Categorical Exclusion · Blackduck Ranger District · updated 6/12/2026
Sugar Lake area on the Blackduck Ranger District · Cass; Itasca, Minnesota

Construct and use new timber access roads on NFS lands.

Special use management
NEPA Start Date
2/3/2026
Finding/Decision Date
6/12/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date6/12/2026
Categorical Exclusion · Walker Ranger District · updated 6/12/2026
Walker Bay Lot 14 · Cass, Minnesota

The old system failed inspection so will be replaced with a new tank in the exact same location as the current system. No trees need to be removed for this project.

Special use management
NEPA Start Date
9/9/2025
Finding/Decision Date
6/11/2026
Kira Kaufmann · Kira.Kaufmann@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date6/11/2026
Categorical Exclusion · Walker Ranger District · updated 6/12/2026
West Pike Bay Lot 2 · Cass, Minnesota

Request to install a new septic system and remove old system.

Special use management
NEPA Start Date
8/6/2025
Finding/Decision Date
6/11/2026
Kira Kaufmann · Kira.Kaufmann@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date6/11/2026
Categorical Exclusion · Walker Ranger District · updated 6/11/2026 · decision 12/2026 (Estimated)
Stony Point, East of Walker · Cass, Minnesota

Request to add an 18’ by 7’ section to their existing cabin.

Special use management
NEPA Start Date
6/11/2026
Finding/Decision Date
Peyton Huotari · Peyton.Huotari@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Walker Ranger District · updated 6/9/2026 · decision 12/2026 (Estimated)
West Pike Bay Lot 4 · Cass, Minnesota

Request to remove old garage and replace with a 20x20 shed.

Special use management
NEPA Start Date
6/9/2026
Finding/Decision Date
Peyton Huotari · Peyton.Huotari@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Walker Ranger District · updated 6/5/2026
Grave: 95°56.6500081’W 47°8.0582235’N Howard Lake: 94°38.4196570’W 47°1.4129194’N Jesse Lake: 93°51.0449313’W 47° 34.8115467’N Whittlestop: 94° 26.5490628’W 47°3.2014436’N Onigum: 94°26.7456213’W 47°3.249442’N · Cass, Minnesota

This project is for prospecting mineral resources (gravel) in areas directly adjacent to the currently active Jessie, Howard, Grave, Whittlestop, and Onigum gravel pits. This effort is intended to evaluate the presence and suitability of additional mineral material that may support Forest activities

Minerals and geology
NEPA Start Date
4/29/2026
Finding/Decision Date
6/4/2026
Anna Plumb · anna.plumb@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-32d-USFS
Decision Signed Date6/4/2026
Categorical Exclusion · Chippewa National Forest · updated 6/4/2026 · decision 11/2026 (Estimated)
Highway 271/200 · Cass, Minnesota

East Ottertail is requesting to install, use, and maintain 5152 feet of fiber optic line. Four pedestals will be installed.

Special use management
NEPA Start Date
5/12/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-27d-USFS
Categorical Exclusion · Deer River Ranger District · updated 6/4/2026 · decision 11/2026 (Estimated)
East Seelye Recreation Residence Summer Home Group · Itasca, Minnesota

Permittee proposes removing a non-compliant septic system and replacing it with a new system. A new 1,650-gallon combination precast concrete tank will be installed along with a lift station, 10’ x 38’ pressure bed drainfield, and connection pipes. No trees will be removed.

Special use management
NEPA Start Date
5/18/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Deer River Ranger District · updated 6/4/2026
Little Cut Foot Sioux Summer Homes Rd · Itasca, Minnesota

Permittee proposes replace failing septic system as part of requirements for the upcoming permit renewal. New system will have a 1,500-gallon tank and pressure mound drainfield installed. Old non-compliant drainfield and tank will be removed as part of this project. One 12-inch spruce tree will need

Special use management
NEPA Start Date
12/9/2025
Finding/Decision Date
6/3/2026
Project documents
ASHLEY MAY KLICK · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date6/3/2026
Environmental Assessment · Walker Ranger District · updated 5/28/2026
The Rock Solid project area is located on the Chippewa National Forest, with a primary focus on the Walker and Deer River Ranger Districts. Portions of the project area fall within the boundaries of the Leech Lake Band of Ojibwe (LLBO) Reservation. Of the eight proposed gravel pits, three are located within areas that include lands inside the LLBO Reservation boundary. · Cass, Minnesota

The purpose of this Environmental Assessment is to evaluate the potential environmental effects of developing, expanding, managing, and closing of select gravel pits within the Chippewa National Forest.

Minerals and geologyRoad management
NEPA Start Date
Finding/Decision Date
Project documents
Anna Plumb · anna.plumb@usda.gov
Environmental Assessment · Blackduck Ranger District · updated 5/28/2026 · decision 2/2027 (Estimated)
The Pennington South project area (Figure 1) is in Beltrami, Cass, and Itasca Counties and is generally bound to the south by Highway 2 spanning north to the Leech Lake Band of Ojibwe (LLBO) reservation boundary, it extends from the western boundary of the Chippewa National Forest (CPF) east to Lake Winnibigoshish. · Beltrami; Cass; Itasca, Minnesota

The Blackduck District of the Chippewa National Forest (CPF) is proposing an integrated resource project which seeks to move towards desired conditions throughout the Pennington South Project area on National Forest System (NFS) administered lands.

Forest productsFuels managementRecreation managementRoad managementSpecial area managementWatershed managementWildlife, fish, rare plants
NEPA Start Date
2/4/2026
Finding/Decision Date
Project documents
Samuel Ainsley · samuel.ainsley@usda.gov
Categorical Exclusion · Deer River Ranger District · updated 5/26/2026
T144N, R26W, Sec. 7 · Cass, Minnesota

Permittee proposes to build a temporary, winter only, access road totaling approximately 5,011 feet. The northern section would be approximately 691 feet and the southern section would be approximately 4,320 feet by 12 feet wide

Road managementSpecial use management
NEPA Start Date
3/27/2026
Finding/Decision Date
5/22/2026
Todd Armbruster · todd.armbruster@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date5/22/2026
Categorical Exclusion · Deer River Ranger District · updated 5/19/2026
North Star Lake Road · Itasca, Minnesota

East Ottertail is requesting to install, use, and maintain 45’ of fiber optic line in a 10’ wide right of way.

