Categorical Exclusion · Chequamegon-Nicolet National Forest · updated 10/6/2026
The project will be along existing right-of-ways along Mail Route, Tuttle Road, CTH "E", Quinlan Spur, Powers Dam, Long Lake, Porcupine Lake, and Perenick Road · Florence; Forest; Vilas, Wisconsin
Wisconsin Energies is proposing to provide better electric reliability to homes and communities. The project involves overhead removal and underground relocation across the Eagle River-Florence Ranger District.
Special use management
NEPA Start Date
8/19/2026
Finding/Decision Date
10/6/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 10/6/2026 |
Categorical Exclusion · Eagle River-Florence Ranger District · updated 10/5/2026
T42N R11E Sections 7, 8, 19, and 20 · Vilas, Wisconsin
Harvesting of Jack Pine and Aspen stands totaling <125 acres to assist in completing a GNA sale to remove aspen, spruce, fir as part of a larger ongoing vegetation project
Vegetation management (other than forest products)
NEPA Start Date
1/12/2026
Finding/Decision Date
9/24/2026
NEPA / regulatory detail
| Categorical Exclusion | TVA 31 (18 CFR Appendix A to Subpart C of Part 1318(31)) |
| Decision Signed Date | 9/24/2026 |
Categorical Exclusion · Lakewood-Laona Ranger District · updated 9/28/2026
Several site in Oconto County. T32N, R15E, Section 6; T33N, R15E, Sections 2, 11, 14, 18, 20, 25, 26, 29, 30, 31; T33N, R16E, Sections 1- 3, 10, 11-14, 23, 24, 29, 34; T33N, R17E Sections 5, 6, 8, 17, 18; T32N, R17E, Sections 12-14 · Oconto, Wisconsin
Spectrum Mid-America, LLC is requesting a special use permit to install 78,374 feet of new buried fiber optic line and 1,374 feet of new aerial fiber optic line on National Forest System lands. Map: https://usfs.app.box.com/folder/342706031004?.s=r8amkow065e1s0hgctdx4gzvtp9vt50j
Special use management
NEPA Start Date
2/13/2026
Finding/Decision Date
9/28/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 9/28/2026 |
Categorical Exclusion · Chequamegon-Nicolet National Forest · updated 9/21/2026 · decision 2/2027 (Estimated)
Right of Way on West Side of Forest Road 341. · Bayfield, Wisconsin
Bayfield Electric Cooperative is proposing to install electric cable from existing Junction box 43520-2 by vibratory plow down the west side of Forest Road 341 (Ehrman Road).
Special use management
NEPA Start Date
8/17/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-28d-USFS |
Categorical Exclusion · Washburn Ranger District · updated 9/21/2026
T.48N R.7W SEC. 9 AND T.47N R.7W SEC. 13, BAYFIELD, WI · Bayfield, Wisconsin
Proposal is to evaluate possible gravel sources by digging test holes in two locations north of Highway 2, up to 15 gravel test holes at each locations (up to 30 holes total).
Minerals and geology
NEPA Start Date
4/22/2026
Finding/Decision Date
9/21/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-32d-USFS |
| Decision Signed Date | 9/21/2026 |
Categorical Exclusion · Lakewood-Laona Ranger District · updated 9/4/2026
T33N R16E Section 23 · Oconto, Wisconsin
Net Lec, LLC is proposing to install 4,551 feet of fiber optic cable underground. This would include an area 10 feet wide for a total of approximately 1.04 acres.
