Environmental Assessment · Tonto National Forest · updated 6/8/2026
Four locations: One along FSR 109; two along FSR 512; and one along FSR 203 · Gila, Arizona
The Forest Service is proposing to authorize Gila County to expand three existing material source pits (Ramer, Braddock, and Castle Dome) and excavate one new material source pit (824), all located in rural Gila County, Az.
Minerals and geology
Finding/Decision Date
6/8/2026
Project documents
NEPA / regulatory detail
| Decision Signed Date | 6/8/2026 |
Environmental Assessment · Payson Ranger District · updated 5/29/2026 · decision 4/2022 (Estimated)
Southwest of Payson, adjacent to private land. · Gila, Arizona
Providing a Right-of-way for a new road on Forest Lands
Special use management
NEPA Start Date
4/16/2021
Project documents
Environmental Assessment · Pleasant Valley Ranger District · updated 5/19/2026 · decision 11/2025 (Estimated)
Located in rural Gila County, Az., approximately 33 miles east of Payson, three miles south of State Route 260 (SR 260), and 4 miles northeast of the unincorporated community of Young, Az. · Gila, Arizona
Authorizing permanent easement and temporary construction easements for construction and maintenance of Young Road from milepost 316.44 to milepost 329.91
Road managementSpecial use management
NEPA Start Date
11/20/2024
Project documents
Categorical Exclusion · Tonto Basin Ranger District · updated 4/7/2026
This project is located at Rye Creek, near the Forest Service Road (FSR) 184, approximately 1.25 air miles south from Rye, AZ · Gila, Arizona
This project will authorize APS to provide permanent electricity to a privately owned parcel near Rye, AZ. To see the FANEC for this project, copy the following into a browser: https://usfs.app.box.com/file/2190692435030
Special use management
NEPA Start Date
2/17/2026
Finding/Decision Date
3/31/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
| Decision Signed Date | 3/31/2026 |
Environmental Impact Statement · Tonto National Forest All Units · updated 3/16/2026
Tonto National Forest · Pinal, Arizona
The Tonto National Forest is preparing an environmental impact statement(EIS) to disclosure the environmental effects from: 1) a mining proposal submitted by Resolution Copper; 2)the exchange of land between Resolution Copper and United States.
Minerals and geologyLand ownership management
NOI in Federal Register
03/18/2016
DEIS NOA in Federal Register
08/09/2019
FEIS NOA in Federal Register
06/20/2025
Objection Period Start
06/20/2025
Decision
03/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Minerals Or Geology Plans Of Operations; Plan Amendment; Land Exchanges |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District; Mesa Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Mesa Ranger District · updated 2/20/2026
. The project is located along the State Route 87 (SR-87) corridor in The Rolls OHV Permit Zone (east side of SR-87) and near Mesquite Staging Area (west side of SR-87). Project site is approximately ten air miles east from Fountain Hills, AZ · Maricopa, Arizona
Rehab approximately 4.5 miles of motorized routes identified as decommissioned. To view the FANEC, copy and paste the following in a browser: https://usfs-public.box.com/s/j60kg2oubjdsrywgkfk8eajf0twrcdbv
Recreation management
NEPA Start Date
12/8/2025
Finding/Decision Date
2/20/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-42d-USFS |
| Decision Signed Date | 2/20/2026 |
Categorical Exclusion · Globe Ranger District · updated 2/20/2026
Approximately 2,800 acres within the “thumb” of the Globe Ranger District, approximately 20 to 30 air miles north from Globe, Arizona · Gila, Arizona
This project will use mastication along select roadways and lop and scatter throughout identified vegetation blocks. To view the FANEC, copy and paste the following in browser: https://usfs-public.box.com/s/sdt71nacwd7wnypbyw0rafmc3tc9c1tj
Fuels management
NEPA Start Date
12/29/2017
Finding/Decision Date
2/20/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-47d-USFS |
| Decision Signed Date | 2/20/2026 |
Categorical Exclusion · Mesa Ranger District · updated 2/19/2026
Located within the Bulldog Canyon Permit Zone, near Bush Highway, approximately 11 air miles Northeast from the Mesa Ranger District border. · Maricopa, Arizona
Prevent OHV users from driving off the designated trail (MT-10) to access Bulldog Wash, decreasing erosion in Bulldog Canyon, benefiting this watershed. https://usfs-public.box.com/s/hhk89mjeqm720k47di67jtb54cudzbn7
Recreation managementWatershed management
NEPA Start Date
12/18/2025
Finding/Decision Date
2/2/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-10d-NRCS |
| Decision Signed Date | 2/2/2026 |
Environmental Assessment · Tonto National Forest All Units · updated 2/19/2026
Four locations: One along FSR 109; two along FSR 512; and one along FSR 203 · Gila, Arizona
The Forest Service is proposing to authorize Gila County to expand three existing material source pits (Ramer, Braddock, and Castle Dome) and excavate one new material source pit (824), all located in rural Gila County, Az.
