White Mountain National Forest — Project Detail

48 projects with crawled detail · milestones · contacts · documents

White Mountain National Forest

R09 Eastern · 48 projects · crawled 2026-06-17
In Progress 2 Developing Proposal 25 On Hold 2 Completed 19
Categorical Exclusion 23 Decision Memo 17 Environmental Assessment 7 Environmental Impact Statement 1
47 with documents 31 with comments page
Categorical Exclusion · Pemigewasset Ranger District · updated 6/1/2026
Within the Pemigewasset Wilderness in Lincoln, Grafton County, NH · Grafton, New Hampshire

Adopt a long-existing bushwhack within the Pemigewasset Wilderness to enhance the sustainability of the Pemigewasset Wilderness Trail network and improve visitor safety.

Recreation management
NEPA Start Date
Finding/Decision Date
Project documents
Michael Benson · michael.benson@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Categorical Exclusion · Pemigewasset Ranger District · updated 6/1/2026 · decision 11/2026 (Estimated)
Bretton Woods Ski Resort in Bethlehem and Crawford's Purchase, Grafton County, New Hampshire · Coos, New Hampshire

Replace 15 bridges within the Bretton Woods cross-country ski network to maintain the Nordic network trail integrity, support a safe and positive visitor recreation experience, and make the trail network more sustainable and resistant to flooding events.

Recreation management
NEPA Start Date
6/1/2026
Finding/Decision Date
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Hale Brook Restoration Developing Proposal
Categorical Exclusion · Pemigewasset Ranger District · updated 6/1/2026
Project is located in the town of Bethlehem, Grafton County, New Hampshire, on Hale Brook about 2 miles south of New Hampshire Route 302 on Zealand Road. Treatments on the brook would occur in the area just downstream of where Hale Brook crosses Zealand Road and downstream to just above the Zealand Bridge. · Grafton, New Hampshire

This project would restore 1.2 miles of the Hale Brook stream channel.

Watershed management
NEPA Start Date
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-03d-NRCS; USDA-31d-USFS
Categorical Exclusion · Androscoggin Ranger District · updated 6/1/2026 · decision 11/2026 (Estimated)
Pinkham Notch Visitor's Center in Pinkham's Grant, Coos County, New Hampshire · Coos, New Hampshire

Reconstruct parts of the Tuckerman's Ravine and Blanchard Loop Ski trails to provide an all-access trail recreation experience opportunity.

Recreation management
NEPA Start Date
5/22/2026
Finding/Decision Date
Nathan Peters · nathan.peters@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Province Pond Dam Decommissioning Developing Proposal
Categorical Exclusion · Saco Ranger District · updated 6/1/2026 · decision 3/2026 (Estimated)
Province Pond Dam is located at the end of the Province Brook Trail (also known as the North South Snowmobile Trail) about 1 mile from the trailhead located at the end of Peaked Hill Road in Chatham. · Carroll, New Hampshire

Decommission the Province Pond Dam and all associated infrastructure, which includes removal of the concrete spillway and beaver deceiver and recontouring the earthen-berm dam and spillway area to a more natural shape.

Watershed management
NEPA Start Date
9/30/2025
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-40d-USFS
Categorical Exclusion · Pemigewasset Ranger District · updated 6/1/2026 · decision 9/2026 (Estimated)
Waterville Valley Ski Resort in Waterville Valley, Grafton County, New Hampshire · Grafton, New Hampshire

Reroute the administrative access road onto a ski trail to reduce maintenance and safety issues.

Recreation management
NEPA Start Date
3/13/2026
Finding/Decision Date
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-44d-USFS
Environmental Impact Statement · White Mountain National Forest · updated 6/1/2026 · decision 5/2027 (Estimated)
Waterville Resort (Grafton County, New Hampshire) and adjacent lands. · Grafton, New Hampshire

Waterville Valley Resort proposes an expansion of their special use permit, Forest Plan amendments, and projects. Project documents are available at https://usfs-public.box.com/s/4jboleynw4gfwsobhm5izhgxjvhxhqnv

Facility managementLand management planningRecreation managementSpecial use management
NEPA Start Date
5/16/2025
Finding/Decision Date
Project documents
Matt Loscalzo · matt.loscalzo@usda.gov
Categorical Exclusion · Pemigewasset Ranger District · updated 6/1/2026 · decision 9/2026 (Estimated)
Waterville Valley Ski Resort in Waterville Valley, Grafton County, New Hampshire · Grafton, New Hampshire

Reconstruct the Schwendi Hutte ski lodge to improve facility structural integrity, visitor amenities, and update technology.

