Tonto National Forest — Project Detail

29 projects with crawled detail · milestones · contacts · documents

Tonto National Forest

R03 Southwestern · 29 projects · crawled 2026-10-17
In Progress 12 On Hold 2 Completed 15
Decision Memo 17 Environmental Assessment 5 Categorical Exclusion 4 Environmental Impact Statement 3
29 with documents 12 with comments page
Categorical Exclusion · Pleasant Valley Ranger District · updated 9/16/2026
This project will conduct a geotechnical field investigation along approximately 13.46 miles of FSR 512 (Young Road), from milepost 316.45 to 329.91. · Gila, Arizona

This project will conduct a geotechnical field investigation along approximately 13.46 miles of FSR 512 (Young Road), from milepost 316.45 to 329.91, on the Tonto National Forest. The geotechnical investigation includes drilling 55 geotechnical borings.

Minerals and geology
NEPA Start Date
4/14/2026
Finding/Decision Date
9/16/2026
Project documents
NEPA / regulatory detail
Categorical ExclusionUSDA-32d-USFS
Decision Signed Date9/16/2026
Environmental Assessment · Pleasant Valley Ranger District · updated 8/27/2026
Located in rural Gila County, Az., approximately 33 miles east of Payson, three miles south of State Route 260 (SR 260), and 4 miles northeast of the unincorporated community of Young, Az. · Gila, Arizona

Authorizing permanent easement and temporary construction easements for construction and maintenance of Young Road from milepost 316.44 to milepost 329.91

Road managementSpecial use management
NEPA Start Date
11/20/2024
Finding/Decision Date
8/27/2026
Project documents
NEPA / regulatory detail
Decision Signed Date8/27/2026
Categorical Exclusion · Globe Ranger District · updated 8/27/2026
The project is in Gila County approximately five miles southwest of Miami, Arizona . (See map at the end of this document in Appendix A). The primary access to the project from Miami, Arizona on U.S. Highway 60/70 west approximately five miles to the Pinto Valley Mine Road turnoff, then turning south on Copper Springs Road/ Forest Service Road (FSR) 349 and continuing 0.3 miles to the northern boundary. FSR 349 and Simpson Lake Road provide access to the central portion of the project. · Gila; Pinal, Arizona

The proposed project includes road maintenance, drill pad construction at 37 sites, and exploratory core drilling. The proposed action incorporates best management practices and design features to avoid and/or minimize impacts to forest resources.

Minerals and geology
NEPA Start Date
1/23/2026
Finding/Decision Date
8/26/2026
Project documents
Cortney Keller · cortney.keller@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSGS 9.5B (516 DM 9); USGS 9.5G (516 DM 9)
Decision Signed Date8/26/2026
Categorical Exclusion · Payson Ranger District · updated 8/26/2026
Located on the Payson Ranger District within an existing authorized 69-kilovolt (kV) overhead transmission line right-of-way (ROW). The project corridor crosses 3.6 miles of Tonto National Forest (TNF) land from Star Valley eastward, running parallel to and north of State Route (SR) 260 to the APS Preacher Canyon Substation in Gila County. · Gila, Arizona

APS is proposing the construction of a fiber optic communication line within the existing authorized 69-kV transmission line ROW that crosses approximately 3.6 miles of the forest; no ROW expansion would be needed.

Special use management
NEPA Start Date
7/1/2025
Finding/Decision Date
8/18/2026
Project documents
Mark McEntarffer · mark.mcentarffer@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-27d-USFS
Decision Signed Date8/18/2026
Triple Tank Corral Completed
Categorical Exclusion · Cave Creek Ranger District · updated 8/25/2026
Project is located at the boundary of Triple Tank and Cedar Mountain pastures on the Black Jack Grazing Allotment, adjacent to FR24. The project area is approximately 20 miles northeast from Cave Creek, AZ. The legal location of the project is Township 9N Range 5E Section 17. · Yavapai, Arizona

Project will construct a corral to aid in the handling of livestock during pasture rotations between the Holmes, Triple Tank, and Cedar Mountain pastures of the Black Jack Allotment. For more information see https://usfs-public.box.com/s/7x820eswvfyvgkb8w1patznrj2rzoklm

Grazing management
NEPA Start Date
6/9/2026
Finding/Decision Date
8/19/2026
Project documents
Austin Jacobson · Austin.jacobson@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-33d-USFS
Decision Signed Date8/19/2026
Environmental Assessment · Tonto National Forest · updated 6/8/2026
Four locations: One along FSR 109; two along FSR 512; and one along FSR 203 · Gila, Arizona

The Forest Service is proposing to authorize Gila County to expand three existing material source pits (Ramer, Braddock, and Castle Dome) and excavate one new material source pit (824), all located in rural Gila County, Az.