Special use management
NEPA Start Date
4/1/2026
Finding/Decision Date
5/19/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-27d-USFS
Decision Signed Date5/19/2026
Environmental Assessment · Chippewa National Forest · updated 5/13/2026 · decision 11/2026 (Estimated)
The proposed project area is an existing corridor for pipelines maintained by Enbridge Energy LLC (Enbridge) that generally parallels Highway 2 extending from just west of the Cass County / Hubbard County line at the western boundary to the Cass County / Itasca County border at the eastern boundary · Cass, Minnesota

The Forest Service is proposing to amend the Special Use Permit currently held by Enbridge and authorize the three types of decommissioning activities described below, including valve flush or removals, pipeline grouting, and pipeline removal.

Special use management
NEPA Start Date
11/18/2025
Finding/Decision Date
Project documents
Christopher Worthington · christopher.worthington@usda.gov
Decision Memo · Deer River Ranger District · updated 5/13/2026
Turn left on to Big Too Much Lake Rd (FR2402) use DNR provided map to locate the 3 new access requests within 4.8 miles of turning on to FR2402. · Itasca, Minnesota

The DNR is requesting to use two old skid trails and Sprue Lake HWT to access timber stands for permit B016173.

Special use management
Scoping Start
12/16/2024
Decision
05/2026 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date05/13/2026
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT149N R25W Sec 21 & 28
Categorical Exclusion · Deer River Ranger District · updated 5/7/2026
South of Round Lake · Itasca, Minnesota

Issue road permit to new owner as well as reroute a portion of the existing road.

Special use management
NEPA Start Date
12/12/2025
Finding/Decision Date
5/7/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date5/7/2026
Categorical Exclusion · Walker Ranger District · updated 5/7/2026
Howard Lake Road Area · Cass; Hubbard, Minnesota

East Ottertail is requesting to install, use, and maintain 6065’ of fiber optic line in a 10’ wide right of way. Three Pedestals will be installed. The project is expected to start in Summer 2026. Construction methods include directional boring and plowing.

Special use management
NEPA Start Date
2/10/2026
Finding/Decision Date
5/7/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-27d-USFS
Decision Signed Date5/7/2026
Categorical Exclusion · Deer River Ranger District · updated 4/21/2026
West side of Six Mile Lake · Cass, Minnesota

MNDNR is requesting to clear and utilize U3289 as part of project 19828. U3289 with be cleared for a width of 18’ and length of 324’. Other roads that will be utilized and covered under a 7700-permit include SLR-S3396, 2130G, SLR-S3395, and 2130.

Special use management
NEPA Start Date
2/5/2026
Finding/Decision Date
4/17/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date4/17/2026
Categorical Exclusion · Chippewa National Forest · updated 4/17/2026 · decision 10/2026 (Estimated)
East of Swift Lake · Cass, Minnesota

Lake Country Power is requesting to install and maintain 8,340’ or 1.58 miles of new line installed in a 30’ ROW way.

Special use management
NEPA Start Date
4/17/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-27d-USFS
Categorical Exclusion · Walker Ranger District · updated 4/16/2026 · decision 10/2026 (Estimated)
NE of Sucker Bay on Leech Lake · Cass, Minnesota

Road permit to authorize the construction, use and maintenance, and rehabilitation of a temporary haul road across NFS lands to access and harvest state timber sale 20091.

Special use management
NEPA Start Date
4/16/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Blackduck Ranger District · updated 4/10/2026
Lot 5 of the Mississippi River Summer Home Group · Cass, Minnesota

Replacement of failed copper facility and installation of fiber optic mainline cable for future use. The cable will be buried at 35 inches. The right-of-way will be approximately 383 feet long and 10 feet wide. The installation is planned to occur in the spring/summer of 2026.

Special use management
NEPA Start Date
12/17/2025
Finding/Decision Date
4/10/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date4/10/2026
Categorical Exclusion · Deer River Ranger District · updated 4/6/2026 · decision 10/2026 (Estimated)
West of Gunderson Lake · Itasca, Minnesota

Road permit to authorize the construction, use and maintenance, and rehabilitation of a temporary haul road across NFS lands to access and harvest state timber sale 20380. The new road would branch off FR2187GA. The new road construction would be 1357 feet in length and 18 feet in width.

Special use management
NEPA Start Date
4/6/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Walker Ranger District · updated 4/6/2026 · decision 10/2026 (Estimated)
West of Waboose Bay · Cass, Minnesota

The State will utilize FR2131, SLR-S5057, and construct 120 feet of new road at the end of SLR-S5057.

Special use management
NEPA Start Date
4/6/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Blackduck Ranger District · updated 4/3/2026 · decision 9/2026 (Estimated)
East of Grass Lake · Cass, Minnesota

: Road permit to authorize the construction, use and maintenance, and rehabilitation of a temporary haul road across NFS lands to access and harvest state timber sale 19433. The newly constructed road would branch off of Forest Service Road 2957A.

Special use management
NEPA Start Date
4/3/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Blackduck Ranger District · updated 4/3/2026 · decision 9/2026 (Estimated)
East of Alvwood · Itasca, Minnesota

FR2232C branching off FR2232 would be cleared and utilized.

Special use management
NEPA Start Date
4/3/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Categorical Exclusion · Blackduck Ranger District · updated 4/3/2026 · decision 9/2026 (Estimated)
East of Webster Lake · Beltrami; Itasca, Minnesota

The new road would branch off FR3423. It would be 1879 feet in length and 18 feet in width.

