R05 Pacific Southwest · 27 projects · crawled 2026-10-17
In Progress 4 Developing Proposal 9 On Hold 2 Completed 12
Categorical Exclusion 11 Decision Memo 10 Environmental Assessment 3 Environmental Impact Statement 3
23 with documents 18 with comments page
Environmental Assessment · Tahoe National Forest · updated 9/23/2026
Forest-wide on Tahoe National Forest · El Dorado; Nevada; Placer; Plumas; Sierra; Washoe; Yuba, California; Nevada

Proposed designation of select trails as open to Class 1 E-Bikes within Tahoe National Forest. ELMS Project ID# 302695. (Was originally PALS Project ID# 66218.) https://www.fs.usda.gov/r05/tahoe/projects/302695

Recreation management
NEPA Start Date
9/6/2024
Finding/Decision Date
9/23/2026
Project documents
Joe Chavez · joe.chavez@usda.gov
NEPA / regulatory detail
Decision Signed Date9/23/2026
Categorical Exclusion · Yuba River Ranger District · updated 9/22/2026
Near Zeibright Mine Road in Bear Valley, 100' on either side of the NID South Yuba Canal · Nevada; Placer, California

Project to reduce wildfire risk along 2.5 miles of the South Yuba Canal on Forest Service land. Clear small trees and brush, thin larger trees, and remove hazards. Wood will be chipped, burned, or hauled away. Link to documents: https://usfs-public.box.com/s/iug64fkb6w2pdr8qbxk5ks6hec3janag

Fuels management
NEPA Start Date
5/19/2026
Finding/Decision Date
9/8/2026
Project documents
monique wright · monique.wright@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-35d-USFS
Decision Signed Date9/8/2026
Categorical Exclusion · Truckee Ranger District · updated 9/10/2026
Just north of Interstae Highway 80 at Donner Summit · Nevada, California

Repair meadow hydrology in Castle Valley and Round Valley on Donner Summit to restore ecosystem function and increase resilience.

Road managementWatershed managementWildlife, fish, rare plants
NEPA Start Date
12/1/2025
Finding/Decision Date
6/8/2026
Project documents
Parker Eversoll · parker@yubariver.org
NEPA / regulatory detail
Categorical ExclusionUSDA-40d-USFS; USDA-42d-USFS; USDA-47d-USFS
Decision Signed Date6/8/2026
Categorical Exclusion · Yuba River Ranger District · updated 9/2/2026
Section 15 of Township 19 North, Range 10 East · Sierra, California

Installation of telecommunication monopole, conduit, and junction box at Ruby Bluff Communication Site. https://usfs-public.box.com/s/xcd1cylk2wfyouwzghk3r9iz4iavkmfp

Special use management
NEPA Start Date
4/16/2026
Finding/Decision Date
9/2/2026
Project documents
SIERRA MADER · sierra.mader@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date9/2/2026
Star Crest Mine Completed
Categorical Exclusion · American River Ranger District · updated 8/31/2026
Approximately three miles west of French Meadows reservoir, coordinates: 39.113584, -120.528263. Can be accessed from Robinson Flat Rd. · Placer, California

Process less than 1000 cubic yards of virgin ground using a small trommel (10 yards per hour) and a compact backhoe for material handling. The trench would be 15 feet wide, by approximately 300 feet long and no more than 5 feet deep. https://www.fs.usda.gov/r05/tahoe/projects/396530

Minerals and geology
NEPA Start Date
7/13/2026
Finding/Decision Date
8/28/2026
Project documents
Michelle Barry · michelle.barry@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSGS 9.5B (516 DM 9); USGS 9.5G (516 DM 9); USGS 9.5H (516 DM 9); USGS 9.5I (516 DM 9); USGS 9.5K (516 DM 9); USGS 9.5P (516 DM 9)
Decision Signed Date8/28/2026
Categorical Exclusion · Yuba River Ranger District · updated 8/14/2026 · decision 11/2026 (Estimated)
Two sites that are along Hwy 20, Nevada Co. CA., Skillman CG, and White Cloud CG · Nevada, California

The Objective is to decrease dense fuel loading and remove hazard trees in and around White Cloud and Skillman Campgrounds. Link to project documents: https://usfs-public.box.com/s/5y3u7au3v6kq63avjd3aokaufkh5bj48

Fuels managementRecreation managementVegetation management (other than forest products)
NEPA Start Date
5/18/2026
Finding/Decision Date
Project documents
Lauren Faulkenberry · lauren.faulkenberry@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-35d-USFS
Categorical Exclusion · Yuba River Ranger District · updated 8/14/2026
Pole #1 at Site 2098 – Gaston Road (39.37047, -120.787945) and Pole #2 at Site 2092 – Sierra City (39.56759, -120.65393) · Nevada; Sierra, California

