Categorical Exclusion · Klamath Ranger District · updated 10/13/2026
The project area is located on the Klamath Ranger District of the Fremont-Winema National Forest in Klamath County, Oregon in T33S, R6E, Sec: 1-5, and T32S, R6E, 13-16, 20-29, 32-36, Willamette Meridian. · Klamath, Oregon
The Klamath Landscape Resilience: Annie Creek project will implement project activities to strengthen forest resilience to drought, insects and and disease, invasive species, and catastrophic wildfire to further the goals outlined in the USDA Forest Service Strategic Plan FY 2022-2026.
Fuels managementRecreation managementVegetation management (other than forest products)
Finding/Decision Date
10/8/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Pub. L. 117-58, Sec. 40806; USDA-44d-USFS; USDA-47d-USFS |
| Decision Signed Date | 10/8/2026 |
Environmental Assessment · Chiloquin Ranger District · updated 10/7/2026
The project area is approximately 7 miles southeast of the town of Chiloquin, Or, in T35 R8 Sec 24-25, and 36; T35 R9 Sec 4, 8-10, 14-23, and 26-35; T36 R8 Sec 1, and 12-13; T36 R9 Sec 1-13, 15-31, and 33-36; T36 R10 Sec 7, 18-19, and 28-33; and T37 R11.2 Sec 2-6. · Klamath, Oregon
The Fremont-Winema National Forest proposes to implement a suite of post fire recovery activities within the Wrights Spring Fire area.
Forest productsFuels managementVegetation management (other than forest products)
NEPA Start Date
9/16/2026
Finding/Decision Date
10/7/2026
Project documents
NEPA / regulatory detail
| Decision Signed Date | 10/7/2026 |
Environmental Assessment · Bly Ranger District · updated 10/5/2026
The Paradise Restoration Project is located on the Bly and Lakeview Ranger Districts of the Fremont-Winema National Forest. The project area spans between 120.5458° – 121.0175°W and 42.1983° – 42.4628°N, located in and around T 36S R 14-17E, T 37S R 15-17E, T 38S R 16-18E, and T 39S R18E. The project area is located approximately 10 miles west of Lakeview, OR, and four miles east of Bly, OR. · Klamath; Lake, Oregon
The primary purpose of the Paradise Restoration Project is ecosystem restoration. Action is needed to restore healthy forest ecosystems, improve wildlife habitats, and protect life, property, and infrastructure within and adjacent to the project area.
Forest productsFuels managementLand management planningVegetation management (other than forest products)Wildlife, fish, rare plants
NEPA Start Date
2/27/2026
Finding/Decision Date
9/2/2026
Project documents
NEPA / regulatory detail
| Decision Signed Date | 9/2/2026 |
Categorical Exclusion · Klamath Ranger District · updated 9/9/2026 · decision 12/2026 (Estimated)
Project area surrounds Lake of the Woods. · Klamath, Oregon
Project uses understory thinning, mastication, and prescribed fire to create and maintain fuel breaks and defensible space. Small trees are thinned, slash piled or burned, and fuels reduced through hand/machine piling, pile burning, underburning, and mastication.
Fuels management
NEPA Start Date
6/17/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | Pub. L. 117-58, Sec. 40806 |
Categorical Exclusion · Bly Ranger District · updated 6/11/2026
The project area is located in south-central Oregon approximately 30 miles west of Lakeview, on NFS lands administered by the Bly Ranger District of the Fremont-Winema National Forest. · Lake, Oregon
Quartz Mountain Gold Ltd., a subsidiary of Q-Gold Resources Ltd., proposes to conduct mineral exploration activities on federal unpatented lode mining claims located on National Forest System (NFS) lands administered by the Fremont-Winema National Forest.
Minerals and geology
NEPA Start Date
4/20/2026
Finding/Decision Date
5/26/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-32d-USFS |
| Decision Signed Date | 5/26/2026 |
Environmental Assessment · Fremont-Winema National Forest · updated 6/5/2026 · decision 2/2027 (Estimated)
The project is located on the Fremont-Winema National Forest. Areas that have been identified fall within recent large fire footprints. These areas include: the Watson Creek Fire (62,160 acres, 2018), Brattain Fire (51,380 acres, 2020), Bootleg Fire (426,500 acres, 2021), Patton Meadow Fire (8,946 acres, 2021), and Cougar Peak Fire (91,710 acres, 2021). · Klamath; Lake, Oregon
The Forest Service is proposing to implement herbicide treatments for forest re-establishment and trail maintenance to reduce competing vegetation on approximately 43,000 acres of Forest System Lands that have been impacted by recent wildfires.