Special use management
NEPA Start Date
4/3/2026
Finding/Decision Date
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
0903 SU BLD104420 Developing Proposal
Categorical Exclusion · Walker Ranger District · updated 3/24/2026 · decision 9/2026 (Estimated)
T141 R25W Sec.27, T141 R28W, Sec.30 · Cass, Minnesota

Permittee proposes to build three different long-term access roads for DNR timber sales and site work. 1) T141N, R25W, S27 totaling approximately 2,200 feet by 18 feet wide following the route of a previous road SLR-S3461. 2) T141N, R28W, S30 totaling approximately 220 feet by 18 feet wide.

Road management
NEPA Start Date
3/24/2026
Finding/Decision Date
Todd.Armbruster · todd.armbruster@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
0903 SU-DER200120_Road Developing Proposal
Categorical Exclusion · Deer River Ranger District · updated 3/24/2026 · decision 9/2026 (Estimated)
T59, R26, sec. 31 · Itasca, Minnesota

Permittee proposes to build and maintain a gravel surface private road crossing Chippewa National Forest land to access their private property.

Special use management
NEPA Start Date
3/12/2026
Finding/Decision Date
Todd Armbruster · todd.armbruster@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Memo · Chippewa National Forest All Units · updated 3/20/2026
This project has study areas on the Chippewa National Forest. Depending on current spread of EAB, there will be three types of study sites selected between Remer and the Brian Palik led EAB study site on Third River Rd, Chippewa NF · Cass; Itasca, Minnesota

University of Minnesota research project using remote sensing techniques and equipment to monitor photosynthesis and transpiration to detect EAB and track spread over time.

Research
Scoping Start
03/04/2025
Decision
03/2026 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityResearch And Development
Decision Decided Date03/20/2026
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Categorical Exclusion · Blackduck Ranger District · updated 3/18/2026 · decision 9/2026 (Estimated)
Just south of the community of Alvwood, MN · Itasca, Minnesota

The project is designed to create quality habitat for the Golden-winged Warbler, American Woodcock, Ruffed Grouse and associated species by reducing the density and age of vegetative species through brush cutting. The project will use TVA CE 30 to authorize.

Facility managementForest productsFuels managementHeritage resource managementRecreation managementRoad managementWatershed managementWildlife, fish, rare plants
NEPA Start Date
3/9/2026
Finding/Decision Date
Reid Plumb · reid.plumb@usda.gov
NEPA / regulatory detail
Categorical ExclusionTVA 30 (18 CFR Appendix A to Subpart C of Part 1318(30))
Decision Memo · Chippewa National Forest All Units · updated 3/5/2026
Directly South of Hwy 200, 4 miles west of Remer, MN · Cass, Minnesota

This project intends to harvest primarily aspen and paper birch to provide sunlight and growing space to midstory and understory hardwoods and improve stand health and resiliency.

Forest products
Scoping Start
08/05/2025
Decision
02/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Categorical Exclusion · Deer River Ranger District · updated 3/2/2026
north side of Spider Lake · Itasca, Minnesota

The overhead lines will be removed, and the existing material will be used to fill in the pole holes. The new underground will be located within the existing right of way and no additional tree clearing will be required. The cable will be buried directly into the soil using a vibratory cable plow. T

Special use management
NEPA Start Date
12/10/2025
Finding/Decision Date
3/27/2026
ASHLEY MAY KLICK · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-27d-USFS
Decision Signed Date3/27/2026
Categorical Exclusion · Deer River Ranger District · updated 2/17/2026 · decision 8/2026 (Estimated)
T59N, R26W, Section 18 · Itasca, Minnesota

Permittee proposes installation of two solar panel arrays.

Special use management
NEPA Start Date
2/17/2026
Finding/Decision Date
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Memo · Walker Ranger District · updated 2/17/2026
T. 141 N., R. 29 W., Sec. 33 · Cass, Minnesota

The project is slated to occur in the Summer of 2026. It includes the installation of BD5 Pedestals and approximately 3429 feet of fiber in an existing right-of-way. The ROW will be 33 feet wide. The line will be plowed and directionally drilled.

Special use management
Scoping Start
09/29/2025
Decision
02/2026 (Estimated)
Implementation
03/2026 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Categorical Exclusion · Deer River Ranger District · updated 2/10/2026
FR 2487, East of Burns lake and directly West of Slauson Lake in Marcell attached to FR 2181 – Clubhouse Lake Road · Itasca, Minnesota

Road Permit for the use and maintenance

Special use management
NEPA Start Date
12/8/2025
Finding/Decision Date
2/10/2026
ASHLEY MAY KLICK · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date2/10/2026
Categorical Exclusion · Deer River Ranger District · updated 1/6/2026
South of Burrows Lake, North of Lost Moose Lake · Itasca, Minnesota

Use and maintenance of a private road crossing NFS lands.

Special use management
NEPA Start Date
12/8/2025
Finding/Decision Date
1/6/2026
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date1/6/2026
Decision Memo · Deer River Ranger District · updated 12/16/2025
49554 State Highway 38, Marcell, MN 56657 · Itasca, Minnesota

Install 960 feet of fiber optic cable to the visitor center, workshop, and lodge including three connection boxes.

Special use management
Scoping Start
05/28/2025
Decision
12/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 12/10/2025
Chippewa NF Supervisor%u2019s Office campus. West of Ash Ave NW in Cass Lake, MN. · Cass, Minnesota

Replace the warehouse roof at the Supervisor's Office

Facility management
Scoping Start
06/10/2025
Decision
12/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Christopher Worthington · Christopher.Worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
Decision Decided Date12/10/2025
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
FR 2360 Reopening Completed
Decision Memo · Blackduck Ranger District · updated 12/9/2025
Segment on northern end of FR 2360, south of Bimijiwan campground and north of recreation residence tract. · Beltrami, Minnesota

Project proposes to remove 2 gates and a rock barricade, allowing motorized access to an overlook, and access to a previously closed segment of road. This segment will be added back to the Forest transportation system and MVUM.