Recreation management
NEPA Start Date
3/13/2026
Finding/Decision Date
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-44d-USFS
Categorical Exclusion · Pemigewasset Ranger District · updated 5/29/2026 · decision 10/2026 (Estimated)

Eversource proposes replacing about 140 wooden utility poles (i.e. structures) with steel pole equivalents in the existing ROW, as well as installing about 102,000 linear feet of Optical Ground Wire.

NEPA Start Date
4/7/2026
Finding/Decision Date
Project documents
Jasmin Faunce · jasmin.faunce@usda.gov
Categorical Exclusion · White Mountain National Forest · updated 5/29/2026 · decision 9/2025 (Estimated)
Forest-wide within alpine and Nordic skiing special use permit areas on non-Forest Service System trails and roads. · Carroll; Coos; Grafton; Oxford, New Hampshire; Maine

Establish standard operating procedures for bridge and culvert replacements across ski special use permit areas to streamline individual project effects analysis.

Recreation managementSpecial use management
NEPA Start Date
3/28/2025
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS; USDA-44d-USFS
Hermit Lake Complex Shelters Developing Proposal
Categorical Exclusion · Androscoggin Ranger District · updated 5/29/2026 · decision 9/2024 (Estimated)
Tuckerman's Ravine in Sargent's Purchase, Coos County, New Hampshire · Coos, New Hampshire

The Appalachian Mountain Club proposes to remove one Adirondack shelter, rehabilitate two shelters, construct three tent platforms and construct a five-bay composting toilet system at the Hermit Lake Complex in Huntington Ravine, just west of Mount Washington.

Recreation management
NEPA Start Date
3/29/2024
Finding/Decision Date
Project documents
Travis Pellerin · travis.pellerin@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-44d-USFS
Categorical Exclusion · Pemigewasset Ranger District · updated 5/29/2026 · decision 11/2026 (Estimated)
The glade skiing network around Black Mountain in Lincoln, Grafton County, NH · Grafton, New Hampshire

Diversify the glade skiing opportunities at the Loon Ski resort by incorporating the Black Mountain glade skiing area into the resorts permit boundary and creating standard access routes into the network.

Recreation management
NEPA Start Date
5/7/2026
Finding/Decision Date
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Categorical Exclusion · Androscoggin Ranger District · updated 5/29/2026 · decision 9/2025 (Estimated)
Along the Appalachian Trail within the Great Gulf Wilderness, crossing the Peabody West Branch river. · Coos, New Hampshire

Replace the current Madison Gulf Bridge with a newly designed structure.

Recreation management
NEPA Start Date
3/28/2025
Finding/Decision Date
Project documents
Nathan Peters · nathan.peters@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Categorical Exclusion · Pemigewasset Ranger District · updated 5/28/2026 · decision 11/2026 (Estimated)
The project is located in Woodstock, Grafton County, New Hampshire north of Route 112 about 1 mile west of Route 3. · Grafton, New Hampshire

The project would reestablish connection between Balance Rock Snomo and Powerline Snomo by realigning Balance Rock Snomo.

Recreation management
NEPA Start Date
5/28/2026
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Categorical Exclusion · Pemigewasset Ranger District · updated 5/28/2026 · decision 11/2026 (Estimated)
NFS lands accessed from the Coppermine trailhead in Franconia, Grafton County, NH · Grafton, New Hampshire

Adopt the Franconia Mountain Bike Trail Network into the Forest Service trail system and install signage.

Recreation management
NEPA Start Date
5/7/2026
Finding/Decision Date
Project documents
Michael Mosley · michael.mosley@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS
Categorical Exclusion · Androscoggin Ranger District · updated 5/28/2026
The project is located at the intersection between Forest Road (FR) 103 (also known as Little Bear Road) and Little Bear Brook in Low and Burbank’s Grant, Coos County, New Hampshire. FR 103 is located off Jefferson Notch Road and is south of U.S. Route 2. · Coos, New Hampshire

This project involves replacing an existing culvert along Little Bear Brook with an appropriately sized crossing structure, while also restoring the stream channel.