Special use management
NEPA Start Date
5/20/2026
Finding/Decision Date
9/4/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 9/4/2026 |
Categorical Exclusion · Chequamegon-Nicolet National Forest · updated 8/26/2026
5 sites: Township-Range-Section: (GRD) T42N, R4W, S24: (WB) T47N, R8W, S01; (LL) T33N, R14E S15; (ER) T38N, R13E, S21; (ER) T40N, R38W S10 · Forest, Wisconsin
Proposal to utilize herbicide to control competing vegetation around seedlings on 5 sites (40 acres) in Assisted Migration Project to better understand reforestation approaches that sustain future healthy forests. For more information: https://usfs-public.box.com/s/zufv8zzlqbme20g96n0yiclb45n8kgwv
Projects that may affect wilderness (for mailing list contacts)Research and developmentVegetation management (other than forest products)
NEPA Start Date
11/15/2025
Finding/Decision Date
6/9/2026
NEPA / regulatory detail
| Categorical Exclusion | TVA 31 (18 CFR Appendix A to Subpart C of Part 1318(31)) |
| Decision Signed Date | 6/9/2026 |
Categorical Exclusion · Lakewood-Laona Ranger District · updated 8/19/2026
T31N R15E Sec. 7, 8, 17, 18, 19, 20 Langlade County · Langlade, Wisconsin
Reroutes are proposed on the Nicolet Roche Mountain Bike System due to safety and erosion issues.
Recreation management
Finding/Decision Date
8/7/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-26d-USFS |
| Decision Signed Date | 8/7/2026 |
Categorical Exclusion · Great Divide Ranger District · updated 8/18/2026 · decision 2/2027 (Estimated)
Southeastern part of Great Divide Ranger District. Stands north of Forest Road (FR) 311, east of FR 162, south of FR 311/FR 161, and north of Burd Lake. · Ashland; Sawyer, Wisconsin
Butternut, a Regional Forester Sensitive Species, is threatened by butternut canker disease. Small openings of up to ~100 feet in diameter will be created around existing butternut seedlings allow them to reach the canopy to prevent local extinction and to protect the genetics of this species.
Wildlife, fish, rare plants
NEPA Start Date
8/17/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-47d-USFS |
Environmental Assessment · Medford-Park Falls Ranger District · updated 7/6/2026 · decision 5/2027 (Estimated)
The Project area is located along the North Fork of the Yellow River and North Road (Forest Road (FR) 112) approximately 15 miles northwest of Medford, Wisconsin. · Taylor, Wisconsin
Greenlight Wisconsin LLC has applied for a prospecting permit to the Bureau of Land Management for hardrock minerals on the Bend deposit in Taylor County, Wisconsin. The Forest Service is the steward of the federally owned surface and has consent authority for mineral permitting and leasing.
Minerals and geology
NEPA Start Date
5/26/2026
Project documents
Categorical Exclusion · Eagle River-Florence Ranger District · updated 6/29/2026
Near the Brule River to the east of Hwy 55. T41N R14E, Sections 17, 18, 22, 23 · Forest, Wisconsin
Lowering wildfire risk by mechanical thinning, mastication, pile burning, and prescribed fire in the wildland urban interface (WUI) of appoximately 25 private residences and the surrounding area.
Fuels management
Finding/Decision Date
6/29/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-47d-USFS |
| Decision Signed Date | 6/29/2026 |
Environmental Assessment · Eagle River-Florence Ranger District · updated 6/29/2026
The project area is in Forest County of northeastern Wisconsin · Forest, Wisconsin
The project proposes treatments on 13,900 acres to enhance wildlife habitat, forest regeneration, and the transportation system.
Forest productsRoad managementVegetation management (other than forest products)Wildlife, fish, rare plants
Finding/Decision Date
6/29/2026
Project documents
NEPA / regulatory detail
| Decision Signed Date | 6/29/2026 |
Environmental Assessment · Chequamegon-Nicolet National Forest · updated 6/18/2026 · decision 11/2026 (Estimated)
Aspen and fir stands across the West Zone of the Chequamegon-Nicolet National Forest, including Washburn, Great Divide and Medford-Park Falls ranger districts. · Ashland; Bayfield; Iron; Price; Sawyer; Taylor, Wisconsin
Meet Forest Plan regeneration, age class, and early successional habitat improvement goals and objectives through treatment of aspen and balsam fir on the west zone.