Road management
Scoping Start
07/03/2025
Comment Period
08/09/2025
Decision
09/2025 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
Michelle Holland · michelle.m.holland@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityRoad Maintenance; Travel Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT.146N, R.30W, Sec. 21, S1/2NE
Decision Memo · Deer River Ranger District · updated 12/9/2025
East shore of Lake Winnibigoshish approximately 1.5 miles south/southwest of Tamarack Point, 17455 North Highbanks Road. -94.134, 47.435 degrees. Within LLBO reservation. · Itasca, Minnesota

Replace two single pane windows, replace cedar siding, and replace two window awnings.

Special use management
Scoping Start
06/04/2024
Decision
06/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date06/20/2024
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R27W, Section 29
Decision Memo · Chippewa National Forest All Units · updated 9/19/2025
Whipholt Area · Cass, Minnesota

Installation and maintenance of 3,376 feet of line using vibratory plow or directional bore. Much of the line listed is existing and is planned to be upgraded to better meet the demands. This project is with the reservation boundary

Special use management
Scoping Start
01/24/2025
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N R30W Sec 3 and R29W Sec 1
Decision Memo · Blackduck Ranger District · updated 9/17/2025
South of Decker Lake · Cass, Minnesota

Road permit to authorize the construction, use and maintenance, and rehabilitation of a temporary haul road across NFS lands to access and harvest state timber sale 20382. The newly constructed road would branch off of Forest Service Road 3406A.

Special use management
Scoping Start
06/28/2025
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 9/8/2025
South East side of Star Island · Beltrami, Minnesota

Rebuilding stairway down to the lake

Special use management
Scoping Start
11/01/2024
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Section 36
East Beach Lot 17 Completed
Decision Memo · Chippewa National Forest All Units · updated 9/8/2025
South West Side of Star Island · Beltrami, Minnesota

Rebuilding stairway down to lake.

Special use management
Scoping Start
07/15/2024
Decision
09/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/08/2025
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Section 34
Decision Memo · Chippewa National Forest All Units · updated 9/8/2025
West side of Lake Winnibigoshish · Beltrami, Minnesota

Building a new deck

Special use management
Scoping Start
09/26/2024
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R29W, Section 2
Decision Memo · Walker Ranger District · updated 8/29/2025
East side of Leech Lake, to the west of the Shingobee RD NW. · Cass, Minnesota

Septic installation and well replacement. Old outhouse and old well to be abandoned

Special use management
Scoping Start
01/24/2025
Decision
08/2025 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R31W, Sect. 14.
Decision Memo · Chippewa National Forest All Units · updated 8/28/2025
The entire Chippewa National Forest · Beltrami; Cass; Itasca, Minnesota

Decision to approve the CPF System Road Maintenance Project which includes forest wide road maintenance activities within the existing roadway and adjacent clearing zones.

Road management
Scoping Start
08/02/2024
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Trapper Marshall · Trapper.Marshall@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 8/26/2025
Southwest side of Little Cut Foot Sioux Lake, east of State Hwy 46. 56192 Little Cut Foot Summer Homes Road. -94.038, 47.502 degrees · Itasca, Minnesota

Recreation residence cabin addition of a new attached garage and removal of the existing detached garage. Within LLBO Reservation.

Special use management
Scoping Start
11/04/2024
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 36
Decision Memo · Chippewa National Forest All Units · updated 8/18/2025
The project analysis area is on the Chippewa National Forest within, Cass County, Minnesota. The treatment includes approximately 1,913 acres of National Forest System lands. · Cass, Minnesota

The use of prescribed fire and mechanical treatments to restore fire-dependent ecosystems and wildlife habitats on 1913 acres of national forest system lands, within the proclamation boundary of the Leech Lake Band of Ojibwe Indian Reservation.

Wildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
01/14/2025
Decision
08/2025 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Cynthia Heyd · cynthia.heyd@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsChippewa National Forest
DistrictsChippewa National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 7/3/2025
Longville Area · Cass, Minnesota

Installation and maintenance of 53,211 ft of line to be installed using a vibratory plow or directional bore under roadways and water ways. Much of the line is existing and is to be upgraded to better meet demands. partly within reservation.

Special use management
Scoping Start
09/29/2023
Decision
07/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 6/12/2025
From Ball Club Mn, Travel south on County Road 18 for 5.25 Miles. Where County Road 18 turns east, continue south on 72nd Ave. Travel south on 72nd Ave for 1.6 miles. Turn east on to FS2329 and travel for approximately1/4 mile ending at project site. · Cass, Minnesota

Establishment of Goose Lake gravel pit near Mud/Goose Lake south of Ball Club Mn. Not on LLBO Reservation

Minerals and geologySpecial use management
Scoping Start
06/28/2024
Decision
08/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Trapper Marshall · Trapper.Marshall@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Minerals Or Geology Plans Of Operations; Road Maintenance
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionSW 1/4 NW 1/4 S6, T143, R25N
Decision Memo · Chippewa National Forest All Units · updated 6/10/2025
T146, R30W, Section 15 · Cass, Minnesota

.25-mile interpretive trail. The trails width of approximately 8ft would involve clearing brush and small trees. portions of the trail will be widened for Interpretive displays. Project will avoid sensitive areas involving Lady Slippers, or other spe

Recreation management
Scoping Start
12/18/2023
Decision
06/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Cole Van Beusekom · Cole.VanBeusekom@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146, R30W, Section 15
Decision Memo · Chippewa National Forest All Units · updated 6/3/2025
The approximate location starts where the current NCT intersects State Highway 6, follows along State Highway 6, and ends at the forest boundary just north of Willow Lake · Cass, Minnesota

The trail reroute section is 10 miles. Decommission old NCT segments. Constructing two parking areas and two dispersed campsites, which will include fire grates, wilderness latrines, and tent pads.

Recreation management
Scoping Start
06/20/2024
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Scott Shipley · scott.shipley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Trail Management
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionWest termini T 142N, R 25W, section 21. East termini T 143N, R 25W, section 25
Decision Memo · Blackduck Ranger District · updated 6/3/2025
primarily along the Mississippi River between Cass Lake and Lake Winnibigoshish · Cass, Minnesota

Thin about 269 acres of pine plantations. Prescribed fire on about 1,500 acres. Brushing, planting, and seeding as needed within the project area.

