ARDOT is requesting the authorization to pile down trees, limbs and other debris caused by storms from surrounding road rights-of-ways in two designated (W54A and 44511) areas on the district. The location of piles would be along exiting roads and with old log landings from previous timber sales.
Location
2.7 miles northeast of Mt. Ida
Project timeline
1
NEPA Start Date
7/17/2026
2
Finding/Decision Date
NEPA / regulatory detail
| Categorical Exclusion | USDA-45d-USFS |