Forest productsRoad management
NEPA Start Date
11/3/2025
Project documents
Categorical Exclusion · Great Divide Ranger District · updated 5/29/2026 · decision 11/2026 (Estimated)
Forest Lodge is located about 8 miles east of Cable, Wisconsin · Ashland; Bayfield; Price; Sawyer, Wisconsin
Improve Forest Lodge road and trail infrastructure to accommodate increased use of Forest Lodge and the Nature Trail - parking, road and trail capacity, drainage, stormwater treatment, traffic sight lines within the complex and ingress and egress.
Facility managementHeritage resource managementRoad management
NEPA Start Date
5/12/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-43d-USFS; USDA-46d-USFS |
Categorical Exclusion · Great Divide Ranger District · updated 5/29/2026 · decision 11/2026 (Estimated)
Off of County Highway GG about five miles southwest of Mellen, WI. · Ashland; Bayfield; Price; Sawyer, Wisconsin
Rehabilitation and reconstruction of 10.5 miles of cross-country ski/snowshoe trail that is also used as a hiking trail in the summer.
Recreation managementWatershed management
NEPA Start Date
5/29/2026
Project documents
NEPA / regulatory detail
| Categorical Exclusion | USDA-26d-USFS |
Categorical Exclusion · Chequamegon-Nicolet National Forest · updated 5/14/2026
Forest wide project. Multiple locations, townships and counties across the Forest. · Price, Wisconsin
Forest wide project to improve watershed health. Over 40 actions including culvert replacement, culvert removal, bridge replacement, dam reconstruction, improving steam habitat and erosion control. For more detailed information: https://usfs-public.box.com/s/5k1pf4uyxyc04nw9mqyvkf5v6ba92ts3
Watershed management
NEPA Start Date
12/1/2025
Finding/Decision Date
5/31/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-31d-USFS; USDA-40d-USFS |
| Decision Signed Date | 5/31/2026 |
Categorical Exclusion · Washburn Ranger District · updated 5/14/2026
T. 49 N., R. 6 W. Sections 1 and 12, Bayfield County, Wisconsin · Bayfield, Wisconsin
Proposal is to regenerate 120 acres of red pine. Actions include mastication of understory trees before harvest, seed-tree cut with red pine seed tree reserves, soil scarification after harvest, followed by a removal harvest of overstory seed trees.
Vegetation management (other than forest products)
Finding/Decision Date
5/14/2026
NEPA / regulatory detail
| Categorical Exclusion | TVA 31 (18 CFR Appendix A to Subpart C of Part 1318(31)) |
| Decision Signed Date | 5/14/2026 |
Categorical Exclusion · Lakewood-Laona Ranger District · updated 4/23/2026
Van Alstine Road, Langlade County, Wisconsin, T31N-R14E, Sec. 12 & T31N-R15E, Sec. 7 · Langlade, Wisconsin
Alliant Energy is proposing to remove approximately 4,524 feet of overhead power line and install approximately 3,251 feet of underground power line along Van Alstine Road on National Forest System land. Map available at: https://usfs-public.box.com/s/d7vvccv9p7vrokxe64jhj6ur4zcgfipv
Special use management
Finding/Decision Date
4/23/2026
NEPA / regulatory detail
| Categorical Exclusion | USDA-27d-USFS |
| Decision Signed Date | 4/23/2026 |
Decision Memo · Washburn Ranger District · updated 3/13/2026
Three locations, north of Highway 2, about 15 miles west of Ashland, WI. Two locations are along Forest Road 236, Brinks Road. One location is along Forest Road 419, north of Finger Lake. · Bayfield, Wisconsin
The three-road maintenance actions include 1) shoulder repair on Forest Road 236, 2) intersection clearing and reshaping on Forest Road 258 and Forest Road 236 and 3) widening and shoulder stabilization along Forest Road 419.