Minerals and geology
Scoping Start
02/2026 (Estimated)
Comment Period
02/2026 (Estimated)
Objection Period Start
04/2026 (Estimated)
Decision
06/2026 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Maintenance |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District; Payson Ranger District; Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Pleasant Valley Ranger District · updated 2/18/2026
Located on the Bryant Mountain and Spring Creek allotments, near the Forest Service Roads 131 and 131A, approximately six air miles southwest from Young, AZ · Gila, Arizona
Installation of a well, above-ground pipelines, troughs, stock ponds, and a water lot, will provide alternative watering points in previously underutilized upland areas. To view the FANEC, copy and paste the following into a browser: https://usfs-public.box.com/s/0pb48w2hv9sqmkpfvgme0hb33mr5s26y
Grazing management
NEPA Start Date
6/16/2025
Finding/Decision Date
1/29/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-01d-FSA |
| Decision Signed Date | 1/29/2026 |
Categorical Exclusion · Pleasant Valley Ranger District · updated 2/12/2026
Located on the Cherry Frio base property within the allotment, approximately 5 miles southeast of Young, Arizona. · Gila, Arizona
Encourage the development of water sources in uplands to improve or restore riparian areas within the Cherry Holding and Deadman pastures. To view the FANEC, copy and paste into a browser: https://usfs-public.box.com/s/qs73t65kwoawwd8latng5ughoequ1gr2
Grazing management
NEPA Start Date
1/12/2026
Finding/Decision Date
1/30/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-01d-FSA |
| Decision Signed Date | 1/30/2026 |
Decision Memo · Tonto National Forest All Units · updated 11/21/2025
This project includes 61 separate abandoned mine features across the Globe, Mesa, and Tonto Basin Ranger Districts. · Gila; Maricopa; Pinal, Arizona
Project would close identified abandoned mine features by blocking the openings using various methods including warning signs, fences, sealed mine openings with bat gates, expanding foam, or backfill.
Minerals and geology
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Abandoned Mine Land Clean-Up |
| Decision Memo Tonto East Abandoned Mine Lands Project | Decision Signed Date: 11/19/2025 |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District; Mesa Ranger District; Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto Basin Ranger District · updated 9/15/2025
Roosevelt Lake Estates and Windy Hill · Gila, Arizona
Grazing fuel break to reduce hazardous fuel loading threating the Roosevelt Lake Estates and the Windy Hill Campground. Some cut and pile with and burning of 35 acres will be included.
Grazing managementFuels management
Decision
09/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (8), 36 Cfr 220.6(D)(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Grazing Allotment Management |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Township 4 North, Range 12 East: Sections 26, 27, 35 Township 3 North, Range 13 East: Sections 2, 10, 11, 14 |
Decision Memo · Globe Ranger District · updated 9/8/2025
Located directly adjacent to the City of Globe and unincorporated communities of Kellner, Icehouse, and Six Shooter Canyons, approximately one air miles South from the City of Globe. · Gila, Arizona
Manipulation of vegetation directly adjacent to private land holdings on approximately 540 acres through the creation of a fuel break up to 200 feet wide
Fuels management
Decision
09/2025 (Estimated)
Implementation
09/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Globe Ranger District · updated 9/5/2025
Project is located along Highway 60, near Forest Road 303, approximately 16 air miles northeast from Globe, Arizona. · Gila, Arizona
Project will decommission Jones Water Campground and reduce maintenance backlog by removing deteriorating infrastructure within it.
