Replacement of failed copper facility and installation of fiber optic mainline cable for future use. The cable will be buried at 35 inches. The right-of-way will be approximately 383 feet long and 10 feet wide. The installation is planned to occur in the spring/summer of 2026.
Location
Lot 5 of the Mississippi River Summer Home Group
Project timeline
1
NEPA Start Date
12/17/2025
2
Finding/Decision Date
4/10/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 4/10/2026 |