Watershed management
NEPA Start Date
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-03d-NRCS; USDA-31d-USFS
Loon Gondola Replacement Developing Proposal
Categorical Exclusion · Pemigewasset Ranger District · updated 5/28/2026
The project is located at Loon Mountain Resort, Lincoln, Grafton County, New Hampshire. It will occur within approximately the same profile and alignment as the existing White Mountain Express gondola. · Grafton, New Hampshire

This project would replace the existing 4-person White Mountain Express Gondola with a Doppelmayr D-Line Omega 10-person gondola.

Facility managementRecreation managementSpecial use management
NEPA Start Date
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-44d-USFS
Categorical Exclusion · Androscoggin Ranger District · updated 5/28/2026 · decision 11/2026 (Estimated)
Within the channels of Mill Brook in Stark, Coos County, New Hampshire · Coos, New Hampshire

Reestablish historic side channel of Mill Brook after recent storm events, which has been classified as “High Risk” by the WMNF Flood Risk Assessment, to protect Forest Service and Town of Stark road infrastructure from damage due to flooding.

Watershed management
NEPA Start Date
5/7/2026
Finding/Decision Date
Project documents
Joshua Sjostrom · joshua.sjostrom@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-41d-USFS
Categorical Exclusion · Saco Ranger District · updated 5/28/2026
The Mount Stanton Trail and Trailhead are located in Bartlett, Carroll County, New Hampshire. · Carroll, New Hampshire

The project involves relocating two sections of the Mount Stanton Trail and relocating the Mount Stanton Trailhead.

Recreation management
NEPA Start Date
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-26d-USFS; USDA-44d-USFS
Paugus Mill Dam Modification Developing Proposal
Categorical Exclusion · Saco Ranger District · updated 5/28/2026 · decision 11/2026 (Estimated)
Between the Bolles and Whitin Brook trails in Albany, Carroll County, New Hampshire. Nearest trailhead is accessed from Paugus Road in Tamworth. · Carroll, New Hampshire

Cut five visible logs making up the top layer of the dam in a lateral staggered pattern such that the wood would then be angled downstream, creating grade controls so that the streamflow is redirected.

Watershed management
NEPA Start Date
5/28/2026
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-40d-USFS
Saco Timber Stand Improvement Developing Proposal
Categorical Exclusion · Saco Ranger District · updated 5/28/2026 · decision 10/2026 (Estimated)
Albany and Chatham, Carroll County, New Hampshire and Stoneham, Oxford County, Maine. · Carroll; Oxford, New Hampshire; Maine

This project proposes manual, precommercial thinning and pruning of about 530 acres of hardwood and softwood stands.

Forest productsVegetation management (other than forest products)
NEPA Start Date
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-47d-USFS
Categorical Exclusion · Androscoggin Ranger District · updated 5/28/2026
The project is located in two areas off of Bog Dam Road in Randolph, Coos County, New Hampshire. Black Crescent Brook: This part of the project is located along Black Crescent Brook downstream of its crossing with Bog Dam 3 Bridge on Bog Dam Road. West Branch Keenan Brook: This part of the project is located at the intersection between Forest Road 33 (also known as Keenan Brook Road) and West Branch Keenan Brook. FR 33 is located off of Bog Dam Road. · Coos, New Hampshire

The project involves replacing an existing culvert and restoring two stream channels to establish stream stability, allow for aquatic organism passage, and allow for a more appropriate hydraulic capacity.

Watershed management
NEPA Start Date
Finding/Decision Date
Project documents
Robin Innes · robin.innes@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-03d-NRCS; USDA-31d-USFS
Environmental Assessment · White Mountain National Forest · updated 5/8/2026 · decision 3/2024 (Estimated)
White Mountain National Forest designated Wilderness

Amending the Forest Plan to enable relocations of trails in Wilderness and addition of existing travel corridors to the National Forest Trail System when for resource protection purposes. Project documents are available at https://usfs-public.box.com/s/dtn6qmrxqwcew68zl3jhcftqai0qdipw.