Recreation management
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Township 3N, Range 16E, Section 23 |
Decision Memo · Globe Ranger District · updated 9/5/2025
Located on Pinal Mountain near Forest Service Roads (FSR) 651 and 112, approximately seven air miles south of Globe, Arizona. · Gila, Arizona
Project will construct approximately 3.3 miles of non-motorized multi-use trail with directional signs for equestrians, mountain bikers, and hikers, and will decommission 3.1 miles of unsustainable and undesirable low-use trail in our current system
Recreation management
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1); 32.2 (20), 36 Cfr 220.6(E)(20) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Dispersed Recreation Mgmt.; Trail Management |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Township 1S, Range 15E, Sections 19-32 & Township 2S, Range 15E, Sections 1-12 |
Decision Memo · Tonto National Forest All Units · updated 8/4/2025
From the APS Dale Substation north of the Phoenix metropolitan area to the future Chevelon Butte Substation, located approximately 28 miles south of Joseph City in Navajo County · Maricopa; Navajo; Pinal, Arizona
Construction of a fiber optic communication line within the existing authorized 345-kV dual tower parallel-line ROW that crosses approximately 91 miles of the Tonto NF and Apache-Sitgreaves NF
Special use management
Decision
11/2025 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (4), 36 Cfr 220.6(D)(4); Ntia_C(8) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Apache-Sitgreaves National Forests; Tonto National Forest |
| Districts | Black Mesa Ranger District; Cave Creek Ranger District; Mesa Ranger District; Payson Ranger District; Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Mesa Ranger District · updated 7/31/2025
The project area includes a 1,000-foot corridor, about 7 miles long, on the east and west sides of AZ 87 north of Goldfield Estates and Bush Hwy. · Maricopa, Arizona
The purpose of the project is to reduce hazardous fuels along the highway by using high-intensity, short-duration livestock grazing (targeted grazing) to remove and trample dense vegetation before it becomes a fire hazard.
Grazing managementFuels management
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Grazing Authorizations |
| Forests | Tonto National Forest |
| Districts | Mesa Ranger District |
| Legal Land Description | Township 3N., Range 8E. and Township 4N., Range 8E |
Decision Memo · Globe Ranger District · updated 7/29/2025
Project is on the Globe Ranger District, located southeast of Globe, Arizona approximately eight air miles south of the U.S. Highway 70/77 intersection. · Gila, Arizona
Project will repair and realign the 1.9 mile segment of FSR 2670 across National Forest System land to improve road function and provide for safe travel for the public and private land users.
Road management
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (24), 36 Cfr 220.6(E)(24) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance; Road Improvements/Construction |
| Decision Memo for the Forest Service Road 2670 Partial Realignment Project | Decision Signed Date: 07/29/2025 |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto National Forest All Units · updated 7/22/2025
Located within Crabtree Wash, near the Apache Lake service road 79, approximately 95 air miles Southwest from the city of Apache Junction · Gila, Arizona
Authorize an increase in the size and use of the recreation residence Lot 3 in a manner that supports the Forest Service mission, meets demonstrated public needs, and is consistent with the desired conditions for the use area.
Special use management
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Township 0.3N, Range 11E, Section 29 |
Decision Memo · Mesa Ranger District · updated 7/14/2025
The project is located approximately one-half mile from the end of First Water Road, approximately 9 air miles Northeast from Apache Junction. · Maricopa, Arizona
Project would adopt two connecting user-created routes in the Forest Service non-motorized trail system.
Recreation managementProjects that may affect wilderness (for mailing list contacts)
Decision
09/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Tonto National Forest |
| Districts | Mesa Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto National Forest All Units · updated 7/14/2025
The legal location of the project is Township 4, Range N. 12, Section E. 20. · Gila, Arizona
Replace old, outdated sign for Marina on existing posts.
Special use management
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Cave Creek Ranger District · updated 7/11/2025
Located west of the Verde River, east of Interstate Highway 17, and north of Cave Creek, approximately 4 to 5 air miles east from New River, Black Canyon City, and north of Cave Creek/Scottsdale. · Maricopa, Arizona
In addition to the continued use of naturally occurring unplanned ignitions when conditions permit, this project proposes the use of planned prescribed fire and different types of mechanical vegetation treatments, such as thinning and mastication.
Vegetation management (other than forest products)Fuels management
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Decision Memo West Verde Firescape and Wildlife Habitat Improvement Project | Decision Signed Date: 07/10/2025 |
| Forests | Tonto National Forest |
| Districts | Cave Creek Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Pleasant Valley Ranger District · updated 7/8/2025
Located in rural Gila County, Az., approximately 33 miles east of Payson, three miles south of State Route 260 (SR 260), and 4 miles northeast of the unincorporated community of Young, Az. · Gila, Arizona
Authorizing permanent easement and temporary construction easements for construction and maintenance of Young Road from milepost 316.44 to milepost 329.91
Road management
Comment Period
07/08/2025
Objection Period Start
10/2025 (Estimated)
Decision
12/2025 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations; Road Maintenance; Road Improvements/Construction |
| Forests | Tonto National Forest |
| Districts | Pleasant Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Mesa Ranger District · updated 7/2/2025
The gravel pit site is near Forest Service Road 143, approximately 15 air miles Northeast from Fountain Hills. The highway tank location is near Hwy 87, approximately 6 air miles South from Sunflower. · Maricopa, Arizona
This project would add two new water sources to the Dos S Unit of the Sunflower allotment to distribute livestock over a larger portion of two pastures.