Land management planningSpecial area managementVegetation management (other than forest products)Watershed management
Scoping Start
08/14/2024
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Cory Mlodik · cory.mlodik@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Special Area Management; Timber Sales (Green)
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land Description146N, R29W and 146N, R30W
Decision Memo · Deer River Ranger District · updated 3/21/2025
Northeast side of Cut Foot Sioux Lake, 45261 Cut Foot Sioux Lake Rd, -94.079, 47.525 degrees. Within LLBO Reservation · Itasca, Minnesota

Replace rotting deck boards with new boards brown in color.

Special use management
Scoping Start
08/08/2024
Decision
03/2025 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date03/21/2025
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 22
Decision Memo · Deer River Ranger District · updated 3/21/2025
Northeast side of Cut Foot Sioux Lake, 44810 Cut Foot Sioux Lake Rd, -94.078, 47.521 degrees · Itasca, Minnesota

Install new heat pump/air conditioning minisplit unit on recreation residence cabin.

Special use management
Scoping Start
08/08/2024
Decision
03/2025 (Estimated)
Implementation
09/2024 (Estimated)
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date03/21/2025
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 27; on LLBO Reservation
Decision Memo · Deer River Ranger District · updated 2/5/2025
Deer Lake campground boat access (Cut Foot area); Winnie campground boat access · Itasca, Minnesota

Authorize reoccurrence of equipment to excavate channel bottom sediment approximately 2ft in depth, 3-6ft in width, and 50-150ft in length. Sediment spoils will be deposited adjacent to previous spoils sites.

Recreation managementFacility management
Scoping Start
09/27/2024
Decision
02/2025 (Estimated)
Implementation
11/2024 (Estimated)
Project documents
Samuel Ainsley · samuel.ainsley@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Facility Maintenance
Decision Decided Date02/05/2025
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Deer River Ranger District
Legal Land DescriptionT147N, R27W, Sec. 28; T146N, R29W, Sec. 35
Decision Memo · Deer River Ranger District · updated 1/23/2025
From Deer River, travel West on HWY 2 for 15.6 miles. Turn left on to Forest Road 2127 and travel 7.1 miles. Turn right on to FR 2266 and follow until arrive at proposed new road. Within Reservation. · Itasca, Minnesota

MN DNR is requesting to create of a temporary road for access across FS land. Location is depicted in the map below and I've requested the proposed route to be flagged in the field.

Special use management
Scoping Start
09/13/2024
Decision
01/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date01/23/2025
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT144N R27W Sec 27
Decision Memo · Deer River Ranger District · updated 1/23/2025
From Deer River, MN travel North on MN-6 for 3.5 miles. Turn right on to Co Rd 19 and travel 3.0 miles. Turn left on to Co Rd 48 travel 6.6. Turn left onto Alder Rd travel until arriving at destination · Itasca, Minnesota

MN DNR is requesting a new temporary access off Alder Rd. to their harvest area depicted in the map below.

Special use management
Scoping Start
05/23/2024
Decision
01/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date01/23/2025
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N R27W Sec 11, 14, & 15
Decision Memo · Deer River Ranger District · updated 1/23/2025
From Deer River, MN travel West on US HWY 2 for 15.6 miles. Turn left on to 6 Mile Lake Rd and travel 0.8 miles until arriving at destination. · Cass, Minnesota

MN DNR is requesting two new temporary roads to access timber sale. The locations are depicted in the map and requested the proposed route to be flagged in the field. Within Reservation.

Special use management
Scoping Start
09/13/2024
Decision
01/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date01/23/2025
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT144N R27W Sec 3 , 4, T145N R27W Sec 33 , 32
Decision Memo · Deer River Ranger District · updated 1/23/2025
From Deer River, MN travel North on MN-6 for 15.6 miles. Turn left onto Co Rd 35 and travel 7.8 miles. Turn right onto Mushgee Rd travel 0.3 miles until arriving at destination. Within LLBO Reservatio · Itasca, Minnesota

MN DNR is requesting a new temporary access off Forest Road 2040 to their harvest area depicted in the map below.

Special use management
Scoping Start
05/23/2024
Decision
01/2025 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date01/23/2025
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N R26W Sec 2}
Decision Memo · Chippewa National Forest All Units · updated 10/10/2024
From Northome, MN travel east on HWY 1 for 14.4 miles. Turn right onto Co Rd 27 and travel 4.9 miles. Continue straight onto Co Rd 31 for 3.7 miles until arriving at Forest Road 24 · Itasca, Minnesota

MN DNR is requesting use of an old skid trail off FR2441C for 1.4 miles to access their southerly harvest area and the northerly harvest area will be accessed using SLR-S117

Special use management
Scoping Start
05/23/2024
Decision
10/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/10/2024
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT150N R26W Sec 34
Decision Memo · Chippewa National Forest All Units · updated 10/10/2024
NE of Natures Lake · Itasca, Minnesota

MN DNR is requesting access on Forest Service U1199

Special use management
Scoping Start
05/23/2024
Decision
10/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/10/2024
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N R27W Sec 34
Decision Memo · Walker Ranger District · updated 10/10/2024
Stony Point Campground · Cass, Minnesota

Stony Point Day Use Boat Landing is for visitor day use. This boat landing need to be dredged so visitors can safely get their boats into the harbors. We will dump the dredge material in the stony brush disposal site.

Recreation management
Scoping Start
08/14/2024
Decision
10/2024 (Estimated)
Implementation
02/2025 (Estimated)
Project documents
David Johnson · drjohnson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.11, 7 Cfr 1B.3(A) (3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Decision Decided Date10/10/2024
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionTownship: 142, Range: 30, Section: 10
Decision Memo · Blackduck Ranger District · updated 10/9/2024
Latitude 47.519920, Longitude -94.422137. · Beltrami, Minnesota

A temporary road and landing area has been requested to access a state timber sale off the end of Forest Road 3424 until arriving at the State/FS property boundary. Approximate road location is depicted in the attached map

Special use management
Scoping Start
05/15/2024
Decision
10/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/09/2024
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N R25W Sec 30
Decision Memo · Blackduck Ranger District · updated 10/9/2024
Latitude 47.381306, Longitude -94.395967. From Cass Lake, MN travel east on US HWY 2 for 10.5 miles. Turn left on Forest Road 2169 for 1.3 miles. Turn left onto 2957 for 0.3 miles. Turn left onto FR 2957A travel until arriving at destination. · Cass, Minnesota

A new temporary road has been requested to access a state timber sale off of Forest Road 2957A until arriving at the State/FS property boundary. Approximate road location is depicted in the attached map.