Land management planningProjects that may affect wilderness (for mailing list contacts)Recreation management
NEPA Start Date
3/2/2023
Finding/Decision Date
Project documents
Theresa Corless · theresa.corless@usda.gov
Categorical Exclusion · Androscoggin Ranger District · updated 5/4/2026
Low and Burbanks Grant, Jefferson, and Randolph, Coos County, New Hampshire · Coos, New Hampshire

Timber harvesting to achieve forest and wildlife habitat management objectives. Project documents are available here: https://usfs-public.app.box.com/v/PinyonPublic/folder/371376037940

Forest productsWildlife, fish, rare plants
NEPA Start Date
Finding/Decision Date
Project documents
Scott Hall · scott.hall@usda.gov
NEPA / regulatory detail
Categorical ExclusionUSDA-47d-USFS
Environmental Assessment · Androscoggin Ranger District · updated 4/15/2026
The One Mile Lonesome Ridge habitat management unit along the Kilkenny Loop Road in Berlin, New Hampshire. · Coos, New Hampshire

The Androscoggin Ranger District is proposing watershed, wildlife habitat, vegetation management, and recreation management actions in the One Mile Lonesome Ridge habitat management unit.

Recreation managementWildlife, fish, rare plantsForest productsWatershed managementRoad management
Scoping Start
09/12/2024
Comment Period
10/01/2025
Objection Period Start
02/11/2026
Decision
04/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Scott Hall · scott.hall@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction; Timber Sales (Green)
ForestsWhite Mountain National Forest
DistrictsAndroscoggin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pemigewasset Ranger District · updated 4/2/2026
Campton Dam, Town of Campton, Grafton County, New Hampshire (NH) Mad River, NH Route 49, Pond Road · Grafton, New Hampshire

Project focus would be to convey the dam, which will result in a similar land use and alleviate the maintenance burden from the Forest Service. This would be a direct sale to the permittee of the special use permit.

Land ownership managementFacility management
Scoping Start
03/29/2024
Decision
04/2027 (Estimated)
Implementation
04/2027 (Estimated)
Project documents
James Detzel · james.detzel@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityBoundary Adjustments; Hydropower; Land Purchases; Facility Maintenance; Land Exchanges
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Saco Ranger District · updated 3/31/2026
Jackson Ski Touring Center Bengt Trail between the Ellis River Trail South Branch and the South Hall Trail. · Carroll, New Hampshire

This project proposes two bridge replacements. If the current locations are not suitable, new locations nearby will be considered, and a small trail reroute to tie the new bridges to the existing trail may be necessary.

Special use management
Scoping Start
03/28/2025
Decision
03/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (4), 36 Cfr 220.6(D)(4)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
Decision Decided Date03/31/2026
ForestsWhite Mountain National Forest
DistrictsSaco Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Pemigewasset Ranger District · updated 3/30/2026
The project is focused on the Lost River and Franconia Habitat Management Units in Woodstock and Lincoln, Grafton County, New Hampshire. · Grafton, New Hampshire

The Pemigewasset Ranger District of the White Mountain National Forest proposes recreation, transportation, vegetation, and wildlife habitat management activities within the Lost River project area, Woodstock, Grafton County, New Hampshire.

Recreation managementWildlife, fish, rare plantsForest productsRoad management
Scoping Start
03/31/2023
Comment Period
04/15/2025
Objection Period Start
08/08/2025
Decision
03/2026 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
Scott Hall · scott.hall@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Dispersed Recreation Mgmt.; Species Habitat Improvements; Road Maintenance; Road Improvements/Construction; Timber Sales (Green)
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 3/25/2026
New Hampshire Route 112, one and a quarter mile east of its junction with New Hampshire Route 116 in the Town of Landaff. · Grafton, New Hampshire

Removing the dam and associated structures and restoring the disturbed areas. Scope of work includes staging area establishment and access road improvement.