Grazing management
Decision
07/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Fsa 7 Cfr 779.32 E(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Grazing Structural Improvements |
| Decision Memo for the Sunflower Allotment Water Storage and Troughs Project | Decision Signed Date: 07/01/2025 |
| Forests | Tonto National Forest |
| Districts | Mesa Ranger District |
| Legal Land Description | Township 4N, Range 9E, Section 08 and Township 5N, Range 8E, Section 39 |
Environmental Assessment · R3 - Southwestern Region All Units · updated 6/13/2025
The Arizona National Scenic Trail goes from the Coronado National Memorial to the Utah Border at Vermillion Cliffs- 800 miles south to north across the State of Arizona. · Cochise; Coconino; Gila; Maricopa; Pima; Pinal; Santa Cruz, Arizona
The comprehensive plan will establish the administrative objectives, policies, processes, and management guidelines necessary to fulfill the legislative requirements for national scenic trails under the National Trails System Act.
Recreation managementSpecial area management
Comment Period
02/23/2024
Objection Period Start
11/20/2024
Decision
03/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Trail Management |
| Forests | Coconino National Forest; Coronado National Forest; Kaibab National Forest; Tonto National Forest |
| Districts | Coconino National Forest All Units; Coronado National Forest All Units; Kaibab National Forest All Units; Tonto National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Globe Ranger District · updated 6/5/2025
Miners Camp drainage is located off Forest Road 1013, off the 645-loop road; and Bear Canyon drainage located near the end of Forest Road 2326, north from Globe. · Gila, Arizona
Installation of erosion control structures to mitigate erosion, increase water infiltration into the soil, and retain sediment to which would promote herbaceous plant production.
Watershed management
Decision
07/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Township 4N, Range 15.5E Section 4; Township 3N, Range 17E, Section 10. |
Decision Memo · Globe Ranger District · updated 6/5/2025
In the Pinal Mountains, off Forest Road 112 and 580. · Gila, Arizona
Re-establish patches of ponderosa pine trees within the project area to encourage recovery of native vegetation and improve Mexican spotted owl habitat.
Vegetation management (other than forest products)
Decision
07/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Township 2S, Range 14.5E and 15E, Section 23 and 24; Township 2S, Range 15E, Section 2, 3, 10, 11 |
Decision Memo · Globe Ranger District · updated 6/4/2025
Project is bounded by the San Carlos Apache Indian Reservation, the forest boundary, the City of Globe, Highway 60, and Devil's Canyon. · Gila, Arizona
Project would use prescribed fire, wildfire, and mechanical vegetation treatments across a total of 80,437 on the Globe Ranger District in collaboration with the San Carlos Apache Tribe who is treating adjacent tribal lands.
Vegetation management (other than forest products)Fuels management
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
T6N R10E Sec. 2, 3, 10, 11, T7N R10E Sec. 27, 34, 35. · Gila, Arizona
The goal would be to protect Sonoran Desert vegetation by reducing herbaceous annual vegetation along highway 188 so that any fire starts does not spread.
Fuels management
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | Not Applicable / Other; 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
T6N - T7N, R11E - R12E · Gila, Arizona
The Maverick RX project will reduce hazardous fuel loading thereby improving habitat for wildlife and grazing.
Wildlife, fish, rare plantsFuels management
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Forest Vegetation Improvements; Species Habitat Improvements |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
The project is located at Roosevelt Lakeview Trailer Park and Roosevelt Lake Marina near the State Highway 188. · Gila, Arizona
The purpose of this project is to approve the installation of fiber optic broadband infrastructure to the Roosevelt Lake Marina.
Special use management
Decision
08/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
T4N, R12E, Sec. 28, 33 · Gila, Arizona
This project will connect Water Users spring and pipeline system to the Two Prong pipeline system.
Grazing management
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
The project is located at Windy Hill Campground, near the Highway 180 road. · Gila, Arizona
Construction of ADA approved ramp for lake access, including paved trail from the existing parking, building beach front at the water, putting pilings into lakebed for floating dock, and blocking boat access to the inlet.
Facility management
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction |
| Forests | Tonto National Forest |
| Districts | Tonto Basin Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Globe Ranger District · updated 5/22/2025
Project is bounded by the San Carlos Apache Indian Reservation to the east, the District boundary to the north and west, and the City of Globe to the south. · Gila, Arizona
Project would use prescribed fire, wildfire, and/or mechanical vegetation treatment across a total area of approximately 115,684 acres of the Globe Ranger District in coordination with San Carlos Apache Tribe who is treating adjacent tribal lands.