Special use management
Scoping Start
05/15/2024
Decision
10/2024 (Estimated)
Implementation
07/2024 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/09/2024
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N R29W Sec 17&18
Decision Memo · Walker Ranger District · updated 10/9/2024
Latitude 47.288188, Longitude -94.314568 · Cass, Minnesota

A new temporary road has been requested to access a state timber sale off of State Logging Road S5057 until arriving at the State/FS property boundary. Approximate road location is depicted in the attached map.

Special use management
Scoping Start
05/15/2024
Decision
10/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/09/2024
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT144N R29W Sec 13&14
Decision Memo · Walker Ranger District · updated 10/9/2024
Latitude 47.288188, Longitude -94.314568. · Cass, Minnesota

A new temporary road has been requested to access a state timber sale off of State Logging Road S5057 until arriving at the State/FS property boundary. Approximate road location is depicted in the attached map.

Special use management
Scoping Start
05/15/2024
Decision
10/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/09/2024
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT144N R29W Sec 13&14
Decision Memo · Walker Ranger District · updated 10/9/2024
From Cass Lake, MN travel east on US Hwy 2 for 6.3 Miles. Turn left on to Cass Co Hwy 10 for 2.4 miles. Turn right on to Cass Co Hwy 91 (Big Fish Rd) for 1.1 miles until arriving at FR 2171F.%u200B · Cass, Minnesota

A temporary road has been requested to access a state timber sale off of Forest Road 2171F. Approximate Road location is depicted in the attached map.

Special use management
Scoping Start
04/26/2024
Decision
10/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/09/2024
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N R30W Sec 2
Decision Memo · Chippewa National Forest All Units · updated 10/8/2024
South West Side of Star Island · Beltrami, Minnesota

Removing old storage buildings and building a new shed as well as installing a septic system.

Special use management
Scoping Start
10/08/2024
Decision
12/2024 (Estimated)
Implementation
05/2025 (Estimated)
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT146N, R31W, Section 34
Decision Memo · Chippewa National Forest All Units · updated 10/3/2024
South Side of Star Island · Beltrami, Minnesota

Rebuilding boathouse after a tree fell on it during a wind event and the removal of two other nearby trees.

Special use management
Scoping Start
09/30/2024
Decision
04/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R31W, Section 2
Environmental Assessment · Deer River Ranger District · updated 10/1/2024
The project extends from the eastern side of the north shore of Lake Winnibigoshish and on up north in a narrow strip to the Forest boarder. · Itasca, Minnesota

This project will include vegetation management. The project is within the exterior boundary of the Leech Lake Band of Ojibwe reservation boundary.

Recreation managementWildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementWatershed managementRoad management
Scoping Start
06/08/2023
Comment Period
05/12/2024
Objection Period Start
08/03/2024
Decision
09/2024 (Estimated)
Implementation
10/2024 (Estimated)
Project documents
Samuel Ainsley · samuel.ainsley@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityDeveloped Site Management; Forest Vegetation Improvements; Research And Development; Travel Management; Timber Sales (Green); Watershed Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Deer River Ranger District
Legal Land DescriptionSection within the following townships T146N/R26W, R27W; T147N/R26W, R27W; T148N/R26W, R27W, T28W; T149N/R26W,R27W;T150N/R27W, R28W
Decision Memo · Deer River Ranger District · updated 9/13/2024
Latitude 47.652429, Longitude -93.974586. 3.8 miles east of Oslund, MN on Co. Rd. 4. · Itasca, Minnesota

A temporary road has been requested across Forest Service land to access a State timber sale. Approximate road location is depicted in the map below.

Special use management
Scoping Start
01/09/2024
Decision
09/2024 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/13/2024
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT148N R26W Sec 9
Decision Memo · Deer River Ranger District · updated 9/13/2024
From Deer River, MN travel North on State Hwy 46 for 17.7 miles. Turn right onto Itasca County Rd 35 for 1.7 miles until arriving at FR3216. · Itasca, Minnesota

Potlatch Deltic is requesting summer/winter access to a state timber sale that requires a temporary road across FS land.

Special use management
Scoping Start
03/06/2024
Decision
09/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Zachary Mclellan · zachary.mclellan@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/13/2024
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N R26W Sec 18
Decision Memo · Chippewa National Forest All Units · updated 9/13/2024
East Seelye Picnic Area and Beach · Itasca, Minnesota

Fishing tournament weigh in for up to 20 boats and people at East Seelye Bay Campground Beach/Picnic Area for one hour.

Special use management
Scoping Start
09/12/2024
Decision
09/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/13/2024
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT147N, R27W, Section 22
Decision Memo · Deer River Ranger District · updated 6/20/2024
From Itasca County Road 49, follow FR 3755 (Wildview Road) north for approximately 1 mile, turn left on 3756 (Imperial Road) and follow approximately 2 miles, turn left on 3756B · Itasca, Minnesota

Permittee proposes to maintain approximately 3,800 feet of existing Forest Road 3756B, Imperial Road, by adding gravel and grading surface. Road width will remain unchanged.

Special use management
Scoping Start
05/20/2024
Decision
06/2024 (Estimated)
Implementation
06/2024 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date06/20/2024
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N, R25W, Section 4
Decision Memo · Chippewa National Forest All Units · updated 5/17/2024
The project is located along the north side of county road 138, East of Shallow Pond Lake · Itasca, Minnesota

A current snowmobile trail has drifted off it's original designated route and now encroaches on private property. This project aims to clear trees and brush to put the route back onto it's designated path and buffer the trail from the adjacent lands.

