pine Electric power poles within an existing right-of-way.
Special use management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | Bienville Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bienville Ranger District · updated 8/28/2025
The project area is in the lot south of Moore Fire Tower (32.3239336, -89.5055884) off Moore Tower Road in Section 32, Township 6 N, Range 8 E of Scott County, MS · Scott, Mississippi
Mississippi Department of Wildlife, Fisheries & Parks is requesting a special use permit to construct an 84x30X16 metal open-pole shed for heavy equipment storage at the Caney Creek Wildlife Management Area (WMA) Headquarter.
Special use management
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | Bienville Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · National Forests In Mississippi All Units · updated 6/25/2025
Project will include the entire Delta National Forest in Sharkey County. · Sharkey, Mississippi
Promote forest health and sustainability of bottomland hardwood habitat for waterfowl and other associated forest wetland-dependent species.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels management
Scoping Start
07/2025 (Estimated)
Decision
10/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Timber Sales (Green) |
| Forests | National Forests In Mississippi |
| Districts | Delta Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · National Forests In Mississippi All Units · updated 6/25/2025
National Forest lands in Mississippi. · Adams; Amite; Benton; Chickasaw; Choctaw; Copiah; Forrest; Franklin; George; Greene; Harrison; Jackson; Jasper; Jefferson; Jones; Lafayette; Lincoln; Marshall; Newton; Oktibbeha; Pearl River; Perry; Pontotoc; Scott; Sharkey; Smith; Stone; Tippah; Union; Wayne; Wilkinson; Winston; Yalobusha, Mississippi
Project will address and minimize the effects from nonnative invasive secies and problematic native species; manage forested ecosystems and associated communities to maintain and restore composition.
Vegetation management (other than forest products)Fuels managementWatershed managementRoad management
Scoping Start
07/2025 (Estimated)
Comment Period
08/2025 (Estimated)
Decision
12/2025 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | 2021 Infrastructure: Emergency Actions |
| Notice and Comment Regulation | 2021 Infrastructure: Emergency Actions |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Noxious Weed Treatments; Road Maintenance; Watershed Improvements |
| Forests | National Forests In Mississippi |
| Districts | National Forests In Mississippi All Units |
| Legal Land Description | Not Applicable |
Decision Memo · De Soto Ranger District · updated 11/11/2023
Black Creek, upstream from Fairley Bridge Road; north of existing right-of-way. · Perry, Mississippi
Relocate a section of natural gas pipeline that has become exposed due to erosion along the banks of Black Creek. New r/w 50' wide, with add'l 25' temp work space needed. Directional bore under Black Creek. Rehabilitation of abandoned r/w.
Special use management
Decision
10/2019 (Estimated)
Implementation
12/2019 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Section 27, T1S, R10W |
Decision Memo · De Soto Ranger District · updated 11/11/2023
West of DeWitt Carter Road. · Forrest, Mississippi
Access to private property using an existing driveway.
Special use management
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Section 8, Township 2 North, Range 12 West, Forrest county, MS, St. Stephens meridian. |
Decision Memo · De Soto Ranger District · updated 11/11/2023
West of Cable Bridge Road. · Stone, Mississippi
Provide access to private property using an existing closed road and a short segment of new construction.
Special use management
Decision
04/2020 (Estimated)
Implementation
05/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Section 26, Township 3 South, Range 10 West, Stone County, MS, St. Stephens Meridian |
Decision Memo · De Soto Ranger District · updated 9/18/2023
North of Austin Anderson Road · Perry, Mississippi
Authorize a special use permit to improve and maintain an existing 'woods' road, approx. 1008 feet long and 20 feet wide (0.5ac.), for access to private land.
Special use management
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Section 34, T2N, R9W |
Decision Memo · De Soto Ranger District · updated 9/18/2023
East of Lee Town Road · Pearl River, Mississippi
Authorize a special use permit to construct and maintain a new road, approx. 1200 feet long and 20 feet wide, to access private land. The new road would be located within an existing powerline corridor.
Special use management
Scoping Start
03/2022 (Estimated)
Decision
06/2022 (Estimated)
Implementation
07/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Section 11, T1S, R14W |
Decision Memo · De Soto Ranger District · updated 2/11/2022
De Soto Ranger District - George, Greene & Perry counties · George; Greene; Perry, Mississippi
Authorize continued operation of telecommunication lines.
Special use management
Decision
02/2022 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Area Management |
| Decision Decided Date | 02/11/2022 |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · De Soto Ranger District · updated 3/17/2020
The designated Black Creek Wild and Scenic River is located within the De Soto Ranger District,between Moody's Landing and Fairley Bridge Landing of the 1/4-mile wide Black Creek Corridor Scenic Area. · Perry, Mississippi
The National Forests in Mississippi proposes to establish a river corridor boundary and the preparation of a Comprehensive River Management Plan (CRMP) for the 21 mile Black Creek Wild and Scenic River.
Land management planningRecreation managementHeritage resource managementSpecial area managementWildlife, fish, rare plantsVegetation management (other than forest products)Special use management
Scoping Start
03/2020 (Estimated)
Comment Period
03/2020 (Estimated)
Objection Period Start
08/2020 (Estimated)
Decision
11/2020 (Estimated)
Implementation
11/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Plan Creation/Revision; Dispersed Recreation Mgmt.; Heritage Resource Management; Trail Management; Special Area Management; Scenery Management; Wilderness Management |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · De Soto Ranger District · updated 6/6/2016
Approximately 5 miles south of Beaumont, MS. · Perry, Mississippi
Directionally drill a new well on the existing production location for USA 15-2, 15-3, 15-5 & 15-6. No additional surface area will be needed and no pits will be dug.
Minerals and geology
Decision
06/2016 (Estimated)
Implementation
04/2016 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (3) |
| Special Authority | Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Oil |
| Decision Decided Date | 06/06/2016 |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · De Soto Ranger District · updated 9/22/2014
Approximately 7 miles southeast of New Augusta, MS. · Perry, Mississippi
Petro Harvester Operating Company proposes to drill a new well on an existing location that currently contains three additional wells. No additional surface disturbance will be required.
Minerals and geology
Decision
09/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (3) |
| Special Authority | Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Oil |
| Decision Decided Date | 09/22/2014 |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Sec. 10, T2N, R10W, St. Stephens Meridian |
Decision Memo · De Soto Ranger District · updated 9/22/2014
Approximately 6 miles south of New Augusta, MS, east of State Highway 29. · Perry, Mississippi
Petro Harvester Operating Company proposes to drill a new oil well on an existing location that currently contains three additional wells. No additional surface disturbance will be required.
Minerals and geology
Decision
09/2014 (Estimated)
Implementation
08/2014 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (3) |
| Special Authority | Oil & Gas - Sec. 390, Energy Policy Act Of 2005 (Sec 390) |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Oil |
| Decision Decided Date | 09/22/2014 |
| Forests | National Forests In Mississippi |
| Districts | De Soto Ranger District |
| Legal Land Description | Sec. 20, T2N, R10W, St. Stephens Meridian |