Vegetation management (other than forest products)Fuels management
Decision
07/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Payson Ranger District · updated 4/11/2025
Tonto NF, Payson Ranger District, Gila County, AZ. · Gila, Arizona
Providing a Right-of-way for a new road on Forest Lands.
Special use management
Comment Period
04/11/2025
Objection Period Start
11/2025 (Estimated)
Decision
01/2026 (Estimated)
Implementation
03/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Special Use Authorizations |
| Forests | Tonto National Forest |
| Districts | Payson Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Tonto National Forest All Units · updated 12/8/2023
Tonto National Forest; Forestwide · Gila; Maricopa; Pinal; Yavapai, Arizona
A collaborative effort to revise the Land and Resources Management Plan for the Tonto National Forest in Arizona
Land management planning
NOI in Federal Register
04/06/2017
DEIS NOA in Federal Register
12/13/2019
FEIS NOA in Federal Register
03/25/2022
Objection Period Start
07/08/2022
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 219 (2012) |
| Project Activity | Plan Creation/Revision |
| Record of Decision Tonto National Forest Revised Land Management | Decision Signed Date: 12/08/2023 (In Appeal Period) Legal Notice Date: 12/08/2023 |
| Forests | Tonto National Forest |
| Districts | Tonto National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto National Forest All Units · updated 8/7/2023
Payson and Pleasant valley Ranger Districts, Tonto National Forest, Gila County, AZ. · Gila, Arizona
New water sources and handling facilities to improve livestock management
Grazing management
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management; Grazing Structural Improvements |
| Forests | Tonto National Forest |
| Districts | Payson Ranger District; Pleasant Valley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Globe Ranger District · updated 3/31/2023
The legal location of the project is Township 2 South, Range 14 East, Section 15. · Gila, Arizona
The Globe Ranger District proposes to extend an above ground pipeline from private land to a new storage tank and two new troughs on the Pinto Creek Allotment.
Grazing management
Decision
03/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Decision Memo Pinto Creek: Registered Pipeline | Decision Signed Date: 03/30/2023 |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Cave Creek Ranger District · updated 1/12/2023
The project location(s) are on the Cave Creek Ranger District of the Tonto National Forest in Maricopa County, AZ, northeast of the Rio Verde Foothills/ Dynamite neighborhoods of North Scottsdale, AZ. · Maricopa, Arizona
Proposal is a staging area improvement and access road construction project. The goal of this project is to address the high level of demand and use, disperse use over the greater Desert Vista area, and improve access along the forest bound
Road managementRecreation management
Comment Period
04/29/2022
Objection Period Start
09/30/2022
Decision
01/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Developed Site Management; Dispersed Recreation Mgmt.; Road Maintenance; Road Improvements/Construction |
| Decision Notice for the Desert Vista Area Improvement Project | Decision Signed Date: 01/12/2023 |
| Forests | Tonto National Forest |
| Districts | Cave Creek Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Globe Ranger District · updated 9/29/2022
4 miles from the junction of Hwy 60 and 77/70 · Gila, Arizona
Parcel of National Forest System lands with private facilities located on it - qualifies for the Small Tract Act Authority.
Land ownership management
Decision
06/2022 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (7), 36 Cfr 220.6(D)(7) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Boundary Adjustments |
| Decision Decided Date | 06/17/2022 |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Not Applicable |
Environmental Impact Statement · Tonto National Forest All Units · updated 10/5/2021
Tonto National Forest · Gila; Maricopa; Pinal; Yavapai, Arizona
The Tonto National Forest is completing the analysis for the Travel Management Rule which calls for establishing a system of roads, trails, and areas designated for motorized vehicle use and determining suitable locations for dispersed camping.
Road managementRecreation management
NOI in Federal Register
02/01/2013
DEIS NOA in Federal Register
04/04/2019
FEIS NOA in Federal Register
05/28/2021
Objection Period Start
10/04/2019
Decision
10/2021 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Plan Amendment; Trail Management; Travel Management |
| Forests | Tonto National Forest |
| Districts | Tonto National Forest All Units |
| Legal Land Description | Not Applicable |
Decision Memo · Tonto National Forest All Units · updated 6/8/2018
Sites 1 & 2 of Pinal Peak Communications site. Pinal Peak is approximately 8 miles south of the town of Globe. · Gila, Arizona
Trench from APS building to AZDPS tower for the purpose of collocating antennas on AZDPS's tower.
Special use management
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Tonto National Forest |
| Districts | Globe Ranger District |
| Legal Land Description | Not Applicable |