Wildlife, fish, rare plantsWatershed managementSpecial use management
Scoping Start
05/09/2025
Decision
03/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Jennifer Burnett · jennifer.burnett2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (18), 36 Cfr 220.6(E)(18)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Special Use Authorizations; Watershed Improvements
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 3/9/2026
Huntington Ravine Winter Access Trail connects Tuckerman Ravine Trail with the base of Huntington Ravine. Eastern flank of Mt Washington 1.6 miles from Pinkham Notch Visitor Center · Coos, New Hampshire

Replace 5 bridges at the end of their lifespan along Huntington Ravine Water Access Trail. The trail network is used for winter recreation and is an admin route as it is used for rescues and winter avalanche forecasting.

Recreation management
Scoping Start
09/30/2024
Decision
03/2026 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
Bryanne Thompson · Bryanne.Thompson@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite Mountain National Forest
DistrictsAndroscoggin Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Saco Ranger District · updated 2/13/2026
The Webster Cliff Trail, part of the Appalachian Trail just north of Crawford Notch in Bean's Grant, Coos County, New Hampshire · Coos, New Hampshire

Relocation of about one mile of the Webster Cliff hiking trail into the Presidential Range Wilderness. This will include a project-specific forest plan amendment to allow the addition of the trail into Wilderness.

Land management planningRecreation managementProjects that may affect wilderness (for mailing list contacts)
Scoping Start
03/03/2025
Comment Period
06/24/2025
Objection Period Start
09/19/2025
Decision
02/2026 (Estimated)
Implementation
05/2026 (Estimated)
Project documents
Brian Johnston · brian.m.johnston@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Amendment; Trail Management; Wilderness Management
ForestsWhite Mountain National Forest
DistrictsSaco Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 2/3/2026
Storage area off of Butler Hill Rd., Chatham, Carroll County, New Hampshire · Carroll, New Hampshire

New Hampshire DoT requests the White Mountain National Forest authorize the replacement of a 70 year old storage building and construction of a new salt storage building.

Special use managementFacility management
Scoping Start
06/30/2022
Decision
10/2026 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
Jennifer Burnett · jennifer.burnett2@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (21), 36 Cfr 220.6(E)(21)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityFacility Improvements/Construction; Special Use Authorizations
ForestsWhite Mountain National Forest
DistrictsSaco Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Androscoggin Ranger District · updated 1/8/2026
On the Perch Path about 1 mile north of the Presidential Range segment of the Appalachian National Scenic Trail in Low and Burbank's Grant. · Coos, New Hampshire

The RMC Pro Trail Crew and Caretaker staff will develop a new sixteen square-foot caretaker tentsite within the existing Perch Tentsite footprint.

Recreation management
Scoping Start
05/09/2025
Decision
04/2026 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Nathan Peters · nathan.peters@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (22), 36 Cfr 220.6(E)(22)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDispersed Recreation Mgmt.
ForestsWhite Mountain National Forest
DistrictsAndroscoggin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pemigewasset Ranger District · updated 12/4/2025
Forest Road 378 West Branch Brook Road, accessed via Adams Farm Road off of New Hampshire Route 175 in Thornton. · Grafton, New Hampshire

Manual pre-commercial thinning (chop and drop) and pruning of about 11 acres of white pine stands to increase sunlight, airflow, and temperature of the growing environment, favoring the healthiest white pine trees.

Vegetation management (other than forest products)
Scoping Start
12/02/2025
Decision
12/2025 (Estimated)
Implementation
02/2026 (Estimated)
Project documents
Benjamin Farina · benjamin.farina@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (6), 36 Cfr 220.6(E)(6)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityForest Vegetation Improvements
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 12/3/2025
The Reel Brook trail in Easton and the Kinsman Ridge section of the Appalachian National Scenic trail within the vicinity of Harrington Pond in Lincoln, Grafton County, New Hampshire. · Grafton, New Hampshire

Relocate about 500 feet of Kinsman Ridge trail to the east away from Harrington Pond, and relocate about 1000 feet of Reel Brook trail onto a higher ridge away from Reel Brook.