Recreation management
Scoping Start
02/21/2024
Decision
05/2024 (Estimated)
Implementation
03/2024 (Estimated)
Project documents
Cole Van Beusekom · Cole.VanBeusekom@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Decision Decided Date05/17/2024
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149, R28W, Section 06, and T150, R28W
Decision Memo · Chippewa National Forest All Units · updated 5/17/2024
The project is located along the north side of county road 138, East of Shallow Pond Lake · Itasca, Minnesota

A current snowmobile trail has drifted off it's original designated route and now encroaches on private property. This project aims to clear trees and brush to put the route back onto it's designated path and buffer the trail from the adjacent lands.

Recreation management
Scoping Start
02/21/2024
Decision
05/2024 (Estimated)
Implementation
11/2024 (Estimated)
Cole Van Beusekom · Cole.VanBeusekom@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
Decision Decided Date05/17/2024
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149, R28W, Section 06, and T150, R28W
Decision Memo · Chippewa National Forest All Units · updated 4/10/2024
Stony Point Campground · Cass, Minnesota

Dredging the three harbors associated with the Stony Point Campground. dredging material will be deposited at a USFS site.

Recreation management
Scoping Start
01/29/2024
Decision
04/2024 (Estimated)
Implementation
04/2024 (Estimated)
Project documents
David Johnson · drjohnson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management
Decision Decided Date04/10/2024
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142, R30, Sec 10
Decision Memo · Deer River Ranger District · updated 12/13/2023
Eagle Nest Rd. Follow Itasca County Road 84, turn north on Fraser Road and follow for approximately ? mile to 2478A Spur A on left. · Itasca, Minnesota

Permittee proposes to maintain approximately 1,500 feet of an existing Forest Road 2478A Spur A, Frazer Road Spur A, by adding gravel, grading, and plowing in the winter to access property. Does not include road expansion.

Special use management
Scoping Start
09/15/2023
Decision
12/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/13/2023
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT146N, R25W, Section 31
Decision Memo · Walker Ranger District · updated 12/4/2023
T142N, R30W, Section 10 · Cass, Minnesota

Removal of old holding tank and installation of new septic system. Within LLBO reservation boundary.

Special use management
Scoping Start
07/11/2022
Decision
12/2023 (Estimated)
Implementation
10/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/04/2023
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Section 10
Decision Memo · Deer River Ranger District · updated 12/4/2023
North of Sugar Lake · Cass, Minnesota

Road permit to access and maintain FR2082AA, Lille Vermillion Dr NE to access private property.

Special use management
Scoping Start
07/07/2022
Decision
12/2023 (Estimated)
Implementation
01/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/04/2023
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT143N, R25W, Section 22
Decision Memo · Chippewa National Forest All Units · updated 12/4/2023
T142N, R28W, Section 35 · Cass, Minnesota

Reissuing a special use road permit on an existing road, FR3102

Special use management
Scoping Start
08/04/2023
Decision
12/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/04/2023
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R28W, Section 35
Decision Memo · Chippewa National Forest All Units · updated 12/4/2023
Norway Beach Road NW on north side of HWY 2, 3 miles east of Cass Lake. Follow Norway Beach Road approximately  mile staying to left. · Cass, Minnesota

Permittee proposes to re-roof cabins 3, 4, 8, 9, and the boat house using Atlas Castlebrook, Weathered Wood color, architectural shingles. All these roofs sustained wind damage this year.

Special use management
Scoping Start
10/10/2023
Decision
12/2023 (Estimated)
Implementation
11/2023 (Estimated)
Project documents
Todd Armbruster · Todd.Armbruster@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/04/2023
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT145N, R30W, Section 18
Decision Memo · Chippewa National Forest All Units · updated 12/4/2023
T142N, R31W, Section 14 · Cass, Minnesota

replacement of window in cabin

Special use management
Scoping Start
09/19/2022
Decision
12/2023 (Estimated)
Implementation
12/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/04/2023
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R31W, Section 14
Decision Memo · Chippewa National Forest All Units · updated 12/4/2023
T142N, R31W, Section 14 · Cass, Minnesota

Building a new 140 sq ft deck at a recreation residence cabin

Special use management
Scoping Start
11/28/2022
Decision
12/2023 (Estimated)
Implementation
04/2023 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/04/2023
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R31W, Section 14
Decision Memo · Chippewa National Forest All Units · updated 9/28/2023
Disregard: Duplicate Project · Beltrami, Minnesota

Disregard: Duplicate Project

Special use management
Scoping Start
09/28/2023
Decision
09/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Shelby Worel · shelby.worel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/28/2023
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 8/17/2023
The project is located approximately 6.5 miles NE of Walker, MN at the Chippewa National Forest Stoney Point Campground · Cass, Minnesota

Removal of live and dead standing trees and woody debris within 10ft of the fence surrounding the Stoney Point Campground equipment storage area to prevent further damage from falling trees.

Facility management
Scoping Start
05/30/2023
Decision
08/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
Reid Plumb · Reid.Plumb@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
Decision Decided Date08/17/2023
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT.142N., R.30W., Sec. 3
Decision Memo · Chippewa National Forest All Units · updated 6/30/2023
Deer Permit Area 679 · Itasca, Minnesota

MN DNR is planning on setting up 30 game cameras within the Chippewa NF boundary for deer density surveys.

Special use managementWildlife, fish, rare plants
Scoping Start
07/2023 (Estimated)
Decision
01/1970 (Estimated)
Implementation
07/2023 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date06/17/2026
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 7/13/2022
T.59N.,R26W., Sec. 4 & 9. FR2182, FR2664, P3293 · Itasca, Minnesota

Road Permit Reissue-Johnson Lake Road Association MAR597003. Not on LLBO reservation.