Work will include the installation of two new poles with weather station equipment. Each pole will be approximately 30 feet in length and installed to a max depth of six feet. To review Project Records please go to this link: https://usfs-public.box.com/s/jy9bhrqa6iohm9edh080fzc5msy8up5i

Special use management
NEPA Start Date
5/19/2026
Finding/Decision Date
8/4/2026
Project documents
Monique Wright · Monique.wright@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date8/4/2026
Categorical Exclusion · Yuba River Ranger District · updated 7/9/2026
Section 3 of Township 20 North, Range 10 East · Sierra, California

Use of a non-system road to access adjacent private property. To view proposal documents visit: https://usfs-public.box.com/s/foe4qzfrwyjylxeiiinso62ue24x4403

Special use management
NEPA Start Date
1/5/2026
Finding/Decision Date
6/12/2026
Project documents
SIERRA MADER · sierra.mader@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date6/12/2026
Categorical Exclusion · Truckee Ranger District · updated 6/17/2026 · decision 6/2026 (Estimated)
North of Prosser Reservoir and east of CA highway 89 · Nevada, California

The project will restore and protect critical ecosystems including meadow and stream habitat, reduce hazardous accumulations of surface and ladder fuels, reduce the risk of high severity wildfire, improve forest eco-system heath and tree vigor, reduce stand densities, and increase resilience.

Forest productsFuels managementVegetation management (other than forest products)Watershed management
NEPA Start Date
12/15/2025
Finding/Decision Date
Project documents
Tiffanee Hutton · thutton@truckeeriverwc.org
NEPA / regulatory detail
Categorical ExclusionSection 605 of HFRA (16 U.S.C.6591d); USDA-47d-USFS
Categorical Exclusion · Truckee Ranger District · updated 6/16/2026
Sugar Bowl Resort · Placer, California

Improve the terrain at the beginner area near white pine and renovate the main lodge at Judah

Special use management
NEPA Start Date
3/11/2026
Finding/Decision Date
6/9/2026
Project documents
Meghan Lowry · mlowry@sugarbowl.com
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date6/9/2026
Mosquito Fire Restoration Developing Proposal
Environmental Assessment · American River Ranger District · updated 6/9/2026 · decision 11/2026 (Estimated)
The planning area stretches from the Forest boundary at Baker Ranch east up to Mumford Bar along the Foresthill Divide, and north to the rim of the North Fork of the American River Canyon. · El Dorado; Placer, California

Biomass; Forest Vegetation Improvements; Timber Sale; Reforestation; Travel Management.

Fuels managementRoad managementSpecial area managementVegetation management (other than forest products)
NEPA Start Date
11/1/2025
Finding/Decision Date
Project documents
Kelly Pavlica · kelly.pavlica@usda.gov
Environmental Impact Statement · Yuba River Ranger District · updated 6/9/2026 · decision 9/2023 (Estimated)
North Yuba River Watershed. The planning area stretches from New Bullards Bar Reservoir up to the Sierra Crest along Highway 49 and encompasses approximately 275,000 acres. · Nevada; Plumas; Sierra; Yuba, California

Improve and restore forest health and resilience, reduce the risk of high-severity wildfire, protect and secure water supplies, and protect communities from the effects of high-severity wildfire on approximately 210,000 acres of National Forest Land. Multiple decisions to result from one EIS.

Forest productsFuels managementLand management planningRoad managementVegetation management (other than forest products)Watershed management
NEPA Start Date
9/16/2021
Finding/Decision Date
Project documents
Amber Nelson · amber.nelson@usda.gov
Environmental Assessment · American River Ranger District · updated 6/9/2026 · decision 9/2024 (Estimated)
The planning area stretches from the Forest boundary at Baker Ranch east up to Mumford Bar along the Foresthill Divide, and north to the rim of the North Fork of the American River Canyon. · Placer, California

Thinning and sanitation harvest, road actions, remove hazardous fuels, reforestation, control competing vegetation, restore water sources or infrastructure, and Project-specific amendments to the Forest Plan.

Forest productsFuels managementRecreation managementRoad managementVegetation management (other than forest products)Watershed management
NEPA Start Date
9/29/2023
Finding/Decision Date
Project documents
Kelly Silva · kelly.pavlica@usda.gov
Environmental Impact Statement · American River Ranger District · updated 6/9/2026 · decision 9/2018 (Estimated)
Sugar Pine Reservoir, north of Foresthill, CA. Sections 13 and 24, T15N, R10E, and Sections 18 and 19, T15N, R11E, Mt. Diablo Meridian. · Placer, California

Amend Foresthill PUD's Special Use Permit for Sugar Pine Reservoir for installation of radial gates to increase water storage capacity (EIS). This will be a joint analysis with the state project to extend the PUD's water right permit (EIR).