Recreation managementWatershed management
Scoping Start
03/28/2025
Decision
12/2025 (Estimated)
Implementation
04/2026 (Estimated)
Project documents
Brett Hillman · brett.hillman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management; Watershed Improvements
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · Pemigewasset Ranger District · updated 11/24/2025
The immediate vicinity of Russell Pond Campground up to 100 feet outside the perimeter, off Russell Pond Road accessed via Tripoli Road in Woodstock and Thornton, Grafton County, New Hampshire. · Grafton, New Hampshire

Harvest white ash and other hazard trees within one tree length to campsites and common areas at the Russell Pond Campground.

Vegetation management (other than forest products)
Scoping Start
03/29/2024
Decision
11/2025 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
Benjamin Farina · benjamin.farina@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (12), 36 Cfr 220.6(E)(12)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Forest Vegetation Improvements
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 11/18/2025
along AT in Coos and Grafton Counties · Coos; Grafton, New Hampshire

NPS proposed projects on the AT to address deferred maintenance. Maintenance work would occur at shelters, privies, parking areas, campsites, and trail bridges across the forest.

Recreation managementFacility management
Scoping Start
09/30/2024
Decision
09/2026 (Estimated)
Implementation
10/2026 (Estimated)
Project documents
Stanley Carte · stanley.carte@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (5), 36 Cfr 220.6(D)(5)
Special AuthorityNepa Document Prepared By Another Federal Agency
Notice and Comment RegulationNot Subject to Regulations
Project ActivityDeveloped Site Management; Dispersed Recreation Mgmt.; Facility Maintenance
ForestsWhite Mountain National Forest
DistrictsWhite Mountain National Forest All Units
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 11/18/2025
Great Glen Outdoors Center, Greens Grant, base of Mount Washington, Route 16 · Coos, New Hampshire

Construction of a new 0.4 of a mile long single-track mountain bike spur trail about 24 inches wide at Great Glen Outdoors Center.

Recreation managementSpecial use management
Scoping Start
03/28/2025
Decision
10/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite Mountain National Forest
DistrictsAndroscoggin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 9/16/2025
Within the Waterville Valley Resort special use permit boundary on National Forest System lands in Waterville Valley, Grafton County, New Hampshire. · Grafton, New Hampshire

Waterville Valley Ski Resort proposes to construct the 2130-foot Red Feathers Nordic ski trail that will connect the Livermore and Moose Run Nordic ski trails as part of the Waterville Valley Ski Resort Nordic ski trail network.

Recreation management
Scoping Start
12/20/2024
Decision
09/2025 (Estimated)
Implementation
11/2025 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityTrail Management
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 8/13/2025
The Bog Dam 3 bridge on the south end of Bog Dam Loop Road in Randolph, Coos County, New Hampshire. · Coos, New Hampshire

Replace the Bog Dam 3 Bridge with a new, larger structure to facilitate improved aquatic organism passage and road sustainability.

Wildlife, fish, rare plantsWatershed managementRoad management
Scoping Start
03/28/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
William Oneill · william.oneill@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (23), 36 Cfr 220.6(E)(23)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecies Habitat Improvements; Road Improvements/Construction; Watershed Improvements
ForestsWhite Mountain National Forest
DistrictsAndroscoggin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 8/13/2025
About one acre of NFS land off Bog Road in Mason Township, Bethel, Oxford County, Maine. · Oxford, Maine

Wagner Forestry requests modification and use of a yarding corridor about one acre in size on National Forest System lands to facilitate a 70-acre timber project on adjacent private property.

Special use management
Scoping Start
03/28/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
William Degrush · William.Degrush@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (3), 36 Cfr 220.6(E)(3)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite Mountain National Forest
DistrictsAndroscoggin Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 8/11/2025
Waterville Valley Resort · Grafton, New Hampshire

Waterville Valley Resort [proposes to construct a new uphill route about 0.8 miles long and three feet wide through trees to move the existing uphill route awayfrom an existing downhill route.

Special use management
Scoping Start
03/28/2025
Decision
08/2025 (Estimated)
Implementation
10/2025 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 8/1/2025
Within the existing permit area of Loon Ski Resort in Lincoln, Grafton County, New Hampshire. · Grafton, New Hampshire

Loon Mountain Recreation Corporation proposes to construct twelve new mountain biking trails, adding about five miles to their existing mountain bike trail network.

