San Juan National Forest — Project Detail

24 projects with crawled detail · milestones · contacts · documents

San Juan National Forest

R02 Rocky Mountain · 24 projects · crawled 2026-06-17
In Progress 1 Developing Proposal 2 Completed 21
Decision Memo 14 Categorical Exclusion 9 Environmental Assessment 1
18 with documents 10 with comments page
Categorical Exclusion · Pagosa Ranger District · updated 6/16/2026 · decision 11/2026 (Estimated)
Pagosa Ranger District · Archuleta; Mineral, Colorado

The Pagosa Ranger District is proposing to improve vigor and forest health through commercial and non-commercial thinning, and fuels treatments. Pinyon Public link here: https://usfs-public.box.com/s/nmox04grwmcplsz93gqbwlmh3xw7cw2k

Vegetation management (other than forest products)
NEPA Start Date
6/3/2026
Finding/Decision Date
Project documents
Adam Tlachac · adam.tlachac@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-47d-USFS
Categorical Exclusion · Mancos/Dolores Ranger District · updated 6/1/2026
North of the Town of Dolores, east of McPhee Reservoir · Montezuma, Colorado

Relocation of a pasture boundary fence to better distribute cattle and improve vegetation resources. Project actions involve construction of 0.25 miles of fence in a new location, and removal of 0.4 miles of existing fence.

Grazing management
NEPA Start Date
2/2/2026
Finding/Decision Date
5/4/2026
Garth Nelson · garth.nelson@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-33d-USFS
Decision Signed Date5/4/2026
Environmental Assessment · Mancos/Dolores Ranger District · updated 6/1/2026
Dolores Ranger District · Dolores; Montezuma, Colorado

Proposal to supplement the Dolores Prescribed Fire Pine Ecosystem EA to include the ability to construct control lines using bladed equipment and masticators.

Fuels management
NEPA Start Date
1/22/2025
Finding/Decision Date
1/28/2026
Project documents
Nicholas Mustoe · nicholas.mustoe@usda.gov
NEPA / regulatory detail
Decision Signed Date1/28/2026
House Creek Corral Completed
Categorical Exclusion · Mancos/Dolores Ranger District · updated 6/1/2026
North of the Town of Dolores and east of McPhee Reservoir · Montezuma, Colorado

Construction of a new corral to house livestock adjacent to an existing exclosure for resource protection.

Grazing management
NEPA Start Date
11/24/2025
Finding/Decision Date
3/25/2026
Garth Nelson · garth.nelson@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-33d-USFS
Decision Signed Date3/25/2026
Categorical Exclusion · Columbine Ranger District · updated 6/1/2026
Near Molas Pass off Highway 550 · San Juan, Colorado

Removal of hazardous vegetation to the operation of the powerline. Removal of vegetation would reduce the risk of uncharacteristic wildfire on federal lands and adjacent at-risk communities.

Vegetation management (other than forest products)
NEPA Start Date
4/17/2025
Finding/Decision Date
4/16/2026
Project documents
Nicholas Glidden · nicholas.glidden@usda.gov
NEPA / regulatory detail
Categorical ExclusionPub. L. 117-58, Sec. 40806
Decision Signed Date4/16/2026
Categorical Exclusion · Mancos/Dolores Ranger District · updated 5/19/2026
South of Hwy 145 · Montezuma, Colorado

Special Use Road Permit DOL644 will establish access to a private land inholding off of Forest Service Road 556. The access road has been in use for many years, and the new permit will bring the access road into compliance and to Forest Service standards.

Special use management
NEPA Start Date
3/10/2026
Finding/Decision Date
5/18/2026
Daniel Chavez · daniel.chavez2@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date5/18/2026
Categorical Exclusion · Pagosa Ranger District · updated 5/13/2026
Intersection of FS road 653 and Highway 84 · Archuleta, Colorado

The project would reroute approximately 1,400 feet of Valle Seco Road (NFSR 653) to improve public safety and allow for large equipment access.

