The overhead lines will be removed, and the existing material will be used to fill in the pole holes. The new underground will be located within the existing right of way and no additional tree clearing will be required. The cable will be buried directly into the soil using a vibratory cable plow. T
Location
north side of Spider Lake
Project timeline
1
NEPA Start Date
12/10/2025
2
Finding/Decision Date
3/27/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 3/27/2026 |