Fuels managementVegetation management (other than forest products)
Project documents
Decision Memo · Klamath Ranger District · updated 4/15/2026
The project area is located approximately 23 miles west of Klamath Falls, surrounding the town of Rocky Point, in Klamath County Oregon. · Klamath, Oregon
The proposed action includes treatments on approximately 4,260 acres including vegetation restoration and resilience treatments, fuel breaks, road maintenance, and recreation enhancement activities.
Forest productsVegetation management (other than forest products)Fuels management
Decision
04/2026 (Estimated)
Implementation
11/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (22), 36 Cfr 220.6(E)(22); 32.2 (25), 36 Cfr 220.6(E)(25); 32.3(11) |
| Special Authority | Not Applicable / Other; 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Timber Sales (Green) |
| Forests | Fremont-Winema National Forest |
| Districts | Klamath Ranger District |
| Legal Land Description | T36S R5E S 1, 12, 13; T36S R6E S 3, 4, 7-11, 15-31; T35S R6E S 22, 23, 26, 27, 34, 35; Willamette Meridian |
Decision Memo · Klamath Ranger District · updated 3/3/2026
This project is located approximately 10 miles southwest of Klamath Falls, Oregon. · Klamath, Oregon
There is a need to improve the network of wildfire control and suppression features in a high-risk region by creating 12-miles of shaded fuel breaks along Clover Creek Road on Green Diamond Resource Company lands.
Fuels management
Decision
03/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3(11) |
| Special Authority | 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Fremont-Winema National Forest |
| Districts | Klamath Ranger District |
| Legal Land Description | T. 39 S., R. 6 E., Sec. 1; T. 39 S., R. 7 E., Sec. 5-6, 8-9, 15-16, 22-23, and 26; T. 38 S., R. 6 E., Sec. 20-22, 26-27, and 35-36. |
Decision Memo · Chiloquin Ranger District · updated 10/7/2025
The project area is approximately six mile southwest of the town of Sprague River, OR. · Klamath, Oregon
The Chiloquin Ranger District aims to improve resource conditions and increase forest resilience to insect and disease infestation in a portion of the Bly Mountain planning area.
Forest productsVegetation management (other than forest products)Fuels management
Decision
10/2025 (Estimated)
Implementation
04/2027 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.3 (5) |
| Special Authority | Hfra Title Vi: Insect And Disease Projects |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Timber Sales (Green) |
| Forests | Fremont-Winema National Forest |
| Districts | Chiloquin Ranger District |
| Legal Land Description | T36S, R9E, Sec. 23-27, 25 and 36; T36S, R10E, Sec 31 |
Decision Memo · Klamath Ranger District · updated 9/9/2025
This project is located approximately nine miles southwest of Rocky Point, OR. · Klamath, Oregon
There is a need to re-establish the northern boundary of the Buck/Indian cattle allotment to allow better management of the northern section of the allotment.
Grazing management
Decision
04/2026 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Allotment Management |
| Forests | Fremont-Winema National Forest |
| Districts | Klamath Ranger District |
| Legal Land Description | T. 37 S., R. 5 E., Sec. 21-24 |
Decision Memo · Klamath Ranger District · updated 9/9/2025
FS road 3228, Klamath Ranger District, Fremont-Winema National Forest · Klamath, Oregon
This project proposes to install a pre-engineered shelter on the edge of a large meadow, known locally as Buffalo Meadow.
Special use management
Decision
08/2026 (Estimated)
Implementation
11/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Fremont-Winema National Forest |
| Districts | Klamath Ranger District |
| Legal Land Description | T. 33 S., R. 6 E., Sec. 5 |
Decision Memo · Fremont-Winema National Forest All Units · updated 6/2/2025
This project is located on the Lakeview and Paisley Ranger Districts of the Fremont-Winema National Forest. · Lake, Oregon
Site preparation and planting of native trees on approximately 17,000 acres in the Cougar Peak Fire footprint. Creating and maintaining linear fuel breaks by reducing vegetation and down woody debris adjacent to roads in the project area.
Vegetation management (other than forest products)Fuels management
Decision
04/2025 (Estimated)
Implementation
07/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (5), 36 Cfr 220.6(E)(5); 32.3(11) |
| Special Authority | Not Applicable / Other; 2021 Infrastructure: Fuel Break Ce |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements |
| Forests | Fremont-Winema National Forest |
| Districts | Lakeview Ranger District; Paisley Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Bly Ranger District · updated 11/4/2024
T38S, R13E, Section 13, 14, 23-25; T38S, R14E, Section 18 & 19. · Klamath, Oregon
Working together, Federal, State and Private land managers have the opportunity to reintroduce fire on an interagency landscape in the Paddock Butte area.