Minerals and geology
NEPA Start Date
3/3/2026
Finding/Decision Date
6/8/2026
Project documents
NEPA / regulatory detail
Decision Signed Date6/8/2026
Environmental Impact Statement · Tonto National Forest All Units · updated 3/16/2026
Tonto National Forest · Pinal, Arizona

The Tonto National Forest is preparing an environmental impact statement(EIS) to disclosure the environmental effects from: 1) a mining proposal submitted by Resolution Copper; 2)the exchange of land between Resolution Copper and United States.

Minerals and geologyLand ownership management
NOI in Federal Register
03/18/2016
DEIS NOA in Federal Register
08/09/2019
FEIS NOA in Federal Register
06/20/2025
Objection Period Start
06/20/2025
Decision
03/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityMinerals Or Geology Plans Of Operations; Plan Amendment; Land Exchanges
ForestsTonto National Forest
DistrictsGlobe Ranger District; Mesa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Tonto National Forest All Units · updated 11/21/2025
This project includes 61 separate abandoned mine features across the Globe, Mesa, and Tonto Basin Ranger Districts. · Gila; Maricopa; Pinal, Arizona

Project would close identified abandoned mine features by blocking the openings using various methods including warning signs, fences, sealed mine openings with bat gates, expanding foam, or backfill.

Minerals and geology
Scoping Start
04/30/2024
Decision
11/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityAbandoned Mine Land Clean-Up
Decision Memo Tonto East Abandoned Mine Lands ProjectDecision Signed Date: 11/19/2025
ForestsTonto National Forest
DistrictsGlobe Ranger District; Mesa Ranger District; Tonto Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Tonto National Forest All Units · updated 8/4/2025
From the APS Dale Substation north of the Phoenix metropolitan area to the future Chevelon Butte Substation, located approximately 28 miles south of Joseph City in Navajo County · Maricopa; Navajo; Pinal, Arizona

Construction of a fiber optic communication line within the existing authorized 345-kV dual tower parallel-line ROW that crosses approximately 91 miles of the Tonto NF and Apache-Sitgreaves NF

Special use management
Scoping Start
08/04/2025
Decision
11/2025 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4); Ntia_C(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsApache-Sitgreaves National Forests; Tonto National Forest
DistrictsBlack Mesa Ranger District; Cave Creek Ranger District; Mesa Ranger District; Payson Ranger District; Tonto Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Mesa Ranger District · updated 7/14/2025
The project is located approximately one-half mile from the end of First Water Road, approximately 9 air miles Northeast from Apache Junction. · Maricopa, Arizona

Project would adopt two connecting user-created routes in the Forest Service non-motorized trail system.

Recreation managementProjects that may affect wilderness (for mailing list contacts)
Scoping Start
11/22/2024
Decision
09/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsTonto National Forest
DistrictsMesa Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Tonto National Forest All Units · updated 7/14/2025
The legal location of the project is Township 4, Range N. 12, Section E. 20. · Gila, Arizona

Replace old, outdated sign for Marina on existing posts.

Special use management
Scoping Start
05/28/2024
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Alison Mettler · alison.mettler@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsTonto National Forest
DistrictsTonto Basin Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · R3 - Southwestern Region All Units · updated 6/13/2025
The Arizona National Scenic Trail goes from the Coronado National Memorial to the Utah Border at Vermillion Cliffs- 800 miles south to north across the State of Arizona. · Cochise; Coconino; Gila; Maricopa; Pima; Pinal; Santa Cruz, Arizona

The comprehensive plan will establish the administrative objectives, policies, processes, and management guidelines necessary to fulfill the legislative requirements for national scenic trails under the National Trails System Act.

Recreation managementSpecial area management
Scoping Start
09/01/2016
Comment Period
02/23/2024
Objection Period Start
11/20/2024
Decision
03/2025 (Estimated)
Implementation
06/2025 (Estimated)
Project documents
Gregory Schuster · gregory.schuster@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTrail Management
ForestsCoconino National Forest; Coronado National Forest; Kaibab National Forest; Tonto National Forest
DistrictsCoconino National Forest All Units; Coronado National Forest All Units; Kaibab National Forest All Units; Tonto National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Globe Ranger District · updated 6/5/2025
Miners Camp drainage is located off Forest Road 1013, off the 645-loop road; and Bear Canyon drainage located near the end of Forest Road 2326, north from Globe. · Gila, Arizona

Installation of erosion control structures to mitigate erosion, increase water infiltration into the soil, and retain sediment to which would promote herbaceous plant production.