Road management
NEPA Start Date
4/17/2025
Finding/Decision Date
4/20/2026
Project documents
Joshua Peck · joshua.p.peck@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-46d-USFS
Decision Signed Date4/20/2026
Decision Memo · Columbine Ranger District · updated 5/6/2026
Bedrock Creek (La Plata Canyon, Columbine RD) and headwaters of East Mancos River (Dolores RD) · La Plata; Montezuma, Colorado

Process application for exploratory core sampling to determine mineral potential in the area. ~14 drill sites located in Bedrock Creek (La Plata Canyon, Columbine RD) and headwaters of East Mancos River (Dolores RD). Some sites accessed by helicopter

Minerals and geology
Scoping Start
04/01/2022
Decision
01/2023 (Estimated)
Implementation
05/2023 (Estimated)
Project documents
Emma Reinemann · emma.reinemann@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (8), 36 Cfr 220.6(E)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityMinerals Or Geology Plans Of Operations
Metallic Minerals Exploratory Core SamplingDecision Signed Date: 01/05/2023
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District; Columbine Ranger District
Legal Land DescriptionT36-37N R11W
Decision Memo · Mancos/Dolores Ranger District · updated 4/23/2026
Navajo Basin, within Lizard Head Wilderness. · Dolores, Colorado

Delineate designated dispersed overnight camping sites in Navajo Basin and execute an emergency closure order to dispersed camping outside of these areas.

Recreation management
Scoping Start
05/13/2025
Decision
03/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Thomas Rice · thomasbrice@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (1), 36 Cfr 220.6(D)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.; Wilderness Management
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionNot Applicable
Categorical Exclusion · Mancos/Dolores Ranger District · updated 3/24/2026
North of the Town of Dolores, East of the McPhee Reservoir · Montezuma, Colorado

Construct a new non-motorized trail segment that bypasses a rocky step section of trail, and designate a second route that is used but is not part of the Forest Service trail system

Recreation management
NEPA Start Date
1/7/2026
Finding/Decision Date
3/16/2026
Christopher Bouton · christopher.bouton@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Decision Signed Date3/16/2026
Categorical Exclusion · Mancos/Dolores Ranger District · updated 2/23/2026 · decision 8/2026 (Estimated)
Northeast of the Town of Dolores and west of Rico. · Dolores, Colorado

To salvage dead, downed, damaged, spruce, fir, and aspen trees on 220 acres within the Stoner Mesa Fire Perimeter

Forest productsFuels management
NEPA Start Date
2/23/2026
Finding/Decision Date
David Casey · david.casey2@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-36d-USFS
Willow Divide Gather Pasture Developing Proposal
Categorical Exclusion · Mancos/Dolores Ranger District · updated 2/2/2026 · decision 8/2026 (Estimated)
North of the Town of Dolores and west of Dunton · Dolores, Colorado

Construct up to 0.5 miles of fence on Northern border of Willow Divide allotment to create a gathering pasture.

Grazing management
NEPA Start Date
2/2/2026
Finding/Decision Date
Garth Nelson · garth.nelson@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-33d-USFS
Decision Memo · Pagosa Ranger District · updated 12/8/2025
Along Highway 160 · Archuleta; La Plata, Colorado

La Plata Electric Association LPEA is proposing to rebuild the 34 mile long Bayfield to Pagosa 69 kV transmission line between Bayfield and Pagosa Springs and upgrade the line capacity to 115 kV.

Special use management
Scoping Start
12/19/2024
Decision
12/2025 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
Julia Adams · Julia.Adams@usda.gov
NEPA / regulatory detail
Categorical ExclusionNtia_C(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Special Uses - La Plata Electric Association Bayfield to Ponderosa Power LiDecision Signed Date: 12/08/2025
ForestsSan Juan National Forest
DistrictsPagosa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mancos/Dolores Ranger District · updated 12/4/2025
Project locations south and east of the McPhee Reservoir and in the town of Dolores. · Dolores, Colorado

Streambank stabilization, access improvement and improvement to aquatic habitat on the Dolores River

Wildlife, fish, rare plantsWatershed management
Scoping Start
07/01/2025
Decision
12/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
Clayton Kampf · clayton.kampf@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Species Population Enhancements
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionN1/2 of S. 16, T. 37N, R15W, N.M.P.M. SE1/4 of S. 5, T. 37N, R14W, N.M.P.M. N1/2 of S. 6, T 38N, R13W, N.M.P.M.
Decision Memo · Mancos/Dolores Ranger District · updated 10/10/2025
Approximately 10 miles NE of Rico, CO, at the Calico Trailhead. · Dolores, Colorado

Permitting Dolores County Emergency Services to construct a temporary cabin for the purpose of search and rescue operations.