Recreation managementSpecial use management
NEPA Start Date
9/2/2016
Finding/Decision Date
Project documents
Michelle Barry · Michelle.Barry@usda.gov
Categorical Exclusion · Truckee Ranger District · updated 5/29/2026
Boreal Woodward Tahoe Ski Area · Nevada, California

Boreal-Woodward Tahoe Mountain Bike Trail Development. Auburn Ski Club is proposing the addition of summer use of lift serviced mountain biking.

Special use management
NEPA Start Date
Finding/Decision Date
Elizabeth Moore · elizabeth.a.moore@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Memo · Tahoe National Forest All Units · updated 5/22/2026
Forest-wide on all Tahoe National Forest System lands. · Nevada; Placer; Plumas; Sierra; Yuba, California

Amend the Tahoe National Forest Land and Resources Management Plan to include plan components that specify where timber management activities can occur based on steeper slopes using tethered logging systems.

Land management planning
Scoping Start
09/16/2025
Objection Period Start
03/20/2026
Decision
05/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Karen Walden · karen.walden@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (16), 36 Cfr 220.6(E)(16)
Special AuthorityNot Applicable / Other
Notice and Comment Regulation219 (2012)
Project ActivityPlan Amendment
ForestsTahoe National Forest
DistrictsTahoe National Forest All Units
Legal Land DescriptionNot Applicable
Categorical Exclusion · Tahoe National Forest · updated 5/14/2026
From the California Department of Transportation Whitmore Maintenance Station (located between Drum Forebay Road and Blue Canyon Nyack Airport) at Post Mile (PM) 50.8 to Truckee, California at the interchange of Interstate-80 PM 16.6 and State Highway (SH) 89 PM 0.6 · Nevada; Placer, California

Construction, installation, operation, use, and maintenance of buried fiber optic cable in the California Department of Transportation's right-of-way along Interstate 80 for approximately 43,653 feet.

Special use management
NEPA Start Date
7/30/2025
Finding/Decision Date
4/27/2026
Hillary Santana · hillary.santana@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-28d-USFS
Decision Signed Date4/27/2026
Decision Memo · Truckee Ranger District · updated 3/27/2026
Tahoe National Forest south of Donner Pass Road, between Soda Springs Road and Sugar Bowl Road, and adjacent to the PG&E Summit Substation in Soda Springs, Nevada and Placer Counties, California. · Nevada; Placer, California

The installation of seven new #7 boxes (WLs 13, 17, 19, 23, 25, 29, and 31) and replacement of four existing #5 boxes with new #7 boxes (WLs 11, 15, 21, 27) will require 11 off-pavement excavations with 11 adjacent work areas.

Special use management
Scoping Start
08/01/2024
Decision
04/2026 (Estimated)
Implementation
06/2026 (Estimated)
Project documents
Christina Hood · Christina.Hood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission
ForestsTahoe National Forest
DistrictsTruckee Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Truckee Ranger District · updated 3/27/2026
The project runs northeast from the west side of Donner Lake to Verdi, California following the existing 133 powerline rights of way. · Nevada; Sierra, California

The Sierra pacific Power Company (NV Energy) proposes replacing three transmission lines (101, 102, 133) to modernize the electric design line along the existing alignment (right of way) and improve reliability within the electric power grid.

Special use management
Scoping Start
07/01/2024
Decision
04/2026 (Estimated)
Implementation
04/2026 (Estimated)
Gabriela Yanez · gabriela.yanez@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsTahoe National Forest
DistrictsTruckee Ranger District
Legal Land DescriptionBeginning at t17N, R15E, S17 running northeast to T19N, R18E, S7.
Decision Memo · Truckee Ranger District · updated 3/26/2026
Martis Peak Lookout, Verdi Peak Lookout, and the top of Blackwood Canyon · Nevada; Placer, California

Issue Special Use permit for installation and maintenance of cameras at three locations on the Truckee Ranger District.

Special use management
Scoping Start
05/2026 (Estimated)
Decision
06/2026 (Estimated)
Implementation
09/2026 (Estimated)
Project documents
Jonathan Cook fisher · jonathan.fisher@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsTahoe National Forest
DistrictsTruckee Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Truckee Ranger District · updated 3/20/2026
Truckee Ranger District of the Tahoe National Forest and the Carson District of the Humbolt Toiyabe National Forest. · Washoe; Nevada; Sierra, California; Nevada

NV Energy proposes replacement of three electrical transmission lines (101, 102, and 133) with modernized electrical design line, using existing alignment (right of way) to significantly improve reliability within the electric power grid.