Road management
Decision
03/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Categorical Exclusion · Eagle River-Florence Ranger District · updated 3/12/2026 · decision 8/2026 (Estimated)
FR 2156 Lost Lake Road/Chipmunk Rapids Road beginning at the intersection with FR 3774 then proceeding north 3.26 miles to FR 2450 Dream Lake Road. Continue to proceed north on FR 2450 0.94 miles until the intersection of highway 70. · Florence, Wisconsin
The Townships of Long Lake and Tipler propose to reconstruct a 4.2 mile stretch of FR2156 and FR2450. Reconstruction would include minor road widening, ditching, clearing and grubbing, culvert replacements, roadbed sub excavation, material staging and asphalt pavement
Road management
NEPA / regulatory detail
| Categorical Exclusion | USDA-45d-USFS |
Decision Memo · Eagle River-Florence Ranger District · updated 2/10/2026
Installation along Hildebrand Road, Military Road, Hay Meadow Road, and Old Military Road. · Forest; Oneida, Wisconsin
Spectrum Mid-America proposes to continue to install new fiber optic telecommunication cables along existing utility corridors in the right of way on National Forest System lands.
Special use management
Decision
02/2026 (Estimated)
Implementation
03/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (2), 36 Cfr 220.6(E)(2) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | T39N R11E Section 12, 13, 14, 23, 24, 25, 26, 35; T38N R11E Section 2; T39N R12E Section 7, 18 |
Decision Memo · Lakewood-Laona Ranger District · updated 2/4/2026
Near the town of Mountain along Hwy 32, Hwy 64, and County Rd W · Oconto, Wisconsin
Spectrum is proposing to place fiber optic line near the town of Mountain, within National Forest boundaries. The overall distance of this project within NFS land is approximately 15 miles.
Special use management
Decision
02/2026 (Estimated)
Implementation
03/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 2/4/2026
Near the Town of Mountain and Riverview · Oconto, Wisconsin
Spectrum is proposing to place a new fiber optic telecommunication cable along existing roadways within the Town of Mountain. The overall distance of this project within NFS land is approximately 14 miles.
Special use management
Decision
02/2026 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 2/3/2026
State Highway 64, County Highway T, and County Highway W by the towns of Lakewood, Langlade, and Mountain. · Oconto, Wisconsin
Spectrum Mid-America, LLC is proposing to place a new buried fiber optic line within Oconto County near the townships of Langlade, Lakewood, and Mountain. All buried fiber will occur within rights-of way totaling 19.57 acres.
Special use management
Decision
02/2026 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Eagle River-Florence Ranger District · updated 1/22/2026
FS Rd 2458 (Carey Dam Rd) road prism and right of way · Forest, Wisconsin
Request from the Town of Alvin to widen FS road 2458 by stumping and grubbing in areas where the road prism is less than 18 feet wide.
Road management
Decision
01/2026 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (23), 36 Cfr 220.6(E)(23) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Eagle River-Florence Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Lakewood-Laona Ranger District · updated 1/13/2026
Various locations across the Lakewood-Laona Ranger District. · Forest; Langlade; Oconto, Wisconsin
The Forest Service is proposing to thin approximately 6,897 acres of red pine plantations across the district.
Forest productsVegetation management (other than forest products)Fuels managementRoad management
Decision
01/2026 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | Townships 31-37 North and Ranges 12-17 East. |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 1/13/2026
North of the East Fork of the Chippewa River and Blaisdell Lake near Winter, Wisconsin. · Sawyer, Wisconsin
Norvado proposes to install fiberoptic line in about 0.4 of a mile of right-of-way on Forest Roads 1661BB and 1661AB with about 0.05 of an acre of soil disturbance.
Special use management
Decision
01/2026 (Estimated)
Implementation
01/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Washburn Ranger District · updated 12/5/2025
Near FR 244 about 6 miles northeast of Iron River, WI. · Bayfield, Wisconsin
Modification of an existing specialist use permit to install a new osprey nesting platform near the existing occupied nest and remove older unoccupied platform. Project includes installing transmission pole nesting deterrents on up to 11 poles.
Special use management
Decision
12/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (3), 36 Cfr 220.6(E)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Special Use Authorizations |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 12/2/2025
Day Lake north of Clam Lake, Wisconsin · Ashland, Wisconsin
Day Lake Dam needs repairs. The repairs will require a drawdown of the lake. While the lake is drawn down other previously analyzed projects and habitat improvement projects will be implemented.