Watershed management
Scoping Start
06/05/2025
Decision
07/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Andrea Wages · andrea.wages@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityWatershed Improvements
ForestsTonto National Forest
DistrictsGlobe Ranger District
Legal Land DescriptionTownship 4N, Range 15.5E Section 4; Township 3N, Range 17E, Section 10.
Pinal Reforestation In Progress
Decision Memo · Globe Ranger District · updated 6/5/2025
In the Pinal Mountains, off Forest Road 112 and 580. · Gila, Arizona

Re-establish patches of ponderosa pine trees within the project area to encourage recovery of native vegetation and improve Mexican spotted owl habitat.

Vegetation management (other than forest products)
Scoping Start
06/05/2025
Decision
07/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsTonto National Forest
DistrictsGlobe Ranger District
Legal Land DescriptionTownship 2S, Range 14.5E and 15E, Section 23 and 24; Township 2S, Range 15E, Section 2, 3, 10, 11
Decision Memo · Globe Ranger District · updated 6/4/2025
Project is bounded by the San Carlos Apache Indian Reservation, the forest boundary, the City of Globe, Highway 60, and Devil's Canyon. · Gila, Arizona

Project would use prescribed fire, wildfire, and mechanical vegetation treatments across a total of 80,437 on the Globe Ranger District in collaboration with the San Carlos Apache Tribe who is treating adjacent tribal lands.

Vegetation management (other than forest products)Fuels management
Scoping Start
05/03/2024
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsTonto National Forest
DistrictsGlobe Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
T6N R10E Sec. 2, 3, 10, 11, T7N R10E Sec. 27, 34, 35. · Gila, Arizona

The goal would be to protect Sonoran Desert vegetation by reducing herbaceous annual vegetation along highway 188 so that any fire starts does not spread.

Fuels management
Scoping Start
03/14/2023
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Eric Hoskins · eric.hoskins@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3(11)
Special AuthorityNot Applicable / Other; 2021 Infrastructure: Fuel Break Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels)
ForestsTonto National Forest
DistrictsTonto Basin Ranger District
Legal Land DescriptionNot Applicable
Maverick RX In Progress
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
T6N - T7N, R11E - R12E · Gila, Arizona

The Maverick RX project will reduce hazardous fuel loading thereby improving habitat for wildlife and grazing.

Wildlife, fish, rare plantsFuels management
Scoping Start
08/23/2023
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Justin Henderson · justin.henderson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements; Species Habitat Improvements
ForestsTonto National Forest
DistrictsTonto Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
The project is located at Roosevelt Lakeview Trailer Park and Roosevelt Lake Marina near the State Highway 188. · Gila, Arizona

The purpose of this project is to approve the installation of fiber optic broadband infrastructure to the Roosevelt Lake Marina.

Special use management
Scoping Start
04/02/2024
Decision
08/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
Mark McEntarffer · mark.mcentarffer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsTonto National Forest
DistrictsTonto Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
T4N, R12E, Sec. 28, 33 · Gila, Arizona

This project will connect Water Users spring and pipeline system to the Two Prong pipeline system.

Grazing management
Scoping Start
09/11/2023
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Eric Hoskins · eric.hoskins@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
ForestsTonto National Forest
DistrictsTonto Basin Ranger District
Legal Land DescriptionNot Applicable
Windy Hill ADA Access In Progress
Decision Memo · Tonto Basin Ranger District · updated 6/4/2025
The project is located at Windy Hill Campground, near the Highway 180 road. · Gila, Arizona

Construction of ADA approved ramp for lake access, including paved trail from the existing parking, building beach front at the water, putting pilings into lakebed for floating dock, and blocking boat access to the inlet.

Facility management
Scoping Start
01/22/2024
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Jason Spence · jason.p.spence@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction
ForestsTonto National Forest
DistrictsTonto Basin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Globe Ranger District · updated 5/22/2025
Project is bounded by the San Carlos Apache Indian Reservation to the east, the District boundary to the north and west, and the City of Globe to the south. · Gila, Arizona

Project would use prescribed fire, wildfire, and/or mechanical vegetation treatment across a total area of approximately 115,684 acres of the Globe Ranger District in coordination with San Carlos Apache Tribe who is treating adjacent tribal lands.