Special use management
Scoping Start
07/01/2024
Decision
04/2026 (Estimated)
Implementation
06/2026 (Estimated)
John Brokaw · john.brokaw@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (2), 36 Cfr 220.6(E)(2)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityElectric Transmission; Special Use Authorizations
ForestsHumboldt-Toiyabe National Forest; Tahoe National Forest
DistrictsCarson Ranger District; Truckee Ranger District
Legal Land DescriptionBeginning at T17N, R15E, S17 running northeast to T19N, R18E, S7.
Decision Memo · Yuba River Ranger District · updated 12/30/2025
On the Pioneer Trail where it meets the Jordan Creek Spillway canal near Lake Spaulding. · Nevada, California

Bear Yuba Land Trust would be hiring a contractor to construct a bridge over the Jordan Creek spillway and the Forest Service would be amending a trail easement with PG&E to include the new bridge and Pioneer Trail spur to the northeast.

Recreation management
Scoping Start
12/17/2025
Decision
12/2025 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
Joel Miller · joel.miller@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (6), 36 Cfr 220.6(D)(6); 32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsTahoe National Forest
DistrictsYuba River Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Truckee Ranger District · updated 9/25/2025
Boca Hill area between Prosser and Boca Reservoirs · Nevada, California

Create healthy forest stands which exhibit resilience to wildfire, insects, disease, and changing climactic conditions. Restore meadow habitat through improved hydrologic function, reconnection of floodplains, stream channel restorations actions.

Vegetation management (other than forest products)Fuels managementWatershed management
Scoping Start
08/08/2025
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Eric Vane · eric.vane@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.3 (9); 32.2 (25), 36 Cfr 220.6(E)(25)
Special AuthorityHfra Title Vi: Wildfire Resilience Ce
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Research And Development; Watershed Improvements
ForestsTahoe National Forest
DistrictsTruckee Ranger District
Legal Land DescriptionMount Diablo Meridian (Code 21) T 18 N R 16 E and R 17 E Sections 17, 18, 19, 20, 24, 28, 29, and 30
Decision Memo · Truckee Ranger District · updated 6/29/2024
The 0.5 mile encroachment to be authorized located in Van Norden Meadow. The operating plan to be approved is located east-west across Tahoe NF and into western portion of Humboldt-Toiyabe NF · Nevada; Placer; Sierra, California

Tahoe NF will authorize a 0.5 mile pipeline encroachment due to the acquisition of Van Norden Meadow. The Humboldt-Toiyabe and Tahoe NFs will also approve a new operating plan for the entirety of the pipeline. Actions are administrative only.

Special use management
Scoping Start
11/14/2019
Decision
10/2023 (Estimated)
Implementation
10/2023 (Estimated)
Project documents
Casey Burns · Casey.Burns2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsTahoe National Forest
DistrictsTruckee Ranger District
Legal Land DescriptionVan Norden section: T17N R15E sec. 25
Decision Memo · Truckee Ranger District · updated 6/29/2024
Highway 89S, south of Goose Meadows Campground, adjacent to existing cellular equipment operated by T-Mobile. · Placer, California

T-Mobile is installing a generator on Hwy 89S below Goose Meadows CG to obtain backup power and provide cell service in the event of an emergency such as wildfire.

Special use management
Scoping Start
07/01/2021
Scoping Start
07/01/2021
Decision
10/2022 (Estimated)
Implementation
11/2022 (Estimated)
Project documents
Christina Hood · Christina.Hood@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsTahoe National Forest
DistrictsTruckee Ranger District
Legal Land DescriptionT. 17N R. 16E Section 4
Environmental Impact Statement · Tahoe National Forest All Units · updated 5/3/2024
Tahoe National Forest · Nevada; Placer; Plumas; Sierra; Yuba, California

Designating over-snow vehicle (OSV) use on National Forest System roads and trails and in areas on National Forest System lands as allowed, restricted, or prohibited. Identifying where grooming for OSV use would be conducted

Recreation management
NOI in Federal Register
02/23/2015
DEIS NOA in Federal Register
04/13/2018
FEIS NOA in Federal Register
05/03/2024
Objection Period Start
02/08/2019
Decision
05/2024 (Estimated)
Implementation
05/2024 (Estimated)
Project documents
Joe Chavez · joe.chavez@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityTravel Management
ForestsTahoe National Forest
DistrictsTahoe National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · Truckee Ranger District · updated 10/19/2023
Approximately 1 mile south of the Town of Truckee, California. · Placer, California

Temporary residential use of Granite Flat Campground for winter season to be used for Palisades Tahoe Resort employee housing.

Special use management
Scoping Start
12/09/2021
Decision
10/2023 (Estimated)
Implementation
01/2022 (Estimated)
Project documents
Sendi Kalcic · sendi.kalcic@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (8), 36 Cfr 220.6(D)(8)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date10/19/2023
ForestsTahoe National Forest
DistrictsTruckee Ranger District
Legal Land DescriptionTownship 17 North, Range 16 East, sections 21 and 28, Mount Diablo Meridian