Special use management
Scoping Start
02/01/2022
Decision
07/2022 (Estimated)
Implementation
03/2022 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); 32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date07/13/2022
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Chippewa National Forest All Units · updated 6/15/2022
T145N, R31W, Section 22 · Cass, Minnesota

Replacement of window with BB damage

Special use management
Scoping Start
05/09/2022
Decision
06/2022 (Estimated)
Implementation
05/2022 (Estimated)
Project documents
Joshua Krecklau · Joshua.Krecklau@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date06/15/2022
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT145N, R31W Section 22
Decision Memo · Blackduck Ranger District · updated 6/14/2022
Northeast of Walker · Cass, Minnesota

Outhouse Relocation - Permit holder is requesting to move their current outhouse to a new location on a new slab and make repairs needed to continue utilizing the same building structure

Special use management
Scoping Start
07/14/2021
Decision
06/2022 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Ashley May klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date06/14/2022
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT142N, R31W, Sec. 14
MN DNR Game Cam Completed
Decision Memo · Deer River Ranger District · updated 1/4/2022
Around Lake Winnibigoshish · Cass, Minnesota

MN DNR wishes to set up 12 game cameras around Lake Winnibigoshish to monitor anglers.

Special use management
Scoping Start
01/04/2022
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (12), 36 Cfr 220.6(D)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date01/04/2022
ForestsChippewa National Forest
DistrictsBlackduck Ranger District; Deer River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 11/18/2021
Stony Point on Leech Lake · Cass, Minnesota

Dredge harbor utilizing a backhoe and then hauling sand to a site down Stony Point Camp Rd.

Special use management
Scoping Start
11/01/2021
Decision
11/2021 (Estimated)
Implementation
11/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date11/18/2021
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R30W, Sec 10
FR2350 Scenic Park Completed
Decision Memo · Deer River Ranger District · updated 9/17/2021
West of Scenic State Park · Itasca, Minnesota

MNDNR is requesting to improve FR2350. They want to improve approximately 3600 feet of existing minimum maintenance road from a width of 9 feet to 12 feet and clear brush and trees to a width of 18 feet.

Special use management
Scoping Start
08/04/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date08/17/2021
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT60N, R26W, Section 1
Decision Memo · Blackduck Ranger District · updated 9/2/2021
West of Pimushe Lake · Beltrami, Minnesota

Road permit reissue

Special use management
Scoping Start
08/20/2021
Decision
09/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/02/2021
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT147N, R30W, Sections 6, 7, 18 and T141N, R31W, Sections 1, 12
Decision Memo · Walker Ranger District · updated 9/2/2021
T141N, R31W, Section 30 · Cass, Minnesota

Road permit reissue for the use and maintenance of an existing forest road, U5189. No projects are being requested at this time and all activities fall within the scope of the standard permit.WAL402204

Special use management
Scoping Start
08/20/2021
Decision
09/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date09/02/2021
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT141N, R31W, Section 30
Decision Memo · Blackduck Ranger District · updated 8/23/2021
North of Shallow Pond Lake · Itasca, Minnesota

Issue a road permit to add gravel to U1117.

Special use management
Scoping Start
08/20/2021
Decision
08/2021 (Estimated)
Implementation
09/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date08/23/2021
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionT149N, R28W, Section 5
FR2518 Road Permit Completed
Decision Memo · Deer River Ranger District · updated 8/17/2021
East of Moon Lake · Cass, Minnesota

Road permit for the use and maintenance of an existing forest road, FR3518 aka Briezin Road. DER102100

Special use management
Scoping Start
08/02/2021
Decision
08/2021 (Estimated)
Implementation
08/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date08/17/2021
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT58N, R25W, Section 2
FR2540 road permit reissue Developing Proposal
Decision Memo · Walker Ranger District · updated 7/29/2021
East side of Boy Lake · Cass, Minnesota

Reissue a special use road permit for FR2540

Special use management
Scoping Start
07/2021 (Estimated)
Decision
01/1970 (Estimated)
Implementation
07/2021 (Estimated)
Project documents
Ashley May-Klick · ashley.n.may-klick@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (11), 36 Cfr 220.6(D)(11)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date06/17/2026
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionT142N, R27W, Section 22, 21
Decision Memo · Blackduck Ranger District · updated 5/21/2021
The project site is in Cass County Minnesota; T145N, R30W, S8 at the Norway Beach Resort on FR2007AA. The nearest town is Cass Lake, MN. · Cass, Minnesota

The project includes construction of 244 feet of rock riprap shoreline protection at the Norway Beach Resort along the shoreline of Cass Lake. The project is within the LLBO

Watershed management
Scoping Start
11/27/2020
Decision
01/2022 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Christopher Worthington · christopher.worthington@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (7), 36 Cfr 220.6(E)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Deer River Ranger District · updated 12/15/2020
South of Sugar Lake · Cass, Minnesota

FR2112B Road Permit Reissue. This is not within the boundary of the Leech Lake Band of Ojibwe reservation

Special use management
Scoping Start
12/15/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Ashley May klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/15/2020
ForestsChippewa National Forest
DistrictsDeer River Ranger District
Legal Land DescriptionT142N R25W Section 4
Decision Memo · Walker Ranger District · updated 12/14/2020
SW of Lake Winnibigoshish · Cass, Minnesota

Road permit reissue for FR2632A. Project is within LLBO boundary.

Special use management
Scoping Start
12/14/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/14/2020
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Blackduck Ranger District · updated 12/14/2020
NW of Rabideau Lake · Beltrami, Minnesota

Road permit reissue for FR3402A and FR3402

Special use management
Scoping Start
09/14/2020
Decision
12/2020 (Estimated)
Implementation
10/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/14/2020
ForestsChippewa National Forest
DistrictsBlackduck Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Walker Ranger District · updated 12/8/2020
T142N, R26W, S. 15 · Cass, Minnesota

Road permit reissue for a private road on NFS lands. Project is within LLBO Reservation lands.

Special use management
Scoping Start
12/08/2020
Decision
12/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Ashley May-Klick · ashleynmayklick@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (10)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date12/08/2020
ForestsChippewa National Forest
DistrictsWalker Ranger District
Legal Land DescriptionNot Applicable