Vegetation management (other than forest products)Fuels management
Scoping Start
05/03/2024
Decision
07/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements
ForestsTonto National Forest
DistrictsGlobe Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Tonto National Forest All Units · updated 12/8/2023
Tonto National Forest; Forestwide · Gila; Maricopa; Pinal; Yavapai, Arizona

A collaborative effort to revise the Land and Resources Management Plan for the Tonto National Forest in Arizona

Land management planning
NOI in Federal Register
04/06/2017
DEIS NOA in Federal Register
12/13/2019
FEIS NOA in Federal Register
03/25/2022
Objection Period Start
07/08/2022
Decision
12/2023 (Estimated)
Implementation
01/2024 (Estimated)
Project documents
Tyna Yost · tyna.yost@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Creation/Revision
Record of Decision Tonto National Forest Revised Land ManagementDecision Signed Date: 12/08/2023 (In Appeal Period) Legal Notice Date: 12/08/2023
ForestsTonto National Forest
DistrictsTonto National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Tonto National Forest All Units · updated 8/7/2023
Payson and Pleasant valley Ranger Districts, Tonto National Forest, Gila County, AZ. · Gila, Arizona

New water sources and handling facilities to improve livestock management

Grazing management
Scoping Start
08/01/2019
Decision
05/2023 (Estimated)
Implementation
06/2023 (Estimated)
Project documents
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Allotment Management; Grazing Structural Improvements
ForestsTonto National Forest
DistrictsPayson Ranger District; Pleasant Valley Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Globe Ranger District · updated 3/31/2023
The legal location of the project is Township 2 South, Range 14 East, Section 15. · Gila, Arizona

The Globe Ranger District proposes to extend an above ground pipeline from private land to a new storage tank and two new troughs on the Pinto Creek Allotment.

Grazing management
Scoping Start
08/10/2022
Decision
03/2023 (Estimated)
Implementation
03/2023 (Estimated)
Project documents
Andrea Wages · andrea.wages@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (9), 36 Cfr 220.6(E)(9)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityGrazing Structural Improvements
Decision Memo Pinto Creek: Registered PipelineDecision Signed Date: 03/30/2023
ForestsTonto National Forest
DistrictsGlobe Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Cave Creek Ranger District · updated 1/12/2023
The project location(s) are on the Cave Creek Ranger District of the Tonto National Forest in Maricopa County, AZ, northeast of the Rio Verde Foothills/ Dynamite neighborhoods of North Scottsdale, AZ. · Maricopa, Arizona

Proposal is a staging area improvement and access road construction project. The goal of this project is to address the high level of demand and use, disperse use over the greater Desert Vista area, and improve access along the forest bound

Road managementRecreation management
Scoping Start
05/29/2020
Comment Period
04/29/2022
Objection Period Start
09/30/2022
Decision
01/2023 (Estimated)
Implementation
02/2023 (Estimated)
Project documents
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Developed Site Management; Dispersed Recreation Mgmt.; Road Maintenance; Road Improvements/Construction
Decision Notice for the Desert Vista Area Improvement ProjectDecision Signed Date: 01/12/2023
ForestsTonto National Forest
DistrictsCave Creek Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Globe Ranger District · updated 9/29/2022
4 miles from the junction of Hwy 60 and 77/70 · Gila, Arizona

Parcel of National Forest System lands with private facilities located on it - qualifies for the Small Tract Act Authority.

Land ownership management
Scoping Start
07/01/2014
Decision
06/2022 (Estimated)
Implementation
03/2020 (Estimated)
Project documents
Mark McEntarffer · mark.mcentarffer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments
Decision Decided Date06/17/2022
ForestsTonto National Forest
DistrictsGlobe Ranger District
Legal Land DescriptionNot Applicable
Environmental Impact Statement · Tonto National Forest All Units · updated 10/5/2021
Tonto National Forest · Gila; Maricopa; Pinal; Yavapai, Arizona

The Tonto National Forest is completing the analysis for the Travel Management Rule which calls for establishing a system of roads, trails, and areas designated for motorized vehicle use and determining suitable locations for dispersed camping.

Road managementRecreation management
NOI in Federal Register
02/01/2013
DEIS NOA in Federal Register
04/04/2019
FEIS NOA in Federal Register
05/28/2021
Objection Period Start
10/04/2019
Decision
10/2021 (Estimated)
Implementation
09/2022 (Estimated)
Project documents
Gregory Schuster · gjschuster@fs.fed.us
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Amendment; Trail Management; Travel Management
ForestsTonto National Forest
DistrictsTonto National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Tonto National Forest All Units · updated 6/8/2018
Sites 1 & 2 of Pinal Peak Communications site. Pinal Peak is approximately 8 miles south of the town of Globe. · Gila, Arizona

Trench from APS building to AZDPS tower for the purpose of collocating antennas on AZDPS's tower.

Special use management
Scoping Start
06/22/2017
Decision
04/2018 (Estimated)
Implementation
04/2018 (Estimated)
Project documents
Mark McEntarffer · mark.mcentarffer@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsTonto National Forest
DistrictsGlobe Ranger District
Legal Land DescriptionNot Applicable