Special use management
Scoping Start
09/10/2025
Decision
10/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
Thomas Rice · thomas.b.rice@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
Special Uses - Dolores County SAR Cabin FANECDecision Signed Date: 10/10/2025
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Columbine Ranger District · updated 9/24/2025
Cole Ranch Administrative Site between Durango and Bayfield, CO · La Plata, Colorado

Demolition of old residence located on the Cole Ranch Admin site

Facility management
Scoping Start
11/13/2023
Decision
07/2025 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
Ryan Tolle · Ryan.Tolle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Maintenance
ForestsSan Juan National Forest
DistrictsColumbine Ranger District
Legal Land DescriptionT 34 N 8 W Sec. 8
Decision Memo · Mancos/Dolores Ranger District · updated 9/24/2025
Far Draw, west of Benchmark Lookout · Dolores, Colorado

Construct up to 3 miles of Wildlife friendly lay-down fence around the Far Draw Meadows in the Far Draw Pasture

Grazing management
Scoping Start
07/01/2025
Decision
08/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
Garth Nelson · glnelson@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionT. 40N R. 16W Sec 3 & 4
Decision Memo · Pagosa Ranger District · updated 8/28/2025
Approximately 5 miles east of Pagosa Springs · Archuleta, Colorado

Vegetation management, including timber and fuels reduction treatments, to address concerns about forest health and fuel loading throughout the 2,796 acre project area.

Forest productsVegetation management (other than forest products)Fuels management
Scoping Start
04/01/2025
Decision
08/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
Adam Tlachac · adam.tlachac@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Timber Sales (Salvage)
Decision Memo - Coal Creek Vegetation Management ProjectDecision Signed Date: 08/28/2025
ForestsSan Juan National Forest
DistrictsPagosa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mancos/Dolores Ranger District · updated 6/12/2025
Just south of highway 145, approximately 1 mile west of Stoner · Montezuma, Colorado

Empire Electric Association has an existing, buried electrical line crossing the Dolores River that is at risk of washing out due to erosion. They propose to construct a replacement overhead line, which will require installation of 2 wood poles.

Special use management
Scoping Start
03/03/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Emma Reinemann · emma.reinemann@usda.gov
NEPA / regulatory detail
Categorical ExclusionNtia_C(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
Decision Memo - Empire Electric Dolores River Overhead ProjectDecision Signed Date: 06/11/2025
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mancos/Dolores Ranger District · updated 6/5/2025
Along Highway 160 at Mancos Hill and southwest of the Town of Dolores. · Montezuma, Colorado

Clearnetworx proposes to install fiber optic communications line between Dolores and Mancos. Approximately 882 linear feet would be installed on National Forest System lands.

Special use management
Scoping Start
03/28/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Emma Reinemann · emma.reinemann@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo - Clearnetworx Fiber Optic Cable InstallationDecision Signed Date: 06/03/2025
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mancos/Dolores Ranger District · updated 6/5/2025
Near Thomas Mountain · Dolores, Colorado

Issuance of a new private road special use permit for the purpose of accessing a private inholding. The road will be 7.95 miles long and will follow the previous alignment of the old Forest Road 245A.

Special use management
Scoping Start
03/28/2025
Decision
06/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Rebecca Smith · rebecca.smith@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo - Hoey Inholding Access ProjectDecision Signed Date: 06/03/2025
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mancos/Dolores Ranger District · updated 5/28/2025
Just north of the Fish Creek State Wildlife Area, along Little Fish Creek · Dolores, Colorado

Colorado Parks and Wildlife (CPW) proposes to enclose the Leavensworth Ditch in corrugated metal pipe. CPW owns all water and ditch rights associated with the Leavensworth Ditch.

Special use management
Scoping Start
09/26/2024
Decision
05/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Emma Reinemann · emma.reinemann@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Memo - Leavensworth Ditch ProjectDecision Signed Date: 05/28/2025
ForestsSan Juan National Forest
DistrictsMancos/Dolores Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Columbine Ranger District · updated 9/23/2024
Pargin Mountain southeast of Bayfield, CO · Archuleta, Colorado

Remove old shelter building and separate tower; replace with new integrated shelter and tower. Minor hazard tree removal and brush removal.

Facility management
Scoping Start
03/26/2019
Decision
04/2019 (Estimated)
Implementation
06/2019 (Estimated)
Project documents
Camela Hooley · chooley@fs.fed.us
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
Decision Decided Date04/03/2019
ForestsSan Juan National Forest
DistrictsColumbine Ranger District
Legal Land DescriptionT34N R5W Section 14U
Decision Memo · Columbine Ranger District · updated 3/15/2024
Along CR 250, 6 miles north of Durango · La Plata, Colorado

The proposed action is to perform necessary maintenance on the East Animas Administrative Site, including the bunkhouse and modular.

Facility management
Scoping Start
12/13/2023
Decision
03/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Ryan Tolle · Ryan.Tolle@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (3), 36 Cfr 220.6(D)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Facility Maintenance
Decision Decided Date03/15/2024
ForestsSan Juan National Forest
DistrictsColumbine Ranger District
Legal Land DescriptionT 36 N R 9 W, Sec. 22