Facility management
Comment Period
08/15/2025
Decision
11/2025 (Estimated)
Implementation
07/2026 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.12 (3), 36 Cfr 220.6(D)(3) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Developed Site Management; Facility Maintenance |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Chequamegon / Nicolet National Forest All Units · updated 12/1/2025
Eight sites across Eagle River-Florence, Lakewood-Laona, Medford-Park Falls, and Washburn Ranger Districts. · Bayfield; Forest; Oneida; Price; Taylor, Wisconsin
Proposed decommissioning of buildings, improvements, or wells at eight acquired property or recreation sites. Activities include well abandonment, building demolition, septic system abandonment, and removal of trash at sites.
Facility management
Decision
12/2025 (Estimated)
Implementation
12/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (21), 36 Cfr 220.6(E)(21); 32.2 (22), 36 Cfr 220.6(E)(22) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Facility Improvements/Construction; Facility Maintenance |
| FY25 Properties Decommissioning | Decision Signed Date: 12/01/2025 |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Medford-Park Falls Ranger District; Eagle River-Florence Ranger District; Lakewood-Laona Ranger District; Washburn Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Great Divide Ranger District · updated 10/29/2025
North of County Highway B East of intersection with Dance Hall Road. · Sawyer, Wisconsin
The Sawyer County Snowmobile Alliance has requested Trail 3 to be moved from the south side of County Road B to the north side to accommodate a private request to move the trail off their property.
Recreation management
Decision
10/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (1), 36 Cfr 220.6(E)(1) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Trail Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Environmental Assessment · Great Divide Ranger District · updated 10/22/2025
Forest Road 164 between County Highway GG and Forest Road 163. · Ashland, Wisconsin
The 11.6-mile-long project area will be cleared and grubbed within 16 feet of the road centerline or as needed to create ditching. All cross-drain culverts will be replaced with polymer coated arch pipes. The entire road length will be resurfaced.
Road management
Comment Period
08/28/2025
Objection Period Start
08/28/2025
Decision
10/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Maintenance; Road Improvements/Construction; Travel Management |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Great Divide Ranger District |
| Legal Land Description | Not Applicable |
Decision Memo · Lakewood-Laona Ranger District · updated 9/24/2025
Located on Forest Road 3256, Range Line Lake Road approximately 0.7 miles southwest of the town of Wabeno, WI. · Forest, Wisconsin
The existing twin 3ft round culverts passing flow from range line creek under FR 3256 Range Line Lake Road are rusted through, heaving, and at risk of failure. The proposed action is to replace the culverts with a 81"X59" pipe arch culvert.
Watershed management
Decision
09/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Categorical Exclusion | 32.2 (18), 36 Cfr 220.6(E)(18) |
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | Not Subject to Regulations |
| Project Activity | Watershed Improvements |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Lakewood-Laona Ranger District |
| Legal Land Description | SW/SW, Sec. 18, T34N, R15E |
Environmental Assessment · Washburn Ranger District · updated 12/20/2024
Project is located in the central portion of the Washburn Ranger District. The project area is about 5 miles east of Iron River, WI. · Bayfield, Wisconsin
Vegetation Management actions would include clearcut and shelterwood systems to regenerate oak, aspen, and pine, and thinnings to promote growth and vigor in pine plantations. Associated actions: updating road system and improving wildlife habitat.
Wildlife, fish, rare plantsForest productsVegetation management (other than forest products)Fuels managementRoad management
Comment Period
02/21/2024
Objection Period Start
08/08/2024
Decision
12/2024 (Estimated)
Implementation
01/2025 (Estimated)
Project documents
NEPA / regulatory detail
| Special Authority | Not Applicable / Other |
| Notice and Comment Regulation | 218 (2013) Non-HFRA |
| Project Activity | Road Decommissioning; Fuel Treatments (Non-Activity Fuels); Forest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Travel Management; Timber Sales (Green) |
| Forests | Chequamegon / Nicolet National Forest |
| Districts | Washburn Ranger District |
| Legal Land Description | Not Applicable |