Fuels management
Decision
01/2025 (Estimated)
Implementation
04/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (6), 36 Cfr 220.6(E)(6) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Fuel Treatments (Non-Activity Fuels) |
| Forests | Fremont-Winema National Forest |
| Districts | Bly Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Klamath Ranger District · updated 6/12/2024
T. 36 S., R. 5 E., Sec 20 · Klamath, Oregon
There is a need to relocate the Mt. Mcloughlin Trailhead and parking area to avoid initial and long-term maintenance costs associated with constructing a new bridge across the Cascade Canal.
Recreation management
Scoping Start
11/2024 (Estimated)
Comment Period
02/2025 (Estimated)
Objection Period Start
05/2025 (Estimated)
Decision
09/2025 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Developed Site Management |
| Forests | Fremont-Winema National Forest |
| Districts | Klamath Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chemult Ranger District · updated 12/8/2023
Project area is located approximately one and a half miles west of the Chemult Ranger District. · Klamath, Oregon
BPA has identified roads that require maintenance to ensure safe access to the LAPI-CHIL-1 transmission facilities. The road maintenance will allow BPA to also perform wood pole replacements that need to be completed along the transmission line.
Special use managementRoad management
Decision
06/2024 (Estimated)
Implementation
08/2024 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2); 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations; Road Maintenance |
| Forests | Fremont-Winema National Forest |
| Districts | Chemult Ranger District |
| Legal Land Description | T. 27 S., R. 8 E., Sec. 7, 18, and 19. |
Decision Memo · Klamath Ranger District · updated 6/15/2023
The ocrchards that will be treated include Lost Creek (Klamath), Horsehoe (Lakeview), and Hager (Silver Lake). · Klamath; Lake, Oregon
There is a need to inoculate three seed orchards in late July/August to stimulate cone production. Available seed is an obstacle reforestation needs. Research has shown that this treatment may increase the production of cones.
Research
Decision
06/2023 (Estimated)
Implementation
08/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.11, 7 Cfr 1B.3(A) (3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Research And Development |
| Decision Decided Date | 06/15/2023 |
| Forests | Fremont-Winema National Forest |
| Districts | Klamath Ranger District |
| Legal Land Description | T.36S., R.6E., Sec.7, T.40S., R.18E., Sec. 22, T. 30., R. 14., Sec. 4. |
Decision Memo · Chemult Ranger District · updated 4/6/2023
Various locations across the Chemult, Silver Lake, and Paisley Ranger Districts. · Klamath, Oregon
Midstate Electric currently has seven separate permits and we are working on combining all seven into one authorization. This Master Permit will also be used to create an Operating Plan to be in compliance with the new FSH 2709.11 Ch. 80.
Special use management
Decision
04/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (11), 36 Cfr 220.6(D)(11) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Decision Decided Date | 04/06/2023 |
| Forests | Fremont-Winema National Forest |
| Districts | Chemult Ranger District |
| Legal Land Description | T28,R11E,SEC25,T28,12E,SEC25-30,32-34,T29S,R13E,SEC36, T29,R14E,SEC15,20,29,30,31,T29S,R15E,SEC18,19,29,30,33, T30,R13E,SEC1,12,T30S,R14E,SEC7,30,31,T31S,R14E,SEC5,9,10,15,22,25,26,34, T31S,R15E,29,30 |
Decision Memo · Bly Ranger District · updated 1/20/2022
T 38 S, R 13 E, S 14 & 23 · Lake, Oregon
The Forest Service proposes to allow the permittee of the Yainax Butte Allotment to excavate the identified springs to find water and develop a water system off the spring to provide water to the cattle on the south end of the Dry Prairie pasture.
Grazing management
Decision
04/2021 (Estimated)
Implementation
04/2021 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (9), 36 Cfr 220.6(E)(9) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Grazing Structural Improvements |
| Forests | Fremont-Winema National Forest |
| Districts | Bly Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chiloquin Ranger District · updated 3/31/2015
Chiloquin Ranger District · Klamath, Oregon
This project will connect the Chiloquin Ranger District to the town of Chiloquin's sewer line
Facility management
Decision
01/1970 (Estimated)
Implementation
06/2015 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Facility Maintenance |
| Decision Decided Date | 06/17/2026 |
| Forests | Fremont-Winema National Forest |
| Districts | Chiloquin Ranger District |
| Legal Land Description | Not Applicable |