Recreation managementSpecial use management
Scoping Start
03/28/2025
Decision
08/2025 (Estimated)
Implementation
08/2025 (Estimated)
Project documents
Erica Dickerman · erica.dickerman@usda.gov
NEPA / regulatory detail
Categorical Exclusion32.2 (1), 36 Cfr 220.6(E)(1)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivitySpecial Use Authorizations; Trail Management
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · White Mountain National Forest All Units · updated 1/8/2025
Sawyer River 2 bridge along Sawyer River Road, off route 302 in Bartlett, Carroll County, New Hampshire. · Carroll, New Hampshire

Replace the Sawyer River 2 bridge with a similar bridge type. A project-specific forest plan amendment is needed to exempt the bridge from the standard on page 2-31 of the forest plan.

Land management planningRoad management
Scoping Start
01/03/2023
Comment Period
08/04/2023
Objection Period Start
11/07/2024
Decision
01/2025 (Estimated)
Implementation
05/2025 (Estimated)
Project documents
Bryanne Thompson · Bryanne.Thompson@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityPlan Amendment; Road Improvements/Construction
ForestsWhite Mountain National Forest
DistrictsSaco Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Saco Ranger District · updated 6/28/2024
Carroll County, NH · Carroll, New Hampshire

Implement a combination of silvicultural and fuels treatments to advance goals, objectives, and desired conditions of the Forest Plan for vegetation, wildlife, and other resources

Forest productsRoad managementWildlife, fish, rare plantsVegetation management (other than forest products)
Scoping Start
06/07/2022
Comment Period
07/31/2023
Objection Period Start
02/15/2024
Decision
06/2024 (Estimated)
Implementation
09/2024 (Estimated)
Project documents
Scott Hall · scott.hall@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityForest Vegetation Improvements; Species Habitat Improvements; Road Maintenance; Scenery Management; Travel Management; Timber Sales (Green)
ForestsWhite Mountain National Forest
DistrictsSaco Ranger District
Legal Land DescriptionNot Applicable
Environmental Assessment · Pemigewasset Ranger District · updated 10/5/2022
The project area is bound roughly by Tripoli Road on the north, Waterville Valley to the east, the Sandwich Range to the south, and Interstate 93 to the west. · Carroll; Grafton, New Hampshire

Proposed recreation, wildlife habitat, vegetation, and transportation management activities.

Vegetation management (other than forest products)Road managementRecreation managementForest productsWildlife, fish, rare plants
Scoping Start
02/22/2018
Comment Period
04/12/2019
Objection Period Start
07/22/2019
Decision
07/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
Johnida Dockens · johnida.dockens@usda.gov
NEPA / regulatory detail
Special AuthorityNot Applicable / Other
Notice and Comment Regulation218 (2013) Non-HFRA
Project ActivityRoad Decommissioning; Developed Site Management; Forest Vegetation Improvements; Dispersed Recreation Mgmt.; Species Habitat Improvements; Trail Management; Road Maintenance; Road Improvements/Construction; Scenery Management; Travel Management; Timber Sales (Green)
Wanosha Integrated Resource Project Decision NoticeDecision Signed Date: 07/27/2020
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable
Decision Memo · White Mountain National Forest All Units · updated 8/7/2020
Mount Washington Cog Railway Base Station, Chandler, Sargents, Thompson and Meserve Purchase, Coos County, New Hampshire · Coos, New Hampshire

Land exchange of about 1.5 acres with the privately owned Cog Railway in the Mount Washington area. Area to be exchanged includes all existing infrastructure. Area to be acquired is undeveloped land adjacent to existing National Forest System land.

Land management planningLand acquisitionLand ownership management
Scoping Start
05/17/2020
Decision
08/2020 (Estimated)
Implementation
12/2020 (Estimated)
Project documents
James Detzel · james.detzel@fusda.gov
NEPA / regulatory detail
Categorical Exclusion32.12 (7), 36 Cfr 220.6(D)(7)
Special AuthorityNot Applicable / Other
Notice and Comment RegulationNot Subject to Regulations
Project ActivityLand Exchanges
Decision Decided Date08/07/2020
ForestsWhite Mountain National Forest
DistrictsPemigewasset Ranger District
Legal Land DescriptionNot Applicable